Ordinance: 6201
File Number: 2019-0412
JACK TYLER ENGINEERING, INC.:
AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND ACCEPT A QUOTE IN THE
AMOUNT OF $49,492.00 PLUS APPLICABLE TAXES AND FREIGHT FROM JACK TYLER
ENGINEERING, INC. FOR THE PURCHASE OF A SUBMERSIBLE PUMP FOR USE AT THE
FARMINGTON LIFT STATION
WHEREAS, Farmington Lift Station Pump #1 experienced mechanical failure in April and was pulled
for disassembly and repair; and
WHEREAS, the recent heavy rainfall exerted heavy pumping demands on the remaining pumps causing
the failure of Pump #3 on June 23rd, which has left the operation of the Farmington West Lift Station
relying solely on a single fully operational pump and temporary pump around solutions to assure full
capacity of the station; and
WHEREAS, staff has explored alternative pump makes, models and configurations and the pump
recommended by Jack Tyler Engineering, Inc. is specifically designed for handling the heavy solids that
consistently cause wear on the pump equipment at the Farmington Lift Station, and is also the only pump
capable of delivering the pump pressure requirements while fitting into the existing piping configuration
without extensive redesign; and
WHEREAS, purchasing a new pump requires a lead time of 8 to 12 weeks and, because of the
additional time involved in competitively bidding such a purchase, staff recommends expediting the
purchase of a replacement pump to reduce the amount of time the temporary measures have to remain
in place.
Page 1 Printed on 7/3/19
File Number.' 2019-0412
Ordinance 6201
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby finds the above
circumstances make competitive bidding not feasible or practical and therefore waives the requirements
of formal competitive bidding and accepts a quote in the amount of $49,492.00 (plus any applicable
taxes and freight charges) from Jack Tyler Engineering, Inc. for the purchase of a submersible pump
for use at the Farmington Lift Station.
PASSED and APPROVED on 7/2/2019
Attest:
Sondra E. Smith, City Clerk TreasurerG��y
`�. . CITY ••'A
.F p•
k%
.'1/VSAS
0 *0.000, O
Page 2 Printed on 713119
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number. 2019-0412
Agenda Date: 7/2/2019 Version: 1 Status: Agenda Ready
In Control: City Council Meeting File Type: Ordinance
Agenda Number: C 3
JACK TYLER ENGINEERING, INC.:
AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND ACCEPT A QUOTE IN THE
AMOUNT OF $49,492.00 PLUS APPLICABLE TAXES AND FREIGHT FROM JACK TYLER
ENGINEERING, INC. FOR THE PURCHASE OF A SUBMERSIBLE PUMP FOR USE AT THE
FARMINGTON LIFT STATION
WHEREAS, Farmington Lift Station Pump #1 experienced mechanical failure in April and was pulled for
disassembly and repair; and
WHEREAS, the recent heavy rainfall exerted heavy pumping demands on the remaining pumps causing the
failure of Pump #3 on June 23rd, which has left the operation of the Farmington West Lift Station relying solely
on a single fully operational pump and temporary pump around solutions to assure full capacity of the station;
and
WHEREAS, staff has explored alternative pump makes, models and configurations and the pump
recommended by Jack Tyler Engineering, Inc. is specifically designed for handling the heavy solids that
consistently cause wear on the pump equipment at the Farmington Lift Station, and is also the only pump
capable of delivering the pump pressure requirements while fitting into the existing piping configuration without
extensive redesign; and
WHEREAS, purchasing a new pump requires a lead time of 8 to 12 weeks and, because of the additional time
involved in competitively bidding such a purchase, staff recommends expediting the purchase of a replacement
pump to reduce the amount of time the temporary measures have to remain in place.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby finds the above circumstances
make competitive bidding not feasible or practical and therefore waives the requirements of formal competitive
bidding and accepts a quote in the amount of $49,492.00 (plus any applicable taxes and freight charges) from
Jack Tyler Engineering, Inc. for the purchase of a submersible pump for use at the Farmington Lift Station.
City of Fayetteville, Arkansas Page 1 Printed on 7/3/2019
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2019-0412
Legistar File ID
7/2/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
6/25/2019
Submitted Date
Action Recommendation:
WATER SEWER (720)
Division / Department
Staff recommends approval of the purchase of one (1) FLYGT-brand submersible pump from Jack Tyler Engineering,
Inc. for the Farmington Lift Station in the amount of $49,492.00 plus applicable taxes and freight.
