HomeMy WebLinkAbout2020-03-10 - Agendas - FinalCITY OF 9im FAYETTEVILLE 4VARKANSAS MEETING AGENDA Water, Sewer, and Solid Waste Committee March 10, 2020 5:30 P.M. (Or immediately following Equipment Committee Session) City Hall - Room 326 Committee: Chairman Mark Kinion; Council Member Sonia Gutierrez, Council Member Sloan Scroggin, Council Member Teresa Turk Copy to: Mayor Lioneld Jordan, Paul Becker, Kara Paxton, Susan Norton, Chris Brown, Alan Pugh, Terry Gulley, Peter Nierengarten, Jeff Coles, Brian Pugh, Mark Rogers, Corey Granderson, Aaron Watkins, Greg Weeks, Matthew Benton, Tim Luther From: Tim Nyander, Utilities Director CALL TO ORDER ROLL CALL OLD BUSINESS: NEW BUSINESS: 1. Bid Award for Highway 16 (15th Street) Utility Relocations The Arkansas Department of Transportation has requested utility relocations to prepare for the widening of Highway 16 (15th Street) from S. College Ave. to Huntsville Rd. The cost of the relocations is 62.88% reimbursable to the City by ARDOT. On February 19, 2020 the City of Fayetteville accepted sealed competitive bids for the Highway 16 Utility Relocations project. Cornerstone Construction of Russellville, Inc. submitted the lowest and best bid. All bids are shown here: Cornerstone Construction $1,689,781.02 KAJACS Contractors $1,799,000.00 TriStar Contractors $1,990,007.00 Goodwin & Goodwin $2,160,505.00 Goins Enterprises $2,290,296.00 Privcon Development Inc. $2,396,105.50 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Staff recommends awarding Bid #20-29 and approving a contract with Cornerstone Construction of Russellville, Inc. in the amount of $1,689,781.20 for construction services associated with the Highway 16 Utility Relocations Project, approving a contingency in the amount of $168,978.12, and approving a budget adjustment to recognize the 62.88% of the project cost that is reimbursable by the Arkansas Department of Transportation. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 2. Construction Engineering Amendment with McClelland Engineers Staff recommends the approval of Amendment No. 4 to the Professional Engineering Services Agreement with McClelland Consulting Engineers, Inc. (MCE) in an amount not to exceed $125,258.00 for construction management and observation services associated with the Highway 16 Utility Relocations Project (ArDOT Project 040579). Resolution 205-17 permitted the original design work with MCE for utility relocations along Highway 16 between S. College Ave. and Huntsville Rd. associated with ARDOT roadway improvements. Resolutions 45-18 (amendment 1) and 83-19 (amendment 2) expanded the project scope to include the Morningside Drive 24 -inch waterline and allowed for separate project bidding, respectively. Resolution 41-20 (amendment 3) provided additional funds for construction phase engineering services for the Morningside Drive work. Amendment No. 4 will allow MCE to provide construction observation and management services associated with this project, in accordance with engineering observation best practices and state law. This amendment will increase the existing agreement amount by $125,258.00 for a total not -to -exceed amount of $442,467.82. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 3. Bid Award for Noland Bleach Tank The Noland Plant utilizes two fiberglass bulk tanks to store chemicals on-site. A crack has developed on the tank used to store bleach. This has resulted in a leak which has damaged the coating on the concrete containment barrier surrounding the tank. The crack is inaccessible from the outside and feedback from industry professionals tell us the cost and life -expectancy of a tank repair outweighs the cost of a tank replacement. This project was sent out for sealed bids and the bid opening occurred on 02/18/2020. Thorpe Plant Services provided a low bid of $41,974 plus taxes and shipping. Sodium Hypochlorite Storage Vessel 7,600 gallon Capacity Thorpe Plant Services $41,974 Plastic - Mart $44,000 D. J. Shubeck Company $61,559 Mercaterra Atlantic LLC $62,990 STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 4. Food Loops, LLC Recycling Agreement Food Loops, LLC has submitted a request to haul compostable and recyclable materials in the City of Fayetteville. The contract will permit Food Loops to haul all organic waste collected in the City of Fayetteville to the Fayetteville Recycling and Trash Collection Facility for composting, which shall be counted toward the City's waste diversion goals. The term of the agreement will be 1 year with automatic renewals for 2 additional 1 -year terms. STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR CONSIDERATION FOR APPROVAL 5. Capital Projects Update Discussion of current capital projects in the design state or underway. 6. Overview of WWTP Monthly Report Discussion of January's Monthly WWTP Report PRESENTATIONS ATTACHMENTS Vicinity Map — Hwy 16 Utility Relocates Bid Tab — Highway 16 Utility Relocates Recommendation of Award — Hwy 16 Utility Relocates Supplemental Agreement — McClelland Engineers Bid Tab — Noland Bleach Tank Memo — Food Loops Agreement Capital Projects Status — March 2020 WWT — January Report ADJOURN Next Water, Sewer, Solid Waste Committee meets on Tuesday, April 14th, 2020, 5:30 p.m., Room 326. {® �} 71B/S SCHOOL AVE 4 H m m rn rt J S College Ave S Washington Ave Morningside Dr IN sa s �'. r, Pllege Ave w CL S W.;h,,, i /r 0 v m n cam 54, 0 l J D m C 0 z Ln J eU�� E s Ha ppy Hollow Rd i y �follmv Rd ull "rw 1 CITY OF IFAYETTEVILLE ARKANSAS Bid 20-29, Construction - HWY 16 UTILITY RELOCATIONS - Schedule 1 Offcal Bid Tabulation Lioneld Jordan, Mayor Oates of Advertisement 01.20202011 Issue Date: 02.19 2020 Numlmrof Addendums'. 0 Certification of funds: $ 2.000,000270 Max Award Amount S 2,500.000.00 Bid No. 2029 Cate: 02 19.W20 Trail 2:WPM Cornerstone Construction of Gains Enterprises, Inc. Goodwin & Cact in, Inc XAJACS Contractors, Inc. Pill Developments, Inc. pmen Tri-Star Contractors, LLC Russellville, Inc. ITEM ESTIMATED UNIT UNIT UNIT UNIT UNIT UNIT NO ULSCxIPIION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1.01 Mobilization IS 1 $ 60,000.00 $ 60,000.00 $ 60,000.00 $ 60,000.00 $ 60,000.00 $ 60,000.00 $ 82,500.00 $ 82,500.00 $ 1000(W00 $ 100000.00 $ 84,26349 $ 84,26349 102 Bonds and Insurance t$ 1 $ 12,400.00 $ 12,400.00 $ 35,000.00 $ 35,000.00 $ 80,000.00 $ 80,000.00 $ 25,23!1.00 $ 251 $ &7,(100.00 $ 80,00000 $ 38,084.51 $ 38,084.51 1.03 Act 291, 1993 Trenchand Excavation Safety System LS 1 $ 4,500.00 $ 4,500.00 5 48,00000 $ 48,000.00 $ 2000000 $ 20,00000 $ 20,000.00 $ 20,000.00 $ 20,00000 $ 20,00000 $ 2,00000 $ 2,000.00 1.04 Erosion and 5edi merit Control LS 1 $ 40,000.00 S 40,000.00 5 12,000.00 $ 12,00000 $ 30,000.00 $ 30W000 $ 40,000.00 $ 401000.00 $ 20,50000 $ 20,500.00 Sr 10,000.00 $ 10,000.00 1.05 Pre Construction Video LS 1 $ 1,500.W $ 1,500.00 $ 1,500.00 $ 1,50000 $ 3,00000 $ 3,00000 $ 2,500.00 $ 2,50000 $ 13,501100 $ 13,500.00 $ 1,100.00 $ 1,IDOW 1.06 Tmffc Control LS 1 $ 6,500.00 $ 6,500.00 $ 23,00000 $ 23,000.00 $ 30,00D.00 $ 30,000.00 $ 8,500.00 $ 8,500.00 $ 66,808.00 $ 66,808.00 $ 15,000.00 $ 15,00000 1.02 Clearing, Grubbing, Tree LS 1 $ 3,50000 $ 3,500.00 $ 6,00000 $ 6,000.00 $ 20,000.00 $ -20,000.00 $ 171500.0) $ 12,500.00 $ 251000.00 $ 25,000.00 $ 20,000.00 $ 20,00000 Removal & Misc. Demo 108 Abandon and Salvage Existing fire Hydrant EA 11 $ 42000 $ 4,620.00 $ 1,000.00 $ 11,00000 $ Boom $ 8,80000 $ 350.00 $ 31 $ 2,000.00 $ 22,000.00 $ 250.00 $ 8,25000 LOB Abandon Existing Valve EA 22 $ 300.00 $ 6,500.00 $ 500.00 $ 11,00000 $ 350.0) $ 2,20000 $ 250.00 $ 5,50000 $ 1,50000 $ 33,000.00 $ 200.00 $ 15,4W.W 1.10 Abantlon Existing Water Meter Settin EA 16 Sr 240.00 $ 3,840.00 $ 400.00 $ 6,40000 $ 350.00 $ 5,600.00 5 200.00 $ 3,20000 $ 1,50000 $ 24,000.00 $ 600,00 $ 9,60000 1.11 Abandon Existing Water Service Line @ Main EA 5 $ 540.W $ 2,200.00 $ 2,000.00 $ 10,000.00 $ 1,000.00 $ 5,00000 $ 200.00 $ 1,000.00 $ 2,50000 $ 12,50000 $ 600.00 $ 3,000.00 1.12 Abandon Existing Water main under Hi hwa LF 282 $ 620 $ 1,88940 $ 55.00 $ 15,510.00 $ 25.00 $ 2,050.00 $ 35.00 $ 9,820.00 $ 63.99 $ 18,045.18 $ 40.00 $ 11,280.00 1.13 Connect New Service to Existing EA 5 $ 622.80 $ 3,114.00 $ 300.00 $ 1,500.00 $ 800.00 $ 4,000.00 $ 400.00 $ 2,000.00 $ 2,028.13 $ 10,390.65 $ 200.00 $ 3,500.00 Meter Setting 1.14 Connect New Service to Existing sonic¢ Jr, E4 15 $ 44628 $ 6,69020 $ 300.00 $ 4,500.00 $ 80000 $ 12,000.00 $ 400.00 $ 6,000.00 $ 2,01962 $ 30294.30 $ 200.00 $ 10,50.00 1.15 Connect New Water Main to EA 1 $ 1,68925 $ 1,68975 $ 5,000.00 $ 5,000.00 $ 1,00000 $ 1,000.00 $ 1,850.00 $ 1,850.00 $ 5,452,76 $ 5,452.76 $ 2,500.00 $ 2,500 ED Existing Water Main 1.16 Dual 1" Meter Settin w/PRV EA 5 $ 1,200.16 $ 8,500.80 $ 2,100.00 $ 10,500.00 1 $ 2,00000 $ 10,000.00 $ 1,80000 $ 9,000.00 $ 2,23342 j $ 11,162.10 $ 1,228.00 $ 8,890.00 1.17 Single Y Meter Setting w/PRV EA 12 $ 1,16415 $ 13,969.80 $ 1,300.00 $ 15,600.00 $ 1,600.00 $ 19,200.00 $ 1,20000 $ 16,400.00 $ 2,034.13 $ 24,409.56 $ 1,250.00 $ 15,000.00 1.18 Single l" I rrigation Meter Set, ng of PIN EA 1 $ 1,382.32 $ 1,382.32 $ 1,800.00 $ 1,8W.W $ 1,800.00 $ 1,800.00 $ 1,50000 $ 1,500.00 $ 4,952.83 $ 4,952.83 $ 1,220.00 $ 1,270ED 1'19 1" Coated Copper Service Tub'ag lF 832 $ 19.82 $ 16,531.84 $ 20.00 $ 16,640.00 $ 25.00 $ 20,800.00 $ 40.00 $ 33,280.00 $ 2050. $ 12,056.00 $ 30.00 $ 24,960.00 120 2" Coated Copper Service Tubing LE 138 $ 3225 $ 4,450.50 $ 3500 $ 4,83000 $ 3300 $ 4,554.00 $ 6500 $ 8,920.00 $ 42.68 $ 5,889.84 $ 40.00 $ 5,52000 121 8"X1"Service Ta EA 4 $ 489.22 $ 1,956.88 $ 1,200.00 $ 4,800.00 $ 800.00 $ 3,200.00 $ 50000 Sr 2,000.00 $ 1,056.89 $ 4,227.56 $ 500.00 $ 2,00000 1.22 12"X1"ServicaTa EA 18 $ 263.38 $ 13,240.84 $ 1,400,00 $ 25,20000 $ 85000 $ 15,300.00 $ 25000 $ 13,500.00 $ 1,085.66 $ 19,541.88 $ 650.00 $ 11,20000 1.23 12"X2"Service Tap EA 2 $ 1,332.34 $ 2,664.68 $ 1,800.00 $ 3,600.00 $ 1,500.00 $ 3,000.00 $ 1,000.00 $ 2,090.00 $ 2,952.22 $ 5,91 $ 200.00 $ LACEED 1.24 6' PVC 900 DR14 Restrained U' 51 $ 3309 $ 1,687,59 $ 62.00 $ 3,162.00 $ 65.00 $ 3,315.00 $ 50.W $ 2,550.00 $ 22.58 $ 3,956.58 $ 85.00 $ 4,33500 Joint Water Main 1.25 8" PVC C900 DR14 Water Main LEt459 Sr.59 $ 1,024.88 $ 6]00 $ 2,144.00 $ 60.00 $ 1,920.00 $ 50.00 $ 1,600.00 $ 82.30 $ 2,633.60 $ 65.00 $ 2,080,00 1.26 8" PVC C900 DR14 Restrained IF80 $ 54,542.80 $ 22.00 $ 85,252.00 $ 68.00 $ 80,988.00 $ 60.00 $ 21,460.00 $ 8909 $ 106,106.19 $ 22.00 $ 85)5200 Joint Water Main 122 12" PVC C900 DR14 Water Main LF.31 $ 200,520.29 $ 82,00 $ 320,538.00 $ 2200 $ 300,993.00 $ 50.00 $ 195,450.00 $ 59.38 $ 232,116.42 $ 25.00 $ 293,12500 1.28 II" PVC 0900 DR14 Restrained LF46 $ 120,052.80 $ 82.00 $ 146,160.00 $ 9400 $ 152,92000 $ 2500 $ 126,00000 $ 10604 $ 178,142.20 $ 8500 $ 142,80000 Joint Water Main1.29 14/2"HDPESDfl 9Bored Casing LF39 $ 12,522.01 $ 30.00 $ 13,220.00 $ 45.00 $ 20,655.00 $ 25.00 $ 11,425.00 $ 68,53 $ 31,455.22 $ 30.00 $ 13,770 ED Cornerstone Construction of Gains Enterprises, Inc. Goodwin & Goodwin, Inc GUACS Contractors, Inc Phil Develo Dmentz, Inc. Tri-Star Contractors, LLC Russellville, Inc. ITEM ESTIMATED UNIT UNIT UNIT UNIT UNIT UNIT No OLSCRIP I ION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1.30 31HDPE SDR 9 Bored Casing LF 90 $ 34.65 $ 3,11850 $ 5000E205,920.W 0.00 $ 50.00 $ 4,500.00 $ 35.00 $ 3,150.00 $ 10653 $ 9,40].]0 $ 40.00 $ 3.60000 1.31 16" Min, Dia, Bored Steel Casing LF 418 S 27657 S 115,606.26 $ 350800.00 $ 360.00 $ 150,480.00 $ 275.00 $ 114,950.00 $ 348.13 $ 145,518.36 $ 280.00 $ 117,04000 1.32 16" Min. Dia. Direct Bury Steel LF 53 $ 11,805.]5 $ 7,950.00 Casin $ 78.13 $ 4,140.89 $ 25000.00 $ 200.00 $ 10,601 $ 120.00 $ 6,360.00 $ 222.75 $ 150.00 1.33 24" Min. Dia, Bored Steel Casing LF 396 $ 150,&0.36 $ 169,488.80 $ 325.59 $ 128,933 fi4 $ 520.00 .00 $ 400.00 $ 158,40000 $ 425.00 $ 168,300.00 $ 380.91 $ 428.00 1.36 24" Min. Dia. Direct Bury Steel LF 234 $ 53,6D706 $ 58,50000 Using $ 101.01 $ 23,636,34 $ 300.00 .00 $ 235.00 $ 54,990.00 $ 125.00 $ 29,250.00 $ 22909 $ 250.00 1.35 3-Way FH EA 19 $ 3,55169 $ 67,482.11 $ 4,50000 .00 $ 5,200.00 $ 98,800.00 $ 3,)5000 $ )1,250.00 $ 4,06429 $ »,22151 $ 5,50000 $ 104,50000 1.36 2"Gate Valve w/Box EA 2 $ 3050.]4 $ 2,101.48 $ 1,300.00 .00 $ 1,200.00 $ 2,40000 $ 1,000.00 $ 2,900.00 $ 1,22260 $ 2,445.20 $ 1,50000 $ 3,00000 1.37 6"Gate Valvew Box EA 18 $ 1,4876] $ 26,»806 $ 1,80000 000 $ 1,80000 $ 32,40000 $ 1,500.00 $ 27,000.00 $ 1,565.63 $ 28,181.36 $ 1,800.00 $ 32,40000 1.38 8" Gate Valve w/Box EA 12 $ 2,107.62 $ 25,291.44 $ 2,700.00 $ 32,400.00 $ 2,300 ED $ 27,60000 $ 2,000.00 $ 26,000.90 $ 2,03323 $ 24,398.76 $ 2,400.00 $ 28,80000 1.39 12" Gate Valve w/ Box EA 1 $ 3,513.80 $ 3,513.80 $ 4,70000 $ 6,700.00 $ 4,00000 $ 4,00000 $ 3,580.00 $ 3,500.00 $ 3,29762 $ 3,297.62 $ 5,500.00 $ 5,50000 140 12'butterfl V sawl Box EA 18 $ 9,791.43 $ 1)6,245.]4 $ 10,000.00 $ 180,000.00 $ 9,30000 $ 167,400.00 $ 9,00000 $ 162,000.00 $ 8,507.16 $ 153,128.88 $ 10,296.00 $ 185,32800 1.41 AWWA C153 Ductile Iron Wafer LBS 9,100 $ 75,8D300 $ 72,80000 Main F.Ungs $ 19.33 $ 175,903.00 $ 15.00 $ 131$ 11.00 $ 100,100.00 $ 15.00 $ 136,500.00 $ 833 $ 8.00 1.42 2"%6" Tapping Sleeve, 2" EA 3 $ 9996.03 $ $55000 Tapping Val $ 2,068.15 $ 6,204.45 $ 3,500.00 $ 10,500.00 $ 2,700.00 $ 8,100.00 $ 2,000.00 $ 6,000.00 $ 3,332.01 , $ 2,850.00 1.43 6"%6" Tapping Sleeve, 6" EA 2 $ 9,692.98 $ 14,00000 Tapping Valve vi Be. $ 3,619.09 $ 7,238.18 $ 4,900.00 $ 8,000.00 $ 5,00000 $ 10,000.00 $ 4,000.00 $ 8,000.00 $ 4,846.49 $ 7,000.00 144 8" N 6" Tapping Sleeve, 6" EA 1 $ 5,3]393 $ 7,242.00 Tapping Valve vi Box $ 4.123.48 $ 4,123.48 $ 4,500.00 $ 4,500.00 $ 6,00000$ 6,000.00 $ 4,500.00 $ 4,500.00 $ 5,373.93 $ 7,262.00 1.45 8"%8" Tap, no Sleeve, B" EA 5 $ 2),821.20 $ 43,69000 TappingValve w Box $ 4,281.56 $ 21,40].80 $ 5,0013.00 $ 25,900.00 $ 6,50000 $ 32,50000 $ 5,000.00 $ 25,000.00 $ 5,564.24 $ 873800 146 12"%12" Tapping Sleeve, 12' EA 2 $ 18,851.58 Ta In Valve w/ Box $ ],2]5.03 $ 14,55005 $ 8,500.00 $ 17,000.00 $ 8,000.00 $ 16,00000 $ 7,50000 $ 15,000.00 $ 9,42539 $ $gg8.00 147 24"%12" Tapping Sleeve, 12" EA 1 $ 18,849.78 $ 14,500.00 Tapping Valvew Box $ 17,421.92 $ 17,421.92 $ 19,000.00 $ 19,000.00 $ 17000.00 $ 17,000.00 $ 9,500.00 $ 9,500.00 $ 18,84978 $ 14,500.00 1.48 Double Cut and Cap Existing 2- EA 3 9,481.02 $ 2700.00 inch Water Main $ 2,107.80 S 6,322.80 $ 3,000.00 $ 9,000.00 $ 1,200.00 $ 3,600.00 $ 1,000.00 $ 3,000.90 $ 3,160.34 $ $ Scram 1.49 Double Cut and Cap Existing 6- EA 3 $ 1041852 $ 3,60C.00inch Water Main $ 2,706.91 $ 8,120.73 $ 3,500.00 $ 10,500.00 $ 2,00000 $ 6,000.00 $ 2,000.00 $ 6,000.00 $ 3,4)2.84 , $ 1,200.00 1.50 Double Cut and Ca p Existing 8- EA 5 $ 1),913.15 $ 7,50000 inch Water Main $ 2,959.26 $ 14796.30 $ 6,000.00 $ 20,000.00 $ 2,50000 $ 12,500.00 $ 2,500.00 $ 12,500,00 $ 3,582.63 $ 1,50000 1.51 Double Cut and Ca p Existing 12 EA 2 $ 7,920.80 $ 4,00000 inch Water Main $ 3,9945] $ 2989.14 $ 5,500,00 $ 111000,00 $ 3,000.00 $ 6,000.00 $ 3,50000 $ 7,000.00 $ 3,960.40 $ 2,000.00 1.52 Flowable Fill Cy 1W $ 337.68 $ 33,76800 $ 13000 $ 13,000.00 $ 13000 $ 13,90000 $ 14500 $ 16,500.00 $ 18350 $ 1835000 1 $ 165.00 $ 16,50080 1.53 Concrete Pavement Repair LF 178 $ 24683.26 $ 21,36000 Hea Duty $ 3900 $ 6,942.00 $ 100.00 $ 17,801 $ 100.00 $ 17,800.00 $ 5500 $ 9,]90.0 $ 138.67 , $ 12000 1.54 Concrete Pavement Repair LF 691 $ 46,635.59 $ 34,55000 0 hl Duty $ 31.80 $ 21,9/3.80 $ 80.00 $ 55,280.00 $ 80.00 S 55,280.00 $ 3000 $ 20730,00 $ 67.49 $ 5000 1.55 Concrete Pavement Repair SY 117 $ 15,969.33 $ 7,@000 ht Duty$ 122.40 $ 14,32080 $ 125.00 $ 14,62500 $ 85.00 $ 9,94500 $ 45.00 $ 5,265.00 $ 136.49 $ W.00 1.56 Concrete Sidewalk Repair LF 10 $ 4440 $ 44400 $ 50.00 $ Scow $ 45.00 $ 450.00 $ 3500 $ 3500 $ 368.00 $ 3,680.00 $ 40.00 $ PIGS DO 1.57 Concrete Curb &Gutter Reair LF fit $ 42.00 $ 2,562,00 $ 65.00 $ 3,965.00 $ 40.00 $ 2,440.00 $ 2000 $ 1,220.0 $ 97.20 $ 5,92920 $ 18.80 1 $ 1,09800 1.58 Asphalt Pavement Repair LF 339 $ 49.80 $ 16,88220 $ 11000 $ 37,290.00 $ 115.00 $ 38,985.00 $ SEED 5 18,645.00 5 124.00 $ 62,036.0 $ 9580 $ 32,20500 1.59 Asphalt Pavement Repair SY 16 $ 129.60 $ 2,07380 $ 14500 $ 2,320.00 $ 135.00 $ 2,160.00 $ 9000 $ 1,440.00 $ 124.00 $ 1,98400 $ SO.W $ 80000 1.60 Gravel Pavement Repair LF 237 $ IDO6 $ 2384.22 $ 35.00 $ 8,295.00 $ 35.00 $ 8,295.00 $ 35.00 $ 8,295.00 $ 45.25 $ 10,724.25 $ 6080 $ 16,22000 1.61 Class 7Aggregate Base Course LF 1207 $ 1508 $ 18,20156 $ 5500 $ 66,38500 $ 35.00 $ 42,245.00 $ 40.00 $ 48,280.00 $ 4525 $ 54,616.75 $ 30.00 $ 36,21080 162 Fence C.Ossin Re air Re lace LF 80 $ )4.28 $ 5,94240 $ 100.00 5 BOW.00 $ 3500 $ 2,800.00 $ 2000 $ 1,680.80 $ 106.]5 $ 8,54000 $ 10.00 $ 88000 1.63 2"Blow Off Assembly EA 1 $ 1,535.16 $ 1,535.16 $ TRUDGE $ 1,680.00 $ 2,000.00 $ 2,000.00 $ 3,00000 $ 3,000.00 $ 2751.50 $ 2,751.50 $ 2,50000 $ 250000 1.64 Trace Wire Connection (T W.A. P.) EA 50 $ 826500 $ 7,500.80 $ 236.53 $ 11,)2650 $ $ 3,250.00 $ 100.00 $ 5,000.00 $ 250.