Loading...
HomeMy WebLinkAboutORDINANCE 6230113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 6230 File Number: 2019-0471 BUFFINGTON WEIR, LLC: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH BUFFINGTON WEIR, LLC, FOR THE INSTALLATION OF A WATER MAIN ALONG A PORTION OF RUPPLE ROAD, WITH THE ESTIMATED AMOUNT OF $262,153.40 TO BE PAID BY THE CITY OF FAYETTEVILLE, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $39,323.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, Buffington Weir, LLC received Planning Commission approval to develop property located along a portion of Rupple Road; and WHEREAS, an 8 -inch water main would be sufficient to serve the development, but this portion of Rupple Road is shown in the Water Master Plan as a portion of the 12 -inch grid to serve this area of the City; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide an extension of the 12 -inch grid, will provide ample future capacity which the City recognizes will be necessary for the area that is served by this water main, and construction will be less expensive and less disruptive if done by the developer's contractor during the construction of the subdivision and Rupple Road; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system: Page 1 Printed on 9124119 File Number.' 2019-0471 NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Buffington Weir, LLC for the installation of a 12 -inch water main along a portion of Rupple Road with the estimated amount of $262,153.40 to be paid by the City of Fayetteville, and further approves a project contingency in the amount of $39,323.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Ordinance. PASSED and APPROVED on 9/17/2019 Page 2 Attest: 011111 1 �11*1& CIT . ,r yp Sondra E. Smith, City Clerk?; .c' . Treasurer =N v FLj •_ '��C• NSAS N ; o kJ N`,`��. Printed on 9124119 �O, FAVEr, City of Fayetteville, Arkansas 113 West Mountain Street .� Fayetteville,AR 72701 / (479)575-8323 ne � Y / \ i1 Text File ,RKn NS PS File Number: 2019-0471 Agenda Date: 9/17/2019 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: 13 4 BUFFINGTON WEIR,LLC: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH BUFFINGTON WEIR, LLC, FOR THE INSTALLATION OF A WATER MAIN ALONG A PORTION OF RUPPLE ROAD, WITH THE ESTIMATED AMOUNT OF $262,153.40 TO BE PAID BY THE CITY OF FAYETTEVILLE, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $39,323.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, Buffington Weir, LLC received Planning Commission approval to develop property located along a portion of Rupple Road;and WHEREAS, an 8-inch water main would be sufficient to serve the development, but this portion of Rupple Road is shown in the Water Master Plan as a portion of the 12-inch grid to serve this area of the City;and WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide an extension of the 12-inch grid, will provide ample future capacity which the City recognizes will be necessary for the area that is served by this water main, and construction will be less expensive and less disruptive if done by the developer's contractor during the construction of the subdivision and Rupple Road;and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Buffington Weir, LLC for the installation of a 12-inch water main along a portion of Rupple Road with the estimated amount of $262,153.40 to be paid by the City of Fayetteville, and further approves a project contingency in the amount of $39,323.00. City of Fayetteville,Arkansas Page 1 Printed on 9/24/2019 File Number: 2019-0471 Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Ordinance. City of Fayetteville,Arkansas Page 2 Printed on 9/24/2019 191 OFFICE OF THE CITY ATTORNEY DEPARTMENTAL CORRESPONDENCE Kit Williams City Attorney Blake Pennington Assistant Ci TO: City Clerk Sondra Smith ty Attorney FROM: Blake Pennington, Assistant City Attorney DATE: September 24, 2019 Jodi Batker Paralegal RE: Scriveners Error in Bid Waiver Ordinance for Buffington Homes Cost Share Agreement This item generated a lot of confusion because of the changing contract amounts from one meeting to the next and because I provided only a partially updated version of the bid waiver ordinance to the City Council. The ordinance should reflect the amounts that are in the signed