Budget Impact:
5400.720.5600-5801.00 Water and Sewer
Account Number
15021.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Fund
Water Storage and Pump Station Maintenance
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 282,968.00
$ 70,753.91
$ 212,214.09
$ 57,609.97
$ 154,604.12
V20180321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number:
Original Contract Number:
Approval Date:
Comments: Freight is estimated at $3,000.00 and taxes are estimated at $5,117.97, for a total of $57,609.97.
CITY OF
FAYETTEVILLE
14'W ARKANSAS
MEETING OF JULY 2, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Tim Nyander, Utilities Director
FROM: Greg Weeks, Wastewater Treatment
DATE: June 25, 2019
CITY COUNCIL MEMO
SUBJECT: Submersible Pump for the Farmington Sewer Lift Station
RECOMMENDATION:
Staff recommends approval of the purchase of one (1) FLYGT-brand submersible pump from
Jack Tyler Engineering, Inc. for the Farmington Lift Station in the amount of $49,492.00 plus
applicable taxes and freight.
BACKGROUND:
The Farmington West Lift -station, on Double Springs Road, pumps untreated influent from
neighboring Farmington directly to the West Side Treatment Facility. This year, on an
increasingly frequent basis, maintenance technicians have been regularly responding to lift -
station SCADA alarms (several times per week) that require back-flushing the submersible
pumps to dislodge clogging rags and other solid debris that bind the pump impellors. In April this
year, the station received a SCADA alarm indicating a failure -to -start when calling for Pump #1.
Maintenance technicians determined the pump's circuit breaker tripped from high amperage
draw. After clearing possible impellor debris, Pump #1 immediately experienced the same high
amperage draw fault. This failure -to -start required pump #1 to be pulled and sent to Jack Tyler
Engineering, Inc (Arkansas's only certified distributor and repair facility for FLYGT products) in
Little Rock for disassembly inspection. The pump inspection found significant damage requiring
approximately $33,190 to repair.
Project staff have been investigating alternative pump makes, models and configurations for a
solution to address the high level of pump wear experienced by this station's consistent issues
of binding rags and other solid waste products. No other pump distributor can provide a pump
capable of delivering the station's pump pressure requirements (TDH = 200 ft) and also fit into
the existing piping configuration without extensive redesign. Jack Tyler Engineering has
recommended FLYGT's patented N -technology 3315 -model pump, with compatible pump
mount, and an impellor specifically designed for passing heavy solids. The 3315 -model's unique
impellor design and chopper ring features are well suited for handling the station's solid wastes
that are leading to the excessive pump wear and subsequent damages experienced by the
station's current 11 -yr old pump models. This pump should provide a major reduction in
maintenance costs and service disruptions due to clogging.
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
DISCUSSION:
Recently, the Fayetteville region experienced heavy rainfall and this weekend; a high-flow event
exerted heavy pumping demands on all lift -station and facility process pumps. On Sunday
afternoon (June 23rd), the Farmington lift -station Pump #3 lost operation due to a water leak into
the motor. This most recent development leaves operation of the Farmington West lift -station
relying solely a single, fully operational pump. Temporary pump around solutions are being
finalized to assure full capacity of the station, but it is essential to expedite the acquisition of the
replacement pump.
Jack Tyler Engineering has submitted a quote to replace the failed Pump #1 in the amount of
$49,492.00. The pump order would have a lead time of 8 to 12 weeks. Freight charges are
estimated at $3,000. Staff recommends approval of the purchase of one submersible pump from
Jack Tyler Engineering, Inc. in the amount of $49,492.00 plus $3,000.00 for estimated freight
charges. Taxes are estimated at $5,117.97 for a total purchase request of $57,609.97.
BUDGET/STAFF IMPACT:
Funds are available within the Water Storage and Pump Station Maintenance account.
Attachments:
Quote from Jack Tyler Engineering
�,\et Et?p .
