Ordinance: 6171
File Number: 2019-0185
BAUMANN CONSTRUCTION, LLC:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH BAUMANN CONSTRUCTION, LLC FOR THE
INSTALLATION OF SEWER MAIN ALONG A PORTION OF SOUTH SCHOOL AVENUE
BETWEEN WEST SOUTH STREET AND SOUTH ARCHIBALD YELL BOULEVARD, WITH THE
ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED
$37,189.38, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $3,720.00
WHEREAS, Baumann Construction, LLC will be developing property located at 304 South School
Avenue and has requested that the City share in the cost of constructing an 8-inch sewer main along a
portion of South School Avenue between West South Street and South Archibald Yell Avenue, a distance
of approximately 277 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide for ample future
capacity which the City recognizes will be necessary for the area that is served by this sewer main;
and
WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size larger than required to service subdivisions when such excess size is specified
and required by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on -site installing the line for the developer's project.
Page 1 Printed on 4117119
File Number: 2019-0185
Ordinance 6171
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement
with Baumann Construction, LLC for the installation of an 8-inch sewer main along a portion of South
School Avenue between West South Street and South Archibald Yell Avenue with the estimated amount
to be paid by the City of Fayetteville not to exceed $37,189.38, and further approves a project
contingency in the amount of $3,720.00.
PASSED and APPROVED on 4/16/2019
Attest:
Sondra E. Smith, City Clerk Treasur��U� 'G��Y CF
Vim• �AY��--1�Vll.
1,61111111110
�'.ry'• • i{ANS •5 ��'
Page 2 Printed on 4117119
City of Fayetteville, Arkansas 113West Mountain Street
=f Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2019-0185
Agenda Date: 4/16/2019 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: C. 3
BAUMANN CONSTRUCTION, LLC:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH BAUMANN CONSTRUCTION, LLC FOR THE
INSTALLATION OF SEWER MAIN ALONG A PORTION OF SOUTH SCHOOL AVENUE
BETWEEN WEST SOUTH STREET AND SOUTH ARCHIBALD YELL BOULEVARD, WITH THE
ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED
$37,189.38, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $3,720.00
WHEREAS, Baumann Construction, LLC will be developing property located at 304 South School Avenue
and has requested that the City share in the cost of constructing an 8-inch sewer main along a portion of South
School Avenue between West South Street and South Archibald Yell Avenue, a distance of approximately 277
feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will provide for ample future
capacity which the City recognizes will be necessary for the area that is served by this sewer main; and
WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size larger than required to service subdivisions when such excess size is specified and required
by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on -site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section I: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Baumann Construction,
LLC for the installation of an 8-inch sewer main along a portion of South School Avenue between West South
Street and South Archibald Yell Avenue with the estimated amount to be paid by the City of Fayetteville not to
exceed $37,189.38, and further approves a project contingency in the amount of $3,720.00.
City of Fayetteville, Arkansas Page 1 Printed on 411712019
File Number.' 2019-0185
City of Fayetteville, Arkansas Page 2 Printed on 411712019
City of Fayetteville Staff Review Form
2019-0185
Legistar File ID
4/16/2019
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 3/19/2019 WATER SEWER (720)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends the approval of a cost share agreement with Baumann Construction, LLC in an amount not to
exceed $37,189.38 for the extension of an 8-inch sanitary sewer line on South School Avenue, and approval of a
contingency in the amount of $3,720.00 for a total of $40,909.38.
5400.720.5700-5815.00
Account Number
04039.1
Project Number
Budget Impact:
Water and Sewer
Fund
Water/Sewer Impact Fee Cost Sharing
Budgeted Item? Yes Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? No Budget Adjustment
Remaining Budget
Project Title
$ 1,237,694.00
$ 80, 041.67
1,157,652.33
$ 40,909.38
1,116, 742.95
V20780321
Purchase Order Number: Previous Ordinance or Resolution #
Change Order Number: Approval Date:
Original Contract Number:
Comments:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF APRIL 16, 2019
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: March 19, 2019
CITY COUNCIL MEMO
SUBJECT: Cost Share Agreement with Baumann Construction, LLC for a Sanitary
Sewer Extension on South School Avenue
RECOMMENDATION:
Staff recommends the approval of a cost share agreement with Baumann Construction, LLC in
an amount not to exceed $37,189.38 for the extension of an 8-inch sanitary sewer line on South
School Avenue, and approval of a contingency in the amount of $3,720.00.
