Resolution: 211-19
File Number: 2019-0559
HAWKINS-WEIR ENGINEERS, INC.:
A RESOLUTION TO APPROVE A PROFESSIONAL ENGINEERING SERVICES AGREEMENT
WITH HAWKINS-WEIR ENGINEERS, INC, IN THE AMOUNT OF $54,220.00 FOR CONCEPTUAL
DRAINAGE DESIGN SERVICES, AND TO APPROVE A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a professional
engineering services agreement with Hawkins -Weir Engineers, Inc., in the amount of $54,220.00 for
conceptual drainage design associated with a project to alleviate flooding near the intersection of North
College Avenue and East Sunbridge Drive.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 9/17/2019
111111
Attest: ��G\,ERK 111"
�!.
-A ..••..•,Q
CITY
•� :.
)rdan, or Lisa Branson, Deputy City Cl
e7rq S
,�.
Page 1 Printed on
Cit of Fayetteville,
� �evArkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
-- ^ File Number: 2019-0559
Agenda Date: 9/17/2019 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A 8
HAWKINS-WEIR ENGINEERS, INC.:
A RESOLUTION TO APPROVE A PROFESSIONAL ENGINEERING SERVICES AGREEMENT
WITH HAWKINS-WEIR ENGINEERS, INC, IN THE AMOUNT OF $54,220.00 FOR CONCEPTUAL
DRAINAGE DESIGN SERVICES, AND TO APPROVE A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a professional
engineering services agreement with Hawkins -Weir Engineers, Inc., in the amount of $54,220.00 for
conceptual drainage design associated with a project to alleviate flooding near the intersection of North College
Avenue and East Sunbridge Drive.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Paye 1 Printed on 9/19/2019
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
2019-0559
Legistar File ID
9/17/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
8/29/2019
Submitted Date
Action Recommendation:
ENGINEERING (621)
Division / Department
Approval of a contract in the amount of $54,220.00 with Hawkins -Weir, Engineers, Inc. for conceptual drainage
design services associated with the flooding near the N College Ave and E Sunbridge Drive Intersection. Approval of
a Budget Adjustment.
4604.860.7415-5860.02
Budget Impact:
4604 - Drainage Projects 2019 Bonds
Account Number Fund
46040.7415.1000 Drainage Project (2019 Bonds),
Sunbridge/College Drainage Phase I
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? Yes
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 8,009,572.00
$ 8,009,572.00
$ S4,220.00
$ 7,955,352.00
V20180321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
V4W ARKANSAS
MEETING OF SEPTEMBER 17, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Alan Pugh, Staff Engineer
DATE: August 27, 2019
CITY COUNCIL MEMO
SUBJECT: Approval of a contract in the amount of $54,220.00 with Hawkins -Weir,
Engineers, Inc. for conceptual drainage design services associated with
the flooding near the N College Ave and E Sunbridge Drive Intersection.
Approval of a Budget Adjusment
RECOMMENDATION:
Staff recommends City Council approval of a contract in the amount of $54,220.00 with
Hawkins -Weir, Engineers, Inc. for conceptual drainage design services associated with the
flooding near the N College Ave and E Sunbridge Drive Intersection. Approval of a budget
adjustment
BACKGROUND:
This project will consist of a conceptual drainage analysis associated with helping to alleviate
flooding within near the intersection of N College Ave and E Sunbridge Drive including, but not
limited to, survey, hydrologic and hydraulic studies, evaluation of detention basins to attenuate
flow and the feasibility of constructing the project in two phases. This project was identified as a
priority project by City Council after the April 2017 flooding event.
DISCUSSION:
This project has been identified as one of the projects to be funded by the first phase of the
2019 Drainage Bond Program. Hawkins -Weir Engineers, Inc has provided a proposed scope
and fee in the amount of $54,220.00 for the design of this project. The contract will be paid
based on hourly rates for work completed, up to the total contract amount.
The conceptual drainage design will help to identify the full scope of the required project and a
contract amendment is anticipated once the full scope is defined. This amendment will be
brought forward to council for review and approval at a later date. The estimated project
amount of $1.4 million is subject to changes based on the results of the conceptual design.
BUDGET/STAFF IMPACT:
The design for this project will be paid for with the funds from the 2019 Drainage Bond Project.
Attachments:
Engineering Agreement
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
AGREEMENT
For
PROFESSIONAL ENGINEERING SERVICES
Between
CITY OF FAYETTEVILLE, ARKANSAS
And
HAWKINS-WEIR, ENGINEERS, INC.
