Loading...
HomeMy WebLinkAbout266-19 RESOLUTIONF pAYE7, IV- A NS PS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 266-19 File Number: 2019-0784 OLSSON, INC.: A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH OLSSON, INC. IN THE AMOUNT OF $123,670.00 FOR ENGINEERING SERVICES RELATED TO THE EAST FAYETTEVILLE WATER SYSTEM AND TOWNSHIP PRESSURE PLANE IMPROVEMENTS PROJECT WHEREAS, on January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. to begin design work on the East Fayetteville Water System and Township Pressure Plane Improvements Project; and WHEREAS, on August 13, 2018, the Mayor signed Amendment No. 1 utilizing project contingency funds to increase the scope of work to include additional waterline replacement work identified during the initial design and planning efforts; and WHEREAS, Amendment No. 2 will adjust the project financials to account for the unexpected additional labor caused by several unexpected permitting and coordination delay and will ensure proper funding to move the designs into the bidding phase. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to the Professional Engineering Services Agreement with Olsson, Inc. in the amount of $123,670.00 for engineering services related to the East Fayetteville Water System and Township Pressure Plane Improvements Project. Page 1 Printed on 1215119 File Number 2019-0784 Resolution 266-19 PASSED and APPROVED on 12/3/2019 Attest: e� AIM1rtii1o� ♦♦♦J `G,ER K e0��•' GITy ''. __'Js � ' A yE •� �_ �EV14 . ~' . Kara Paxton, City Clerk Treasurer --P. /1O1111111 0, ♦♦ Page 2 Printed on 1215119 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 -�' Text File File Number: 2019-0784 Agenda Date: 12/3/2019 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A. 8 OLSSON, INC.: A RESOLUTION TO APPROVE AMENDMENT NO. 2 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH OLSSON, INC. IN THE AMOUNT OF $123,670.00 FOR ENGINEERING SERVICES RELATED TO THE EAST FAYETTEVILLE WATER SYSTEM AND TOWNSHIP PRESSURE PLANE IMPROVEMENTS PROJECT WHEREAS, on January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. to begin design work on the East Fayetteville Water System and Township Pressure Plane Improvements Project; and WHEREAS, on August 13, 2018, the Mayor signed Amendment No. 1 utilizing project contingency funds to increase the scope of work to include additional waterline replacement work identified during the initial design and planning efforts; and WHEREAS, Amendment No. 2 will adjust the project financials to account for the unexpected additional labor caused by several unexpected permitting and coordination delays and will ensure proper funding to move the designs into the bidding phase. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment No. 2 to the Professional Engineering Services Agreement with Olsson, Inc. in the amount of $123,670.00 for engineering services related to the East Fayetteville Water System and Township Pressure Plane Improvements Project. 01 City of Fayetteville, Arkansas Page 1 Printed on 12/4/2019 Tim Nyander Submitted By City of Fayetteville Staff Review Form City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 11/13/2019 WATER SEWER (720) Submitted Date Division / Department Action Recommendation: Staff recommends approval of Amendment No. 2 to the agreement between the City of Fayetteville and Olsson, Inc. in the amount of $123,670.00 for engineering services related to the East Fayetteville Water System and Township Pressure Plane Improvements Project. Budget Impact: 5400.720.5600-5314.00 Water and Sewer Account Number 12009.1801 Project Number Fund Water System Rehabilitation/Replacement Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Remaining Budget Project Title $ .9,028,784.00 $ 3,117,681.30 $ 123,670.00 V20180321 Purchase Order Number: 2018-319 Previous Ordinance or Resolution # Change Order Number: 2 Approval Date: Original Contract Number: 2018-6 Comments: CITY OF FAYETTEVILLE ARKANSAS MEETING OF DECEMBER 3, 2019 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Tim Nyander, Utilities Director FROM: Corey Granderson, Utilities Engineer DATE: November 13, 2019 CITY COUNCIL MENTO SUBJECT: Approval of Amendment No. 2 to the Agreement Between the City of Fayetteville and Olsson, Inc. for Engineering Services Related to the East Fayetteville Water System and Township Pressure Plane Improvements Project RECOMMENDATION: Staff recommends approval of Amendment No. 2 to the agreement between the City of Fayetteville and Olsson, Inc. in the amount of $123,670.00 for engineering services related to the East Fayetteville Water