HomeMy WebLinkAboutORDINANCE 6219113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Ordinance: 6219
File Number: 2019-0456
HUTCHENS CONSTRUCTION:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE
BIDDING AND APPROVE BID FROM HUTCHENS CONSTRUCTION FOR
REPLACEMENT OF THE FIRE MARSHALL PARKING LOT LOCATED AT 4140 SOUTH SCHOOL
AVENUE IN THE AMOUNT OF $21,922.50, AND TO APPROVE A PROJECT CONTINGENCY IN
THE AMOUNT OF $5,000.00
WHEREAS, Hutchens Construction is currently paving the other half of the lot associated with the Airport
taxiway project; and
WHEREAS, employing the same contractor which already has his equipment and crew at the site will
save money, ensure the pavement is continuous in level, finish and appearance and help the City to enforce
the warranty for this paving.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines the facts above
show that an exceptional situation exists in which competitive bidding is deemed not feasible or
practical and therefore waives the requirements of formal competitive bidding and approves a bid from
Hutchens Construction for the milling and repaving of the Fire Marshall Parking Lot with the estimated
amount to be paid by the City of Fayetteville to be $21,922.50, and further approves a project
contingency in the amount of $5,000.00.
Page 1 Printed on 8!22/19
File Number.' 2019-0456
Ordinance 6219
PASSED and APPROVED on 8/20/2019
Attest:
t rL-1�
C�a
Sondra E. Smith, City Clerk TreasuraO'" '
.`���.•' cIrk
'.e%00
. 4Y
.D. C�ell•1
S
Page 2 Printed on 8122119
City of Fayetteville, Arkansas 113 West Mountain Street
/ Fayetteville, AR 72701
/ —'••� i (479) 575-8323
Text File
/ File Number: 2019-0456
Agenda Date: 8/20/2019 Version: 1 Status: Passed
In Control: City Council Meeting
Agenda Number: C. 6
HUTCHENS CONSTRUCTION:
File Type: Ordinance
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE BID FROM HUTCHENS CONSTRUCTION FOR REPLACEMENT OF THE FIRE
MARSHALL PARKING LOT LOCATED AT 4140 SOUTH SCHOOL AVENUE IN THE AMOUNT
OF $21,922.50, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,000.00
WHEREAS, Hutchens Construction is currently paving the other half of the lot associated with the Airport
taxiway project; and
WHEREAS, employing the same contractor which already has his equipment and crew at the site will save
money, ensure the pavement is continuous in level, finish and appearance and help the City to enforce the
warranty for this paving.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines the facts above show
that an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore
waives the requirements of formal competitive bidding and approves a bid from Hutchens Construction for the
milling and repaving of the Fire Marshall Parking Lot with the estimated amount to be paid by the City of
Fayetteville to be $21,922.50, and further approves a project contingency in the amount of $5,000.00.
City of Fayetteville, Arkansas Page 1 Printed on 8122/2019
City of Fayetteville Staff Review Form
2019-0456
Legistar File ID
8/20/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Brad Hardin 7/29/2019 FIRE (300)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff requests council approval of a Bid Waiver authorizing Hutchens Construction to replace the Fire Marshal
Building parking lot at 4140 S. School in the amount of $21,922.50 plus a $5,000 Contingency.
4470.300.8300-5400.00
Account Number
02006.1
Project Number
Budgeted Item? Yes
Does item have a cost? No
Budget Adjustment Attached? NA
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
Capital
Fund
Fire Facility Maintenance
Project Title
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
$
187,767.00
$
5,100.00
$
182,667.00
$
26,922.50
$ 155,744.50
Previous Ordinance or Resolution #
Approval Date:
V20180321
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF AUGUST 20, 2019
TO: Mayor and City Council
FROM: Brad Hardin, Fire Chief
DATE: July 29, 2019
CITY COUNCIL MEMO
SUBJECT: Approval of a Bid Waiver authorizing Hutchens Construction to replace the
Fire Marshal Building parking lot at 4140 S. School in the amount of $21,922.50 plus a
$5,000 Contingency
RECOMMENDATION:
Staff requests council approval of a Bid Waiver authorizing Hutchens Construction to replace
the Fire Marshal Building parking lot at 4140 S. School in the amount of $21,922.50 plus a
$5,000 Contingency.