THIS AGREEMENT is made as of I q , 2019, by and between City of
Fayetteville, Arkansas, acting by and tht ugh its Mayor (hereinafter called CITY OF FAYETTEVILLE)
and HAWKINS-WEIR ENGINEERS, INC. (hereinafter called ENGINEER).
CITY OF FAYETTEVILLE from time to time requires professional engineering services in connection
with the evaluation, design, and/or construction supervision of capital improvement projects. Therefore,
CITY OF FAYETTEVILLE and ENGINEER in consideration of their mutual covenants agree as follows:
ENGINEER shall serve as CITY OF FAYETTEVILLE's professional engineering consultant in those
assignments to which this Agreement applies, and shall give consultation and advice to CITY OF
FAYETTEVILLE during the performance of ENGINEER's services. All services shall be performed
under the direction of a professional engineer registered in the State of Arkansas and qualified in the
particular field.
SECTION 1 - AUTHORIZATION OF SERVICES
1.1 Services on any assignment shall be undertaken only upon written Authorization of CITY OF
FAYETTEVILLE and agreement of ENGINEER.
1.2 Assignments may include services described hereafter as Basic Services or as Additional Services
of ENGINEER.
1.3 Changes, modifications or amendments in scope, price or fees to this contract shall not be
allowed without a formal contract amendment approved by the Mayor and the City Council in
advance of the change in scope, costs, fees, or delivery schedule.
SECTION 2 - BASIC SERVICES OF ENGINEER
2.1 Perform professional services in connection with the Project as hereinafter stated.
2.1.1 The Scope of Services to be furnished by ENGINEER during the Project is included in Appendix
A attached hereto and made part of this Agreement.
2.2 ENGINEER shall coordinate their activities and services with the CITY OF FAYETTEVILLE.
ENGINEER and CITY OF FAYETTEVILLE agree that ENGINEER has full responsibility for
the engineering services.
Professional Engineering Services Contract.doc
FY19 1
SECTION 3 - RESPONSIBILITIES OF CITY OF FAYETTEVII.LE
3.1 CITY OF FAYETTEVILLE shall, within a reasonable time, so as not to delay the services of
ENGINEER.
3.1.1 Provide full information as to CITY OF FAYETTEVILLE's requirements for the Project.
3.1.2 Assist ENGINEER by placing at ENGINEER's disposal all available information pertinent to
the assignment including previous reports and any other data relative thereto.
3.1.3 Assist ENGINEER in obtaining access to property reasonably necessary for ENGINEER to
perform its services under this Agreement.
3.1.4 Examine all studies, reports, sketches, cost opinions, proposals, and other documents
presented by ENGINEER and render in writing decisions pertaining thereto.
3.1.5 The City Engineer is the CITY OF FAYETTEVILLE's project representative with respect to
the services to be performed under this Agreement. The City Engineer shall have complete
authority to transmit instructions, receive information, interpret and define CITY OF
FAYETTEVILLE's policies and decisions with respect to materials, equipment, elements and
systems to be used in the Project, and other matters pertinent to the services covered by this
Agreement.
3.1.6 CITY OF FAYETTEVILLE and/or its representative will review all documents and provide
written comments to ENGINEER in a timely manner.
SECTION 4 - PERIOD OF SERVICE
4.1 This Agreement will become effective upon the first written notice by CITY OF
FAYETTEVILLE authorizing services hereunder.
4.2 The provisions of this Agreement have been agreed to in anticipation of the orderly progress of
the Project through completion of the services stated in the Agreement. ENGINEER will proceed
with providing the authorized services immediately upon receipt of written authorization from
CITY OF FAYETTEVILLE. Said authorization shall include the scope of the services
authorized and the time in which the services are to be completed. The anticipated schedule for
this project is included as Appendix B.
SECTION 5 - PAYMENTS TO ENGINEER
5.1 The maximum not -to -exceed amount authorized for this Agreement is $54,220.00. The
maximum not -to -exceed amount authorized for Reimbursable Expenses is $250.00.
Reimbursable Expenses shall be limited to reproduction and printing costs.
The CITY OF FAYETTEVILLE shall compensate ENGINEER based on a hourly NTE basis
described in Appendix C.
5.2 Statements
5.2.1 Monthly statements for each calendar month shall be submitted to CITY OF
FAYETTEVILLE or such parties as CITY OF FAYETTEVILLE may designate for
professional services consistent with ENGINEER's normal billing schedule. Once
established, the billing schedule shall be maintained throughout the duration of the Project.