$ 00 12,500.00 $ 165.30 ,. $ 150 .80 1.65 8"Anchor Collar EA 1 $ 288540 $ 2,885.40 G0 $ 2,500CC00 $ 2,500.00 $ 2,00.00 $ 2000.00 $ 6,500.00 $ 4,500.00 $ 6,954.56 $ 6,954.54 $ 950.00 $ 95001 !.fib 12" Anchor Collar E4 1 $ 3,93568 $ 3,93568 $ 3,00000 $ 3,000.00 $ 2,6600.00 $ 2,600.00 $ 6,500.00 $ 6,500.00 $ 6,998.36 $ 6,998.36 $ 1,100.00 $ 1,300.00 1.67 Bank Staflohzadmir LF 190 $ 30.17 $ 5,)32.30 $ 25.00 $ 4750.00 $ 13500 $ 25,650.00 $ 70.80 $ 13,300.00 $ 47.25 $ 8,9//.50 $ 50.00 $ 9,50000 1,68 4" PVC SCH405ewer Service LF 256 $ 86.56 $ 22,159.36 $ 9500 $ 24,320.00 $ 40.00 $ 10,240.00 $ 6S.W $ 16,64000 $ 3239 $ 8,29184 $ 3000 $ 7,68000 1.69 6"PVC SCH40 Sewer Service LF 46 $ 133.21 $ 6,127,66 $ 110.00 $ 5,060.00 $ 5000 $ 2,300.00 $ 7000 $ 3,220.00 $ 5647 $ 2,597.62 $ 35.00 $ 1,61000 130 Soft Shovel Locate Existing Sewer EA 6 Service Llne @ AFOOT R/W $ 240.00 $ 1,440.00 $ 2,000.00 $ 12,000.00 $ 2,00000 $ 12,00000 $ TOO $ 6,000.00 $ 3,13500 $ 18,810.00 $ 1,000.00 $ 6,00000 171 Plug Abandoned Sewer Main at EA 1 $ 3817.50 $ 98000 Existin MH $ 720.00 $ 72000 $ 1,000.00 $ 3,OW.00 $ 1,20000 5 1,200.00 $ 950.00 $ 950.00 $ 3,817.50 , $ 980.00 Error H1127 (2010 .In Cornerstone Construction of Gains Enterprises, Inc. Goodwin S, Goodwin, Inc WACS Contractors, l nc. Privcon Developments, Inc. Tri-Star Contractors, LLC Russellville, Inc. ITEM ESTIMATED UNIT UNIT UNIT UNIT UNIT UNIT NO. DESCRIPHUN UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 1.72 Plug Abandoned Sewer Service at E, 3 Main $ 1,020.00 $ 3,060.00 $ 1,00000 $ 3,000.00 $ 1,000.00 $ 3,00000 $ 1,25000 $ 3,750.00 $ 3,812.00 $ 11,451.00 $ $ 1,200.00 3,60000 1.73 Abandon Sewer Manhole EA 2 $ 3,582.60 $ 7,16510 $ 6000.00 $ 12,000.00 $ 1,500.00 $ 3,000.00 $ 1,750.00 $ 3,500.00 $ 10,315.00 $ 20,530.00 $ 1,100.00 $ 2,2D000 1,74 Abandon Existing Sewer Main LE 424 under Highway $ 600 $ 3,175.80 $ 20.00 $ 9p8000 $ 25.00 $ 11,850.00 $ 20.00 $ 9,48000 $ 30.90 $ 14,64660 $ $ 2000 9,48000 1.75 Sewer Service Cleanout EA 6 $ 885.12 $ 5,310,72 $ 1,000.00 $ 6,000.00 $ 600.00 $ 3,600.00 $ 35000 $ 2,100.00 $ 96571 $ 5,79426 $ 750.00 $ 4,50000 1J6 Sewer Service Tap Main 4' EA 4 $ 1,042.80 $ 4,171.20 $ 1,200.00 $ 4,800.00 $ 1,500.00 $ 6,000.00 $ 1,000.00 $ 4,00000 $ 3,43556 $ 13,742.24 $ 800.00 $ 3,20000 1.77 Sewer Service Tap Main 6" EA 1 $ 1,024.50 $ 1,074.50 $ 1,400.00 $ 1,400.00 $ 2,00000 $ 2,000.00 $ 1,00000 $ 1,000,00 $ 3,471.73 $ 3,47173 $ 950.00 $ 95000 1.78 Conned New Sewer Service to EA 6 Existing Sewer Service $ 814.16 $ 4,884.96 $ 2,500.00 $ 15,000.00 $ 1,250.00 $ 7,500.00 $ 1,000.00 $ 6,000.00 $ 4,11876 $ 26,712.56 $ 500.00 $ 3'00GOO TOTAL BASE BID 1 $ 1,689,781.02 $ 2,290,296.00 I $ 2,160,50500 $ 1,799,000.00 1 $ 2,396,105.50 $ 1,990,007.00 Error H1127 (2010 .In McCLELLAND 1810 N. College Ave. NEE CONSULTING Fayetteville, AR 72703 479-443-2377/Fax 479-443-9241 ENGINEERS, INC. mce.us.com February 27, 2020 Mr. Corey Granderson, PE Utilities Engineer City of Fayetteville 2435 S Industrial Drive Fayetteville, AR 72701 RE: Bid No. 20-29, Construction — Highway 16 Utility Relocations Recommendation of Award Dear Mr. Granderson, On Wednesday, February 19, 2020 bids were opened on the referenced project, and six responsive bids were received. Cornerstone Construction of Russellville, Inc. of Russellville, AR is the low bidder with a total bid in the amount of $1,689,781.02. The certified bid tabulation is attached for reference. We have reviewed Cornerstone Construction's bid and, have direct experience working with them on a recent utility project, and have received good feedback from their references; therefore, we recommend awarding the bid to Cornerstone Construction of Russellville, Inc. in the amount of $1,689,781.02. Please do not hesitate to call should you have any questions and as always, thank you for allowing us to be of service. Sincerely, McClelland Consulting Engineers, Inc. Zane Lewis, PE, LEED AP Project Manager Enck Certified Bid Tabulation K:\2017\172162 Highway 16 Utility Relocations, Fayetteville, AR\Construction-Hwy 16\Certified Bid Tab\Hwy 16 Utility Relocations Recommendation of Award.docx Supplemental Agreement No. 4 Highway 16 Utility Relocations Date: WHEREAS, the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc. (ENGINEER) entered into an Agreement for Professional Engineering Services (AGREEMENT) on October 3, 2017; and, WHEREAS, the CITY OF FAYETTEVILLE has requested that ENGINEER perform additional services outside of the scope of the AGREEMENT. NOW THEREFORE, the following modifications will be made to the AGREEMENT to include the additional services requested: MODIFICATIONS: Section 2. 1.1 — the additional scope of services are included in the attached Appendix "A-4". 2. Section 5.1 — the maximum not -to -exceed amount is increased from $317,209.82 to $442,467.82. Modifications to compensation are included in the attached Appendix `B-6". IN WITNESS WHEREOF, the parties execute this Supplemental Agreement No. 4, to be effective on the date set out above. McClelland Consulting Engineers, Inc BY: Daniel Barnes, PE President, Fayetteville Office City of Fayetteville, Arkansas IBM Mayor Lioneld Jordan APPENDIX A-4 — SCOPE OF ADDITIONAL SERVICES SUPPLEMENTAL AGREEMENT NO. 4 — HIGHWAY 16 UTILITY RELOCATIONS SERVICES DURING CONSTRUCTION 1.0 General The scope of additional services includes construction administration and construction observation services for the referenced project, which includes approximately 5,700 linear feet of 12 -inch water main; 1,100 linear feet of 8 -inch water main; new water/sewer services; and related appurtenances and interconnections along Highway 16 (15th Street) between Hwy 71B (S School Avenue) and Fairlane Street. Construction is anticipated to commence in April 2020. The construction contract allows 240 calendar days to Substantial Completion, and 270 calendar days to Final Completion. 2.0 Construction Administration 2.1 Assist CITY OF FAYETTEVILLE with issuing the Notice to Proceed (NTP) and obtaining executed Contract Documents from the selected Contractor, if requested by the CITY OF FAYETTEVILLE. 2.2 Conduct the pre -construction meeting with the Contractor and issue meeting minutes. 2.3 Review and respond to Contractor submittals for conformance to the Contract Documents, Drawings, and Specifications. Up to ten (10) submittals are anticipated on this project. The initial review and one (1) re -submittal review are included in this scope of services. Additional re -submittal reviews will be considered Additional Services. 2.4 Review Contractor's Requests for Information (RFIs) and issue clarifications as required. Up to ten (10) RFIs are anticipated on this project. 2.5 Assist the CITY OF FAYETTEVILLE with the evaluation, negotiation, and processing of Contractor change order requests, if required. 2.6 Review monthly Pay Estimates from the Contractor and provide recommendation for payment. A total of ten (10) pay estimates are assumed. 2.7 Engineer of Record shall conduct monthly site visits and attendance at monthly progress meetings as required to observe the progress and quality of the executed work to determine compliance with approved Contract Documents, Drawings, and Specifications in accordance with Arkansas State Law 22-9-101. A total of twenty (20) site visits/progress meetings are estimated over the course of the 270 calendar day construction contract. 2.8 Assist the CITY OF FAYETTEVILLE with the final inspection walk-through. Develop a punch list of outstanding items, and review project closeout documents. Appendix A-4 — Scope of Additional Services Page 1 of 3 2/20/2020 Highway 16 Utility Relocations Services During Construction 2.9 Prepare Record Drawings based upon information furnished by the Contractor and field representatives. 3.0 Construction Observation 3.1 Provide a field representative to perform comprehensive construction observation services. Field representative shall meet with CITY OF FAYETTEVILLE field representative at least once weekly to stay informed on construction progress and any issues that may arise. 