BACKGROUND:
The existing Fire Marshal Building parking lot has exceeded its life expectancy and is needing
replacement. There are several holes and missing asphalt.
DISCUSSION:
A Bid Waiver is being proposed and is necessary because it is not practical or feasible for the
formal bid process. This is because Hutchens Construction is already paving the other half of
the lot associated with the Airport taxiway project. Upon review with Facilities Management, it
is important that Hutchens Construction do the entire parking lot due to warranty issues and the
final finish and appearance being the same.
BUDGET/STAFF IMPACT:
The Bid Proposal amount from Hutchens Construction is $21,922.50 plus a $5,000 project
contingency for a total expense of $26,922.50. The funds are already budgeted in the capital
project 02006.1 Fire Facility Maintenance for this expense.
Attachments:
Hutchens Construction Bid Proposal, Supporting Documentation
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
REVISED BID PROPOSAL 7/25/2019
Asphalt Paving/Gushed Umestone
. b IWa offim =7 Meia Swat SROM = S15 Sardw%Ave
CMAle. MO 65625 St:ingdtlq AR 72766
www.hutchertsconstraction.com dw*(4t7)aA-& 0aw(s79)9�2?- M0
Iou Fee (BBB) MA172 - (BU) 726-3482
AR Contractor License: 0387030520
cote To:
City of Fayetteville
Job Name:
Fire Marshall Parking Lot - Fayetteville
113 West Mountain Street
Job Location:
4140 S School Street
Fayetteville, AR 72701
Fayetteville, Arkansas
Attn:
Wade / Mark
Proposal Datc:
7/25/2019
Phone:
479-575-8361
Bid Date:
Fax:
Addcndums
Mobile:
Estimator:
ITEM
DESCRIPTION
QUANTITY
UNIT UNIT PRICE AMOUNT
100 Mill Existing Asphalt Q 3" Depth
395.00
SY 14.50 5,727.50
200 Install Asphalt Surface (Qa 3" Depth
395.00
SY 41.00 16,195.00
NOTES:
***CITY OF FAYETTEVILLE WOULD BE RESPONSIBLE FOR OBTAINING ANY PERMITS THAT MAYBE
REQUIRED FROM ArDOT FOR WORKING IN ArDOT RIGHT OF WAY.***
* **PRICE IS BASED ON MILLING OUT 3 INCHES PAVING BACK AT 3 INCHES. THE LARGE POTHOLE AREA
WILL BE MILLED OUT 6 INCHES AND A TOTAL OF 6 INCHES OF ASPHALT PUT BACK.***
***IF ADDITIONAL ASPLHALT IS NEEDED (GREATER THAN 76 TONS) DUE TO HAVING TO MILL DEEPER
THAN ANTICIPATED IN THE AREA DISCUSSED, THE CITY WOULD BE CHARGED A PRICE OF $81.95 PER TON
FOR EACH TON OVER 76 TONS. THE PRICE OF $81.95 IS THE PER TON PRICE OF THE ASPHALT PLUS HAUL
COST PER TON.***
*WORK PERFORMED M -F, 7AM TO SPM, NO NIGHTS OR WEEKENDS.
*PERMITS, STRIPING, BOND, SAWCUTTTNG AND CONSTRUCTION CONTROL ARE EXCLUDED.
*WORK IS BASED ON ONE MOBILIZATION FOR ASPHALT AND ONE FOR MILLING. ADDITIONAL
MOBILIZATIONS TO BE CHARGED AT $2,000 EACH.
*HUTCHENS CONSTRUCTION SHALL NOT BE HELD RESPONSIBLE FOR DRAINAGE PROBLEMS WHERE THE
PERCENT OF FALL IS LESS THAN 2°/a ANY CORRECTIVE ACTION TO BE DONE ON A TIME AND MATERIALS
BASIS.
*PROPOSAL VALID FOR IS CALENDAR DAYS AND WITH WORK BEING PREFORMED WITHIN 90 CALENDAR
DAYS.
*WORK TO BE DONE IN ACCORDANCE WITH A MUTUALLY AGREED UPON SCHEDULE.
*ADD 1% IF PERFORMANCE & PAYMENT BOND IS REQUIRED.
See the attached Terms and Conditions for additional proposal conditions and signature block.