Professional Engineering Services Contract.doc
FY 19 2
Applications for payment shall be made in accordance with a format to be developed by
ENGINEER and approved by CITY OF FAYETTEVILLE. Applications for payment shall
be accompanied each month by the updated project schedule as the basis for determining the
value earned as the work is accomplished. Final payment for professional services shall be
made upon CITY OF FAYETTEVILLE's approval and acceptance with the satisfactory
completion of the conceptual design for the Project.
5.3 Payments
5.3.1 All statements are payable upon receipt and due within thirty (30) days. If a portion of
ENGINEER's statement is disputed by CITY OF FAYETTEVILLE, the undisputed portion
shall be paid by CITY OF FAYETTEVILLE by the due date. CITY OF FAYETTEVILLE
shall advise ENGINEER in writing of the basis for any disputed portion of any statement.
CITY OF FAYETTEVILLE will make reasonable effort to pay invoices within 30 days of
date the invoice is approved, however, payment within 30 days is not guaranteed.
5.4 Final Payment
5.4.1 Upon satisfactory completion of the work performed under this Agreement, as a condition
before final payment under this Agreement, or as a termination settlement under this
Agreement, ENGINEER shall execute and deliver to CITY OF FAYETTEVILLE a release of
all claims against CITY OF FAYETTEVILLE arising under or by virtue of this Agreement,
except claims which are specifically exempted by ENGINEER to be set forth therein. Unless
otherwise provided in this Agreement or by State law or otherwise expressly agreed to by the
parties to this Agreement, final payment under this Agreement or settlement upon termination
of this Agreement shall not constitute a waiver of CITY OF FAYETTEVILLE's claims
against ENGINEER or his sureties under this Agreement or applicable performance and
payment bonds, if any.
SECTION 6 - GENERAL CONSIDERATIONS
6.1 Insurance
6.1.1 During the course of performance of these services, ENGINEER will maintain (in United
States Dollars) the following minimum insurance coverages:
Tvoe of Coveraee
Workers' Compensation
Employers' Liability
Commercial General Liability
Bodily Injury and
Property Damage
Automobile Liability:
Bodily Injury and
Property Damage
Professional Liability Insurance
Professional Engineering Services Contract.doc
FY19
Limits of Liability
Statutory
$500,000 Each Accident
$1,000,000 Combined Single Limit
$1,000,000 Combined Single Limit
$1,000,000 Each Claim
ENGINEER will provide to CITY OF FAYETTEVILLE certificates as evidence of the
specified insurance within ten days of the date of this Agreement and upon each renewal of
coverage.
6.1.2 CITY OF FAYETTEVILLE and ENGINEER waive all rights against each other and their
officers, directors, agents, or employees for damage covered by property insurance during
and after the completion of ENGINEER's services.
6.2 Professional Responsibility
6.2.1 ENGINEER will exercise reasonable skill, care, and diligence in the performance of
ENGINEER's services and will carry out its responsibilities in accordance with customarily
accepted professional engineering practices. CITY OF FAYETTEVILLE will promptly
report to ENGINEER any defects or suspected defects in ENGINEER's services of which
CITY OF FAYETTEVILLE becomes aware, so that ENGINEER can take measures to
minimize the consequences of such a defect. CITY OF FAYETTEVILLE retains all
remedies to recover for its damages caused by any negligence of ENGINEER.
6.3 Cost Opinions and Projections
6.3.1 Cost opinions and projections prepared by ENGINEER relating to construction costs and
schedules, operation and maintenance costs, equipment characteristics and performance, and
operating results are based on ENGINEER's experience, qualifications, and judgment as a
design professional. Since ENGINEER has no control over weather, cost and availability of
labor, material and equipment, labor productivity, construction Contractors' procedures and
methods, unavoidable delays, construction Contractors' methods of determining prices,
economic conditions, competitive bidding or market conditions, and other factors affecting
such cost opinions or projections, ENGINEER does not guarantee that actual rates, costs,
performance, schedules, and related items will not vary from cost opinions and projections
prepared by ENGINEER.
6.4 Changes
6.4.1 CITY OF FAYETTEVILLE shall have the right to make changes within the general scope of
ENGINEER's services, with an appropriate change in compensation and schedule only after
Fayetteville City Council approval of such proposed changes and, upon execution of a
mutually acceptable amendment or change order signed by the Mayor of the CITY OF
FAYETTEVILLE and the duly authorized officer of ENGINEER.
