Resolution: 174-19
File Number: 2019-0422
FLEMING ELECTRIC, INC.:
A RESOLUTION TO AUTHORIZE THE PURCHASE OF FOUR ELECTRICAL JUNCTION BOXES
AND THE REPAIR OF AN ELECTRICAL CONDUIT FOR THE BIOLOGICAL TREATMENT
UNITS AT THE WEST SIDE WASTEWATER TREATMENT FACILITY FOR THE TOTAL AMOUNT
OF $18,704.00 PLUS APPLICABLE TAXES AND FREIGHT CHARGES, AND TO APPROVE A
BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts a quote in the
amount of $18,704.00 plus applicable taxes and freight charges from Fleming Electric, Inc. for the
purchase of four new electrical junction boxes and the repair of an electrical conduit for the biological
treatment units at the West Side Wastewater Treatment Facility.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
PASSED and APPROVED on 8/6/2019
o•
•c-
�G'J•• SAS •• �.�
�iy coo
City of Fayetteville, Arkansas 113 West Mountain Street
/ l
Fayetteville, AR 72701
(479) 575-8323
I ,v'
/ Text File
--- / File Number: 2019-0422
Agenda Date: 8/6/2019 Version: 1 Status: Agenda Ready
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 2
FLEMING ELECTRIC, INC.:
A RESOLUTION TO AUTHORIZE THE PURCHASE OF FOUR ELECTRICAL JUNCTION BOXES
AND THE REPAIR OF AN ELECTRICAL CONDUIT FOR THE BIOLOGICAL TREATMENT UNITS
AT THE WEST SIDE WASTEWATER TREATMENT FACILITY FOR THE TOTAL AMOUNT OF
$18,704.00 PLUS APPLICABLE TAXES AND FREIGHT CHARGES, AND TO APPROVE A BUDGET
ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts a quote in the amount of
$18,704.00 plus applicable taxes and freight charges from Fleming Electric, Inc. for the purchase of four new
electrical junction boxes and the repair of an electrical conduit for the biological treatment units at the West Side
Wastewater Treatment Facility.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a
copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 8/712019
City of Fayetteville Staff Review Form
2019-0422
Legistar File ID
8/6/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 7/11/2019 WASTEWATER TREATMENT (730)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends the replacement of four (4) damaged electrical junction boxes and the repair of electrical
conduit for the biological treatment units located at the West Side Wastewater Treatment Facility by Fleming
Electric, Inc. in the amount of $18,704.00 plus applicable taxes, and approval of a budget adjustment.
Budget Impact:
5400.730.5800-5414.00 Water and Sewer
Account Number
Fund
02069.1
Plant Pumps and Equipment
- WWTP
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$
1,060,718.00
Funds Obligated
$
1,060,715.61
Current Balance
[ $ 2.39
Does item have a cost? Yes
Item Cost
$
20,527.64
Budget Adjustment Attached? Yes
Budget Adjustment
$
20,528.00
Remaining Budget I $ 2.75
V20180321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Approval Date:
Comments: Taxes are estimated at $1,823.64 for a total cost of $20,527.64.
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF AUGUST 6, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Water & Sewer Committee
Tim Nyander, Utilities Director
FROM: Greg Weeks, Wastewater Treatment
DATE: July 11, 2019
CITY COUNCIL MEMO
SUBJECT: Electrical Junction Box and Conduit Repairs at the West Side Wastewater
Treatment Facility
RECOMMENDATION:
Staff recommends the replacement of four (4) damaged electrical junction boxes and the repair
of electrical conduit for the biological treatment units located at the West Side Wastewater
Treatment Facility by Fleming Electric, Inc. in the amount of $18,704.00 plus applicable taxes,
and approval of a budget adjustment.
BACKGROUND:
The West Side Treatment Facility utilizes a series of four biological nutrient removal reactors
(bio -units) to treat an average of 7.2 million gallons of wastewater per day (2017, Annual AVG).
Since the facility's start-up in 2008, gradual settling of some asphalt and concrete surfaces have
slowly occurred next to the bio -units. Four junction boxes near these areas have been damaged
as a result and need to be replaced, and repairs are also needed for nearby electrical conduits
that were damaged by the settling.
DISCUSSION:
Adjacent to the facility's biological treatment units, there are several areas where asphalt or
concrete surfaces show signs of approximately 1-3 inches of sub -grade settling. Above the
concrete or asphalt surfaces are electrical junction boxes attached to the bio -unit's exterior
walls. As the impervious surfaces have slowly shifted in elevation, a downward pressure has
been exerted on nearby electrical conduits resulting in both damaged conduit and junction
boxes. Staff believes the shifting asphalt and concrete surfaces are the result of a very gradual
settling of the subgrade-backfill going back to the facility's initial construction over ten years ago.
