Loading...
HomeMy WebLinkAbout174-19 RESOLUTIONOF FAYETrF a i 'wAr= m 9 qKA NSpS 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 174-19 File Number: 2019-0422 FLEMING ELECTRIC, INC.: A RESOLUTION TO AUTHORIZE THE PURCHASE OF FOUR ELECTRICAL JUNCTION BOXES AND THE REPAIR OF AN ELECTRICAL CONDUIT FOR THE BIOLOGICAL TREATMENT UNITS AT THE WEST SIDE WASTEWATER TREATMENT FACILITY FOR THE TOTAL AMOUNT OF $18,704.00 PLUS APPLICABLE TAXES AND FREIGHT CHARGES, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts a quote in the amount of $18,704.00 plus applicable taxes and freight charges from Fleming Electric, Inc. for the purchase of four new electrical junction boxes and the repair of an electrical conduit for the biological treatment units at the West Side Wastewater Treatment Facility. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 8/6/2019 o• •c- �G'J•• SAS •• �.� �iy coo City of Fayetteville, Arkansas 113 West Mountain Street / l Fayetteville, AR 72701 (479) 575-8323 I ,v' / Text File --- / File Number: 2019-0422 Agenda Date: 8/6/2019 Version: 1 Status: Agenda Ready In Control: City Council Meeting File Type: Resolution Agenda Number: A. 2 FLEMING ELECTRIC, INC.: A RESOLUTION TO AUTHORIZE THE PURCHASE OF FOUR ELECTRICAL JUNCTION BOXES AND THE REPAIR OF AN ELECTRICAL CONDUIT FOR THE BIOLOGICAL TREATMENT UNITS AT THE WEST SIDE WASTEWATER TREATMENT FACILITY FOR THE TOTAL AMOUNT OF $18,704.00 PLUS APPLICABLE TAXES AND FREIGHT CHARGES, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby accepts a quote in the amount of $18,704.00 plus applicable taxes and freight charges from Fleming Electric, Inc. for the purchase of four new electrical junction boxes and the repair of an electrical conduit for the biological treatment units at the West Side Wastewater Treatment Facility. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 8/712019 City of Fayetteville Staff Review Form 2019-0422 Legistar File ID 8/6/2019 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 7/11/2019 WASTEWATER TREATMENT (730) Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends the replacement of four (4) damaged electrical junction boxes and the repair of electrical conduit for the biological treatment units located at the West Side Wastewater Treatment Facility by Fleming Electric, Inc. in the amount of $18,704.00 plus applicable taxes, and approval of a budget adjustment. Budget Impact: 5400.730.5800-5414.00 Water and Sewer Account Number Fund 02069.1 Plant Pumps and Equipment - WWTP Project Number Project Title Budgeted Item? Yes Current Budget $ 1,060,718.00 Funds Obligated $ 1,060,715.61 Current Balance [ $ 2.39 Does item have a cost? Yes Item Cost $ 20,527.64 Budget Adjustment Attached? Yes Budget Adjustment $ 20,528.00 Remaining Budget I $ 2.75 V20180321 Purchase Order Number: Previous Ordinance or Resolution # Change Order Number: Original Contract Number: Approval Date: Comments: Taxes are estimated at $1,823.64 for a total cost of $20,527.64. CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 6, 2019 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Water & Sewer Committee Tim Nyander, Utilities Director FROM: Greg Weeks, Wastewater Treatment DATE: July 11, 2019 CITY COUNCIL MEMO SUBJECT: Electrical Junction Box and Conduit Repairs at the West Side Wastewater Treatment Facility RECOMMENDATION: Staff recommends the replacement of four (4) damaged electrical junction boxes and the repair of electrical conduit for the biological treatment units located at the West Side Wastewater Treatment Facility by Fleming Electric, Inc. in the amount of $18,704.00 plus applicable taxes, and approval of a budget adjustment. BACKGROUND: The West Side Treatment Facility utilizes a series of four biological nutrient removal reactors (bio -units) to treat an average of 7.2 million gallons of wastewater per day (2017, Annual AVG). Since the facility's start-up in 2008, gradual settling of some asphalt and concrete surfaces have slowly occurred next to the bio -units. Four junction boxes near these areas have been damaged as a result and need to be replaced, and repairs are also needed for nearby electrical conduits that were damaged by the settling. DISCUSSION: Adjacent to the facility's biological treatment units, there are several areas where asphalt or concrete