6.5 Termination
6.5.1 This Agreement may be terminated in whole or in part in writing by either party in the event
of substantial failure by the other party to fulfill its obligations under this Agreement through
no fault of the terminating party, provided that no termination may be effected unless the
other party is given:
6.5.1.1 Not less than ten (10) calendar days written notice (delivered by certified mail, return
receipt requested) of intent to terminate,
6.5.1.2 An opportunity for consultation with the terminating party prior to termination.
Professional Engineering Services Contract.doc
FY 19 4
6.5.2 This Agreement may be terminated in whole or in part in writing by CITY OF
FAYETTEVILLE for its convenience, provided that ENGINEER is given:
6.5.2.1 Not less than ten (10) calendar days written notice (delivered by certified mail, return
receipt requested) of intent to terminate,
6.5.2.2 An opportunity for consultation with the terminating party prior to termination.
6.5.3 If termination for default is effected by CITY OF FAYETTEVILLE, an equitable adjustment
in the price provided for in this Agreement shall be made, but
6.5.3.1 No amount shall be allowed for anticipated profit on unperformed services or other work,
6.5.3.2 Any payment due to ENGINEER at the time of termination may be adjusted to cover any
additional costs to CITY OF FAYETTEVILLE because of ENGINEER's default.
6.5.4 If termination for default is effected by ENGINEER, or if termination for convenience is
effected by CITY OF FAYETTEVILLE, the equitable adjustment shall include a reasonable
profit for services or other work performed. The equitable adjustment for any termination
shall provide for payment to ENGINEER for services rendered and expenses incurred prior to
the termination, in addition to termination settlement costs reasonably incurred by
ENGINEER relating to commitments which had become firm prior to the termination.
6.5.5 Upon receipt of a termination action under Paragraphs 6.5.1 or 6.5.2 above, ENGINEER
shall:
6.5.5.1 Promptly discontinue all affected work (unless the notice directs otherwise),
6.5.5.2 Deliver or otherwise make available to CITY OF FAYETTEVILLE all data, drawings,
specifications, reports, estimates, summaries and such other information and materials as
may have been accumulated by ENGINEER in performing this Agreement, whether
completed or in process.
6.5.6 Upon termination under Paragraphs 6.5.1 or 6.5.2 above CITY OF FAYETTEVILLE may
take over the work and may award another party an agreement to complete the work under
this Agreement.
6.5.7 If, after termination for failure of ENGINEER to fulfill contractual obligations, it is
determined that ENGINEER had not failed to fulfill contractual obligations, the termination
shall be deemed to have been for the convenience of CITY OF FAYETTEVILLE. In such
event, adjustments of the agreement price shall be made as provided in Paragraph 6.5.4 of
this clause.
6.6 Delays
6.6.1 In the event the services of ENGINEER are suspended or delayed by CITY OF
FAYETTEVILLE or by other events beyond ENGINEER's reasonable control, ENGINEER
shall be entitled to additional compensation and time for reasonable costs incurred by
ENGINEER in temporarily closing down or delaying the Project.
Professional Engineering Services Contract.doc
FY 19 5
6.7 Rights and Benefits
6.7.1 ENGINEER's services will be performed solely for the benefit of CITY OF
FAYETTEVILLE and not for the benefit of any other persons or entities.
6.8 Dispute Resolution
6.8.1 Scope of Paragraph: The procedures of this Paragraph shall apply to any and all disputes
between CITY OF FAYETTEVILLE and ENGINEER which arise from, or in any way are
related to, this Agreement, including, but not limited to the interpretation of this Agreement,
the enforcement of its terms, any acts, errors, or omissions of CITY OF FAYETTEVILLE or
ENGINEER in the performance of this Agreement, and disputes concerning payment.
6.8.2 Exhaustion of Remedies Required: No action may be filed unless the parties first negotiate.
If timely Notice is given under Paragraph 6.8.3, but an action is initiated prior to exhaustion
of these procedures, such action shall be stayed, upon application by either party to a court of
proper jurisdiction, until the procedures in Paragraphs 6.8.3 and 6.8.4 have been complied
with.
6.8.3 Notice of Dispute
6.8.3.1 For disputes arising prior to the making of final payment promptly after the occurrence of
any incident, action, or failure to act upon which a claim is based, the party seeking relief
shall serve the other party with a written Notice.
6.8.3.2 For disputes arising within one year after the making of final payment, CITY OF
FAYETTEVILLE shall give ENGINEER written Notice at the address listed in
Paragraph 6.14 within thirty (30) days after occurrence of any incident, accident, or first
observance of defect or damage. In both instances, the Notice shall specify the nature
and amount of relief sought, the reason relief should be granted, and the appropriate
portions of this Agreement that authorize the relief requested.