Staff have not observed evidence suggesting the settling rate is increasing or the result of a
suddenly recent occurrence. Also, area evidence points to the shifting surfaces being that of the
concrete and asphalt (next to the biological basins) rather than settling of the basins
themselves. It is our expectation the next 10 years will not repeat the same extent of subgrade
settling. However, this repair proposal does include expansion fittings that will protect against
the possibility of future damage.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Recently, written quotes were requested from three local vendors with Fleming Electric, Inc.
having the lowest bid. Below are the three bid amounts that were received:
Fleming Electric, Inc. $18,704.00
Crossland Heavy Contractors $25,571.00
King Electric $35,930.00
Staff recommends completion of the proposed repairs by Fleming Electric, Inc. in the amount of
$18,704.00. Taxes are estimated to be $1,823.64 for a total project cost of $20,527.64.
BUDGET/STAFF IMPACT:
Budgeted funds will be moved from the Sanitary Sewer Rehabilitation account to the Plant
Pumps and Equipment account to cover the repair costs for the damaged electrical junction
boxes and electrical conduit. Funds being moved are budgeted funds for sewer
rehabilitation/replacement and maintenance.
Attachments:
Three Repair Quotes
Budget Adjustment
Fleming Electric, Inc. ( U Q T E
Your Total Solution Provider NWAQ7440-01
3311 Southwest I Street Bentonville, AR 72712 Date Jun 14, 0-01
(479)715-6099 Fax: (479)715-6855
2019
email: dispatch@fleminc.com Expires Jul 13, 2019
Quoted To: Contractors License # 0023160416
Jacobs Project # Conduit and box
repairs
Jeremy LaCoe/Tim Marr Plan # AAE#90254
1400 N. Fot Hunter Road
Fayetteville, AR 72701 Tips/Taps#
MC # 11732
Submitted By:
Phone 479-443-3292 Tim Edens
Email Jeremy.LaCoe@Jacobs.com/-Fim.Marr@J
Estimator:
Shay Hardin
�escripion Unit Price Qty Ext. Price l
Provide and install 4 new nema 4x boxes $18,704.00 1 $18,704.00
Provide and install expatiation joints on all conduits coming out of ground
Provide 3 guy for 10 days to pull all wires back to install boxes
AIII labor quoted for week days no over time included
No wires to be spliced unless existing
Terminal blocks will be installed to accommodate all existing spliced wires in south
box
Jeremy IaCoe & Tim Marr will coordinate the shut down if needed
Excluding new wireing due to unseen damage
.................. -...... ..
Subtotal $18,704.00
I accept the terms and con diti ns of this quotation. Sales Tax $0.00
SignedA30
OhC Y ah Date: 0—&—�q
Name: Title: A 0
Grand Total** $18,704.00
Termsay Draw, . lance Due Upon Completion/De very.
**APPLICABLE SHIPP CHARGES AND SALES TAX, IF ANY, WILL BE CHARGED AT TIME OF BILLING**
Exclusions: 1) Cutting, Patching & Painting 2) Concrete 3) Asphalt Cutting & Patching 4) Trash Removal & Dumpster 5) Core Drilling 6)
Power Company Charges 7) Roof Penetration 8) Engineering Fees 9) No welding or fabrication 10) No programming or commissioning,
unless specifically included in above quote.
Note: If any case of solid rock is encountered, a rock clause will be in effect. The rock clause states there will be a minimum charge of
$1,000.00 per cubic foot removal fee. We exclude all engineering fees.
Page 1 of 1
HEAVY CONTRACTORS
Fayetteville West Side WWTP — Fayetteville, AR
501 S. East Ave, P.O. Box 350
Columbus, KS 66725
Tel: 620.429.1410
Fax: 620.429.2977
June 14, 2019
Mr. Jeremy LaCoe
Maintenance Supervisor
1400 N Foxhunter Rd.
Fayetteville, AR. 72701
Reference: Electrical Component Removal & Replacement
Mr. LaCoe,
Crossland Heavy Contractors is pleased to provide to you a quotation to complete the
replacement of the specified electrical components at the Fayetteville West WWTP. Below is a
brief outline of the work as proposed.
Crossland Heavy Contractors will contract with Harvey Preston Electric Co. Inc, to replace the
specified electrical boxes & damaged conduit that were observed on 6/04/2019. Crossland Heavy
Contractors will replace all asphalt and sod areas disrupted during the repair. Attached is the
scope of work for Harvey Preston for this project.