System and Township Pressure Plane Improvements Project. BACKGROUND: On January 2, 2018, the City Council passed Resolution 19-18 to approve a professional engineering services agreement with Olsson, Inc. to begin design work on this project. On August 13, 2018, the city utilized $57,326.00 of contingency funds to approve Amendment No. 1, increasing the project scope to include additional waterline replacement work identified during initial design and planning efforts. This project is intended to bid as four separate contract sections. DISCUSSION: Throughout the design phase, several unexpected permitting and coordination delays have occurred which necessitate Amendment No. 2. These include, by bid contract: • Contract Sect. 1: Additional re -design iterations of the pressure sustaining valves' rehabilitation and travel to Little Rock based on Arkansas Department of Health comments and questions. • Contract Sect. 2: Additional design effort to retrofit overflow appurtenances on existing Gulley Road water tank, based on Arkansas Department of Health comments. Soil Boring tests at tank site. • Contract Sect. 3: 18 -inch Waterline alignment re -designs and meetings based on Washington Co. Road Dept. comments on Gulley Road. Archeological Survey. • Township Contract: Re -design iterations of water tank site and access designs due to property acquisition negotiations. Mailing Address: 113 W. Mountain Street www.fayetteville-argov. Fayetteville, AR 72701 Amendment No. 2 will adjust the project financials to account for this unexpected additional labor and will ensure proper funding to move these designs into the bidding -phase. This amendment will also provide,funding for easement acquisition services on Contract Section 3, which requires easements from 68 individual land tracts. Due to the number of these easements, staff recommends Olsson participate in property owner contact, offer letters, meetings, and negotiations as project delays would occur if this work was performed solely by city staff. The total costs for proposed Amendment No. 2 are based on Olsson's fee schedule and level of effort per task, not to exceed $123,670.00. This will raise the overall engineering project fees from $630,635.00 to $754,305.00. Current engineering estimates for the construction of these projects is as follows, by contract: • Contract Sect. 1 $550,000 • Contract Sect. 2 $2,812,500 • Contract Sect. 3 $5,000,000 • Township Contract $3,194,712 TOTAL $11,557,212 BUDGET/STAFF IMPACT: Funds for this amendment are budgeted and available from the Water System Rehabilitation/ Replacement account. The total costs for proposed Amendment No. 2 are not to exceed $123,670.00. Attachments: Engineering Services Agreement Amendment No. 2 Fee Schedule/Matrix AMENDMENT NO. 2 To AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And OLSSON, INC. (formerly McGOODWIN, WILLIAMS, AND YATES, a DIVISION OF OLSSON ASSOCIATES) EAST FAYETTEVILLE AND TOWNSHIP PRESSURE PLANE IMPROVEMENTS WHEREAS, on January 2, 2018, the City of Fayetteville, Arkansas (CITY OF FAYETTEVILLE) and Olsson (formerly McGoodwin, Williams and Yates, a Division of Olsson Associates) of Fayetteville, Arkansas (ENGINEER) entered into an Agreement for engineering services in connection with the East Fayetteville and Township Pressure Plane Improvements (the "Project"); and WHEREAS, on August 13, 2018, the CITY OF FAYETTEVILLE and the ENGINEER agreed to Amendment No. l that included the ENGINEER providing services in connection with the evaluation, design and/or construction administration for a 12 -inch waterline along Highway 45; and WHEREAS, the CITY OF FAYETTEVILLE now wishes to increase the scope of work to include additional services for the East Fayetteville and Township Pressure Plane Improvements. The work includes meetings with Washington County Road Dept., Arkansas Department of Health, property owners, East Fayetteville Contract Section I redesign, geo-technical borings for the new Gulley Rd. and Township tanks, easement acquisition services, and miscellaneous analyses and infrastructure designs; and WHEREAS, the current Agreement must now be amended to provide the additional scope and amount of compensation to the ENGINEER for the additional work; and NOW THEREFORE, in consideration of the mutual covenants and Agreements herein contained, CITY OF FAYETTEVILLE and the ENGINEER, the parties hereto, stipulate and agree that the Agreement for Engineering Services dated January 2, 2018, and amended on August 13, 2018, is hereby amended in the following particulars: SECTION 5 — PAYMENTS TO ENGINEER Delete