Loading...
HomeMy WebLinkAbout210-19 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 210-19 File Number: 2019-0-560 POPLAR STREET RAILROAD CROSSING SIGNALS IMPROVEMENT PROJECT: A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO PARTNER WITH THE ARKANSAS DEPARTMENT OF TRANSPORTATION FOR THE POPLAR STREET RAILROAD CROSSING SIGNALS IMPROVEMENT PROJECT WITH A 10% LOCAL MATCH IN THE ESTIMATED AMOUNT OF $30,000.00 WHEREAS, the Rail -Highway Crossing Program provides funds for the elimination of hazards at railway -highway crossings; and WHEREAS, the Arkansas Department of Transportation has identified the crossing at Poplar Street in the City of Fayetteville to be a candidate to receive Rail -Highway Crossing Program funding based upon its hazard rating as compared to similar highway -rail crossings throughout the state; and WHEREAS, an on-site diagnostic meeting was conducted on November 17, 2017, and identified needed improvements to improve safety; and WHEREAS, the Federal Highway Administration (FHWA) limits the Federal share of funding for Rail - Highway Crossing Program projects to 90 percent of the total project cost, thus necessitating a 10 percent share provided by the local roadway authority, and WHEREAS, the Department requests that the roadway authority indicates its willingness to provide the required matching funds in order to obtain Arkansas Highway Commission authorization to program a Federal -aid project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF Page 1 Printed on 9/19/19 File Number: 2019-0560 Resolution 210-19 FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the City of Fayetteville to participate in accordance with its designated responsibilities in this project, including the payment of a 10% local match which is estimated to be $30,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan or his designated representative to execute all appropriate agreements and contracts necessary to expedite the development and construction of the project. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby indicates its willingness to proceed with the project and hereby proposes that the Department initiate action to implement the improvements to the Poplar Street railroad crossing. PASSED and APPROVED on 9/17/2019 Attest: `�.�`yGLER:! �����. T �V�.• CITY��F9% G: 14 Lisa Branson, Deputy City Clerk-,.4-••gNSPS .•1����� vCCN'11111i 0; ; Page 2 Printed on 9119119 -'" City of Fayetteville, Arkansas / 113 West Mountain Street • ^. Fayetteville, AR 72701 (479) 575-8323 r Text File -- File Number: 2019-0560 Agenda Date: 9/17/2019 Version: 1 Status: Passed In Control: City Council Meeting Agenda Number: A 7 File Type: Resolution POPLAR STREET RAILROAD CROSSING SIGNALS IMPROVEIVIEN'I PROJECT: A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO PARTNER WITH THE ARKANSAS DEPARTMENT OF TRANSPORTATION FOR THE POPLAR STREET RAILROAD CROSSING SIGNALS IMPROVEMENT PROJECT WITH A 10% LOCAL MATCH IN THE ESTIMATED AMOUNT OF $30,000.00 WHEREAS, the Rail -Highway Crossing Program provides funds for the elimination of hazards at railway -highway crossings; and WHEREAS, the Arkansas Department of Transportation has identified the crossing at Poplar Street in the City of Fayetteville to be a candidate to receive Rail -Highway Crossing Program funding based upon its hazard rating as compared to similar highway -rail crossings throughout the state; and WHEREAS, an on-site diagnostic meeting was conducted on November 17, 2017, and identified needed improvements to improve safety; and WHEREAS, the Federal Highway Administration (FHWA) lit -nits the Federal share of funding for Rail -Highway Crossing Program projects to 90 percent of the total project cost, thus necessitating a 10 percent share