HomeMy WebLinkAboutOrdinance 6311of FAYFrTF u m 0 H d-" 4RkANso, 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Ordinance: 6311 File Number: 2020-0334 STEFFAN AND CATHERINE SARKIN - STREET AND DRAINAGE IMPROVEMENTS: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH STEFFAN AND CATHERINE SARKIN FOR STREET AND DRAINAGE IMPROVEMENTS ALONG STORER AVENUE WITH A REFUND IN AN AMOUNT NOT TO EXCEED $36,696.63 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT WHEREAS, Steffan and Catherine Sarkin are developing six new single-family residential homes along the west side of Storer Avenue which, pursuant to § 171.13 of the Unified Development Code requires the installation of sidewalks; and WHEREAS, the City Engineering Division recommends several additional improvements including new trench drainage, new piping to convey water underground, and new curb and gutters which would exceed the rough proportionality of the development's impact; and WHEREAS, the City proposes to enter into an agreement with the Sarkins to refund an amount of up to $36,696.63, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact; and WHEREAS, allowing the Sarkins to utilize their own contractor who will be on -site installing the sidwalk for the additional improvements will allow the City to achieve significant savings. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Page 1 Printed on 516120 Ordinance 6311 File Number 2020-0334 Section 1: That the City Council of the City of Fayetteville, Arkansas hereby detennines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Steffan and Catherine Sarkin for street and drainage improvements along Storer Avenue with a refund in an amount not to exceed $36,696.63 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development. PASSED and APPROVED on 5/5/2020 Attest: T R'����i . �G • of Y px' •sC, /', .� 1A, — FAYETTEVILLE Kara Paxton, City Clerk Treasure .,";h,`NG j oN1�``�,. Page 2 Printed on 516120 113 West Mountain Street City o Fayetteville, Arkansas Fayetteville, AR 72701 `t!"77�:, (479) 575-8323 I TA r'Y Text File File Number: 2020-0334 Agenda Date: 5/5/2020 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 8 STEFFAN AND CATHERINE SARKIN - STREET AND DRAINAGE IMPROVEMENTS: AN ORDINANCE TO WAIVE FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH STEFFAN AND CATHERINE SARKIN FOR STREET AND DRAINAGE IMPROVEMENTS ALONG STORER AVENUE WITH A REFUND IN AN AMOUNT NOT TO EXCEED $36,696.63 TO BE PAID BY THE CITY OF FAYETTEVILLE FOR THE COST OF IMPROVEMENTS THAT EXCEED THE ROUGH PROPORTIONALITY OF THE IMPACT OF THE DEVELOPMENT WHEREAS, Steffan and Catherine Sarkin are developing six new single-family residential homes along the west side of Storer Avenue which, pursuant to § 171.13 of the Unified Development Code requires the installation of sidewalks; and WHEREAS, the City Engineering Division recommends several additional improvements including new trench drainage, new piping to convey water underground, and new curb and gutters which would exceed the rough proportionality of the development's impact; and WHEREAS, the City proposes to enter into an agreement with the Sarkins to refund an amount of up to $36,696.63, which represents the estimated cost of improvements that exceed the rough proportionality of the development's impact; and WHEREAS, allowing the Sarkins to utilize their own contractor who will be on -site installing the sidwalk for the additional improvements will allow the City to achieve significant savings. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section I: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Steffan and Catherine Sarkin for street and drainage improvements along Storer Avenue with a refund in an amount not to exceed $36,696.63 to be paid by the City of Fayetteville for the cost of improvements that exceed the rough proportionality of the impact of the development. City of Fayetteville, Arkansas Page 1 Printed on 51612020 File Number. 