A breakdown of the cost of work is below:
• CHC Materials — $1.041.00
o Asphaltic Cold Patch
o Bermuda Square Sod
o Class 7 Baserock
• Labor- $1,676.00
o Foreman
o Skilled Operator
o Skilled Laborer
• Equipment - $650.00
o CAT 256 Wheeled Skid Steer
o Light Duty Truck(s)
• Subcontractors - $21,103.00
o Harvey Preston Electric Co. Inc.
• Contractor Bond & Insurance - $1.101.00
The total cost of construction to remove and replace the specified electrical components as well
as restore the disturbed areas at the working sites back to acceptable condition:
• Complete Total Cost - $25,571,00
• Total Working Days Required — 5 Days
If there are any questions or concerns regarding this matter please feel free to give me a call.
Respectfully,
Garrett Street
620-202-1834
Project Manager
Crossland Heavy Contractors
HARVEY -PRESTON ELECTRIC CO. INC.
12110 Old Hwy 71 South
Fort Smith, AR. 72916
email<bjohson@harveyprestonelectric.com> Phone 479-646-0433
Fax 479-646-2245
www.harveyprestonelectric.com
6-14-19 PROPOSAL page 1 of 1
Fayetteville, AR
West side wastewater treatment plant
Ref: Junction box replacement
Harvey -Preston Electric Company, Inc., will furnish all tools, material and labor to repair stainless junction boxes.
Included
(south J -Boxes)
- Remove asphalt over south junction box conduits
- Demo (2) 14x14x6 NEMA 4X junction boxes
- Demo existing vertical conduits all the way back to PVC
- Determinate all conductors.
- Tap on to existing underground PVC conduit to install new ROBROY conduit and 90's
- Replace J -boxes with new SS NEMA 4x hinged cover junction boxes.
- All box and conduit support to be in stainless steel.
- Re terminate all existing conductors. (control conductors to be in terminal's)
(north J -boxes)
- Excavate down to existing underground PVC conduits.
- Pull out all existing conductors
- Tap on to existing underground PVC conduit to install new ROBROY conduit and 90's
- Replace all existing junction boxes with new stainless steel NEMA 4X hinged cover J -boxes.
- All box and conduit support to be in stainless steel.
- Re terminate all existing conductors. (no terminals on controls)
Excluded
- Asphalt repair.
- Excavation spoil disposal.
- City of Fayetteville Permit.
Note
- Owner will be responsible for start up testing Harvey Preston will aid if needed.
Bonding if required at an additional cost of $15.00 per $1000.00.
All work to be performed during normal working hours.
KING ELECTRICAL CONTRACTORS, INC.
2145 WEST MOORE LANE
FAYETTEVILLE, AR 72704
479-443-0006 FAX 479-443-2594
Email: gordon@ckingelectric.net
PROPOSAL
TO:
PHONE
DATE
Jacobs
April 10, 2019
1400 North Fox Hunter Road
JOB NAME
Fayetteville, AR 72701
Westside WWTP
Attn: Tim Marr
brft-Statnns7
.Li.��tstivrri2�
JOB DESCRIPTION
See attached scope sheet
We have seen zero (0) addendum(s) or revision(s) or clarification(s)
Contractor's License #0063870419
Westside Unit I junction box repair $16,700.00
Westside Unit 2 junction box repair $19,230.00
Westsidechange out $4,300.00 each
d�
Lift Station]j3a g D change out $5,100.00 each
Lift Station LPAO-YrW verachange out $9,200.00
PROPOSAL GOOD FOR 30 DAYS
DOLLARS:
$ SEE ABOVE
TERMS: PAYMENT DUE UPON RECEIPT OF INVOICE
AUTHORIZED SIGNATURE
A FINANCE CHARGE WILL BE CHARGED ON ALL
PAST DUE ACCOUNTS OF .0833% PER MONTH. ALL
ATTORNEY FEES WILL BE COLLECTED ON PAST DUE
�G ""' 12
ACCOUNTS.
7
Gordon Ray
Project Manager/ Estimator
THE ABOVE PRICES SPECIFICATIONS AND CONDITIONS
ACCEPTANCE SIGNATURE
ARE SATISFACTORY AND ARE HEREBY ACCEPTED.
YOU ARE AUTHORIZED TO DO WORK AS SPECIFIED.
PAYMENT WILL BE MADE AS OUTLINED ABOVE.
KING ELECTRICAL CONTRACTORS
Scope Sheet
General Inclusions & Exclusions
Inclusions
1. Wiring per site visits 3/29/2019 Division 26 electrical. All estimates are based
upon our contract rates with the City of Fayetteville.