6.8.4 Negotiation: Within seven days of receipt of the Notice, the Project Managers for CITY OF
FAYETTEVILLE and ENGINEER shall confer in an effort to resolve the dispute. If the
dispute cannot be resolved at that level, then, upon written request of either side, the matter
shall be referred to the President of ENGINEER and the Mayor of CITY OF
FAYETTEVILLE or his designee. These officers shall meet at the Project Site or such other
location as is agreed upon within 30 days of the written request to resolve the dispute.
6.9 CITY OF FAYETTEVILLE represents that it has sufficient funds or the means of obtaining
funds to remit payment to ENGINEER for services rendered by ENGINEER.
6.10 Publications
6.10.1 Recognizing the importance of professional development on the part of ENGINEER's
employees and the importance of ENGINEER's public relations, ENGINEER may prepare
publications, such as technical papers, articles for periodicals, and press releases, pertaining
to ENGINEER's services for the Project. Such publications will be provided to CITY OF
FAYETTEVILLE in draft form for CITY OF FAYETTEVILLE's advance review. CITY OF
FAYETTEVILLE shall review such drafts promptly and provide CITY OF
FAYETTEVILLE's comments to ENGINEER CITY OF FAYETTEVILLE may require
Professional Engineering Services Contract.doc
FY 19 6
deletion of proprietary data or confidential information from such publications, but otherwise
CITY OF FAYETTEVILLE will not unreasonably withhold approval. The cost of
ENGINEER's activities pertaining to any such publication shall be for ENGINEER's
account.
6.11 Indemnification
6.11.1 CITY OF FAYETTEVILLE agrees that it will require all construction Contractors to
indemnify, defend, and hold harmless CITY OF FAYETTEVILLE and ENGINEER from and
against any and all loss where loss is caused or incurred or alleged to be caused or incurred in
whole or in part as a result of the negligence or other actionable fault of the Contractors, or
their employees, agents, Subcontractors, and Suppliers.
6.12 Ownership of Documents
6.12.1 All documents provided by CITY OF FAYETTEVILLE including original drawings, CAD
drawings, estimates, field notes, and project data are and remain the property of CITY OF
FAYETTEVILLE. ENGINEER may retain reproduced copies of drawings and copies of
other documents.
6.12.2 Engineering documents, computer models, drawings, specifications and other hard copy or
electronic media prepared by ENGINEER as part of the Services shall become the property
of CITY OF FAYETTEVILLE when ENGINEER has been compensated for all Services
rendered, provided, however, that ENGINEER shall have the unrestricted right to their use.
ENGINEER shall, however, retain its rights in its standard drawings details, specifications,
databases, computer software, and other proprietary property. Rights to intellectual property
developed, utilized, or modified in the performance of the Services shall remain the property
of ENGINEER.
6.12.3 Any files delivered in electronic medium may not work on systems and software different
than those with which they were originally produced. ENGINEER makes no warranty as to
the compatibility of these files with any other system or software. Because of the potential
degradation of electronic medium over time, in the event of a conflict between the sealed
original drawings/hard copies and the electronic files, the sealed drawings/hard copies will
govern.
6.13 Notices
6.13.1 Any Notice required under this Agreement will be in writing, addressed to the appropriate
party at the following addresses:
CITY OF FAYETTEVILLE's address:
113 West Mountain Street
Fayetteville, Arkansas 72701
ENGINEER's address:
438 East Millsap Road, Suite 107,
Fayetteville, Arkansas 72703
Professional Engineering Services Contract.doc
FY 19 7
6.14 Successor and Assigns
6.14.1 CITY OF FAYETTEVILLE and ENGINEER each binds himself and his successors,
executors, administrators, and assigns to the other party of this Agreement and to the
successors, executors, administrators, and assigns of such other party, in respect to all
covenants of this Agreement; except as above, neither CITY OF FAYETTEVILLE nor
ENGINEER shall assign, sublet, or transfer his interest in the Agreement without the written
consent of the other.
6.15 Controlling Law
6.15.1 This Agreement shall be subject to, interpreted and enforced according to the laws of the
State of Arkansas without regard to any conflicts of law provisions.
6.16 Entire Agreement
6.16.1 This Agreement represents the entire Agreement between ENGINEER and CITY OF
FAYETTEVILLE relative to the Scope of Services herein. Since terms contained in
purchase orders do not generally apply to professional services, in the event CITY OF
FAYETTEVILLE issues to ENGINEER a purchase order, no preprinted terms thereon shall
become a part of this Agreement. Said purchase order document, whether or not signed by
ENGINEER, shall be considered as a document for CITY OF FAYETTEVILLE's internal
management of its operations.