surfaces show signs of approximately 1-3 inches of sub -grade settling. Above the concrete or asphalt surfaces are electrical junction boxes attached to the bio -unit's exterior walls. As the impervious surfaces have slowly shifted in elevation, a downward pressure has been exerted on nearby electrical conduits resulting in both damaged conduit and junction boxes. Staff believes the shifting asphalt and concrete surfaces are the result of a very gradual settling of the subgrade-backfill going back to the facility's initial construction over ten years ago. Staff have not observed evidence suggesting the settling rate is increasing or the result of a suddenly recent occurrence. Also, area evidence points to the shifting surfaces being that of the concrete and asphalt (next to the biological basins) rather than settling of the basins themselves. It is our expectation the next 10 years will not repeat the same extent of subgrade settling. However, this repair proposal does include expansion fittings that will protect against the possibility of future damage. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Recently, written quotes were requested from three local vendors with Fleming Electric, Inc. having the lowest bid. Below are the three bid amounts that were received: Fleming Electric, Inc. $18,704.00 Crossland Heavy Contractors $25,571.00 King Electric $35,930.00 Staff recommends completion of the proposed repairs by Fleming Electric, Inc. in the amount of $18,704.00. Taxes are estimated to be $1,823.64 for a total project cost of $20,527.64. BUDGET/STAFF IMPACT: Budgeted funds will be moved from the Sanitary Sewer Rehabilitation account to the Plant Pumps and Equipment account to cover the repair costs for the damaged electrical junction boxes and electrical conduit. Funds being moved are budgeted funds for sewer rehabilitation/replacement and maintenance. Attachments: Three Repair Quotes Budget Adjustment Fleming Electric, Inc. ( U Q T E Your Total Solution Provider NWAQ7440-01 3311 Southwest I Street Bentonville, AR 72712 Date Jun 14, 0-01 (479)715-6099 Fax: (479)715-6855 2019 email: dispatch@fleminc.com Expires Jul 13, 2019 Quoted To: Contractors License # 0023160416 Jacobs Project # Conduit and box repairs Jeremy LaCoe/Tim Marr Plan # AAE#90254 1400 N. Fot Hunter Road Fayetteville, AR 72701 Tips/Taps# MC # 11732 Submitted By: Phone 479-443-3292 Tim Edens Email Jeremy.LaCoe@Jacobs.com/-Fim.Marr@J Estimator: Shay Hardin �escripion Unit Price Qty Ext. Price l Provide and install 4 new nema 4x boxes $18,704.00 1 $18,704.00 Provide and install expatiation joints on all conduits coming out of ground Provide 3 guy for 10 days to pull all wires back to install boxes AIII labor quoted for week days no over time included No wires to be spliced unless existing Terminal blocks will be installed to accommodate all existing spliced wires in south box Jeremy IaCoe & Tim Marr will coordinate the shut down if needed Excluding new wireing due to unseen damage .................. -...... .. Subtotal $18,704.00 I accept the terms and con diti ns of this quotation. Sales Tax $0.00 SignedA30 OhC Y ah Date: 0—&—�q Name: Title: A 0 Grand Total** $18,704.00 Termsay Draw, . lance Due Upon Completion/De very. **APPLICABLE SHIPP CHARGES AND SALES TAX, IF ANY, WILL BE CHARGED AT TIME OF BILLING** Exclusions: 1) Cutting, Patching & Painting 2) Concrete 3) Asphalt Cutting & Patching 4) Trash Removal & Dumpster 5) Core Drilling 6) Power Company Charges 7) Roof Penetration 8) Engineering Fees 9) No welding or fabrication 10) No programming or commissioning, unless specifically included in above quote. Note: If any case of solid rock is encountered, a rock clause will be in effect. The rock clause states there will be a minimum charge of $1,000.00 per cubic foot removal fee. We exclude all engineering fees. Page 1 of 1 HEAVY CONTRACTORS Fayetteville West Side WWTP — Fayetteville, AR 501 S. East Ave, P.O. Box 350 Columbus, KS 66725 Tel: 620.429.1410 Fax: 620.429.2977 June 14, 2019 Mr. Jeremy LaCoe Maintenance Supervisor 1400 N Foxhunter Rd. Fayetteville, AR. 72701 Reference: Electrical Component Removal & Replacement Mr. LaCoe, Crossland Heavy Contractors is pleased to provide to you a quotation to complete the replacement of the specified electrical components at