2020-0334 City of Fayetteville, Arkansas Page 2 Printed on 5/6/2020 Jonathan Ely Submitted By City of Fayetteville Staff Review Form 2020-0334 Legistar File ID 5/5/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 4/15/2020 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Staff recommends approval of this cost share with Steffan and Catherine Sarkin to pay $36,696.63 for street and drainage improvements along Storer Avenue. Budget Impact: 4470.800.8820-5809.00 Sales Tax Capital Improvements Account Number Fund 02116.1 Cost Share/ROW/Intersection/Street Calming Project Number Project Title Budgeted Item? Yes Current Budget $ 730,606.00 Funds Obligated $ 95,892.16 Current Balance $ 634,713.84 Does item have a cost? Yes Item Cost $ 36,696.63 Budget Adjustment Attached? NA Budget Adjustment Remaining Budget I $ 598,017.21 Purchase Order Number: Change Order Number: Original Contract Number: Comments: N/A N/A N/A V20180321 Previous Ordinance or Resolution # Approval Date: N/A CITY OF FAYETTEVILLE ARKANSAS MEETING OF MAY 5, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Garner Stoll, Development Services Director Chris Brown, City Engineer CITY COUNCIL MEMO FROM: Jonathan Ely, Development and Construction Manager, Engineering Division DATE: April 15, 2020 SUBJECT: Cost Share, Steffan and Catherine Sarkin Street and Drainage Improvements Storer Avenue RECOMMENDATION: Staff recommends approval of this cost share with Sarkin to pay $36,696.63 for street and drainage improvements along Storer Avenue. BACKGROUND: In October 2019, the Development Services Office received a request for six new single-family residential houses to be constructed along the west side of Storer Avenue, between Douglas and Cleveland. These residential structures were permitted based on a lot split, that was previously approved, and replaced two existing single-family structures that were demolished. Along with development of the new houses, sidewalk is required to be installed per the Unified Development Code. This section of Storer Avenue, north of Caraway Street is very steep, narrow and unimproved with open ditches on each side. It is one of the only remaining sections of Storer Avenue that is not improved, which makes construction of a sidewalk challenging, and will ultimately increase maintenance burden for the city maintain a sidewalk next to an open ditch with active erosion issues. DISCUSSION: During permitting review for the project, the engineering division met multiple times with the developer to discuss options to improve the existing street in this location and were approached about the possibility of a cost share to complete the improvements. The improvements will consist of a new trench drain to capture water flowing down the hill, as well as new piping to convey the water underground and facilitate removal of the open ditch. In addition, new curb and gutter will be included new driveway aprons and sidewalks to complete the street scape on this portion of the street. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL AGREEMENT FOR COST SHARE OF STREET IMPROVEMENT COSTS This Agreement, made and entered into on this 5th day of May, 2020, by and between the City of Fayetteville, Arkansas ("City') and Steffan and Catherine Sarkin ("Sarkin"), witnesseth: WHEREAS, Sarkin has proposed a new residential development, approved along the west side of Storer Avenue. and WHEREAS, the Sarkin development is required to construct sidewalk improvements along its property frontage of Storer Avenue: and WHEREAS, Sarkin has committed to completing these required sidewalk improvements along their property frontage, and WHEREAS, street and drainage improvements, which exceed the rough proportionality of impact of the project are necessary along the property frontage to complete the street scape and make installation of the sidewalk possible. WHEREAS, the City of Fayetteville Engineering Division recommends the street improvements, which exceed the rough proportionality of impact from the development be funded by means of a cost share. NOW, THEREFORE, the City of Fayetteville. Arkansas and Sarkin agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Sarkin for $36,696.63 which represents one half of the cost to install approximately 224 linear feet of curb and sidewalk, 180 linear feet of concrete sto►7n pipe, a junction box, curb inlet, and trench drain, as well as full cost to extend the curb, storm drainage and sidewalk north to Cleveland Street as shown in Exhibit "A", attached. B. Payments due to Sarkin, shall be remitted within sixty (60) days after receipt of valid invoices, and pending successful inspection and acceptance of the completed work by the City of Fayetteville Engineering Division. 2. Sarkin a�0rees to: A. Provide the necessary and normal project management, inspection, and testing as necessary to complete the work shown on Exhibit "A", in accordance with the City of Fayetteville Minimum Street Standards, and City Standard Details, both of which are available at http://w-,vw.faNetteville-ar.<(ov/445/Engineering_ SSpecs-Details Page 1 of 2 B. Provide a copy of the invoices from the Contractor upon completion and City approval of the street, drainage and sidewalk improvements described in Exhibit "A" C. Pay for the street, sidewalk and drainage improvements (with reimbursement of $36,696.63 of the cost by the City of Fayetteville). 3. It is further understood that the contract for construction is between Sat -kin and their Contractor and that the City has no contractual obligation with either the Contractor or any agent for Sarkin. The City's only obligation shall be to participate in a contractual agreement with a not -to -exceed amount of $36,696.63 for the street, sidewalk, and drainage improvements. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: STEFFAN AND CATHERINE SARKIN ATTEST: By: - CITY OF FAYETTEVILLE, ARKANSAS ATTEST: `\�.��?,Y./ TRF�s,�� G.•GX1y pF •G': By.— ' FAYETTEVILLE; Kara Paxton, City Clerk Page 2 of 2 R CIe.Y'a,w 5. Aft Wo ENGINEERING DIVISION N Storer Ave Street, Sidewalk and Drainage Improvements ZA....... Li-!Alu PAVEMENT SERVICES Multifamily • Commercial. Residential Cost Share Breakdown for Storer- Fayetteville, AR Cost Share Description Quantity Unit Per unit Bid Amount Driveway Repair 140 SF $ 12.00 $ 1,680.00 Type A C&G w base 224 LF $ 22.00 $ 4,928.00 5' Sidewalk w base 4/4 1120 SF $ 7.00 $ 7,840.00 4X4 Junction box 1 LS $ 4,400.00 Trench Drain- 24' 1 LS $ 8,600.00 12" concrete flume (handform/pour 1 LS $ 1,400.00 18" RCP 180 LF $ 42.00 $ 7,560.00 Curb Inlet 4', no extension 1 LS $ 3,800.00 Saw cut 1', remove spoils and prep 1 LS $ 500.00 $ 500.00 Asphalt 224 SF $ 4.50 $ 1,008.00 Base- class 7 25 SY $ 11.25 $ 281.25 Red dirt, w install and testing 17 CY $ 26.00 $ 442.00 Cost Share total (112 Developer, 1/2 City) $ 42,439.25 City Only Quantity Unit Per unit Bid Amount Demo existing drive 1 LS $ 600.00 $ 600.00 Commercial Drive 225 SF $ 12.00 $ 2,700.00 Type A C&G 140 LF $ 22.00 $ 3,080.00 5' Sidewalk w base 4/4 105 SF $ 7.00 $ 735.00 18" RCP 120 LF $ 42.00 $ 5,040.00 Modify Inlet 1 LS $ 2,400.00 Saw cut 1', remove spoils and prep 1 LS $ 400.00 $ 400.00 Asphalt 140 SF $ 4.50 $ 630.00 Base- Class 7 16 SY $ 11.25 $ 180.00 Red Dirt, w install and testing 12 CY $ 26.00 $ 312.00 City Total $15,477.00 'Total Construction Cost $ 57,916.25 Cost Share Summary: "Developer: 1/2 of Cost Share Total above = $21,219.62 ;City : 1/2 of Cost Share Total above $21,219.62 + City Only Portion $15,477.00 = $36,696.63; Total Cost: $57,916.25 In close proximity to the University of Arkansas, this neighborhood sees a large amount of pedestrian traffic. Without a sidewalk, the only option currently is to walk in the street. This cost share if approved will improve vehicular and pedestrian safety for the neighborhood, as well as reduce future maintenance associated with open ditches with active erosion. BUDGET/STAFF IMPACT: This project is funded by the Sales Tax Capital Improvements Fund Attachments: Contractual Agreement for Cost Share of Street Improvement Cost Exhibit "A" Cost Share Map showing location and scope of improvements Cost Share Breakdown