SECTION 7 - SPECIAL CONDITIONS
7.1 Additional Responsibilities of ENGINEER
7.1.1 CITY OF FAYETTEVILLE's review, approval, or acceptance of design drawings,
specifications, reports and other services furnished hereunder shall not in any way relieve
ENGINEER of responsibility for the technical adequacy of the work. Neither CITY OF
FAYETTEVILLE's review, approval or acceptance of, nor payment for any of the services
shall be construed as a waiver of any rights under this Agreement or of any cause of action
arising out of the performance of this Agreement.
7.1.2 ENGINEER shall be and shall remain liable, in accordance with applicable law, for all
damages to CITY OF FAYETTEVILLE caused by ENGINEER's negligent performance of
any of the services furnished under this Agreement except for errors, omissions or other
deficiencies to the extent attributable to CITY OF FAYETTEVILLE or CITY OF
FAYETTEVILLE-furnished data.
7.1.3 ENGINEER's obligations under this clause are in addition to ENGINEER's other express or
implied assurances under this Agreement or State law and in no way diminish any other
rights that CITY OF FAYETTEVILLE may have against ENGINEER for faulty materials,
equipment, or work.
7.2 Remedies
7.2.1 Except as may be otherwise provided in this Agreement, all claims, counter -claims, disputes
and other matters in question between CITY OF FAYETTEVILLE and ENGINEER arising
Professional Engineering Services Contract.doc
FY 19
out of or relating to this Agreement or the breach thereof will be decided in a court of
competent jurisdiction within Arkansas.
7.3 Audit: Access to Records
7.3.1 ENGINEER shall maintain books, records, documents and other evidence directly pertinent
to performance on work under this Agreement in accordance with generally accepted
accounting principles and practices consistently applied in effect on the date of execution of
this Agreement. ENGINEER shall also maintain the financial information and data used by
ENGINEER in the preparation of support of the cost submission required for any negotiated
agreement or change order and send to CITY OF FAYETTEVILLE a copy of the cost
summary submitted. CITY OF FAYETTEVILLE, the State or any of their authorized
representatives shall have access to all such books, records, documents and other evidence for
the purpose of inspection, audit and copying during normal business hours. ENGINEER will
provide proper facilities for such access and inspection.
7.3.2 Records under Paragraph 7.3.1 above, shall be maintained and made available during
performance on assisted work under this Agreement and until three years from the date of
final payment for the project. In addition, those records which relate to any controversy
arising out of such performance, or to costs or items to which an audit exception has been
taken, shall be maintained and made available until three years after the date of resolution of
such appeal, litigation, claim or exception.
7.3.3 This right of access clause (with respect to financial records) applies to:
7.3.3.1 Negotiated prime agreements:
7.3.3.2 Negotiated change orders or agreement amendments in excess of $10,000 affecting the
price of any formally advertised, competitively awarded, fixed price agreement:
7.3.3.3 Agreements or purchase orders under any agreement other than a formally advertised,
competitively awarded, fixed price agreement. However, this right of access does not
apply to a prime agreement, lower tier subagreement or purchase order awarded after
effective price competition, except:
7.3.3.3.1 With respect to record pertaining directly to subagreement performance, excluding
any financial records of ENGINEER;
7.3.3.3.2 If there is any indication that fraud, gross abuse or corrupt practices may be involved;
7.3.3.3.3 If the subagreement is terminated for default or for convenience.
7.4 Covenant Against Contingent Fees
7.4.1 ENGINEER warrants that no person or selling agency has been employed or retained to
solicit or secure this Agreement upon an agreement of understanding for a commission,
percentage, brokerage or continent fee, excepting bona fide employees or bona fide
established commercial or selling agencies maintained by ENGINEER for the purpose of
securing business. For breach or violation of this warranty, CITY OF FAYETTEVILLE shall
have the right to annul this Agreement without liability or at its discretion, to deduct from the
Professional Engineering Services Contract.doc
FY 19
contract price or consideration, or otherwise recover, the full amount of such commission,
percentage, brokerage, or contingent fee.
7.5 Gratuities
7.5.1 If CITY OF FAYETTEVILLE finds after a notice and hearing that ENGINEER or any of
ENGINEER's agents or representatives, offered or gave gratuities (in the form of
entertainment, gifts or otherwise) to any official, employee or agent of CITY OF
FAYETTEVILLE, in an attempt to secure an agreement or favorable treatment in awarding,
amending or making any determinations related to the performance of this Agreement, CITY
OF FAYETTEVILLE may, by written notice to ENGINEER terminate this Agreement. CITY
OF FAYETTEVILLE may also pursue other rights and remedies that the law or this
Agreement provides. However, the existence of the facts on which CITY OF
FAYETTEVILLE bases such finding shall be in issue and may be reviewed in proceedings
under the Remedies clause of this Agreement.