the Fayetteville West WWTP. Below is a brief outline of the work as proposed. Crossland Heavy Contractors will contract with Harvey Preston Electric Co. Inc, to replace the specified electrical boxes & damaged conduit that were observed on 6/04/2019. Crossland Heavy Contractors will replace all asphalt and sod areas disrupted during the repair. Attached is the scope of work for Harvey Preston for this project. A breakdown of the cost of work is below: • CHC Materials — $1.041.00 o Asphaltic Cold Patch o Bermuda Square Sod o Class 7 Baserock • Labor- $1,676.00 o Foreman o Skilled Operator o Skilled Laborer • Equipment - $650.00 o CAT 256 Wheeled Skid Steer o Light Duty Truck(s) • Subcontractors - $21,103.00 o Harvey Preston Electric Co. Inc. • Contractor Bond & Insurance - $1.101.00 The total cost of construction to remove and replace the specified electrical components as well as restore the disturbed areas at the working sites back to acceptable condition: • Complete Total Cost - $25,571,00 • Total Working Days Required — 5 Days If there are any questions or concerns regarding this matter please feel free to give me a call. Respectfully, Garrett Street 620-202-1834 Project Manager Crossland Heavy Contractors HARVEY -PRESTON ELECTRIC CO. INC. 12110 Old Hwy 71 South Fort Smith, AR. 72916 email<bjohson@harveyprestonelectric.com> Phone 479-646-0433 Fax 479-646-2245 www.harveyprestonelectric.com 6-14-19 PROPOSAL page 1 of 1 Fayetteville, AR West side wastewater treatment plant Ref: Junction box replacement Harvey -Preston Electric Company, Inc., will furnish all tools, material and labor to repair stainless junction boxes. Included (south J -Boxes) - Remove asphalt over south junction box conduits - Demo (2) 14x14x6 NEMA 4X junction boxes - Demo existing vertical conduits all the way back to PVC - Determinate all conductors. - Tap on to existing underground PVC conduit to install new ROBROY conduit and 90's - Replace J -boxes with new SS NEMA 4x hinged cover junction boxes. - All box and conduit support to be in stainless steel. - Re terminate all existing conductors. (control conductors to be in terminal's) (north J -boxes) - Excavate down to existing underground PVC conduits. - Pull out all existing conductors - Tap on to existing underground PVC conduit to install new ROBROY conduit and 90's - Replace all existing junction boxes with new stainless steel NEMA 4X hinged cover J -boxes. - All box and conduit support to be in stainless steel. - Re terminate all existing conductors. (no terminals on controls) Excluded - Asphalt repair. - Excavation spoil disposal. - City of Fayetteville Permit. Note - Owner will be responsible for start up testing Harvey Preston will aid if needed. Bonding if required at an additional cost of $15.00 per $1000.00. All work to be performed during normal working hours. KING ELECTRICAL CONTRACTORS, INC. 2145 WEST MOORE LANE FAYETTEVILLE, AR 72704 479-443-0006 FAX 479-443-2594 Email: gordon@ckingelectric.net PROPOSAL TO: PHONE DATE Jacobs April 10, 2019 1400 North Fox Hunter Road JOB NAME Fayetteville, AR 72701 Westside WWTP Attn: Tim Marr brft-Statnns7 .Li.��tstivrri2� JOB DESCRIPTION See attached scope sheet We have seen zero (0) addendum(s) or revision(s) or clarification(s) Contractor's License #0063870419 Westside Unit I junction box repair $16,700.00 Westside Unit 2 junction box repair $19,230.00 Westsidechange out $4,300.00 each d� Lift Station]j3a g D change out $5,100.00 each Lift Station LPAO-YrW verachange out $9,200.00 PROPOSAL GOOD FOR 30 DAYS DOLLARS: $ SEE ABOVE TERMS: PAYMENT DUE UPON RECEIPT OF INVOICE AUTHORIZED SIGNATURE A FINANCE CHARGE WILL BE CHARGED ON ALL PAST DUE ACCOUNTS OF .0833% PER MONTH. ALL ATTORNEY FEES WILL BE COLLECTED ON PAST DUE �G ""' 12 ACCOUNTS. 7 Gordon Ray Project Manager/ Estimator THE ABOVE PRICES SPECIFICATIONS AND CONDITIONS ACCEPTANCE SIGNATURE ARE SATISFACTORY AND ARE HEREBY ACCEPTED. YOU ARE AUTHORIZED TO DO WORK AS SPECIFIED. PAYMENT WILL BE MADE AS OUTLINED ABOVE. KING ELECTRICAL CONTRACTORS Scope Sheet General Inclusions & Exclusions Inclusions 1. Wiring per site visits 3/29/2019 Division 26 electrical. All estimates are based upon our contract rates with the City of Fayetteville. 2. Permit and inspection fees if applicable. 3. Division 26 excavation. 