3.2 It is estimated that the level of observation required by the ENGINEER to provide comprehensive services will equate to an average of 30 hours per week for the duration of the 270 calendar day construction contract. Partial observation will be conducted on non-critical construction items such as, but not limited to general site cleanup, seeding, sodding, etc. 3.3 CITY OF FAYETTEVILLE shall provide adequate notice to ENGINEER when a field representative is required. Minimum notice shall be three (3) business days, with one (1) week notice preferred. 4.0 Surveying Services At the request of the CITY OF FAYETTEVILLE, provide up to 32 hours of field surveying to assist in reviewing the Contractor's work and/or to address property owner questions. 5.0 Project Deliverables 5.1 PDF copy of the approved shop drawings and submittals from the Contractor. 5.2 One (1) hard copy set, a PDF copy and AutoCAD file of the Record Drawings. 5.3 Other electronic files as requested by the CITY OF FAYETTEVILLE. 6.0 General 6.1 All water main construction shall follow the guidelines described in the CITY OF FAYETTEVILLE Standard Specifications for Design and Construction of Water Lines and Sewer Lines (2017 Edition), the Contract Documents, Drawings, and Specifications. 6.2 Attending at meetings other than progress meetings and the pre -construction meeting will be considered Additional Services. 6.3 Should construction delays occur, which are beyond the control of the ENGINEER and cause the project to be completed later than 270 calendar days, the ENGINEER and CITY OF FAYETTEVILLE will review the ENGINEER' remaining budget and mutually agree upon a plan of action, whether it be a reduction in the scope of services to stay within budget, or authorize Additional Services. Appendix A-4 — Scope of Additional Services Page 2 of 3 2/20/2020 Highway 16 Utility Relocations Services During Construction 6.4 Subcontracting of services by the ENGINEER shall have prior approval of the OWNER. Appendix A-4 — Scope of Additional Services Page 3 of 3 2/20/2020 Highway 16 Utility Relocations Services During Construction Appendix B-6: Fee Proposal - Supplemental Agreement No. 4 Services During Construction In Conjunction with the Highway 16 Utility Relocations MCE Job No. 172162 Labor Classification Time/Hours Direct Labor Rate Extended Sr Project Manager 32.00 $63.00 $2,016.00 Project Manager 108.00 $43.00 $4,644.00 Project Engineer 140.00 $32.00 $4,480.00 Construction Observer 1160.00 $25.00 $29,000.00 Chief Draftsman 40.00 $28.00 $1,120.00 Survey Technician 4.00 $20.00 $80.00 Registered Land Surveyor 2.00 $40.00 $80.00 Survey (2 -Man or Robotic) 32.00 $50.00 $1,600.00 Direct Labor Subtotal $43,020.00 Title II Labor Multiplier 2.90 Subtotal Labor Costs $124,758.00 EXPENSES Estimated Reimbursable Expenses Amount Mileage $500.00 Total Estimated Reimbursable Expenses $500.00 Total Costs - Construction Engineering $125,258.00 Notes: 1. Title II Multiplier based upon MCE FY19 Indirect Cost Rate (158.92°/x) for ARDOT projects, plus fixed fee of 12%. 2. Construction Duration Assumed - 240 Calendar Days (Substantial); 270 Calendar Days (Final) 3. Construction Observeration may be performed by MCE, City of Fayetteville, or a combination of both, depending on availability of personnel at time of construction 2/20/2020 Supplemental Agreement No. 4 - Highway 16 Utility Relocations Services During Construction McCLELLAND Manhour Estimate NEFCONSULTING Date: 02/20/2020 ENGINEERS, INC. Task Description Sr Project Manager Project Manager Project Designer Const. Observer V Const. Observer II Chief Draftsman Survey Technician Reg. Land Surveyor Survey (2 -Man or Robotic) Construction Administration Pre construction meeting 2.00 2.00 Review Submittals 2.00 8.00 40.00 Respond to RFIs 2.00 8.00 20.00 4.00 Evaluate Change Order Requests 4.00 16.00 40.00 8.00 Pay request review/preparation 20.00 Periodic site visits (20 estimated) 20.00 40.00 20.00 Final inspection/punch list preparation 1 2.00 1 4.00 1 8.00 As- built construction documents 1 1 8.00 1 8.00 24.00 Project close out 1 1 2.00 4.00 4.00 Sub total Manhours 32.00 108.00 140.00 0.00 0.00 40.00 0.00 0.00 0.00 Construction Observation Comprehensive Field Observation Services 90.00 1020.00 Pre construction meeting 2.00 2.00 Pay request review/preparation 4.00 20.00 Final inspection 8.00 As- built construction documents 2.00 6.00 Project close out 1 1 2.00 1 4.00 Sub total Manhours 0.00 0.00 0.00 100.00 1060.00 0.00 0.00 0.00 0.00 Surveying Services Review Contractor's work and address property owner questions, as required 4.00 2.00 32.00 Sub total Manhours 0.00 0.00 0.00 0.00 0.00 0.00 4.00 2.00 32.00 Total Estimated Manhours 32.00 108.00 140.00 100.00 1060.00 40.00 4.00 2.00 32.00 Page 1 of 1 2/20/2020 AlOth CITY OF FAYETTEVILLE ARKANSAS Bid 20-32, Sodium Hypochlorite Storage Tank Official Bid Tabulation Lioneld Jordan, Mayor Date of Advertisement: 1/27/2020 Date of Issue: 2/18/2020 Bid No. 20-32 Date: 02.18.2020 Time: 2:00 PM U CPPO Les McGaugh NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. D. J. Shubeck Company Mercaterra Atlantic LLC Plastic - Mart Thorpe Plant Services, Inc. QTY Item Description Extended Price Extended Price Extended Price Extended Price Sodium Hypochlorite Storage Vessel (7,600 -gallon capacity) $61,559.00 $ 62,990.00 $ 44,000.00 $ 41,974.00 Total Balance: $ 61,559.00 $ 62,990.00 $ 44,000.00 $ 41,974.00 U CPPO Les McGaugh NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. CITY OF FAYETTEVILLE ARKANSAS MEETING OF APRIL 7, 2020 TO: Mayor Jordan and City Council CITY COUNCIL MEMO THRU: Peter Nierengarten, Environmental Director Jeff Coles, Recycling and Trash Collections Director FROM: Shannon Newman, Financial Analyst - Recycling and Trash Collections DATE: March 6, 2020 SUBJECT: A resolution to approve an agreement between the City of Fayetteville, Arkansas and Food Loops, LLC to haul and dispose of organic compostables and recyclable material in the City of Fayetteville RECOMMENDATION: Staff recommends City Council approval of a resolution with Food Loops, LLC, for the hauling and disposal of organic compostables and recyclable material in the City of Fayetteville. BACKGROUND: Food Loops, LLC has submitted a request to haul compostable and recyclable materials in the City of Fayetteville. The contract will permit Food Loops to haul all organic waste collected in the City of Fayetteville to the Fayetteville Recycling and Trash Collection Facility for composting, which shall be counted toward the City's waste diversion goals. The City of Fayetteville approved a hauling agreement for Food Loops in 2018. The original contract has expired; therefore a new agreement is requested. DISCUSSION: The hauling contract will permit Food Loops, LLC to collect and haul organic waste for composting and recyclable materials. Hauler may collect organic waste and recyclable materials from residential, commercial and industrial activities. Hauler is not authorized to collect of haul any other type of solid waste. The agreement requires Food Loops to pay a monthly fee to the City of Fayetteville of 5% of the gross revenue received for providing organic waste hauling services and 5% of the gross revenue received for providing the hauling of recyclables. The term of the agreement will be 1 year with automatic renewals for 2 additional 1 -year terms. Staff proposes approval for Food Loops, LLC to haul and dispose of organic compostables and recyclable material within the City of Fayetteville per the terms of the attached agreement. BUDGET/STAFF IMPACT: None Attachments: Food Loops, LLC Agreement to Haul and Dispose of Organic Compostables and Recyclable Materials in the City of Fayetteville Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Capital Projects Update - March 2020 No. Project Description Location Contractor or Project Status Cost % Under Construction 1 Sang Avenue/Pleasant Woods/Maple-Oliver Wards 1, 2, & 4 Kajacs Closeout $1,546,754 95% 2 West Fork Lift Station & Sewer Lines Note: This is a West Fork project with Fayetteville cost -share Ward 1 Boyles Construction Active Construction $256,790 25% 3 Morningside Dr. 24" Waterline Replacement Ward 1 Kajacs Active Construction $1,595,000 8% 4 Annual Manhole Rehabilitaton (sewer) Contract City Wide Krapff Reynolds Pre Construction $590,789 0% 5 1-49/Wedington Interchange Water & Sewer Relocations Wards 2 & 4 Forsgren, Inc. Pre Construction $2,495,705 0% 6 Utility Relocations Hwy 16 Ward 1 Cornerstone Construction Bid Award $1,689,781 0% Engineering Design 7 Electrical Improvements for the Noland WRRF (15kV Phase) Note: "Total Cost" includes future design phases