provided by the local roadway authority, and WHEREAS, the Department requests that the roadway authority indicates its willingness to provide the required matching funds in order to obtain Arkansas Highway Commission authorization to program a Federal -aid project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the City of Fayetteville to participate in accordance with its designated responsibilities in this project, including the payment of a 10% local match which is estimated to be $30,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan or his City of Fayetteville, Arkansas Paye 1 Printed on 9119/2019 File Number: 2019-0560 designated representative to execute all appropriate agreements and contracts necessary to expedite the development and construction of the project. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby indicates its willingness to proceed with the project and hereby proposes that the Department initiate action to implement the improvements to the Poplar Street railroad crossing. City of Fayetteville, Arkansas Page 2 Printed on 911912019 Chris Brown Submitted By City of Fayetteville Staff Review Form 2019-0560 Legistar File ID 9/17/2019 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/29/2019 ENGINEERING (621) Submitted Date Division / Department Action Recommendation: Approval of a Resolution expressing the willingness of the City of Fayetteville to partner with the Arkansas Department Of Transportation for the Poplar Street Railroad Signals Upgrade Rail -Highway Crossing Improvement project. Budget Impact: Account Number Fund Poplar Street Railroad Crossing Upgrade Project Number Budgeted Item? NA Does item have a cost? NA Budget Adjustment Attached? NA Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title 0 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Comments: Approval Date: CITY OF FAYETTEVILLE ARKANSAS MEETING OF SEPTEMBER 17, 2019 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Garner Stoll, Development Services Director Chris Brown, City Engineer FROM: Paul Libertini, Staff EngineeL6;?,, DATE: August 29, 2019 CITY COUNCIL MEMO SUBJECT: Poplar Street Railroad Crossing Signals Upgrade Project RECOMMENDATION: Staff requests approval of a Resolution expressing the willingness of the City of Fayetteville to partner with the Arkansas Department Of Transportation (ARDOT) to upgrade the Poplar Street Railroad Crossing Signals. BACKGROUND: On November 7, 2017, the Railroad -Highway Crossing Diagnostic Team inspected the railroad crossing on Poplar Street just west of the intersection with Gregg Avenue. The Team recommended to install railroad gates with lights and separate crossing arms with lights for pedestrians. DISCUSSION: ARDOT has access to funding for railroad crossing safety enhancements that will pay for 90% of the cost of projects that meet funding criteria. The remaining 10% match must come from the local jurisdiction where the crossing is located. ARDOT is requesting the City indicate its willingness to participate in the program at an estimated cost to the City of $30,000 for the Poplar Street crossing. This item was presented to and approved by the City's Transportation Committee at their August 27, 2019 meeting. BUDGET/STAFF IMPACT: Funding for the City's 10% match of $30,000 will come the Capital Improvement Program or the Transportation Bond Program. (This number is subject to change as the project is developed and a more detailed estimate is available.) Attachments: Letter from Kevin Thornton, ARDOT dated 8/02/2019 RR -Highway Crossing Diagnostic Team Inspection Report 11/07/2017 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 ■� KANSAS DEPARTMENT ARKANSAS TRANSPORTATION The Honorable Lioneld Jordan Mayor of Fayetteville 113 