4. Trenches backfilled with existing dirt and tamped. 5. Taxes. 6. Equipment rental. 7. Demolition/debris or trash removal as directed on site. 8. Division 26 excavations dirt or spoils removal from site. 9. Owner is responsible for de -energizing equipment, controls and communication for our lock out and tag out. Exclusions 1. Payment, Bid or Performance Bond. 2. Engineering services, stamps or plans. 3. Overtime labor. 4. Furnishing or installing wiring and equipment for Fire Alarm, Phone, VOIP, POS, CATV, Data, Fiber Optic, CCTV, Security, Access control, SCADA, Audio, and Video systems. 5. Allowances. 6. Electrical System coordination and/or Arc Flash investigation, studies, calculations or reports. 7. Access panels for electrical equipment. 8. Cutting, painting, penetrations, backing or repair & patching of concrete, asphalt, walls, ceiling, roof or floors for electrical conduit & equipment. 9. Cutting or patching parking lot for electrical equipment. 10. Ditch compaction testing. 11. Back filling Division 26 excavations with classified rock. 12. Any type of rock excavation. 13. Landscaping or repair due to Division 26 excavation. 14. Directional Boring. 15. Formed or finished concrete. 16. Asbestos or hazardous material abatement. 2 KING ELECTRICAL CONTRACTORS Scope Sheet Westside WWTP Unit 1 & Unit 2 Junction Box Repair Inclusions 1. Saw cut and demo approximately 4 foot by 8 eight section of asphalt in front of unit 1 junction boxes. 2. Excavate dirt in front of unit 2 junction boxes. 3. We are assuming the existing conduits are not concrete encased. 4. Excavate down to existing conduits and attempt to raise to original height. 5. Pour concrete around conduit to stabilize. 6. Replace two 12x12 Nema 4x stainless steel junction boxes at unit 1. 7. Replace two 12x12 Nema 4x stainless steel junction boxes and replace one 24x24 junction box at unit 2. 8. Replace unistrut for junction boxes and conduit strapping. 9. Repair and replace above ground sections of plastic coated GRC conduit. 10. Install plastic coated GRC conduit expansion fittings. 11. Replace plastic coated GRC conduit myers hubs. 12. Install terminal strips for existing wire retermination. 13. Estimated repair time for each location 4 days. Exclusions 1. Repulling existing wire. To lengthen we will mark, cut and install on terminal blocks. 2. Repulling existing wire. To lengthen we will mark, cut and crimp butt splice and heat shrink for large conductors. 3. Asphalt replacement. 4. Engineering services, stamps or plans. 5. Furnishing or installing wiring and equipment for Fire Alarm, Phone, VOIP, POS, CATV, Data, Fiber Optic, CCTV, Security, Access control, SCADA, Audio, and Video systems. 6. Allowances or unit prices. 7. Electrical System coordination and/or Arc Flash investigation, studies, calculations or reports. 8. Access panels for electrical equipment. 9. Cutting, painting, penetrations, backing or repair & patching of concrete, asphalt, walls, ceiling, roof or floors for electrical conduit & equipment. 10. Ditch compaction testing. 11. Back filling Division 26 excavations with classified rock. 12. Any type of rock excavation. 13. Landscaping or repair due to Division 26 excavation. 14. Directional Boring. 15. Formed or finished concrete. 16. Asbestos or hazardous material abatement. KING ELECTRICAL CONTRACTORS Scope Sheet Westside WWTP Areator VFD Replacement's Inclusions 1. Remove existing Altivar VFD and componentplace on pallets for removal or disposal by owner. 2. Install new Altivar VFD, display and comp gents relays, contactors, SPD and fuses furnished by owner. 3. Electrician present for factory start-up d commissioning. 4. Wire, lugs and miscellaneous materi for interconnections and terminations. Exclusions 1. Repulling existingwire. To ngthen we will mark, cut and install on terminal blocks or but spl' a and heat shrink large conductors. 2. New VFD programmin start-up and commissioning fees. 3. Engineering services, amps or plans. 4. Furnishing or install' g wiring and equipment for Fire Alarm, Phone, VOID, POS, CATV, Dat , Fiber Optic, CCTV, Security, Access control, SCADA, Audio, and Vid systems. 5. Allowances. 6. Electrical S stem coordination and/or Arc Flash investigation, studies, calculatio s or reports. 7. Access panels for electrical equipment. 