7.5.2 In the event this Agreement is terminated as provided in Paragraph 7.5.1, CITY OF
FAYETTEVILLE may pursue the same remedies against ENGINEER as it could pursue in
the event of a breach of the Agreement by ENGINEER As a penalty, in addition to any other
damages to which it may be entitled by law, CITY OF FAYETTEVILLE may pursue
exemplary damages in an amount (as determined by CITY OF FAYETTEVILLE) which
shall be not less than three nor more than ten times the costs ENGINEER incurs in providing
any such gratuities to any such officer or employee.
7.6 Arkansas Freedom of Information Act
7.6.1 City contracts and documents, including internal documents and documents of subcontractors
and sub -consultants, prepared while performing City contractual work are subject to the
Arkansas Freedom of Information Act (FOIA). If a Freedom of Information Act request is
presented to the CITY OF FAYETTEVILLE, ENGINEER will do everything possible to
provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom
of Information Act (A.C.A. §25-19-101 et seq.). Only legally authorized photocopying costs
pursuant to the FOIA may be assessed for this compliance.
IN WITNESS WHEREOF, CITY OF FAYETTEVILLE, ARKANSAS by and through its Mayor, and
ENGINEER, by its authorized officer have made and executed this Agreement as of the day and year first
above written.
CITY OF FA^TT LE, ARKANSAS ENGINEER
By'�
M or, ionel ord
By: v -W UW �Oy \
City Clerk
END OF AGREE
Professional Engineering Services
FY 19
CITY •.e
F.
D'
"IVS Ac
,6114111110
GINEERING SERVICES
10
Task Description
Task 1 — Conceptual Design
1. Perform initial survey to determine flowline elevations of necessary drainage facilities (pipes,
inlets, ditches, etc) within project study area
2. Prepare a scaled drawing in AutoCAD Civil 3D
3. Participate in a project kickoff meeting with the Owner
4. Hydrologic and Hydraulic Design
a. Determine Watersheds
i. Evaluate upstream watershed east of College Avenue
1. Use provided GIS Information
2. Site visit and field investigation
ii. Evaluate upstream watershed north of Granada Street
1. Use provided GIS Information
2. Site visit and field investigation
b. Prepare Drainage Model
c. Perform Hydrologic and Hydraulic analysis of proposed improvements
d. Evaluate Detention Pond Locations and Sizes (maximum of 3 locations)
e. Evaluate feasibility of constructing improvements in separate Phases
f. Evaluate alternate stormwater routings
g. Prepare exhibits including plans and profiles for Phase 1 and Phase 2
h. Prepare Preliminary Drainage Report
i. Meet with City Staff to present the Preliminary Drainage Report
2019070\Appendix A (Conceptual Design).docx
Page 1
17YY
Appendix B
Proposed Schedule
Sunbridge Drive and College Avenue
Drainage Improvements
City of Fayetteville, Arkansas
HWEI Project No. 2019070
August 2019
Project Milestone
Complete Hydraulic Model
Prepare Draft Drainage Report
Submit to Owner and address Owner's Comments
Deliver Preliminary Drainage Report
(ci 1,y (_ r.
YETTE4'ILL
ARKANSAS
Days from Notice to Proceed
60
90
120
150
2019070\Appendix B (Conceptual Design).docx Page 1
\\
k\
o\E
\«)°
_C) z
*
)2�~
4) E
U -
\ƒk)
35
Q
{z
e]
f
C'4
w
@\
/_»
_
0cn
?
{
»
»
U)
/_»
»,
=aa@aARR=¥®R
CO
0
/_
,
„
a,p
}®
/4
]
vi
ui
_
/
}
_
< co
f
/\
)
9(
\
co
-
%\7
r4
�)
\
/%
7=E
{E
{,
}
\\
Qom\
_
}
\
\)\)�/
70Em
/
0777{0
c!
,g»@e§§:a
_
[o
;\)
77777243e{QQ7/EJB
2-
e@±a3�z322==ƒ}
Engineer
Standard Billing Rate Structure
For Hourly Fee Based Contracts
Hawkins -Weir Engineers, Inc.