Paragraph 5.1 of Amendment No. l and replace with the following: 5.1 The maximum not -to -exceed amount authorized for this Agreement is $754,305.00. The CITY OF FAYETTEVILLE shall compensate ENGINEER based on a Unit Price or Lump Sum basis as described in Appendix A. APPENDIX A — SCOPE OF SERVICES Add the following Paragraph A.2.3: A.2.3 Easement Services Olsson shall provide a suitable staff to acquire easements for the East Fayetteville Improvements Contract Section III project. Work includes coordination with appraisal firm(s), 018-0031 & 018-0032 Amendment No.2 Page 1 drafting and sending letters, and an initial and follow-up meeting with property owners. The staff shall consist of engineers, engineering technicians, and other assistants as may be necessary to carry on the work in an efficient and expeditious manner. A.4 Compensation Delete Paragraph A.4.1 of Amendment No.I and replace with the following: A.4.1 E. Fayetteville Improvements (Olsson Project No. 018-0031): 1. The maximum not -to -exceed amount for services described in Section A.2.1 Detailed Design and Preparation of Construction Plans and Specifications and Section A.2.2 Bidding and Preconstruction Services and Easement Acquisition Services is $558,703.00. A.4.2 Township Pressure Plane Improvements (Olsson Project No. 018-0032): 1. The maximum not -to -exceed amount for services described in Section A.2.1 Detailed Design and Preparation of Construction Plans and Specifications and Section A.2.2 Bidding and Preconstruction Services is $195,602.00. For clarification purposes, this Amendment No. 2 increases the maximum not -to -exceed amount project by $123,670.00. A.5 Project Design Schedule Delete Paragraph A.5.2 and replace with the following: A.5.2 E. Fayetteville Contract Section II and III (Olsson Project No. 018-0031): Anticipated overall design timeline to produce biddable construction documents for agency/city review: o January 2018 through November 2019 2. Anticipated overall timeline to perform easement services as described in A:2.3: o December 2018 through April 2019 Delete Paragraph A.5.3 and replace with the following: A.5.3 Township Pressure Plane Improvements (Olsson Project No. 018-0032): 1. Anticipated overall design timeline to produce biddable construction documents for agency/city review: o January 2018 through November 2019 All other provisions of the original Agreement remain in full force and effect. 018-0031 & 018-0032 Amendment No.2 Page 2 IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its Mayor, and ENGINEER, by its authorized officer have caused this Amendment to be duly executed this day of , 2019. CITY OF FAYETTEVILLE, ARKANSAS OLSSON. INC. t%L ir.ai By: City Clad �sstss;,,�� GOER K ``O`J •• CITY •,� Z 01t AG.. Ni ON 41111111000 By: Brad B. Hammond, P.E.; Team Leader By. Tony Stanton,,00w, Water Practice Leader END OF AMENDMENT NO.2 TO FOR PROFESSIONAL ENGINEERING SERVICES 018-0031 & 018-0032 Amendment No.2 Page 3 Date: 30 -Oct -19 Job: 018-0031 East Service Area Improvements TOTALS Phase/ Description of Work Task Total Man -Days Total Labor Fee Total Expense Fee Total Fee 600 EAST SERVICE AREA ADDITIONAL SERVICES - DESIGN PHASE 601 Contract Section I - Ex. System Modifications Meetings & Correspondence w/ADH - $ - $ $ 18 392.75 602 Contract Section 11 - 0.76 -MG Tank Air ap for Existing Gulley Tank and Tank Borings - $ - $ - $ 13 321.51 603 Contract Section III - Pump Station & Waterline Improvements Re -design of New 18 -inch Waterline Meetings w/ Wash. County, - $ $ $ 17 621.00 Archeological Survey, etc. 700 EAST SERVICE AREA EASEMENT SERVICES 701 Contract Section III - Pump Station & Distribution Waterlines Coordination with Appraisal Firms 4.50 $ 4,424.00 $ - $ 4,424.00, Letters to Property Owners 7.25 $ 5,264.00 $ 40.80 $ 5,304.80 Property Owner Meetings (Approx. 68 36.13 $ 35 564.00 $ 204.00 $35,768.00 GRAND TOTAL 47.88 $ 45 252.00 $ 244.80 $ 94 830.00 F:\2018\0001-0500\018-0031\20-Management\Estimates\[19-10-29_0031 Add. Services—Easement Fees.xlsx]WORKSHEEI Date: Job: 30 -Oct -19 018-0032 Township Pressure Plane Improvements TOTALS Phase/ Task Description of Work Total Days Total Total Labor Fee Expense Total Fee 130 TOWNSHIP IMPROVEMENTS ADDITIONAL SERVICES DESIGN PHASE ADH Meeting, Tank Site Negotiations Assistance additional Studies and Anal ses $ $12,310.25 Tank Borin s/Geotech Report 3.00 $ - $ $10,000.00 Coordination/Negotiations with Property Owners New Tank 6.50 $6,512.00 $ 17.40 $ 61529.40 GRAND TOTAL 9.50 $6,512.00 $ 17.40 $28 840.00 F:\2018\0001-0500\018-0032\20-Management\Estimates\[19-10-29_0032 Add Fees.xlsx]WORKSHEET