HomeMy WebLinkAbout124-20 RESOLUTIONOF GAYrrr` i I t� 0 �RKANSa`' 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 124-20 File Number: 2020-0291 HAWKINS-WEIR, ENGINEERS, INC. AMEND 1 - BOND PROJECT: A RESOLUTION TO APPROVE AMENDMENT NO. I TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $46,680.00 FOR ADDITIONAL CONCEPTUAL DRAINAGE DESIGN SERVICES ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION ASSOCIATED, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 DRAINAGE BOND PROJECT WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor Jordan to sign a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and WHEREAS, the initial analysis revealed that the proposed detention areas would not sufficiently reduce the flow and staff recommends amending the agreement to allow the contract engineer to analyze alternate routing. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount of $46,680.00 for additional conceptual drainage design services associated with the project to alleviate flooding near the intersection of North College Avenue and East Sunbridge Avenue. Page 1 Printed on 4122120 Resolution: 124-20 File Number. 2020-0291 Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 4/21/2020 Attest: FAYETTEVILLE Kara Paxton, City Clerk Treasurer' yNG A Page 2 Printed on 4/22/20 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 i r , Text File �— File Number: 2020-0291 Agenda Date: 4/21/2020 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: D 3 HAWKINS-WEIR, ENGINEERS, INC. AMEND 1 - BOND PROJECT: A RESOLUTION TO APPROVE AMENDMENT NO. 1 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH HAWKINS-WEIR ENGINEERS, INC. IN THE AMOUNT OF $46,680.00 FOR ADDITIONAL CONCEPTUAL DRAINAGE DESIGN SERVICES ASSOCIATED WITH THE PROJECT TO ALLEVIATE FLOODING NEAR THE NORTH COLLEGE AVENUE AND EAST SUNBRIDGE DRIVE INTERSECTION ASSOCIATED, AND TO APPROVE A BUDGET ADJUSTMENT - 2019 DRAINAGE BOND PROJECT WHEREAS, on September 17, 2019, the City Council passed Resolution 211-19 to authorize Mayor Jordan to sign a Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. for conceptual drainage design services to alleviate the flooding at the intersection of North College Avenue and East Sunbridge Drive; and WHEREAS, the initial analysis revealed that the proposed detention areas would not sufficiently reduce the flow and staff recommends amending the agreement to allow the contract engineer to analyze alternate routing. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan to sign Amendment No. 1 to the Professional Engineering Services Agreement with Hawkins -Weir Engineers, Inc. in an amount of $46,680.00 for additional conceptual drainage design services associated with the project to alleviate flooding near the intersection of North College Avenue and East Sunbridge Avenue. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 412212020 Chris Brown Submitted By City of Fayetteville Staff Review Form 2020-0291 Legistar File ID 4/21/2020 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 3/31/2020 Submitted Date Action Recommendation: ENGINEERING (621) Division / Department Approval of a contract amendment in the amount of $46,680.00 ($100,900 total contract amount) with Hawkins - Weir, Engineers, Inc. for conceptual drainage design services associated with the flooding near the N College Ave and E Sunbridge Drive Intersection and approval of a Budget Adjustment. 4604.860.7415 - 5817.00 Account Number 46040.7415.1000 Project Number Budgeted Item? Yes Does item have a cost? Budget Adjustment Attached? Yes Yes Budget Impact: 4604 - Drainage Projects (2019 Bonds) Fund Drainage Project (2019 Bonds), Sunbridge/College Drainage Phase I Project Title Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget $ 1,363,788.00 $ 19,190.00 $ 1,344,598.00 $ 46,680.00 $ 46, 680.00 $ 1,344,598.00 V20180321 Purchase Order Number: Previous Ordinance or Resolution # 211-19 Change Order Number: Original Contract Number: Comments: Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF APRIL 21, 2020 TO: Mayor and City Council THRU: Susan Norton, Chief of Staff Garner Stoll, Development Services Director Chris Brown, City Engineer FROM: Alan Pugh, Staff Engineer DATE: March 30, 2020 CITY COUNCIL MEMO SUBJECT: Approval of a contract amendment