Owner/Contrac r Hutchens Construction
Initials: Initials:
Page 1 of 1
nn, Granville
From:
Hardin, Brad
Sent:
Thursday, July 25, 2019 4:16 PM
To:
Wynn, Granville
Cc:
Abernathy, Waylon
Subject:
FW: Fire Marshal Parking Lot
Attachments:
revised bid proposal 7-25-19.pdf
Granville can you please get this added to Legistar? Please include a $5,000 contingency. Thanks, Brad
Brad Hardin
Fire Chief
Fire Department
City of Fayetteville, Arkansas
T 479.973.4824 1 F 479.575.0471 1 M 479.841.5671
Facebook I Twitter I YouTube
MA Please consider the environment before printing this e-mail
From: Waylon Abernathy <wabernathy@fayetteville-ar.gov>
Date: Thursday, July 25, 2019 at 2:08 PM
To: Brad Hardin <bhardin@fayetteville-ar.gov>
Subject: FW: Fire Marshal Parking Lot
Can you have Granvile get this one on legistar? The deadline is Aug. 2nd
Sole source justifiable because they are already paving the other half associated with the Airport taxiway project.
Wade Abernathy
Facilities and Building Projects Manager
City of Fayetteville
wa bernathy@fayettevi I le -a r.Rov
T 479-575-8361
CITY OF
IWA FAYETTEV�IILLE
ARKANSAS
From: Shawn Shrum <Shawn@ HutchensConstruction.com>
Sent: Thursday, July 25, 2019 1:27 PM
To: Abernathy, Waylon <wabernathy@fayetteville-ar.gov>
Subject: RE: Fire Marshal Parking Lot
1
Wade,
1 have added an asphalt allowance per ton price in the notes. I cannot give a total dollar or tonnage amount because I
have no idea what it may be. The per ton price of asphalt (this includes the asphalt per ton price and the per ton haul
price) is $81.95. If you want to guess at a certain number of tons over the 76 tons, you can figure it at $81.95 per
ton. Based on the small area, I do not think it would go over by much. A load (approx. 20 tons) would put it over by
$1,639. If we were just going in and overlaying an area, it is easy to figure the tonnage. When you start removing
asphalt, especially with the pothole areas and uneven areas, it is hard to say what you are going to get into.
Shawn Shrum
Office: 479-927-0000
Fax: 479-927-0096
Cell: 479-466-6005
Shawn PHutchensConstruction.com
1ddaL.ILt
Asphalt Paving/Crushed Limestone
F
fl "Mt OfftE 1007 Man SMA S�gdd*0R%r. 515 Sanders Ave
cassVik M0 61629 S drgiale. AR 72764
Employee owned pie (417) 847-2494 phone (479) 427-=
Toll Free (888) AAVEM - (BU) 728-3482
www.huithens[ons[rut fiora.cam
APlease consider the environment before printing ti -ii_ email
From: Abernathy, Waylon <wabernathv@fayetteville-ar.gov>
Sent: Thursday, July 25, 2019 11:46 AM
To: Shawn Shrum <Shawn@ HutchensConstruction.com>
Cc: Hardin, Brad <bhardin@fayetteville-ar.gov>
Subject: RE: Fire Marshal Parking Lot
We realize it will be over 20K ... that is the threshold that will send it to council for approval.
I need an allowance figure included in your bid for the asphalt .... it can be per ton or SY. For example you have a base bid
of 21,922.50 plus 50 SY @ 41.00 for an allowance of 2,050 for a total agreement of 22,972.50.
I'm just using 50SY as an example you may recommend more.
We can do our own contingency on the Purchase Order to cover anticipated soils.
Wade Abernathy
Facilities and Building Projects Manager
City of Fayetteville
wabernathv@favettevil le-ar.eov
T479-575-8361
CITY OF
VA FAYETTEVILLE
ARKANSAS
From: Shawn Shrum <Shawn@HutchensConstruction_com>
Sent: Thursday, July 25, 2019 11:31 AM
To: Abernathy, Waylon <wabernathv@favetteville-ar.eov>
Cc: Hardin, Brad <bhard in@favetteville-ar.gov>
Subject: RE: Fire Marshal Parking Lot
Wade,
The three inch option will put it over the $20,000 price. Is that okay? I will give you a price for asphalt by the ton. I bid
the job by the square yard, but I will give you a price for asphalt only in the event we go over the quantity I have in the
bid. I have 76 tons figured in the 3 inch option. When we go over on a job, we usually just charge the price of the
asphalt plus the haul, unless the area or scope of work changes. Does this sound like what you are needing?