West Mountain Fayetteville, AR 72701 Dear Mayor Jordan: ARKANSAS DEPARTMENT OF TRANSPORTATION AaDOT.gov I IDriveArkansas.com I Scott E. Bennett, P.E., Director TRANSPORTATION PLANNING & POLICY DIVISION 10324 Interstate 30 1 P.O. Box 22611 Little Rock, AR 72203-2261 Phone: 501.569.2201 .R;. August 2, 2019 1 Reference is made to the potential safety improvements at the Poplar Street at -grade railroad crossing of Arkansas and Missouri Railroad tracks. On November 17, 2017, a Diagnostic Team Meeting was held to discuss the need for potential safety improvements at the above mentioned location. A copy of the Diagnostic Team Meeting Report is enclosed for your information. Recent guidance for the Rail -Highway Crossing Program (RHCP) from the Federal Highway Administration (FHWA) limits the Federal share of funding for RHCP projects to 90 percent of the total project cost. A ten percent match must be provided by the local roadway authority. Based on a preliminary cost estimate provided by Arkansas and Missouri Railroad, the 10 percent share would be approximately $30,000. At this time, the Department requests City of Fayetteville to indicate its willingness to provide the required matching funds by adopting a resolution similar to the sample enclosed. We respectfully request a response from you by September 2, 2019. Upon receipt of the resolution, a Minute Order will be submitted to the Arkansas Highway Commission requesting a Federal -aid project be programmed when funds become available. Once a project is programmed, a formal project agreement will be developed including an engineering estimate from Arkansas and Missouri Railroad. The actual amount of funding requested from the city will be based on this estimate. We look forward to working with you to improve the safety at this crossing. If you should have any questions about this project or process, please feel free to contact Tyler Post, the Department's Railroad Coordinator, at 501-569-2115. eiy, i OKevi hornton ssi ant Chief Engineer —Planning Enclosures Deputy Director and Chief Engineer Program Management Transportation Planning and Policy District 4 FHWA - Arkansas Division RAILROAD -HIGHWAY CROSSING DIAGNOSTIC TEAM INSPECTION REPORT Date Inspection Made: 11/7/2017 County: Washington Railroad: A&M Crossing DOT Number: 667190A (Lights) Location: Fayetteville Highway or Street: Poplar St. Hazard Rating by AIITD: 5.137 Rank: 518 of 2448 (2 crashes) TRAIN AND TRACK INFORMATION: Number of Trains per Day:)l'�,Number of Switching Movements: Scheduled Train Speed: Number of Main Tracks: 1 Other: 0 Type Track i.e. Spur, Industry, etc: Track Alignment at Crossing: 90° Type of Crossing Surface Between Ends of Ties: Concrete Panel ROADWAY OR STREET INFORMATION: i ADT: 4300 Width at Crossing: z - ype of Surfacing on Crossing Approaches: Asphalt Roadway Speed at Crossing: 15 mph Close to Signalized Roadway Intersection: Yes, Poplar & Gregg (interconnect) SIGHT DISTANCE IN ALL FOUR QUADRANTS: Northwest : ,rR;, Northeast Southwest f Southeast Other conditions at crossing THE DIAGNOSTIC TEAM RECOMMENDS• - 1 �> t tSignals- Surface Pavement Markings anAdvance Warning Signs - , Comments - l�=r I 10% Match Re ponsibility: ,ter kAj el This recommendation represents a eons esus of opinion of the'f3fagnostic Team and is not a commitment to construct this project nor is it a recommendation that this project be scheduled until adequate funds become available. Railroad Representative L ,_x. AHTD MPP Representa ve t'"� _ , V4 U AHTD District Representative FHWA Representative Ll City/County RepresentativeX/V1,✓ V/ .