forthcoming Noland WRRF Allgeier Martin Bid Opening March 17 $515,049 100% 8 Benson Mtn. Water Tank Improvements Wash. Co. Hawkins -Weir Easement Acquisition $130,280 100% 9 Kitty Creek Sewer Line Replacement Ward 3 McClelland Easement Acquisition $250,793 95% 10 East Service Area Water System Improvements 1. Contract Section I - PSV's and PRV's 2. Contract Section 11 - Gulley Road Tank 3. Contract Section III - Gulley & Goshen Improv's 4. Township Contract - New tank, pump station, mains Wards 2&3, Wash. Co Olsson 1 -Bid Prep 2 -ADH Review 3-Esmt. Acquisition 4-Engr. Design $754,305 1-100% 2-90% 3-90% 4-90% 11 Hwy 170 Water & Sewer Relocations, Farmington Farmington Garver Easement Acquisition $265,975 95% 12 Waterline Replacements along S. Garland Ave. & Rolling Hills Dr. Wards 1 & 3 Garver Engr. Design $246,450 30% 13 Noland WRRF Aeration Basin Gates Noland WRRF Jacobs Engr. Design $71,150 90% 14 Cultural Arts Corridor Utility Replacements - Phase 1 Ward 2 Olsson Engr. Design $122,322 30% 15 Round Mountain Standpipe Rehabilitation Wash. Co. Garver Engr. Design $59,600 90% 16 Gregg Ave./Fulbright Expy. Sewer Bypass Ward 3 Hawkins -Weir Engr. Design $162,130 0% 17 Lake Sequoyah Water Quality Improvements Ward 1 Olsson Survey & Data Collect. $114,220 0% Engineering Studies & Master Plans 18 2018 Water Tank Inspections and Water Quality Analysis City Wide Garver Final Report Review $154,000 99% 19 North College Water Main Replacement Evaluation Wards 2 & 3 McClelland Bond Projects Coordination $128,930 44% 20 Electrical Improvements at Water Pump Statons City Wide Allgeier Martin Final Report Review $46,144 100% 21 Fire Flow Improvements Within City Limits City Wide Hawkins -Weir Water Modeling $134,720 32% 22 Biosolids Master Plan BMS & WRRFs Jacobs Workshops $254,108 21% 23 Lake Fayetteville Spillway Study - Phase 1 Ward 3 FTN Modeling $63,466 51% 24 Automated Metering Infrastructure - Task 1 City Wide Jacobs Background & Kick Off $116,450 0% 25 Wastewater Collection System Master Plan Update City Wide RJN Flow Metering j $408,543 0% Note: % Complete for 'Under Construction' and 'Engineering Studies' represents actual invoice payments. However, for 'Engineering Design' the % Complete represents the phase of document completeness. WEST SIDE .yiir.ira r■t►rr�.m euia�rr FAYETTEVILLE PROJECT- JACOBS JACOBS MONTHLY REPORT -JANUARY 2020 BS Fayetteville January Client Report City of Fayetteville JACOBS MONTHLY REPORT -JANUARY 2020 Jacobs Monthly Report —January 2020 PREPARED FOR: Tim Nyander COPY TO: City: Susan Norton / Lynn Hyke / Cheryl Partain / Marsha Hertweck / Pam Henson / Cory Granderson / Peter Nierengarten / Water & Sewer Committee Jacobs: Steve Carpenter / Matt Benton / Lisa Clancy PREPARED BY: Greg Weeks DATE: February 21, 2020 This monthly report is provided as an accounting of the performance of the Water Resource Recovery Facilities (WRRF) operated by Jacobs. Please review and let me know if you have any questions regarding the operation. We are committed in our pursuit of excellence in every scope of service that we provide and in remaining a leader in our industry. With this focus as our core philosophy, we will provide the service that continues to enrich the environment and community today, while keeping future regulations and technologies in our sights. We will be making this report more narrative around what we are doing for operations and maintenance, but will also include more information on sustainability, energy efficiency, capital programs, and community involvement. We value your feedback regarding format and content with the goal of making this report more responsive to your needs. Thank you again for your business and our trusted relationship. FAYETTEVILLE PROJECT-JACOBS JACOBS MONTHLY REPORT -JANUARY 2020 Table of Contents Jacobs Monthly Report — January 2020............................................................................................. 2 ExecutiveSummary..................................................................................................................4 PlantOperations....................................................................................................................... 4 ProcessControl............................................................................................................ 4 Ozone HyDoz Summary............................................................................................... 5 BiosolidsProcess.......................................................................................................... 5 Compliance................................................................................................................... 5 Successes...................................................................................................................... 6 Issues/Resolutions....................................................................................................... 7 Revenue........................................................................................................................ 7 Maintenance............................................................................................................................. 8 WestSide...................................................................................................................... 8 LiftStations.................................................................................................................. 8 Key Performance Indicators/Measures...................................................................... 9 Capital Improvement Projects (CIP)........................................................................... 9 Laboratory/Industrial Pretreatment...................................................................................... 10 WoolseyWet Prairie................................................................................................................ 12 CommunityOutreach............................................................................................................. 12 Sustainability.......................................................................................................................... 13 Health& Safety / Training..................................................................................................... 14 AppendixA.............................................................................................................................. 15 FAYETTEVILLE PROJECT- JACOBS 3 JACOBS MONTHLY REPORT -JANUARY 2020 Executive Summary January began what is hoped to be less eventful and very productive year. The plants continued to run at high rates but 100% within compliance. The expanded CIP program begun in 2019 continues in 2020 providing much needed improvements and replacement of worn and obsolete equipment to the plant. It was another month of a clean safety performance. This was the first month operating under the renewed contract and we are working through the changes that were included in that extension, including; an upgraded SCADA program, predictive maintenance, moving billing of BMS revenue to the city, and the ability to include engineering projects related to the plants as scope adjustments. Plant Operations The Noland and West Side WRRF's effluent discharges were 100% in compliance with the National Pollutant Discharge Elimination System (NPDES) permit. Details of effluent quality and influent loadings are shown in Appendix A. The West Side WRRF continues to run at high efficiency, treating over designed flow for the month of January. Process Control Biological unit 2 at the West Side facility was placed online for routine equipment rotation and maintenance of biological unit 4. This was accomplished by transferring 2.9 million gallons of process inventory from bio unit 4 into bio unit 2. Unlike the Noland WRRF, which is designed to transfer the treatment basins, the West Side WRRF normally requires two portable 74 -hp diesel pumps and 100 feet of 6 -inch transfer hoses and piping to accomplish this task. The operations supervisor recognized an opportunity to eliminate the need for portable pumps and piping by utilizing the facility's two 50 -hp EQ basin return pumps and a few valve adjustments to move the bio mass back through the drain piping of the unit receiving the transfer. This provided a much safer transfer with reduced labor