contract, which are the not -to -exceed amount of $262,153.40 plus a project contingency in the amount of $39,323.00. Because the contract that was attached to the packet was correct and because the ordinance refers specifically to the contract and authorizes Mayor Jordan to sign, we should correct the language in the bid waiver ordinance to reflect the correct amounts above. Tim Nyander Submitted By City of Fayetteville Staff Review Form 2019-0471 Legistar File ID 9/3/2019 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/8/2019 Submitted Date Action Recommendation: WATER SEWER (720) Division / Department Staff recommends the approval of a Cost Share Agreement with Buffington Weir, LLC in the amount of $206,070.00 for the installation of a 12" water main along Rupple Road between Tanyard Drive and Weir Road, approval of a project contingency of $30,900.00, and approval of a budget adjustment. Original Contract Number: Comments: Total includes the project contingency of $30,900.00. Budget Impact: 5400.720.5600-5808.00 Water and Sewer Account Number Fund 12009.1 Water System Rehabilitation/Replacement Project Number Project Title Budgeted Item? Yes Current Budget $ 8,727,307.00 Funds Obligated $ 2,818,690.46 Current Balance I $ 5,908,616.54 Does item have a cost? Yes Item Cost $ 236,970.00 Budget Adjustment Attached? Yes Budget Adjustment $ 236,970.00 Remaining Budget $ 5,908,616.54 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Approval Date: Original Contract Number: Comments: Total includes the project contingency of $30,900.00. FINAL REVISED MEMO CITY OF FAYETTEVILLE ARKANSAS MEETING OF SEPTEMBER 17, 2019 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Chris Brown, City Engineer FROM: Tim Nyander, Utilities Director DATE: September 5, 2019 CITY COUNCIL MEMO SUBJECT: Water Main Cost Share at Magnolia Park Subdivision RECOMMENDATION: Staff recommends approving a Cost Share Agreement with Buffington Weir, LLC in the not -to - exceed amount of $262,153.40 for the installation of a 12" water main along Rupple Road between Tanyard Drive and Weir Road, approval of a project contingency in the amount of $39,323.00, and approval of a budget adjustment. BACKGROUND: On October 23, 2018, the City Council approved a cost -share with Buffington for the construction of Rupple Road in association with the annexation and development of a 68.65 acre residential subdivision along the future portion of Rupple Road between Tanyard Drive and Weir Road. On March 25, Buffington received Planning Commission approval for the construction of this proposed subdivision and will be installing new 8" water mains within this development. DISCUSSION: This portion of Rupple Rd. is shown in the Water Master Plan as a portion of the 12" grid to serve this area of the city. The City of Fayetteville would benefit from the cost share as it will provide an extension of this 12" grid and the construction will be less expensive and less disruptive if done during the construction of the subdivision and Rupple Road. The City will be paying for 100% of the construction of this 12" water main and the developer will be responsible for 100% of the construction within the Magnolia Park Subdivision. The developer received bids from contractors for the waterline project. The cost came in at $262,153.40, which is higher than the engineer's estimate. Staff requests approving the cost share agreement in this amount, and approval of a contingency in the amount of $39,323.00. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 FINAL REVISED MEMO BUDGET/STAFF IMPACT: This project is funded by the Water Impact Fee Improvements Fund. Water Impact Fee Improvement budgeted funds will be transferred to the Water System Improvement/Replacement project to cover the cost of this project. Attachments: Cost Share Agreement Map of Area Bid Tabulation from Contractor Budget Adjustment FINAL REVISED AGREEMENT CONTRACTUAL AGREEMENT FOR COST SHARE OF WATER MAIN UPGRADE COSTS This Agreement, made and entered into on this of September, 2019, by and between the City of Fayetteville, Arkansas ("City") and Buffington Weir, LLC ("Buffington"), witnesseth: WHEREAS, on October 23, 2018, the City Council approved a cost -share with Buffington for the construction of Rupple Road in association