-0 W 57, Zo `W O r N N Q rmi m N V m 1Li �n Q N 19 Ta Ol Ol N � C CT � 01 U O v P pp o (Ig1 49 J U J iii .17j3Ly{' C 1� D e Q J J3 U U U U U U U U U U U U Q Q 1p' C7 U V So U LL U O U U U 1R o ad U cr-i A U 2 & U U It ct: cr 1Q'i rn rro n A o ct: o Q U d m U U U UL) IL W o U p C U it d Q. d y Y Y d d d d d a U a a p> >Nc • p o �qp � NN • ^ N � N t+f f^G M V � 1� m m <y f1QV CO ..�M N M � Q N N N N M Q Q Q Q Y9 Y9 1p m t0 1� aD m rn � O i� V 0 J W E O L) Na) cef S § H 8 H § HH i R NN 8 § _R $ S § by 8 H § 8 o R N ��Hpp M mm N mm N LI lll�H ^� qp N V� M p O 1.09 cz N V;C O m 8 OJ Q ppb OD N m O � 4N9 O CN9 O O CN9 pO �O�pp f7 O N O m O _ H N H N N N H N H H H H N H H N N H 16 N N N N M _ M N N Q 1 Q N H L.- i� V 0 J W E O L) Na) cef EA70FARKANSAS DEPARTMENT OF TRANSPORTATION , ARDOT.gov I IDriveArkansas.com I Scott E. Bennett, RE., Director KANSAS DEPARTMENT 10324 Interstate 30 1 P.O. Box 22611 Little Rock, AR 72203-2261 TRANSPORTATION Phone: 501.569.2000 1 Voice/M711 1 Fax: S01569.2400 RECEIVED DEC 3 2019 November 22, 2019 CITY OF FAYETTEVILLE MAYOR'S OFFICE The Honorable Lioneld Jordan Mayor of Fayetteville 113 West Mountain Fayetteville, AR 72701 Dear Mayor Jordan: Reference is made to Resolution 210-19 received from the City of Fayetteville for safety improvements at the Poplar Street at -grade railroad crossing of Arkansas and Missouri Railroad (A&M) tracks. As indicated in the resolution, the City expressed its willingness to provide the required ten percent match for Federal -aid Rail -Highway Crossing Safety Program funds to develop a project at this railroad crossing. With the City's commitment for the ten percent match, the Highway Commission approved Minute Order 2019-106 at their October 23, 2019 meeting, authorizing the Department to implement safety improvements at this location. Department staff will coordinate with A&M and the Federal Highway Administration to develop the Federal -aid project. Once an engineering estimate is received from A&M, a formal project agreement and a request for the match will be sent to the City. We appreciate the City's willingness to partner with the Department to improve safety at this crossing. If you have any questions, please contact Tyler Post, the Department's Railroad Coordinator, at 501-569-2115 orjohn.post@ardot.gov. Sincerely, K �inThornton Assistant Chief Engineer — Planning Enclosures c: Deputy Director and Chief Engineer Program Management Transportation Planning and Policy District 4 FHWA - Arkansas Division KDT:JXJ:JTP \\sant\planning\MPP\5 - Rail Coordination\Railroad Jobs\Match Documentation\MO_Approval_Notice_05NOV2019\MO_Approval_Letters_Local_2019_11_22.docx ARKANSAS STATE. HIGHWAY COMMISSION MINUTE ORDER District: Statewide County: Statewide Category: Improvement Project Pagel of 1 Page WHEREAS, it has been determined that improvements are warranted to enhance safety at the three on -system and six off -system railroad crossings indicated on the attached list; and WHEREAS, Federal -aid Rail -Highway Crossing Safety funds are eligible for these improvements; and WHEREAS, local road authorities and one railroad have indicated their willingness to provide rcquired matching funds for the off -system railroad crossings. NOW THEREFORE, the Director is authorized to proceed with improvements at these crossings as funds become available subject to the following conditions: • Maintcnance of the signals and surfaces shall be performed by the Railroad Company at no cost to the State. • All required right-of-way shall be furnished at no cost to the State. Approved: Chairman ice- simian / Member /LA Member Member Submitted 13y: . 