hours and eliminated the need for the costly rental pumps and the potential for unpermitted discharges from the temporary piping. An estimated savings of $7,000 for equipment rental and diesel fuel consumption was recognized and, with two basin transfers per year identified by the asset management plan, this could result in $15,000 saved in Labor and resource costs. FAYETTEVILLE PROJECT- JACOBS JACOBS MONTHLY REPORT -JANUARY 2020 Ozone HyDoz Summary As preparation for the upcoming April permit change to a more stringent fecal coliform limit, 56,000 pounds of sand was added to the filter cells at the Noland facility. The ozone disinfection system relies heavily on the quality and clarity of the filter cell filtrate water to disinfect at the Level. required for the more stringent spring and summer permit limits. The addition of new sand will increase the efficiency of the filters by removing excess solids and prevent a demand on the ozone, which would hamper the removal of fecal coliform. Biosolids Process During the month of January, the WRRF's produced 2,076 wet tons of biosolids with approximately 167 wet tons of biosolids sent into the solar houses prior to the thermal dryer and 1,865 wet tons processed directly through the thermal dryer. Two loads of solar house biosolids totaling 34 tons and two West Side belt filter press loads totaling 44 tons were transferred to area landfills for disposal at a cost of $3,371 due to capacity issues related to the current solar house damage. The biosolids drying operation saved an estimated $50,954 in disposal costs this month, compared to landfill disposal. One 25 -ton load of City vactor truck spoils from Noland was transported to area landfills at a cost of $1,065. The semiannual fertilizer tonnage report to the Oklahoma Agriculture, Food, and Forestry Division was completed in January. Compliance During the month of January, the Arkansas Department of Environmental Quality performed a Compliance Evaluation Inspection (CEI) for the Noland and West Side facilities. These biennial non -sampling inspections are designed to verify permittee compliance with applicable permit self-monitoring requirements, effluent limits, and compliance schedules. Inspectors review records, make visual observations, and evaluate treatment facilities, laboratories, effluent FAYETTEVILLE PROJECT-JACOBS JACOBS MONTHLY REPORT -JANUARY 2020 outfalls, and receiving waters. During the CEI, the inspector must examine both chemical and biological self-monitoring. The final report will be completed upon data review by the inspector. No deficiencies were noted at the time of inspection. Successes Cleaning the tri -pack media from the scrubber condenser and velocity stack is a time consuming and labor-intensive task. BMS staff accepted the challenge to develop a process that will reduce the labor required. Two empty 275 -gallon IBC totes were modified by cutting the plastic top out of one and the top rail support section out of the second. The rail support section was placed on the first tote and wrapped with wire mesh. To clean the media, the rail support section is removed, tri -pack media is put in the tote, and the rail support section is re -attached. W3 water is used to fill the tote through the drain valve, allowing the tri -pack media to float and move around from the W3 water current. This action allows the material on the media to come loose and flow over the top of the wire mesh section or out of the drain. The cleaning device requires no further labor time and can be left unattended until the media is clean. This process has O i t ri r .Y {% New tri -pack media installed in the Noland scrubber condenser unit FAYETTEVILLE PROJECT-JACOBS 6 JACOBS MONTHLY REPORT—JANUARY 2020 Issues/Resolutions January precipitation totaled 6.46 inches over 11 events causing soil saturation. Standing water throughout the BMS site restricted the application of Water Treatment Residuals (WTR). Revenue Table 1: Revenue Generated from the BMS it Revenue Generated from the BMS $50,000 $45,000 $40,000 $35,000 $30,000 $25,000 $20,000 $15,000 $10,000 $5,000 411 F P Lie�w �o Qe Monthly —0— Cumulative Year to Date Figure 1: Revenue Generated from the BMS via Hay, Fertilizer, and WTR FAYETTEVILLE PROJECT- JACOBS 7 Tons Sold/Received Revenue Hay 39 $2,483 Fertilizer 277 $5,534 Water Treatment Residuals 0 $0 Revenue Generated from the BMS $50,000 $45,000 $40,000 $35,000 $30,000 $25,000 $20,000 $15,000 $10,000 $5,000 411 F P Lie�w �o Qe Monthly —0— Cumulative Year to Date Figure 1: Revenue Generated from the BMS via Hay, Fertilizer, and WTR FAYETTEVILLE PROJECT- JACOBS 7 JACOBS MONTHLY REPORT -JANUARY 2020 Maintenance In the month of January staff continued efforts on capital projects as well as preparing for upcoming capital projects. Staff also completed unscheduled repairs to prevent imminent failure on critical equipment with developing deficiencies. West Side Mechanical inspections began on belt filter press #2 to inspect bearing, tracking, tension, and drive rollers. The rollers are sent to the manufacturer to be machined to specifications and x-rayed for cracks that might require a recoating process. The belt presses are designed to separate water from the biosolids removed from the biological process. Noland A The suction and discharge valves were replaced for secondary clarifier scum pumps 1 and 2. Scum pumps remove skimmed material from the 90 -foot diameter clarifiers back to the head of the plant for further processing. CIP repairs were completed on the gearboxes for anoxic mixers 8 and 11. The units were reinstalled and are operating as designed. The mixing blades turned by the gear boxes are showing signs of wear and will be replaced with rebuilt blades in February. The 32 -year-old safety railing throughout the plant is showing signs of wear and separation. Replacement parts have been ordered to repair sections that have failed. An overall condition assessment and replacement strategy is being formulated. Lift Stations Clog -proof impellers were installed on pumps 2 and 3 at lift station 19, Mally Wagnon. The station experiences constant pump clogging issues that require the pumps to be pulled and cleaned to pump efficiently. A new style of impeller was introduced that is expected to reduce or eliminate the clogging issues. The vendor gave the City of Fayetteville one impeller to place on one of the three pumps to evaluate the impeller effectiveness. Several months of testing revealed that the pump with the new impeller was able to pass material that clogged the other two pumps. The savings in labor should pay for the impellers in just over two years. The safety improvement was impactful, as well, by not requiring maintenance to work with a crane over a 40 -foot -deep wet well during inclement weather, when many clogs occur. A concrete slab was constructed at lift station 10, Futrall Drive to accommodate a larger emergency back-up generator that replaced an undersized generator. Once installed the new generator will supply enough power to operate both pumps at the station. FAYETTEVILLE PROJECT-JACOBS JACOBS MONTHLY REPORT -JANUARY 2020 Key Performance Indicators/Measures Figure 2: Total number of work orders completed in January - 1897 Figure 3: Total labor hours worked per work order type. In the month of January more time was spent performing reactive tasks, which are accounted for in three different types: Corrective Maintenance Emergency, Corrective Maintenance Non -Emergency and Corrective Maintenance from PM/PdM. All other WO types are proactive. FAYETTEVILLE PROJECT- JACOBS JACOBS MONTHLY REPORT -JANUARY 2020 Capital Improvement Projects (CIP) Plants, Pumps, and Equipment 1. The CIP report was updated with five carry-over projects from 2019 a. West Side UV touchscreen replacement is scheduled for completion in February b. The remaining carry-over projects are awaiting vendor response 2. 