JACK TYLER ENGINEERING, INCORPORATED
6112 PATTERSON AVENUE, LITTLE ROCK, ARKANSAS 72209
(501) 562-2296 FAX (501) 562-4273 WATTS 1-800-562-2296
a
�corporaNe
QUOTATION NUMBER: FAY51619-1 QUOTATION DATE: May 16, 2019 PAGE: 1 OF 2
TO: City of Fayetteville
ATTN:
COPIES: Steve Cooper
Phone:
Email:
ITEM 1: FLYGT Submersible Pump
Xylem FLYGT model NP3315.185 458 130HP 460/3/60 50' FLS FV submersible pumps, with
130HP 460 volt 3 phase motor suitable for inverter service, hardened iron N -Technology
impeller, 50ft cable and FLYGT Leak Sensor.
PRICE EACH ................ .............................. $ 49,492
..............
DELIVERY: 8-12 Weeks, ARO
FOB POINT: Freight Not Included
***NOTE: FREIGHT CHARGES AND ANY APPLICABLE SALES TAXES ARE NOT INCLUDED
IN QUOTED PRICE.
Thank you for the opportunity to quote on your requirements. If we may be of further assistance,
please do not hesitate to contact me at scottCo-,jtenq.ccm or 479-806-8970.
Very truly yours,
JACK TYLER ENGINEERING, INCORPORATED
Scott Jones
Senior Sales Representative
RECEIVED Ordinance:6201
File Number:2019-0412
JACK TYLER ENGINEERING,INC.:
AN WAIVE JUL 1 ,5 2019 DDINGNANCE AND ACCOEPT A QUOTE N THE ETITIVE
AMOUNT OF 549,492.00 PLUS APPLICABLE
I\ORTHWEST ARKANSAS S F� l`t ENGINES AND FREIGHT FROM K TYLER
aim.����� ENGINEERING,INC.FOR THE PURCHASE
OF A SUBMERSIBLE PUMP FOR USE AT
THE FARMINGTON LIFT STATION
ir
e ®crat (! iztk WHEREAS,Farmington Lift Station #1
experienced mechanical failure in April and
was
pulled for disassembly and repair;and
WHEREAS,the recent heavy rainfall exerted
heavy pumping demands on the remaining
pumps causing the failure of Pump#3 on June
23rd,which has left the operation of the
Farmington West Lift Station relying solely on a
single fully operational pump and temporary
pump around solutions to assure full capacity of
AFFIDAVIT OF PUBLICATION the station;and
WHEREAS,staff has explored alternative pump
makes,models and configurations and the pump
I Cathy Staggs, do solemnly swear that I am the Accounting Manager of the secommended sig Jr hanEngineering,Inc.is
specifically designeedk d for handling the heavy
Northwest Arkansas Democrat-Gazette, printed and published in solids that consistently cause wear on the pump
equipment at the Farmington Lift Station,and is
Washington County and Benton County, Arkansas, and of bona fide also the only pump capable of delivering the
circulation, that from myownpersonal knowledge and reference pump pressureinpipingnconfiguration while fittinght into
g the existing without
to the files of said publication, the advertisement of: extensive redesign;and
WHEREAS,purchasing a new pump requires a
lead time of 8 to 12 weeks and,because of the
additional time involved in competitively
CITY OF FAYETTEVILLE bidding such a purchase,staff recommends
Ord. 6201 expediting the purchase of a replacement pump
to reduce the amount of time the temporary
measures have to remain in place.
NOW,THEREFORE,BE IT ORDAINED BY
THE CITY COUNCIL OF THE CITY OF
Was inserted in the Regular Edition on: SAYoTTE That the ARKANncil
g Section l: the City Council of the City of
Fayetteville,Arkansas hereby finds the above
circumstances make competitive bidding not
July 11, 2019 feasible or practical and therefore waives the
requirements of formal competitive bidding and
accepts a quote in the amount of$49,492.00
Publication Charges: $ 132.60 (plus any applicable taxes and freight charges)
g from Jack Tyler Engineering,Inc.for the
purchase of a submersible pump for use at the
Fannington Lift Station.
PASSED and APPROVED on 7/2/2019
EtAps -S kApproved:
t ' • LionelJordan,Mayor
Cathy St g s �� Attest:
Sondra E.Smith,
City Clerk Treasurer
75007012 July 11,2019
Subscribed and sworn to before me
This l k day of i„Q , 2019.
Notary Public
My Commission Expires: Z4.0(244'
CATHY WILES
Arkansas-Benton County
Notary Public-Comm# 12397118
My Commission Expires Feb 20, 2024
**NOTE**
Please do not pay from Affidavit.
Invoice will be sent.