2. Permit and inspection fees if applicable.
3. Division 26 excavation.
4. Trenches backfilled with existing dirt and tamped.
5. Taxes.
6. Equipment rental.
7. Demolition/debris or trash removal as directed on site.
8. Division 26 excavations dirt or spoils removal from site.
9. Owner is responsible for de -energizing equipment, controls and
communication for our lock out and tag out.
Exclusions
1. Payment, Bid or Performance Bond.
2. Engineering services, stamps or plans.
3. Overtime labor.
4. Furnishing or installing wiring and equipment for Fire Alarm, Phone, VOIP,
POS, CATV, Data, Fiber Optic, CCTV, Security, Access control, SCADA,
Audio, and Video systems.
5. Allowances.
6. Electrical System coordination and/or Arc Flash investigation, studies,
calculations or reports.
7. Access panels for electrical equipment.
8. Cutting, painting, penetrations, backing or repair & patching of concrete,
asphalt, walls, ceiling, roof or floors for electrical conduit & equipment.
9. Cutting or patching parking lot for electrical equipment.
10. Ditch compaction testing.
11. Back filling Division 26 excavations with classified rock.
12. Any type of rock excavation.
13. Landscaping or repair due to Division 26 excavation.
14. Directional Boring.
15. Formed or finished concrete.
16. Asbestos or hazardous material abatement.
2
KING ELECTRICAL CONTRACTORS
Scope Sheet
Westside WWTP Unit 1 & Unit 2 Junction Box Repair
Inclusions
1. Saw cut and demo approximately 4 foot by 8 eight section of asphalt in front
of unit 1 junction boxes.
2. Excavate dirt in front of unit 2 junction boxes.
3. We are assuming the existing conduits are not concrete encased.
4. Excavate down to existing conduits and attempt to raise to original height.
5. Pour concrete around conduit to stabilize.
6. Replace two 12x12 Nema 4x stainless steel junction boxes at unit 1.
7. Replace two 12x12 Nema 4x stainless steel junction boxes and replace one
24x24 junction box at unit 2.
8. Replace unistrut for junction boxes and conduit strapping.
9. Repair and replace above ground sections of plastic coated GRC conduit.
10. Install plastic coated GRC conduit expansion fittings.
11. Replace plastic coated GRC conduit myers hubs.
12. Install terminal strips for existing wire retermination.
13. Estimated repair time for each location 4 days.
Exclusions
1. Repulling existing wire. To lengthen we will mark, cut and install on
terminal blocks.
2. Repulling existing wire. To lengthen we will mark, cut and crimp butt splice
and heat shrink for large conductors.
3. Asphalt replacement.
4. Engineering services, stamps or plans.
5. Furnishing or installing wiring and equipment for Fire Alarm, Phone, VOIP,
POS, CATV, Data, Fiber Optic, CCTV, Security, Access control, SCADA,
Audio, and Video systems.
6. Allowances or unit prices.
7. Electrical System coordination and/or Arc Flash investigation, studies,
calculations or reports.
8. Access panels for electrical equipment.
9. Cutting, painting, penetrations, backing or repair & patching of concrete,
asphalt, walls, ceiling, roof or floors for electrical conduit & equipment.
10. Ditch compaction testing.
11. Back filling Division 26 excavations with classified rock.
12. Any type of rock excavation.
13. Landscaping or repair due to Division 26 excavation.
14. Directional Boring.
15. Formed or finished concrete.
16. Asbestos or hazardous material abatement.
KING ELECTRICAL CONTRACTORS
Scope Sheet
Westside WWTP Areator VFD Replacement's
Inclusions
1. Remove existing Altivar VFD and componentplace on pallets for
removal or disposal by owner.
2. Install new Altivar VFD, display and comp gents relays, contactors, SPD
and fuses furnished by owner.
3. Electrician present for factory start-up d commissioning.
4. Wire, lugs and miscellaneous materi for interconnections and terminations.
Exclusions
1. Repulling existingwire. To ngthen we will mark, cut and install on
terminal blocks or but
spl' a and heat shrink large conductors.
2. New VFD programmin start-up and commissioning fees.
3. Engineering services, amps or plans.
4. Furnishing or install' g wiring and equipment for Fire Alarm, Phone, VOID,
POS, CATV, Dat , Fiber Optic, CCTV, Security, Access control, SCADA,
Audio, and Vid systems.
5. Allowances.
6. Electrical S stem coordination and/or Arc Flash investigation, studies,
calculatio s or reports.