14x� Assistht Chief Engineer - Planning Approved: .. /,. k' f Director Minute Order No. Date Passed OCT 2 3 2019 Form 19456 Rev. 1/13/2016 C:\Users\kr40168\Desktop\MO Authorize On- & Off -System RR Xing Improvements 2019-1 O.docx 16-0 AV W O 0- ^w W nE `W O CL 1� L- cn N O U 0 W 'a CD E E O �D O 3 v a c L 0 g o o o g p a�Q S� �� V t7 (7 In N w 69 N ww N • 8 8w O qpw O ppw pw pw Op QN oOopp pOp �O�77 O {O�� w w w w w w w w w o $ o M M Q o v� etf en w w w w w w w w w 0 g o w w w N w w w w w w M W 0 N N � f" 12 E E � c� T� O N N O p N [V N w w Q co Ue u -i u'i j m u"i d D N CO c+> p� op X Z W LtJ W z _+ I ry �I a� Xi v O C7 OI c c 0 g s znS YJ � L L J J J 0 U � Y3 �t y C > L F rC N gi R ri o H 5 aLL `o z cn H m ATC C C Im C H ZB N N G SI Q� N Q K N a a Ld Y a M R tD C." �D O 3 v a c L 0 ul ssou"PlA4 J4-9,5, N ' !400w N � 49Z a;enud U) ul PoauuayS N m m CL any alwwlr N w any uAiey1 N j(] uljsn� jID At4d0J9 N ti P^I8 e111A N O &5 y a rn c a c c H U) w LU 0 Colt Sql§o P� ani J 1 til p/0 m a� a Q w C) Ol Jai Aemaunr N NPS<kosv%yacom c c _ N vo m c5 U co L cc w w c Q a Ili w w 9AVJal994M N d GD C) a^banu�eM N r r c4 90 Q O ti� 09Z Aally 0 z F- 0 Im LLL ale^Ijd c 0 U c 0 any aolue[ N tm c �e P NN G\�o�a E w C c m �06Z o4gnd m O an b AOS100M I MN m ,ai °pa,/�p�,�� slH )saJOJ N c u-1 APe4S N oos jQ esser N any yoJIS N m -96 o o ai o r4 00 lip 2 m y t (� Q U O LL 089 MpO JO cora\d Rd 3 6ZL Nenud a/p� ���a8 N vo N CSL atenud o z p` ro C� any uaJanal N Q m d c m w m Y �` i Ism"_ �'.--�a-_—U. �•-----. �i 3 c 0 U c 0 any aolue[ N tm c �e P NN G\�o�a C c m m O r N d m x � m o = a 3 i r o m` UD Oak Dr CD 3 o Z 3 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 210-19 File Number: 2019-0560 POPLAR STREET RAILROAD CROSSING SIGNALS IMPROVEMENT PROJECT: A RESOLUTION TO EXPRESS THE WILLINGNESS OF THE CITY OF FAYETTEVILLE TO PARTNER WITH THE ARKANSAS DEPARTMENT OF TRANSPORTATION FOR THE POPLAR STREET RAILROAD CROSSING SIGNALS IMPROVEMENT PROJECT WITH A 10% LOCAL MATCH IN THE ESTIMATED AMOUNT OF $30,000.00 WHEREAS, the Rail -Highway Crossing Program provides funds for the elimination of hazards at railway -highway crossings; and WHEREAS, the Arkansas Department of Transportation has identified the crossing at Poplar Street in the City of Fayetteville to be a candidate to receive Rail -Highway Crossing Program funding based upon its hazard rating as compared to similar highway -rail crossings throughout the state; and WHEREAS, an on-site diagnostic meeting was conducted on November 17, 2017, and identified needed improvements to improve safety; and WHEREAS, the Federal Highway Administration (FHWA) limits the Federal share of funding for Rail - Highway Crossing Program projects to 90 percent of the total project cost, thus necessitating a 10 percent share provided by the local roadway authority, and WHEREAS, the Department requests that the roadway authority indicates its willingness to provide the required matching funds in order to obtain Arkansas Highway Commission authorization to program a Federal -aid project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF Page 1 Printed on 9119119 File Number: 2019-0560 Resolution 210-19 FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby authorizes the City of Fayetteville to participate in accordance with its designated responsibilities in this project, including the payment of a 10% local match which is estimated to be $30,000.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby authorizes Mayor Jordan or his designated representative to execute all appropriate agreements and contracts necessary to expedite the development and construction of the project. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby indicates its willingness to proceed with the project and hereby proposes that the Department initiate action to implement the improvements to the Poplar Street railroad crossing. PASSED and APPROVED on 9/17/2019 Attest: ����.•'• CITyo Lisa Branson, Deputy City ClerkS,'✓C•�IVSPS •�������` 1";."4 ";. S'ON'66\) 6 ; Page 2 Printed on 9119M