8. Cutting, painting, penetrations, backing or repair & patching of concrete, asphalt, walls, ceiling, roof or floors for electrical conduit & equipment. 9. Asbestos or hazardous material abatement. Inclusions KING ELECTRICAL CONTRA ORS Scope Sheet Lift Station 12 Hamstring V Replacement Remove existing E/d* components and place on pallets for removal or disposal by owne Install new Altivar and components including relays, contactors, SPD, power factor fuses furnished by owner. Electrician present -up and commissioning. Wire, lugs and miscerial for interconnections and terminations. Exclusions 1. Repulling existing wire. To lengthen we will mark, cyf and install on terminal blocks or butt splice and heat shrink large conductofs. 2. New VFD programming, start-up and commissioning fees. 3. Engineering services, stamps or plans. 4. Furnishing or installing wiring and equi/ent for Fire Alarm, Phone, VOIP, POS, CATV, Data, Fiber Optic, CCT , Security, Access control, SCADA, Audio, and Video systems. 5. Allowances. 1�- 6. Electrical System coordinatio and/or Are Flash investigation, studies, calculations or reports. 7. Access panels for electri 1 equipment. 8. Cutting, painting, pen rations, backing or repair & patching of concrete, asphalt, walls, ceili , roof or floors for electrical conduit & equipment. 9. Asbestos or hazar ous material abatement. KING ELECTRICAL CONTRACTORS// Scope Sheet Lift Station 2 400 KW Generator Replacement Inclusions 1. Disconnect and remove existing 40015, 9 diesel generator. 2. Install and connect new 400 KW di del generator furnished by owner. 3. Load and transport new 400 KW enerator from the Noland WWTP to Lift Station 2. 4. Load and transport old 400 generator from Lift Station 2 to the Noland WWTP. 5. Electrician present for rt -up and commissioning. 6. Crane rental. 7. Transport truck an trailer. Exclusions 1. Any work/o existing automatic transfer switch. 2. Remov of diesel for existing generator. 3. Furni ing diesel for new generator. 4. Ne Igenerator and automatic transfer switch programming, start-up and co missioning fees. 5.Xb pulling existing wire. To lengthen we will mark, cut and install on terminal locks or butt splice and heat shrink large conductors. Unloading new generator when delivered. 611 Owner is responsible that existing battery r harger and block heater circuits are adequate for new generator. 8. Owner is responsible that new genera 6r will fit in existing location for conduit entry, required safe clearan s and maintenance door opening clearance. 9. Engineering services, stamps or 10. Furnishing or installing wirin POS, CATV, Data, Fiber O Ie. Audio, and Video systems. 11. Allowances. 12. Electrical System coord' ation calculations or reports pians. nd equipment for Fire Alarm, Phone, VOIP, CCTV, Security, Access control, SCADA, and/or Arc Flash investigation, studies, 13. Access panels for el trical equipment. 14. Cutting, painting, netrations, backing or repair & patching of concrete, asphalt, walls, cei ng, roof or floors for electrical conduit &equipment. 15. Asbestos or haz dous material abatement. 16. Landscaping o repair due to Division 26 work. City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division WASTEWATER TREATMENT (730) Adjustment Number 2019 /Org2 Requestor: Cheryl Partain BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: A Budget Adjustment is needed in the Plant Pumps and Equipment - WWTP project for the replacement of four damaged electrial junction boxes and the repair of electrical conduit for the biological treatment units at the Westside WWTP. Budgeted funds from the Sanitary Sewer Rehabilitation project will be transferred to this project to cover the cost of this item. The budgeted funds being transferred are for sewer rehabilitation/replacement and maintenance. COUNCIL DATE: 8/6/2019 LEGISTAR FILE ID#: 2019-0422 LinkHtttcZleylw 7/11/2019 10:31 AM Budget Director Date TYPE: D - (City Council) JOURNAL #: GLDATE: RESOLUTION/ORDINANCE CHKD/POSTED: TOTAL - - x.20190516 increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub.Detl AT Account Name 5400.730.5800-5414.00 20,528 - 02069 1 EX Plant Equipment Maintenance 5400.720.5700-5815.00 (20,528) - 02017 1 EX Sewer Improvements H:\Budget Adjustments\2019_Budget\City Council\08-06-2019\2019-0422 BA Fleming Electric, Inc. 1 of 1