Shawn
From: Abernathy, Waylon <wabernathy@favetteville-ar.gov>
Sent: Thursday, July 25, 2019 9:00 AM
To: Shawn Shrum <Shawn@HutchensConstruction.com>
Cc: Hardin, Brad <bhardin@favetteville-ar.gov>
Subject: Fire Marshal Parking Lot
Shawn,
Chief Hardin and I have decided we need to re -vise the bid to include some contingencies in event there are some
unforeseen conditions.
Therefore we would like to consider your original bid, however include an allowance figure for undercut, and another
for extra asphalt if the milling takes out all of the exiting paving.
Of course the allowances may or may not be used, but our intent is to present that that figure to council for approval,
and not have to go back for additional approval later if something is found.
The council approval time frame is August 20th. We can work with the Airport project to coordinate this work.
Let me know if you have any questions.
Wade Abernathy
Facilities and Building Projects Manager
City of Fayetteville
wabernathy@favetteville-ar.p-ov
T 479-575-8361
CITY OF
WA FAYETTEVILLE
ARKANSAS
NORTHWEST ARKANSAS
Democrat r� � Gazette
AFFIDAVIT OF PUBLICATION
I Cathy Staggs, do solemnly swear that I ani the Accounting INlana�gcr ol'the
Northwest Arkansas Democrat -Gazette, printed and published in
Washington County and Benton County, Arkansas, and of -bona fide
circulation, that from my own personal knowledge and reference
to the files of said publication, the advertisement of:
CITY OF FAYETTEVILLE
Ord. 6219
Was inserted in the Regular Edition on:
August 29, 2019
Publication Charges: 97.50
Cathy Sty g
0,13
Subscribed and sworn to before me
This S day of S1 2019.
P,A�V-,T I � )- , &
Notary Public I��� /-Zuq
My Commission Expires: Z
**NOTE**
Please do not pay from Affidavit.
Invoice will be sent.
Ordinance: 6219
File Number 3019-0-156
I It II'C I IENS CONSTRUCTION
AN ORDINANCE TO WAIVE
I'IIE:REOUIRFML•NTS OF FORMAL
COMPE'l I IIVI: BIDDING AND APPROVE
BID FROM HUTCHENS
CONSTRUCTION FOR
REPLACEMENT OF THF: FIRE MARSHALL
PARKING LOT LOCATED AT 4140 SOUTI I
SCHOOL AVENUE IN THE AMOUNT OF
S21.922 50, AND TO APPROVE A PROJECT
CONTINGENCY IN 7'1 IE AMOUNT OF
55,000.00
WI IEREAS, I hachens Construction us currently
paring the other halfof the lot associated Dodi
the Airprrl tam%%ay prolect: and
WHEREAS, employing the same contractor
%%hick already has his equipment and crew at the
Soe "III Save Mone%. ensure the pa%emenl is
eonttnuouS tit Ie%el, finish and appearance and
help Ilse City to enforce the %%arranly for this
paving
NOW, THEREFORE, BE 1'1 ORDAINED BY
TI IE CITY COUNCI1. 01: THE CITY OF
FAYETTEVILLE, ARKANSAS
Scelion 1.,I hal lite Cite Council ofihc Cil%ol'
Favetle%ille. Arkansas hereby determines the
facts abo%e slum that an ewepfional situation
exists in %%hich compelnive bidding is deemed
not Fusible or practical and therefore %%ai\es the
requurvinews of I-onnal competitive bidding and
approves a bud From 1 hachens Construction for
the milling and repaving of the Fire Marshall
I%Irking Lot with the estimated amount to be
paid hr the Cit% of Fayetteville to be $21,922.50.
and fulrheu appro%es a project contingency in the
amount of 55,000 00.
PASSED and APPROVED on 812012019
Appro%cd
honeld Jordan, Ma%or
Attest
Sondra L, Smith, City Clerk Treasurer
75061111 Aug 29, 2019