Effective August 18, 2019 through August 15, 2020
Engineer VII
$
190
Per
Hour
Engineer VI
$
175
Per
Hour
Engineer V
$
160
Per
Hour
Engineer IV
$
145
Per
Hour
Engineer III
$
125
Per
Hour
Engineer II
$
100
Per
Hour
Engineer I
$
85
Per
Hour
Engineering Technician
Designer II
$
100
Per Hour
Designer I
$
75
Per Hour
Technician IV
$
85
Per Hour
Technician III
$
75
Per Hour
Technician II
$
65
Per Hour
Technician I
$
55
Per Hour
Field Technician - Field Inspector
Resident Project Representative (RPR) $ 120 Per Hour
Inspector II $ 75 Per Hour
Inspector I $ 65 Per Hour
Field Surveying
GPS Survey $ 175 Per Hour
GPS Mapping Survey $ 95 Per Hour
Surveyor $ 85 Per Hour
Administrative
Business Manager $ 85 Per Hour
Expert Witness
Preparation At Engineer's Hourly Rate
Testimony, less than 1/2 day $1,000
Testimony, per Day $ 2,000
Expenses Reimbursable Expenses and upcharges are determined by the Client Agreement/Contract
Subconsultants/Outside Services
Express Delivery, Field Supplies, Testing, Review/Filing Fees
and Advertising
Travel: Hotel and meals
Actual Cost
Vehicle*
$0.58 per mile effective 1/1/19
Reproduction: Outside printing service
Actual Cost
In-house printing
Letter Copy - B&W
$ 0.10 Per Copy
Letter Copy - Color
$ 0.75 Per Copy
22 x 34 Size Copy - B&W
$ 3.00 Per Copy
22 x 34 Size Copy - Color
$10.00 Per Copy
11 x 17 Size Copy - B&W
$ 1.50 Per Copy
11 x 17 Size Copy - Color
$ 5.00 Per Copy
CD Copy
$ 5.00 Per Copy
Binding
$ 1.00 Each
* To be adjusted periodically to current IRS mileage rate
All Billings are due upon receipt unless prior arrangements for payment have been made.
N
O
m
�
C
.fid
• �1
O
O
iT
CL
O
N
.o
U
Y
Qi
CU
Y
N
C-
d.
O
Qi
O
C
O
O
O
Y
Qi
Y
Nra
u
�
O
E
Y
Z
CCV
G
f0
L
v
�
�
v
a
v
L
U
OA
i
Y61
p
p
�
�
Ql
Y
3
N
'a
N
N
67
p
m
o
l
U
3-
a
Y
L
CL
v\
u=
a
Q
i�
Y
w
'-'p
,^u
u
a
a
Q
°1
a
Q
3
w
c
i n
S
O
O
i
Y
N
L
^
a
L cy
U
N
L
Q
>
m
NO
O
a
cn
u�.
oc
w
Z
cn
S
N'
+
ry
rn
v
in
w
n
oo
cn
a
O
a
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division Adjustment Number
/Org2 ENGINEERING (621)
2019
Requestor: Kevin Springer
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Budget Adjustment allocating $1,400,000 to the Drainage 2019 Bond Projects sub -project (46040.7415.1000) -
Sundbridge/College Drainage). $54,220 will be used to fund the contract with Hawkins -Weir, Engineers, Inc. for
conceptual drainage design services associated with the flooding near the N College Ave and E Sunbridge Drive
Intersection. The remaining budget is estimated to be needed for future engineering and construction contracts. The
budget transferred is coming from the unallocated portion of the project.
RESOLUTION/ORDINANCE
COUNCIL DATE
LEGISTAR FILE ID#
9/17/2019
2019-0559
xelvbr�lsprbyt
8/29/2019 12:47 PM
Budget Director
TYPE:
JOURNAL #:
Date
D - (City Council)
GLDATE:
CHKD/POSTED: /
TOTAL
- -
v.20190816
Increase / (Decrease)
Proiect.Sub#
Account Number
Expense Revenue
Project
Sub.Detl
AT
Account Name
4604.860.7415-5817.00
1,335,780 -
46040
7415.1000
EX
Improvements - Bridge & Drainage
4604.860.7415-5860.02
54,220 -
46040
7415.1000
EX
Capital Prof Svcs - Engineering
4604.860.7415-5860.04
10,000 -
46040
7415.1000
EX
Capital Prof Svcs -Engineering Contra
4604.860.7999-5899.00
(1,400,000) -
46040
7999
EX
Unallocated - Budget
H:\Budget Adjustments\2019_Budget\City Council\09-17-2019\BA19 - 2019-0559 46040.7415.1000 Sunbridge Hawkins Weir
Engineering.xlsm 1 of 1