with the annexation and development of a 68.65 acre residential subdivision along the future portion of Rupple Road between Tanyard Drive and Weir Road; and WHEREAS, on March 25, Buffington received Planning Commission approval for the construction of this proposed subdivision and will be installing new 8" water mains within this development; and WHEREAS, this portion of Rupple Rd is shown in the Water Master Plan as a portion of the 12" grid to serve this area of the city; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide an extension of this 12" grid and the construction will be less expensive and less disruptive if done during the construction of the subdivision and Rupple Road; NOW, THEREFORE, the City of Fayetteville, Arkansas and Buffington Weir, LLC agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Buffington Weir, LLC for 100% of the cost to install approximately 2,000 linear feet of 12 -inch water main in the area identified in Exhibit "A" up to a maximum -not -to -exceed amount of $262,153.40 with a contingency fund not -to -exceed $39,323.00, as was estimated by the builder's representative and shown on Exhibit `B", attached. B. Remit payments due to Buffington Weir, LLC within sixty (60) days after receipt of valid invoices. 2. Buffington Weir, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Provide a copy of the invoices from the Contractor upon City approval of the water main upgrade. FINAL REVISED AGREEMENT C. Pay for the water main installation (with reimbursement of 100% of the cost by the City of Fayetteville in a not -to -exceed amount of $262,153.40 with a contingency fund not -to -exceed $39,323.00. 3. It is further understood that the contract for construction of the water main upgrade is between Buffington Weir, LLC and its Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in this agreement with a not -to -exceed reimbursable amount of $262,153.40 for the water main installation, with a contingency fund not -to -exceed $39,323.00. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: BUFFINGTON WEIR, LLC, By: ATTEST: By: CITY OF FAYETTEVILLE, ATTEST: By: SONDRA SMITH, City lerk Ic NN EX -n •v � F • o,•LSAS �F •'�,� Weir Road West Mount Goll&) 0 E m s 0 Z West Mount Goll&) III�II�II �IIIII�O��V�9 ill IIIIVVII�IVVII��IIIIII�II IIeIli111119�IliIIIIIVIiiIIIIiII�ip�p1�9VV1 � Illlllllllll�lllllillliliillillll Illlll�llilll�lll�llil��lllllllll �IIIIIIII IIT ��IIIII EI9 ........... ........ .... . FINAL REVISED BA City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division WASTEWATER TREATMENT (730) Adjustment Number 2019 /Org2 Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A Budget Adjustment is needed in the Water System Rehabilitation/Replacemnt project to fund the cost share for the 12 inch water main on Rupple Road. Budgeted funds from the Water Impact Fee Improvements Project will be transferred to this project to cover the cost of this item. This cost share project meets the requirments for utilizing impact fee fund budgeted funds.. RESOLUTION/ORDINANCE COUNCIL DATE: LEGISTAR FILE ID#: 9/17/2019 2019-0471 KeA/i wSM+� 9/5/2019 10:51 AM Budget Director TYPE: JOURNAL #: GLDATE: CHKD/POSTED: Date D - (City Council) TOTAL 602,954 602,954 v.20190516 Increase / (Decrease) Project.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 5400.860.7050-5808.00 301,477 - 12009 1902 EX Water Line Improvements 5400.860.7050-6602.30 301,477 12009 1902 RE Transfer from Fund - Impact Fee 2300.720.9300-7602.40 301,477 - 07002 1 EX Transfers To Funds - Water & Sewer Func 2300.720.9300-4999.99 - 301,477 RE Use Fund Balance - Current H:\Budget Adjustments\2019-Budget\City Council\09-17-2019\2019-0471 BA Buffington Weir, LLC.xlsm 1 of 1 CITY OF FAYETTEVILLE ARKANSAS MEETING OF SEPTEMBER 3, 2019 TO: Mayor Lioneld Jordan THRU: Don Marr, Chief of Staff Tim Nyander, Utilities Director Chris Brown, City Engineer FROM: Matt Casey, Engineering Design Manager DATE: August 8, 2019 CITY COUNCIL MEMO SUBJECT: Water Main Cost Share, Magnolia Park Subdivision RECOMMENDATION: Staff recommends the approval of a Cost Share Agreement with Buffington Weir, LLC in the amount of $206,070.00 for the installation of a 12" water main along Rupple Road between Tanyard Drive and Weir Road, approval of a project contingency