BACKGROUND:
Baumann Construction, LLC has requested that the City share in the cost of extending an 8-inch
sewer line along a portion of S. School Ave. between W. South St. and S. Archibald Yell Blvd., a
distance of approximately 277 linear feet. The proposed sanitary sewer line would extend east
from an existing 8-inch sewer line on S. School Ave., run north parallel to the existing line for
approximately 100 feet, then extend east into the property intended to be developed.
DISCUSSION:
Constructing this sewer main will allow the development of three townhomes on the property
and will also allow for any future developments in the immediate area to obtain sewer service.
Baumann Construction, LLC has received three bids for the proposed sanitary sewer
improvements. A bid from S & K Dirtworks, LLC of Fayetteville has been determined to be the
lowest qualified bid. Bates & Associates will provide the engineering and surveying services.
BUDGET/STAFF IMPACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing project.
Attachments:
Agreement
Exhibit A — Map of Area
Exhibit B — S & K Dirtworks, LLC Quote and Bates & Associates Proposal
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF SEWER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this -RA —day of April, 2019, by and between
the City of Fayetteville, Arkansas ("City") and Baumann Construction, LLC; witnesseth:
WHEREAS, Baumann; Construction, LLC has requested that the City share in the cost of
constructing an 8-inch sewer main along a portion of S. School Ave. between W. South St. and S
Archibald Yell Blvd., a distance of approximately 277 feet; and
WHEREAS, constructing this segment of 8-inch sewer main will allow Baumann
Construction, LLC to obtain sewer service to facilitate the construction of three townhomes on the
property, and also allow for ample future capacity which the City recognizes will be necessary for
the area that is served by this sewer main; and
NOW, THEREFORE, the City of Fayetteville, Arkansas and Baumann Construction,
LLC agree as follows:
I
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Baumann Construction, LLC for 50% of the cost to install
approximately 277 linear feet of 8-inch sewer main in the area identified in Exhibit
"A" up to a maximum -not -to -exceed amount of $37,189.38, as was estimated by
the' builder's representatives and shown on Exhibit "B", attached.
B. Payments due to Baumann Construction, LLC, shall be remitted within sixty (60)
days after receipt of valid invoices upon completion of the project.
2. Baumann Construction, LLC. agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable sewer main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Submit all required plans and specifications to the City and receive approval
from the City's Engineering and Utilities Departments prior to commencing
work on the project.
C. Provide a copy of the invoices from the Contractor upon City approval of the
sewer main upgrades.
D. Pay for the sewer main installation (with reimbursement of 50% of the cost by
the City of Fayetteville in a not -to -exceed amount of $37,189.38).
IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
BAUMANN CONSTRUCTION, LLC
V-.WF,
By:
UMANN,
Managing Member
ATTEST:
By:
CITY OF,, FAYETTEVILLE,
LIONEED JORDAN, Mayor
ATTEST:
+.fit%/13l11 tl f),
By: Xn64� CO—
SONDRA SMITH, City Clerlc'1 ,
EAYETTEVILLE*�=
i
SVSN"dV '7TIMI11.1V3
— ,ems ..........
.. ,.�..,
.--....
NVId ,llllllfl ?p 3115 8.