10 CIP projects have been added for 2020 a. Three projects represent January break-ins. Break-ins denote equipment failures that were not planned for CIP budgeting. Lift Station Improvements 1. The CIP report was updated with three carry-over projects from 2019 a. Broyles lift station pump rebuild was completed with the rebuilt pump to be delivered to the West Side facility b. Two carry-over projects are scheduled for completion in February Two VFD upgrades at lift station 7, Hamestring Building Improvements 1. Two carry-over projects from 2019 a. Noland bulk chemical tank replacement i. Bid opening February 18`" b. Secondary containment repairs 2. A total of four 2020 CIP projects were added with their associated costs Laboratory/Industrial Pretreatment At the request of the City of Fayetteville Water & Sewer Department, samples were collected and analyzed during two different sampling events. On January 6`", a series of four samples were collected from a site located on Dead Horse Mountain Road. These samples were analyzed for fecal coliform bacteria and chemical oxygen demand to help determine if a source of sewage contamination exists. Data results are as follows: FAYETTEVILLE PROJECT- JACOBS 10 FECAL COLIFORM (MPN/100ML) CHEMICAL OXYGEN DEMAND (MG/L) BACKWATER 1 greater than 12,098 76 BACKWATER 2 67.5 63 BACKWATER INLET 15.5 45 POND 1 less than 5 46 FAYETTEVILLE PROJECT- JACOBS 10 JACOBS MONTHLY REPORT -JANUARY 2020 On January 7`", one sample was collected from a residential site located at 735 North Austin Drive in Fayetteville. The sample was analyzed for fecal coliform bacteria and chemical oxygen demand to help determine if a source of sewage contamination exists. As a result of the whole effluent toxicity C. dubia (water flea) sub -lethal failure in October, additional samples were collected for the required retesting. The samples were sent to the Ecotoxicology Research Facility at Arkansas State University for analysis and passed. Quarterly samples of Noland and West Side effluent and influent were collected for the analysis of 14 metals, low level mercury, cyanide and total phenolics, as required by 40 CFR 122 Appendix D Table III. Data results were normal and exhibit no unusual trends. The results are reported annually to ADEQ by the Industrial Pretreatment department. Arsenic results are reported quarterly to ADEQ as required by the newest Noland permit. Biosolids Management Site (BMS) staff collected soil samples from areas 1, 2, 3, and 15. Samples were tested for the following analyses: pH, electrical conductivity, cation -exchange capacity, total solids, sodium absorption ratio (SAR), nitrate nitrogen, and metals. The SAR data is a measure of the ability of the soil to allow proper water drainage and root growth. An SAR below 13 indicates a well aerated soil. Data results exhibit no unusual trends. The lab is investigating the CBOD test to determine the source of recent quality control failures. Procedures are being reviewed to evaluate the bottle cleaning method, chemical quality, and equipment performance. Samples are being sent to a commercial lab until a resolution is found. Industrial waste discharge permit number FAY12 was transferred from Pinnacle Foods Corporation to ConAgra Foods Packaged Foods, LLC (Conagra) effective January 1, 2020. All permit requirements and conditions remained the same as the previous permit. An annual compliance inspection was conducted at Superior Industries to determine compliance status with the industrial waste discharge permit, City of Fayetteville Code, and 40 CFR Parts 403 and 433. No findings were discovered. Annual compliance sampling for metals and cyanide was also performed at Superior. Results were within permit limits. ADEQ and federal regulations require the city of Fayetteville to conduct a wastewater survey of the users within service areas every three years. The reason for this survey is to determine if users' wastewater could have a significant impact on the wastewater collection and treatment system and its processes, as well as to confirm compliance with the Industrial Pretreatment Program and the Discharge and Pretreatment Regulations in the Fayetteville code. Surveys were mailed at the end of January and are due back to the IPP coordinator by the end of February. Monthly surcharge and waste hauler reports were completed and sent to the City for billing. For revenue generated from the IPP, see Table 2. FAYETTEVILLE PROJECT-JACOBS 11 FECAL COLIFORM (MPN/100ML) CHEMICAL OXYGEN DEMAND (MG/L) 735 N. AUSTIN DR. CURB 535.5 77 As a result of the whole effluent toxicity C. dubia (water flea) sub -lethal failure in October, additional samples were collected for the required retesting. The samples were sent to the Ecotoxicology Research Facility at Arkansas State University for analysis and passed. Quarterly samples of Noland and West Side effluent and influent were collected for the analysis of 14 metals, low level mercury, cyanide and total phenolics, as required by 40 CFR 122 Appendix D Table III. Data results were normal and exhibit no unusual trends. The results are reported annually to ADEQ by the Industrial Pretreatment department. Arsenic results are reported quarterly to ADEQ as required by the newest Noland permit. Biosolids Management Site (BMS) staff collected soil samples from areas 1, 2, 3, and 15. Samples were tested for the following analyses: pH, electrical conductivity, cation -exchange capacity, total solids, sodium absorption ratio (SAR), nitrate nitrogen, and metals. The SAR data is a measure of the ability of the soil to allow proper water drainage and root growth. An SAR below 13 indicates a well aerated soil. Data results exhibit no unusual trends. The lab is investigating the CBOD test to determine the source of recent quality control failures. Procedures are being reviewed to evaluate the bottle cleaning method, chemical quality, and equipment performance. Samples are being sent to a commercial lab until a resolution is found. Industrial waste discharge permit number FAY12 was transferred from Pinnacle Foods Corporation to ConAgra Foods Packaged Foods, LLC (Conagra) effective January 1, 2020. All permit requirements and conditions remained the same as the previous permit. An annual compliance inspection was conducted at Superior Industries to determine compliance status with the industrial waste discharge permit, City of Fayetteville Code, and 40 CFR Parts 403 and 433. No findings were discovered. Annual compliance sampling for metals and cyanide was also performed at Superior. Results were within permit limits. ADEQ and federal regulations require the city of Fayetteville to conduct a wastewater survey of the users within service areas every three years. The reason for this survey is to determine if users' wastewater could have a significant impact on the wastewater collection and treatment system and its processes, as well as to confirm compliance with the Industrial Pretreatment Program and the Discharge and Pretreatment Regulations in the Fayetteville code. Surveys were mailed at the end of January and are due back to the IPP coordinator by the end of February. Monthly surcharge and waste hauler reports were completed and sent to the City for billing. For revenue generated from the IPP, see Table 2. FAYETTEVILLE PROJECT-JACOBS 11 JACOBS MONTHLY REPORT—JANUARY 2020 Table 2: Revenue Generated from the IPP Revenue $84,076.04 ISurcharges on December data $1,650.00 IFees from hauled waste accepted in January $0.00 Other fees paid in January $0.00 IFines assessed in January Zero violations for all industrial users (Violations on December data Revenue Generated Industrial Pretreatment Program $100,000 $so,oa0 560,000 $40,000 524,444 OMorrthfy5urcharge Fees p us Hauled Waste Fees ---�>—Cumulatne Fees Figure 4: Revenue Total from surcharges, fees, and Woolsey Wet Prairie A final inspection was completed by Ozark Ecological Restoration (OER) in preparation of the prescribed burn. Safety precautions, such as the bare -soil fire break and mown fire buffers, all received favorable feedback from the burn contractor. Unfortunately, steady rain showers did not leave a favorable weather window to execute this year's prescribed burn in January. Nearly 6.5 inches of January rainfall marks 2020 as the second highest monthly accumulation for this month since record tracking began in 1950. On only four other occasions, over a 70 - year period, has January experienced 6 -plus inches of accumulated rainfall. To help facilitate favorable prescribed burn site conditions, all stop -log boards have been pulled from the water control structures to minimize volumes of stored water throughout the wetland cells. OER and Jacobs will watch February forecasts closely for favorable burn conditions. Community Outreach The Ozarks Go contractors that have utilized the Mitchel Barn area of the BMS as a staging area