of $30,900.00, and approval of a budget adjustment. BACKGROUND: On October 23, 2018, the City Council approved a cost -share with Buffington for the construction of Rupple Road in association with the annexation and development of a 68.65 acre residential subdivision along the future portion of Rupple Road between Tanyard Drive and Weir Road. On March 25, Buffington received Planning Commission approval for the construction of this proposed subdivision and will be installing new 8" water mains within this development. DISCUSSION: This portion of Rupple Rd. is shown in the Water Master Plan as a portion of the 12" grid to serve this area of the city. The City of Fayetteville would benefit from the cost share as it will provide an extension of this 12" grid and the construction will be less expensive and less disruptive if done during the construction of the subdivision and Rupple Road. The City will be paying for 100% of the construction of this 12" water main and the developer will be responsible for 100% of the construction within the Magnolia Park Subdivision. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 SEE REVIED MEMO BUDGET/STAFF IMPACT: This project is funded by the Water Impact Fee Improvements Fund. Water Impact Fee Improvement budgeted funds will be transferred to the Water System Improvement/Replacement project to cover the cost of this project. Attachments: Cost Share Agreement Engineer's Cost Estimate Vicinity Map Budget Adjustment SEE REVISED AGREEMENT CONTRACTUAL AGREEMENT FOR COST SHARE OF WATER MAIN INSTALLATION COSTS This Agreement, made and entered into on this 3rd day of September, 2019, by and between the City of Fayetteville, Arkansas ("City") and Buffington Weir, LLC ("Buffington"), witnesseth: WHEREAS, on October 23, 2018, the City Council approved a cost -share with Buffington for the construction of Rupple Road in association with the annexation and development of a 68.65 acre residential subdivision along the future portion of Rupple Road between Tanyard Drive and Weir Road: and WHEREAS, on March 25, Buffington received Planning Commission approval for the construction of this proposed subdivision and will be installing new 8" water mains within this development; and WHEREAS, this portion of Rupple Rd is shown in the Water Master Plan as a portion of the 12" grid to serve this area of the city; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide an extension of this 12" grid and the construction will be less expensive and less disruptive if done during the construction of the subdivision and Rupple Road; NOW, THEREFORE, the City of Fayetteville, Arkansas and Buffington Weir, LLC agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Buffington Weir, LLC for 100% of the cost to install approximately 2,000 linear feet of 12 -inch water main in the area identified in Attachment "A" up to a maximum -not -to -exceed amount of $206,070.00 with a contingency fund not -to -exceed $30,900.00 as was estimated by the builder's representative and shown on Attachment `B", attached. B. Remit payments due to Buffington Weir, LLC within sixty (60) days after receipt of valid invoices. 2. Buffington Weir, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Provide a copy of the invoices from the Contractor upon City approval of the water main upgrade. SEE REVISED AGREEMENT C. Pay for the water main installation (with reimbursement of 100% of the cost by the City of Fayetteville in a not -to -exceed amount of $206,070.00 with a contingency fund not -to -exceed $30,900.00. 3. It is further understood that the contract for construction of the water main upgrade is between Buffington Weir, LLC and its Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in this agreement with a not -to -exceed reimbursable amount of $206,070.00 for the water main installation, with a contingency fund not -to -exceed $30,900.00. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: BUFFINGTON WEIR, LLC, By: ATTEST: By: % CITY OF FAYETTEVILLE, ARKANSAS LIONELD JORDAN, Mayor ATTEST: LM SONDRA SMITH, City Clerk EXHIBIT A ENGINEER'S ESTIMATE Water Line (City Only Cost) 12" PVC Class C900 DR14 Class 305 Water tvlaln 2.002 L.F. $60.00 S120,120 8" PVC Class C900 DR14 Class 305 Water klain 265 L. F. S40.00 510.600 12"x8" Cross 1 EA. $1,500.04 $1,500 12"X8" Tee 2 EA. $1.000.00 $2.000 8"x8" Tapping Sleeve and Valve 1 EA. 53,500.00 53.500 8"x12" Reducer 1 EA. $750.00 $750 8" Gate Valve 6 EA. $1,750.00 $10,500 12" Butterfly Valve 5 EA. $2,000.00 S10,000 12" Plug 1 EA. S500.00 ,5500 Fire Hydrant Assembly 4 EA. $5,000.00 S20,000 8"x22.5 Degree Bend 2 EA. S75000 $1,500 12"x45 Degree Bend 2 EA. 5750.00 51.500 Single Set Water Service (dear Side) 2 E.A. 51,000.00 $2,000 24" Steel Casing 40 L.F. 5100.00 $4,000 16" Steel Casing 140 L.F. $90.00 512,600 Inspection and I esting ot Water Lines an serviceInes 1 L.SUM 5,000.00 $5,000 Water Line Total 5206,070 CD r. x J f SEE REVISED BA City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 WASTEWATER TREATMENT (730) 2019 Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A Budget Adjustment is needed in the Water System Rehabilitation/Replacemnt project to fund the cost share for the 12 inch water main on Rupple Road. Budgeted funds from the Water Impact Fee Improvements Project will be transferred to this project to cover the cost of this item. This cost share project meets the requirments for utilizing impact fee fund budgeted funds.. RESOLUTION/ORDINANCE COUNCIL DATE: 9/3/2019 LEGISTAR FILE ID#: 2019-0471 L bk H utche*w 8/15/2019 10:20 AM Budget Director TYPE: JOURNAL #: G LDAT E: CHKD/POSTED: Date D - (City Council) TOTAL 473,940 473,940 v.20190516 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 5400.720.5600-5808.00 236,970 - 12009 1 EX Water Line Improvements 5400.720.5600-6602.30 236,970 12009 1 RE Transfer from Fund - Impact Fee 2300.720.9300-7602.40 236,970 - 07002 1 EX Transfers To Funds - Water & Sewer Func 2300.720.9300-4999.99 - 236,970 RE Use Fund Balance - Current H:\Budget Adjustments\2019-Budget\City Council\09-03-2019\2019-0471 BA Buffington Weir, LLC 1 of 1 RECEIVED OCT 04 2019 NORTHWEST ARKA T,, , ^ CITY OF FAYETTOFFICE E K W �� CITY CLERK'S OFFICE Vemocmtgmazette T AFFIDAVIT OF PUBLICATION I Cathy Staggs, do solemnly swear that I am the Accounting Manager of the Northwest Arkansas Democrat -Gazette, printed and published in Washington County and Benton County, Arkansas, and of bona fide circulation, that from my own personal knowledge and reference to the files of said publication, the advertisement of: CITY OF FAYETTEVILLE Ord. 6230 Was inserted in the Regular Edition on: September 26, 2019 Publication Charges: 144.30 Cathy StIs s Subscribed and sworn to before me This -7X> day o1Se pj- , 2019. I-, t t, t V U., &, Notary Public My Commission Expires: 2-12,0 f2," r CATHY WILES Arkansas - Benton County Notary Public -Comm# 12397118 " My Commission Expires Feb 20, 2024 **NOTE** Please do not pay from Affidavit. Invoice will be sent. Ordinance: 6230 File Number: 2019-0471 BUFFINGTON WEIR, LLC: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH BUFFINGTON WEIR, LLC, FOR THE INSTALLATION OF A WATER MAIN ALONG A PORTION OF RUPPLE ROAD, WITH THE ESTIMATED AMOUNT OF $262,153.40 TO BE PAID BY THE CITY OF FAYETTEVILLE, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $39,323.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, Buffington Weir, LLC received Planning Commission approval to develop property located along a portion of Rupple Road; and WHEREAS, an 8 -inch water main would be sufficient to serve the development, but this portion of Rupple Road is shown in the Water Master Plan as a portion of the 12 -inch grid to serve this area of the City; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide an extension of the 12 -inch grid, will provide ample future capacity which the City recognizes will be necessary for the area that is served by this water main, and construction will be less expensive and less disruptive if done by the developer's contractor during the construction of the subdivision and Rupple Road; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Buffington Weir, LLC for the installation of a 12 -inch water main along a portion of Rupple Road with the estimated amount of $262,153.40 to be paid by the City of Fayetteville, and further approves a project contingency in the amount of 539,323.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this PASSED and APPROVED on 9/17/2019 Approved: Lioneld Jordan, Mayor Lisa Branson, Deputy City Clerk 75096192 Sept. 26, 2019