in the amount of $46,680.00 ($100,900 total contract amount) with Hawkins -Weir, Engineers, Inc. for conceptual drainage design services associated with the flooding near the N College Ave and E Sunbridge Drive Intersection. Approval of a Budget Adjustment RECOMMENDATION: Staff recommends City Council approval of a contract in the amount of $46,680.00 with Hawkins -Weir, Engineers, Inc. for conceptual drainage design services associated with the flooding near the N College Ave and E Sunbridge Drive Intersection. Approval of a budget adjustment BACKGROUND: This project will consist of a conceptual analysis of alternate drainage routing as shown on the attached exhibit associated with helping to alleviate flooding within near the intersection of N College Ave and E Sunbridge Drive including, but not limited to, survey as well hydrologic and hydraulic studies,. This project was identified as a priority project by City Council after the April 2017 flooding event. DISCUSSION: This project has been identified as one of the projects to be funded by the first phase of the 2019 Drainage Bond Program. Hawkins -Weir Engineers, Inc has provided a proposed scope and an additional fee/reimbursables in the amount of $46,680 to complete the alternate routing analysis. The contract will be paid based on hourly rates for work completed, up to the total contract amount (currently $100,900 including this amendment). The initial analysis revealed that proposed detention areas would likely not reduce the flow enough such that the downstream existing capacity would be adequate. Based on that fact and the desire to match the current drainage patterns as closely as possible, staff proposes to analyze the alternate routing as shown which was not included in the original contract. Upon completion, a final decision on the routing will be determined and the full design will begin. The conceptual drainage design will help to identify the full scope of the required project and a contract amendment is anticipated once the full scope is defined. This amendment will be Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 brought forward to council for review and approval at a later date. The estimated project amount of $1.4 million is subject to changes based on the results of the conceptual design. BUDGET/STAFF IMPACT: The design for this project will be paid for with the funds from the 2019 Drainage Bond Project. Attachments: Engineering Agreement AMENDMENT NO. 1 TO THE AGREEMENT For PROFESSIONAL ENGINEERING SERVICES BETWEEN CITY OF FAYETTEVILLE, ARKANSAS AND HAWKINS-WEIR ENGINEERS, INC. In accordance with the AGREEMENT For PROFESSIONAL ENGINEERING SERVICES for the Sunbridge/College, Phase 1 Drainage Project (HW Project No. 2019070), dated September 17, 2019, between the City of Fayetteville, Arkansas (hereinafter called Owner) and Hawkins -Weir Engineers, Inc. (hereinafter called Engineer), Owner hereby authorizes Engineer to proceed with engineering services as modified by this Amendment No. 1. SECTION 1— SCOPE OF SERVICES 1.1 The City of Fayetteville Engineering Department has directed the Engineer to amend services included in the AGREEMENT on the PROJECT. These amended services include additional conceptual design services that are needed due to and expanded scope and limits of the project. Detailed services are included in the attached Appendix A, Scope of Services. SECTION 2 — TIME OF SERVICE 2.1 The additional scope of services defined herein will be completed within an additional 105 calendar days added to the 150 calendar days provided in the AGREEMENT. Details of the additional time of services are included in the attached Appendix B, Proposed Schedule. Engineer will proceed with providing the services set forth herein immediately upon execution of this Authorization by all parties. Amendment No. I .docx Pagel of 2 April 1, 2020 SECTION 3 — COMPENSATION 3.1 Owner shall compensate Engineer for providing the services set forth herein in accordance with the terms of the Agreement. Total payment for Scope of Services described herein shall not exceed Thirty Four Thousand One Hundred and Eighty Dollars ($34,180.00) plus reimbursable expenses of twelve thousand two hundred and fifty dollars ($12,250.00) without written approval of Owner. These