7. Access panels for electrical equipment.
8. Cutting, painting, penetrations, backing or repair & patching of concrete,
asphalt, walls, ceiling, roof or floors for electrical conduit & equipment.
9. Asbestos or hazardous material abatement.
Inclusions
KING ELECTRICAL CONTRA ORS
Scope Sheet
Lift Station 12 Hamstring V Replacement
Remove existing E/d*
components and place on pallets for removal
or disposal by owne
Install new Altivar and components including relays, contactors,
SPD, power factor fuses furnished by owner.
Electrician present -up and commissioning.
Wire, lugs and miscerial for interconnections and terminations.
Exclusions
1. Repulling existing wire. To lengthen we will mark, cyf and install on terminal
blocks or butt splice and heat shrink large conductofs.
2. New VFD programming, start-up and commissioning fees.
3. Engineering services, stamps or plans.
4. Furnishing or installing wiring and equi/ent for Fire Alarm, Phone, VOIP,
POS, CATV, Data, Fiber Optic, CCT , Security, Access control, SCADA,
Audio, and Video systems.
5. Allowances. 1�-
6. Electrical System coordinatio and/or Are Flash investigation, studies,
calculations or reports.
7. Access panels for electri 1 equipment.
8. Cutting, painting, pen rations, backing or repair & patching of concrete,
asphalt, walls, ceili , roof or floors for electrical conduit & equipment.
9. Asbestos or hazar ous material abatement.
KING ELECTRICAL CONTRACTORS//
Scope Sheet
Lift Station 2 400 KW Generator Replacement
Inclusions
1. Disconnect and remove existing 40015, 9 diesel generator.
2. Install and connect new 400 KW di del generator furnished by owner.
3. Load and transport new 400 KW enerator from the Noland WWTP to Lift
Station 2.
4. Load and transport old 400 generator from Lift Station 2 to the Noland
WWTP.
5. Electrician present for rt -up and commissioning.
6. Crane rental.
7. Transport truck an trailer.
Exclusions
1. Any work/o existing automatic transfer switch.
2. Remov of diesel for existing generator.
3. Furni ing diesel for new generator.
4. Ne Igenerator and automatic transfer switch programming, start-up and
co missioning fees.
5.Xb
pulling existing wire. To lengthen we will mark, cut and install on terminal
locks or butt splice and heat shrink large conductors.
Unloading new generator when delivered.
611
Owner is responsible that existing battery r harger and block heater circuits are
adequate for new generator.
8. Owner is responsible that new genera 6r will fit in existing location for
conduit entry, required safe clearan s and maintenance door opening
clearance.
9. Engineering services, stamps or
10. Furnishing or installing wirin
POS, CATV, Data, Fiber O Ie.
Audio, and Video systems.
11. Allowances.
12. Electrical System coord' ation
calculations or reports
pians.
nd equipment for Fire Alarm, Phone, VOIP,
CCTV, Security, Access control, SCADA,
and/or Arc Flash investigation, studies,
13. Access panels for el trical equipment.
14. Cutting, painting, netrations, backing or repair & patching of concrete,
asphalt, walls, cei ng, roof or floors for electrical conduit &equipment.
15. Asbestos or haz dous material abatement.
16. Landscaping o repair due to Division 26 work.
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division WASTEWATER TREATMENT (730) Adjustment Number
2019 /Org2
Requestor: Cheryl Partain
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
A Budget Adjustment is needed in the Plant Pumps and Equipment - WWTP project for the replacement of four
damaged electrial junction boxes and the repair of electrical conduit for the biological treatment units at the Westside
WWTP. Budgeted funds from the Sanitary Sewer Rehabilitation project will be transferred to this project to cover the
cost of this item. The budgeted funds being transferred are for sewer rehabilitation/replacement and maintenance.
COUNCIL DATE: 8/6/2019
LEGISTAR FILE ID#: 2019-0422
LinkHtttcZleylw
7/11/2019 10:31 AM
Budget Director Date
TYPE: D - (City Council)
JOURNAL #:
GLDATE:
RESOLUTION/ORDINANCE CHKD/POSTED:
TOTAL - -
x.20190516
increase / (Decrease) Proiect.Sub#
Account Number Expense Revenue Project Sub.Detl AT Account Name
5400.730.5800-5414.00 20,528 - 02069 1 EX Plant Equipment Maintenance
5400.720.5700-5815.00 (20,528) - 02017 1 EX Sewer Improvements
H:\Budget Adjustments\2019_Budget\City Council\08-06-2019\2019-0422 BA Fleming Electric, Inc. 1 of 1