finished their clean up and left the site in January. Washington County Search and Rescue K9 unit utilized BMS for training once during January. BMS staff received a request for information from the property manager of the Pea Ridge National Park concerning how the City of Fayetteville hay is priced to customers. The Parks property manager also sells hay from the Park site and received our contact information from a Benton County Extension Agent. We discussed the use of the lab test for Relative Forage Quality as a simplistic method to price hay based on nutritive quality. Websites for research and references, labs that perform the RFQ analysis, and general practices were discussed. The FAYETTEVILLE PROJECT-JACOBS 12 JACOBS MONTHLY REPORT -JANUARY 2020 property manager was grateful for the information and time spent to share this unique method of hay commodity pricing. Jacobs team members collected 17 bags of trash from Broyles Road and Old Wire Road. Roadside beautification on a crisp winter morning Sustainability BMS staff routinely search for waste reduction opportunities. A new solar house material handling device was designed from a reused tire. Historically, a 100 -inch materials bucket is used to push the biosolids up to the front of the solar house before loading into the dryer. This OF Val slow .• 1 t � Improved solar house material handling by using a re -purposed tire FAYETTEVILLE PROJECT- JACOBS 13 JACOBS MONTHLY REPORT -JANUARY 2020 process requires ten to fifteen passes down the 200 -foot length of the house to move all the material. The tire scraper can move the same amount of material in four to six passes. This is a 60% improvement in labor, fuel consumption, and emissions reduction. Additional benefits include; reduced wear on the bucket cutting edge and solar house floors and walls, and the reuse/re-purposing of the large heavy equipment tire. Health & Safety / Training With more than 260 safety training events held throughout 2019, Jacobs is committed to providing relevant and practical safety training to its employees. The team will place emphasis on training, inspections, and hazard elimination going forward into 2020. This process starts with Looking for existing hazards and developing a hierarchy of control matrix with low, moderate, and elevated hazard identification. The matrix outlines the essential safety controls for hazards. The primary level of protection in PPE (personal protective equipment) is to provide a physical shield from the hazard, but the importance of other controls is also highlighted in the matrix. Administrative actions include staff rotation, frequent breaks, and observation of co-workers. The final and preferred approach is to engineer a solution that eliminates a hazard. This step follows closely within the Jacobs brand to aim higher, challenge the accepted, and utilize the resourceful ingenuity of our employees. Lab and IPP attended the Jacobs environmental scorecard training webinar. Brenda Nunnally, with Jacobs Compliance & Reporting, provided onsite IPP training, specifically related to the sewer use ordinance and industrial permits FAYETTEVILLE PROJECT-JACOBS 14 JACOBS MONTHLY REPORT -JANUARY 2020 Appendix A Table 3: White River Effluent Characteristics Table 4: White River Effluent Characteristics— Minerals 20,940 119 12,505 76 3,809 1 1 ,m9m 1 ,mqm 1 3,809 FAYETTEVILLE PROJECT-JACOBS 15 JACOBS MONTHLY REPORT -JANUARY 2020 Table 5: Goose Creek Effluent Characteristics 167.9 1.0 84 10.7 7.1 7.5 10.8 2.0 167.9 1.0 84 0.1 5.9 0.2 17.4 10.7 7.1 7.5 FAYETTEVILLE PROJECT- JACOBS 16 Noland Monthly Hydraulic BOD Organic TSS —110� PO4 PO4 NH3 NH3 WRRF Average Loadings Loading Loading Loading Loading Loading Loading Loading Loading Percent Flow Percent Obs/d) Percent Obs/d) Percent Obs/d) Percent (lbs/d) Percent (MGD) of Design Design of of of of Design Design Design Design Designed Ir 1111 � 1�1111111 1 (Annual a January February March April May June July August September October November December Average West Side WRRF Monthly Hydraulic BOD Organic TSS W� TSS-M=rPO4 PO4 NH3 NH3 Average Loadings Loading Loading Loading Loading Loading Loading Loading Loading Flow Percent (lbs/d) Percent (lbs/d) Percent (lbs/d) Percent (lbs/d) Percent (MGD) of Design of of of of Design Design Design Design Designed (Annual Avg.) January February March April May June July August September October November December Average JACOBS MONTHLY REPORT—JANUARY 2020 Table 8: Monthly Energy Usage and Expenditure NOTE: January costs are not accurately reflecting the impact of the solar project. Efforts to interpret the total costs are underway. Data for 2020 Noland gas use (CCF) and cost is not available due to metering issues. FAYETTEVILLE PROJECT-JACOBS 18 Million Cost per 2019 kWh Electric Cost CCF Gas Cost Gallons Total Cost Million Gallons Noland 885,764 $50,476.23 42,890 $26,391.14 247 $76,867.37 West Side 651.180 $40,103.97 5,525 $4,371.52 345 $44,475.49 Hamstring 266,400 $17,715.42 - $- - $17,715.42 Totals 1,803,344 $108,295.62 48,415 $30,762.66 592 $139,058.28 $234.84 FAYETTEVILLE PROJECT-JACOBS 18 Million Cost per 2020 kWh Electric Cost CCF Gas Cost Gallons Total Cost Million Gallons Noland 652,800 $28,478.16 (42,890) 217 $28,478.16 West Side 424,800 $31,019.67 5,262 $4,609.99 336 $35,629.66 Hamstring 239,400 $18,900.45 - $- - $18,900.45 Totals 1,317,000 $78,398.28 5,262 $4,609.99 553 $83,008.27 $150.11 FAYETTEVILLE PROJECT-JACOBS 18 Million Cost per Variance kWh Electric Cost CCF Gas Cost Gallons Total Cost Million Gallons Noland (232,964) $(21,998.07) (42,890) (30) $(48,389.21) West Side (226,380) $(9,084.30) (263) $238.47 (9) $(8,845.83) Hamstring (27,000) $1,185.03 - $- - $1,185.03 Totals (486,344) $(29,897.34) -43153 -39 $(56,050.01) $1,431.67 FAYETTEVILLE PROJECT-JACOBS 18 JACOBS MONTHLY REPORT -JANUARY 2020 Table 9: Labor Status Admin Job Employee FAY % Department Title Name FTE Admin Area Manager Greg Weeks 95% Admin Assistant Project Manager Matt Benton 60% Admin - SCADA SCADA Supervisor Mayo Miller 100% Admin - Operations Operations Manager Tim Luther 100% Admin - Operations Operations Supervisor VACANT 80% Admin Environmental Specialist Jeff Hickle 100% Admin Health, Safety, Compliance Professional Wes Cloud 70% BMS Operator Brandi Miller- 100% Admin Project Coordinator Ben Shondelmyer 70% BMS Operator In Training DeWeese 100% Admin Administrative Assistant Christy Taylor 100% Admin Administrative Assistant Kassandra Foster 100% BMS Lead Operator Jerry Genz 100% BMS Lead Operator John Tenberge 100% BMS Equipment Operator Johnnie Deason 100% BMS Equipment Operator Anthony DeJesus 100% BMS Equipment Operator Rick Witherspoon 100% BMS Equipment Operator Chris Howard 100% BMS Operator I David Dajani 100% BMS Operator Peter Burrow 100% BMS Operator In Training Ben Shondelmyer 100% BMS Operator In Training Todd Bachman 100% BMS Operator In Training Rony Ralpho 100% BMS Operator In Training Mike Reed 100% LAB Admin-Lab/IPP Supervisor Thom Vinson 80% LAB Industrial Pretreatment Coordinator Ashley Gregg 100% LAB Lead Laboratory Analyst Nicholas King 100% LAB Laboratory Analyst II Donna McChristian 100% LAB Laboratory Analyst Madeline Graham 100% Maint Maintenance Supervisor Joshua Apeman 100% Maint Lead Mechanic Brian Daniels 80% Maint Lead Electrician Tim Marr 100% Maint Mechanic Kevin Inkster 100% Maint Mechanic Buddy Carter 100% Maint Mechanic Steve Cook 100% Maint Mechanic Michael Spohn 100% Maint Mechanic Philip Beach 100% Maint Mechanic In Training David Abbott 100% Operations Operations Supervisor Austin Ramsfield 100% Operations Lead Operator Vacant 100% Operations Operator Anthony Ramsfield 100% Operations Operator Shawn Santellanes 100% Operations Operator Travis Patton 100% Operations Operator In Training Tom Meunier 100% Operations Operator Justin Sweeney 100% FAYETTEVILLE PROJECT-JACOBS 19 JACOBS MONTHLY REPORT -JANUARY 2020 Operations Operator In Training Grace Germon 100% Operations Operator In Training Rick Dollarhide 100% Operations Operator In Training Kasey Lybrant 100% SCADA Instrument & Control Tech Pat Cooley 92% SCADA Instrument & Control Tech Vacant 100% 47.0 Filled Positions = 45.0 Filled FTE's= 43.3 TEMPS BMS Engineering Intern, U of A Olivea Groeber 100.00% Admin Engineering Intern, U of A Summer Wilkie 100.00% Maint Engineering Intern, U of A VACANT 100.00% SPECIAL PROJECTS (Performed in scope) FAYETTEVILLE PROJECT- JACOBS 20