additional services adjust the Agreement's not to exceed fee to $88,400.00 and the not to exceed reimbursable expenses to $12,500.00. Attachments: Appendix A, Scope of Services dated February 2020 Appendix B, Proposed Schedule dated February 2020 Appendix C, Fee Proposal Breakdown dated February 2020 AUTHORIZATION BY: CITY OF FAVETTEVILLE, ARKANSAS BY; ACCEPTED BY: HAWKINS-WEIR ENGINEERS, INC. By: J. Kyle Salycr, P.E., P.S. Vice President Datc: 4N111 /, 2o7-0 Jordan, Mayor 0 Amendment No. I .docx Page 2 of 2 April 1, 2020 Appendix A Scope of Services Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas HWEI Project No. 2019070 February 2020 Task Description Task 1 — Conceptual Design Addendum II CITY OF FAYETTEVILLE ARKANSAS 1. Perform initial survey to determine flowline elevations of necessary drainage facilities (pipes, inlets, ditches, etc) within project study area 2. Prepare a scaled drawing in AutoCAD Civil 3D 3. Hydrologic and Hydraulic Design a. Determine Watersheds using data acquired from City of Fayetteville GIS b. Prepare Drainage Model in Autodesk Storm and Sanitary Analysis c. Perform Hydrologic and Hydraulic analysis of proposed improvements 4. Evaluate condition of the existing drainage system along Granada and Sunbridge a. Perform CCTV work of approximately 4,000 If of storm drain pipes to evaluate condition of existing drainage system 5. Prepare Preliminary Drainage Report Addendum 6. Meet with City Staff to present the Preliminary Drainage Report Addendum 2019070Wppendix A (Conceptual Design Addendum).docx Page 1 Appendix B Proposed Schedule Sunbridge Drive and College Avenue Drainage Improvements City of Fayetteville, Arkansas HWEI Project No. 2019070 February 2020 Project Milestone Complete Hydraulic Model Prepare Draft Drainage Report Submit to Owner and address Owner's Comments Deliver Preliminary Drainage Report I� CITY OF FAYETTEVILLE ARKANSAS Days from Notice to Proceed 30 60 90 105 2019070\Appendix B (Conceptual Design Addendum).docx Page 1 Appendix C City of Fayetteville, Arkansas - Sunbridge Drive and Colllege Avenue Drainage Improvements HWEI Project No. 2019070 FAYETTE V I LLE February 2020 AnKANsws Task Engr VII Engr VI Engr III Engr I Surveyor GPS Survey Dsgnr II Tech III Tech 1 1. Inbal Survey to determine flowline elevations of all drainage facilities (pipes, inlets, ditches, etc) within project im rovements limits 4 4 24 4 2. 1 Prepare a scaled drawing in AutoCAD Civil 30 4 8 8 3. Hydrologic and Hydraulic Design a. Determine Watersheds 8 8 b. Prepare Drain a Model using Storm and Sanitary AnaylSiS 20 16 c. Perform H & H analysis 4 24 4. Evaluate existing drainage system 4 1 16 a Coordinate CCN work 8 8 5. Prepare relimina Dreina a Report Addendum 24 40 8 16 6. Meet with Owner to present Preliminary Drama e Report Addendum 4 4 1 8 Total Hours 4 36 1 132 1 40 4 24 1 12 8 16 2. Reimbursable ENGINEERING SERVICES SUMMARY 1. Conce tual Design $34, 180 2. Reimbursabe Costs 572,210 Total Engineering Fee 846.430 20190)0\Apperalu C\Sw0e sM Fes.aiv Cl fm km,.:lw 1 L• t VATIVT -�- ^fiY�a mmw CCN EVALUATION' - - - E SUNBRIOGE OR. 1} 1 S[/NBRIDORIVE AND OLAVENUE DRAINAGE INAGE IMPROV£M£NTWNT S ALTERNATIVE STORM WATER ROUTING FOR: CITY OF FAYEREVILLE ARKANSAS —�� AN. 2020 1 SCALE 1'=100• NO. 201 HAW KINS AWE IR F N 0 1 N E E R$ 1 N Q w.�awM n City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 ENGINEERING (621) 2020 Requestor: Alan Pugh BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of a contract amendment in the amount of $46,680.00 ($100,900 total contract amount) with Hawkins -Weir, Engineers, Inc. for conceptual drainage design services associated with the flooding near the N College Ave and E Sunbridge Drive Intersection and approval of a Budget Adjustment. RESOLUTION/ORDINANCE COUNCIL DATE: LEGISTAR FILE ID#: 4/21/2020 2020-0291 xev&yv SpY&yLq,e_►- 4/2/2020 4:56 PM Budget Director TYPE: JOURNAL #: Date D - (City Council) GLDATE: 4/21/2020 CHKD/POSTED: TOTAL v.20200324 - - Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 4604.860.7415-5860.02 46,680 - 46040 7415.1000 EX Capital Prof Svcs - Engineering 4604.860.7999-5899.00 (46,680) - 46040 7999 EX Unallocated - Budget H:\Budget Adjustments\2020_Budget\City Council\04-21-2020\BA 2020-0291 Sunbridge and College Change Order.xlsm 1 of 1