HomeMy WebLinkAbout222-19 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 222-19
File Number: 2019-0587
MOHAWK RESOURCES LTD:
A RESOLUTION TO APPROVE THE PURCHASE AND INSTALLATION OF A VEHICLE LIFT AND
LIGHTING SYSTEM FOR THE FLEET SHOP FROM MOHAWK RESOURCES LTD IN THE
AMOUNT OF $124,831.23 PLUS ANY APPLICABLE SALES TAXES AND FREIGHT CHARGES,
PURSUANT TO A SOURCEWELL COOPERATIVE PURCHASING CONTRACT, AND TO APPROVE
A PROJECT CONTINGENCY IN THE AMOUNT OF
$12,483.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the purchase and
installation of a flush mount vehicle lift and lighting system for the Fleet Shop from Mohawk Resources
LTD in the amount of $124,831.23 plus any applicable sales taxes and freight charges, pursuant to a
Sourcewell cooperative purchasing contract, and further approves a project contingency in the amount of
$12,483.00.
PASSED and APPROVED on 10/1 /2019
Page 1 Printed on 10/2/19
File Number: 2019-0587
Resolution 222-19
Attest: `'01InnnIIII/ �
�1., � � � �• Fey � � .�
Lisa Branson, Deputy City G.* ,f- '�
9NSAS •.• �`.
Page 2 Printed on IWV19
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
0Text File
File Number: 2019-0587
Agenda Date: 10/1/2019 Version: 1 Status: Passed
In Control: City Council Meeting
Agenda Number: A. 5
MOHAWK RESOURCES LTD:
File Type: Resolution
A RESOLUTION TO APPROVE THE PURCHASE AND INSTALLATION OF A VEHICLE LIFT AND
LIGHTING SYSTEM FOR THE FLEET SHOP FROM MOHAWK RESOURCES LTD IN THE
AMOUNT OF $124,831.23 PLUS ANY APPLICABLE SALES TAXES AND FREIGHT CHARGES,
PURSUANT TO A SOURCEWELL COOPERATIVE PURCHASING CONTRACT, AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $12,483.00
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the purchase and
installation of a flush mount vehicle lift and lighting system for the Fleet Shop from Mohawk Resources LTD in
the amount of $124,831.23 plus any applicable sales taxes and freight charges, pursuant to a Sourcewell
cooperative purchasing contract, and further approves a project contingency in the amount of $12,483.00.
City of Fayetteville, Arkansas Paye 1 Printed on 101212019
Sara Glenn
Submitted By
City of Fayetteville Staff Review Form
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
9/11/2019 Fleet Operations (770)
Submitted Date Division / Department
Action Recommendation:
A resolution to authorize the purchase and installation of a Flush Mount Parallelogram with its accompanying
lighting system for the Fleet Shop for the Sourcewell contract price of $124,831.23, plus a 10% contingency,
through Mohawk Resources LTD of Amsterdam, NY.
Budget Impact:
9700.770.1910-5801.00
Account Number
Project Number
Budgeted Item? Yes Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? No Budget Adjustment
Remaining Budget
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Shop
Fund
Project Title
$ 150,000.00
$ 137,314.35
3
Previous Ordinance or Resolution #
Approval Date:
V20180321
CITY OF
FAYETTEVILLE
V4W ARKANSAS
MEETING OF OCTOBER 1, 2019
TO: Mayor and City Council
THRU: Terry Gulley, Director of Transportation
FROM: Sara Glenn, Fleet Operations Superintendent
DATE: September 11, 2019
SUBJECT: Shop Parallelogram
CITY COUNCIL MEMO
RECOMMENDATION:
A resolution to authorize the purchase and installation of a Flush Mount Parallelogram with its
accompanying lighting system for the Fleet Shop for the Sourcewell contract price of
$124,831.23, plus a 10% contingency, through Mohawk Resources LTD of Amsterdam, NY.
BACKGROUND:
Fleet's currently parallelogram is 20+ years of age, antiquated, excessively large, and lacks the
ability to safely lift all City units properly. In addition, current parallelogram is not flush floor
mounted, causing tripping hazards, and limits the use of one of the shop bays.
DISCUSSION:
The selection of a Parallelogram from Mohawk Resources, LTD was chosen based on:
The best suited equipment for the overall fleet needs; providing a safer work
environment for all who enter the shop.
a. Wider lift runs to safely fully support any sized tires used by the City's units.
b. Allowing the bay containing the lift to be operational even when the lift is not
required, this will increase productivity.
c. Floor flush walk way, eliminating tripping hazards.
This replacement would improve the shops functionality, productivity, and ensure a safer work
environment.
This item was approved by the Equipment Committee September 10, 2019.
BUDGET/STAFF IMPACT:
Sufficient funds have been budgeted for this replacement and installation.