SNVId NOLIon 11SNOO '� saae9
N01SN31X3 OCS 100HOS 'S
x g
Y f
IN
R � • p .9 G" i � � � � f3 i NQt N R , y R g i si +6i b � gY if ' � � 8
i �+}�ggs F i
�14 y�gp if- l i6Y6P 11d 101 4� 31 � Saf3� }n� ,ao
e g
p�p x¢x`�
YES
I
of L �
Ak�F �y eF�'agB� .Le eag br±
fiI0111:411H, I' Will jj�j
K g eeleedjj yyy S 1' erir,q•;;^..-.tip,•,__`.:
IM
NNn o°:8ymyq @@ap9[LC�LeB �'pr zAotlEtly" !� ' 'I —...� ,:�e,•��:j� _ —
9%,%a��Yi[9dGYG_PYiir�ae I ji
f�f!
s I �.� �� l •. S 4 II
A — t
j it � ,� �_• �� - b-
_ �� r t • _ '
j
r'
TO
Al
r _
Rpr
It
I¢�_3i ! EiiGltif � �i3.��$f
"
�,�r.j
�WP
���`��ii'
�9iSi
�
dflijiCBipixi
3
I
n
e
I,
r
I,,
•�0
1
+
,
f
j
I�.•
S & K Dirtworks, LLC EXHIBIT B
1923 Pinewoods Dr.
Rogers, AR 72758
I Name/Address I
Baumann & Crosno
Project Quote
Date
Quote#
2/22/2019
018-148
Project
South School Sewer ...
Description
Qty
Cost
Total
Sanitary Sewer per plan
1
35,191.00
35,191.00
Sawcut Asphalt
1
1,800.00
1,800.00
Replace Asphalt 6" concrete & 2" surface
1
20,427.75
20,427.75
Demolition of trees
1
3,000.00
3,000.00
Sidewalk & curb remove & replace
1
1,000.00
1,000.00
Retaining wall remove & replace
1
300.00
300.00
Tree Fencing
1
1,060.00
1,060.00
Sewer Tap
1
600.00
600.00
Striping
1
400.00
400.00
Traffic Control
1
6,100.00
6,100.00
Total $69,878.75
Signature
Phone #
479-631-7400
,ADBates
■ Associates, i m.
—Civil Engineering • Land Surveying • Landscape Architecture
7230 S. Pleasant Ridge Dr. / Fayetteville, AR 72703
PH: 472-442-93501 FAX: 479-521-9350
December 4, 2018
Mike Baumann
Baumann & Crosno Construction
124 W. Sunbridge Dr. Suite 8
Fayetteville, AR 72703
RE: Civil Proposal for sewer main extension
Dear Mr. Bauman,
We appreciate the opportunity to provide you with engineering and surveying services
for the proposed 180' sewer main extension located off South School in Fayetteville
Arkansas. It is my understanding that we are to provide you with construction plans for
a sewer main extension. We propose to provide the following services:
1. Construction Plans
• Prepare grading application forms
• Prepare topographic survey in construction area
Prepare site & utility plan
o Show all existing utilities
o Show proposed utility locations
o Show water & sewer service line locations
o Show setback and utility easements
Q Show existing and proposed buildings
• Prepare Plan and Profile Sheets.
o Sewer manhole location
o Sewer main size
o Sewer main slope
• Prepare Detail Sheets.
City Engineering Review
o Revise plans per city comments
• Submit to Arkansas Department of Health
o Revise plans per comments
2. Construction
• Prepare letter to City engineering for performance bonds
• Set up and attend pre -construction meeting
• Construction observation for public improvements
o Full time for water and sewer
3. Close out items before for Final acceptance; by City
• Preliminary walk-through and prepare punch list for city
Final walk-through with City
• As -built plans of public improvements
• As -built survey of public improvements
Prepare letter to City engineering with unit price construction cost for public
improvements to get number for 2 year maintenance bond.
• Certifications
o Engineering certification of public improvements
o Surveying certification of compliance
Professional Fee ro osal:
We proposed to provide the above information for:
$ 500 Topographic strip survey
$2,000 Construction plans (item 1 )
2 000 Inspection and closeout (item 2-3)
$4,500
The iro osal does not include the followin Items:
• City or state review fee's
• Construction Staking must be provided by Bates & Associates.