Attachments:
Mohawk Resources, LTD Quote
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
askJ
Vendor: MOHAWK RESOURCES LTD
65 Vrooman Ave, PO Box 110
Amsterdam, NY 12010
Phone: 800-833-2006
Fax: 518-842-1289
Contact: 518-275-9254
Email: pudiIck @�ntohawkQQs.Corp
-- — BILL TO
Winston McGowan
City of Fayetteville Fleet Operations
113 West Mountaian Rd.
Fayetteville, AR 72701
(479)444-3496
QUOTATION
Quote No: RP19-SCOAe
Quote Date: 8/27/2019
Good Through 9/26/2019
SHIP TO
Winston McGowan
City of Fayetteville Fleet Operations
113 West Mountaian Rd,
Fayetteville, AR 72701
(479)444-3496
Shlpptng Method
Shipping Terms
Lead Tire
Payment Terms
Best Way
FDS Destination, Freight Prepaid
12-14 Weeks ACRO*
Net 30
Part Number
Description
Qty
List Prue
Purchase Price
Total
P -000-A-019
Parallelogram 75,0001b x 35'- Flush Mount **ALI CERTIFIED"
1
$ 129,150.00
$ 108,9D4.76
$ 108,904.76
P -800-A-036
Track Lighting 35' (Class I, Div II) ••ALI CERTIFIED—
1
$ 9,400.00
$ 7,926.48
$ 7,926.48
'After Receipt of Completed Order - When a Ilcable, includes s Subtotal
P P Pp signed quote, data
sheets, and receipt of required payment Sales Tax (if applicable)
Freight
NOTES: Installation (optional)
Credit Card Fee •
TOTAL
$ 116,831.23
$
Included
$ 8,000.00
N/A
$ 124,831.23
This quotation is subject to the terms and conditions noted on the following page.
BUYONCE. BUYRIGHT. BUYAMOHAWKI
,•--_._._. _.___._._...__A_._.__.._._•.._. ---.-------------._--------_----
FINANCING OPTIONS i
I I
I• • I
24 Into FINANCE 36 mo 48 Into 60 mo i
! $52,959.60 $3,625.27 $2,810.96 $2,323.77 '
! FIRST YEAR SECTION 179 TAX DEDUCTION•• '
COST AFTER SECTION 179 TAX SAVINGS $ 75,940.30
•-Assumes 35% T.. Rate 1
I I
This example was provided to Mohawk Lifts by GreatAmenco Financial Servlces("Greaukmerlca"), to whom we regularly refer certain customers Interested in financing purchases from us. Actual '
flnandng terms and arrangements ere proposed by GreatAmerice at the time of credit application. Mohawk does not panicipele In the credit application or credit decision process, which Is solely
between our customer and Greeusmerlca. Mohawk does not hove any owrsership interest In Great America and Mohawk does not receive any referral fees or other compensaten from GreatAmedca. Our
referral to GreatAmerlca Is wleiy as a convenience to cur customers Interested In financing purchases from .Mohawk. It Is not a condition of this transaction that the c—u,- , finance Its purchase er
finance with GreetAmerke.
TERMS AND CONDITIONS
This order Is subject to the General Terms and Conditions of Sale and Warranties found at
www.mohawklins.com/terms and www.mohawklft.com/warranty
Delivery and Installation
:A fork truck must be supplied at the offload site to unload the equipment from the freight carriers'trailer and if applicable for the installation.
YThe Customer is responsible for Inspecting all Products at the time of delivery and before signing the delivery receipt, freight bill, or bill of lading. Should the
customer determine at the ume of delivery that env items are damaged or missing the Customer must note the Item, timci or condition on the deiivery
receipt, freight bill, or bill of lading. Mohawk is not responsible for missing or damaged products when the Customer has signed the delivery receipt, freight bill, or
bill of lading in good condition.
Y Quoted installation does not Include electrical hook-up or any concrete work which may be required. Electrical and any concrete work that may be required must
be preformed prior to Installer's appointment date.
);e Quoted Installation does not include any unforeseen circumstances such as plumbing, electrical, in floor heat, rebar, steel structures, drain, or drain slopes in the
existing floor. Installation price Is subject to change if the lift is unable to be installed at the time of scheduled appointment, if the shop condition Is not ready for
Installation (lack of adequate concrete, no electrical service, etc), or any other condition which would require additional return trips by the installer.
➢Price does not include Sales tax (unless applicable), duties, brokerage, or any other fees.
➢Any and all permits, licenses, fees, etc. are the Customers' responsibility
PAYMENT
Payment for your equipment, Including installation, Is due with order or prior to shipping.
Payment can be made by certifled check or wire transfer.
"VISA or MasterCard accepted for orders less than $18,000.00. A 3.25% processing fee will apply.
Acknowledged and Accepted by: 6e I SsLkt pay- e{kaS f ^�
will accept PO in place of signature
Signature: Date:
Name (printed): Title:
Phone: Email:
To place your order, please return a signed copy of the quote to:
MOHAWK RESOURCES LTD.
PO Box 110, Amstel dam, NY 12010
Emall orders@mohawklifts.com or Fax 518-842-1289
THANK YOU FOR YOUR BUSINESS!