Should you have any questions or require any additional information, please feel free to
contact us at your convenience. If this Proposal is satisfactory to you, please sign
below for our authorization to begin working.
Sincerely,
Bates & Associates, Inc
Geoffrey H. Bates, P.E.
President of Engineering
Owner Signature
Address for invoicing
By signing above, I agree to pay Bates & Associates, Inc. the fee as stated above within
30 days of receiving invoice.
This Agreement consisting of the proposed services stated above, constitutes the entire
agreement between Owner mayeer only bedamended�supplem ntedes all prior �ltten or modified oral
or
understandings. This AgreementY
canceled by a duly executed written instrument.
RECEIVED
iAY 0 3 2019
NORTHWEST ARKANSAS CITY CLFAYETTEVILLE'FI
Democrat (1�aatte
11M
AFFIDAVIT OF PUBLICATION
I Cathy Staggs, do solemnly swear that I am the Accounting Manager of the
Northwest Arkansas Democrat -Gazette, printed and published in
Washington County and Benton County, Arkansas, and of bona fide
circulation, that from my own personal knowledge and reference
to the files of said publication, the advertisement of:
CITY OF FAYETTEVILLE
Ord 6171
Was inserted in the Regular Edition on:
April 25, 2019
Publication Charges: $ 145.60
Cathy Stag
Subscribed and sworn to before me
This -,50 day of , 2019.
(�� V v/ ,-WJ
Notary Public
My Commission Expires:
CtMv WILES
i4Qr15.a$ • dgiitull couniv
1Ir r� r uillir.. CarlLnl:r 123971
%lu Cor'1Ffli5'Sir�;, IT 'If. F-I, �r
**NOTE**
Please do not pay from Affidavit.
Invoice will be sent.
Oidinance:6171
File Nunilicr: 2019-0185
BAUMANN CONSTRUCTION, LLC
AN ORDINANCE TO WAIVE THE
REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND APPROVE A
COST SHARE AGREEMENT WITH
13ALJMANN CONSTRUCTION, LLC FOR
THE INSTALLATION OF SEWER MAIN
ALONG A PORTION OF SOUTH SCHOOL.
AVENUE BETWEEN WEST SOUTH STREET
AND SOUTH ARCHIBALD YELL
BOULEVARD, WITH THE ESTIMATED
AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED
S37,189.38, AND TO APPROVE A PROJECT
CONTINGENCY IN THE AMOUNT OF
S3,720.00
WHEREAS, Baumann Constniclion, LLC will
be developing properly located at 304 South
School Avenue and has requested that the City
share in the cost of constructing an 8-inch sewer
main along a portion of South School Avenue
between West South Street and South Archibald
Yell Avenue, a distance of approximately 277
feel; and
WHEREAS, the City of Fayetteville would
benefil from the cost share as it will provide for
ample future capacity which the City recognizes
will be necessary for the area that is served by
this sewer main; and
WHEREAS, $ 51,113 of the Fayetteville City
Code provides that "the City shall pay the excess
material cost of facilities of a size larger than
required to service subdivisions when such
excess size is specified and required by the waler
and waslewater director for the general benefit
of the sewerage system"; and
WHEREAS, waiving formal competitive
bidding will save time and cost by utilizing the
developer's contractor who will be on -site
installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY
THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section I : That the City Council of the City of
Fayellcville, Arkansas hereby determines an
exceptional situation exists in which competitive
bidding is deemed not feasible or practical and
Therefore waives the requirements of formal
competitive bidding and approves a cost share
agreement with Baumann Construction, LLC for
the installation of an 8-inch sewer main along a
portion of South School Avenue between West
South Street and South Archibald Yell Avenue
wish the eslimatcd amount to be paid by [lie City
of Fayetteville not to exceed $37,18938, and
further approves a project contingency in the
amounl of S3,720,00,
PASSED and APPROVED on 4/16/2019
Approved:
Lioneld Jordan, Mayor
Attest:
Sondra E. Smith, City Clerk Treasurer
74919372 Apr. 25, 2019