HomeMy WebLinkAboutORDINANCE 6082113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Ordinance: 6082 File Number: 2018-0421 BENCHMARK CONSTRUCTION: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND AUTHORIZE A CONTRACT FOR THE IMMEDIATE REMOVAL AND REPLACEMENT OF THE ENTRY STAIRS AND LANDING AT THE FAYETTEVILLE TOWN CENTER BY BENCHMARK CONSTRUCTION OF NWA, INC. IN THE AMOUNT OF $205,300.00, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $14,800.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, leaking chlorinated fountain water has caused the substructure of the stairs and landing at the Fayetteville Town Center to corrode resulting in settling; and WHEREAS, on December 19, 2017, the City Council, passed Resolution No. 269-17 authorizing funding for the engineering design and construction of the necessary repairs and Olsson Associates Engineering Firm was engaged to generate the construction drawings; and WHEREAS, since the passage of that resolution the stairs have settled an additional three inches and it is important to prevent further settling as quickly as possible; and WHEREAS, staff solicited three contractors and received two bids for the project and, as time is of the essence for this repair, staff recommends awarding the contract to the lowest responsive bidder. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines that the facts shown above establish that an exceptional situation exists in which competitive bidding is not feasible or practical and therefore waives the requirements of formal competitive bidding and authorizes Mayor Jordan to sign a contract for the immediate removal and replacement of the entry stairs and landing at the Fayetteville Town Center by Benchmark Construction of NWA, Inc. in the amount of Page 1 Printed on 8122118 Ordinance: 6082 1- 1 $205,300.00, and further approves a project contingency in the amount of $14,800.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to the staff review memo, in the amount of $70,000.00. PASSED and APPROVED on 8/21/2018 Attest: Sondra E. Smith, City Clerk Treasurer �011111In1,� FAYETTEVILLE; .mow Page 2 Printed on 8/22118 -r_ City of Fayetteville Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 s Text File File Number: 2018-0421 Agenda Date: 8/21/2018 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 1 BENCHMARK CONSTRUCTION: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND AUTHORIZE A CONTRACT FOR THE IMMEDIATE REMOVAL AND REPLACEMENT OF THE ENTRY STAIRS AND LANDING AT THE FAYETTEVILLE TOWN CENTER BY BENCHMARK CONSTRUCTION OF NWA, INC. IN THE AMOUNT OF $205,300.00, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $14,800.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, leaking chlorinated fountain water has caused the substructure of the stairs and landing at the Fayetteville Town Center to corrode resulting in settling; and WHEREAS, on December 19, 2017, the City Council, passed Resolution No. 269-17 authorizing funding for the engineering design and construction of the necessary repairs and Olsson Associates Engineering Firm was engaged to generate the construction drawings; and WHEREAS, since the passage of that resolution the stairs have settled an additional three inches and it is important to prevent further settling as quickly as possible; and WHEREAS, staff solicited three contractors and received two bids for the project and, as time is of the essence for this repair, staff recommends awarding the contract to the lowest responsive bidder. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines that the facts shown above establish that an exceptional situation exists in which competitive bidding is not feasible or practical and therefore waives the requirements of formal competitive bidding and authorizes Mayor Jordan to sign a contract for the immediate removal and replacement of the entry stairs and landing at the Fayetteville Town Center by Benchmark Construction of NWA, Inc. in the amount of $205,300.00, and further approves a project contingency in the amount of $14,800.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to the staff review memo, in the amount of $70,000.00. City of Fayetteville, Arkansas Page 1 Printed on 812212018 City of Fayetteville Staff Review Form 2018-0421 Legistar File ID 8/21/2018 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Wade Abernathy 8/3/2018 FACILITIES MANAGEMENT (140) Submitted By Submitted Date Division / Department Action Recommendation: approval of a Contract with Benchmark Construction for the removal and repalcement of the Town Center entry steps and landings in the amount of $205,300,and 8% contingency and approval of a Budget Adjustment. 1010.090.6600-5314.00 Account Number 17012 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Budget Impact: General Miscellaneous Fund Town Center Entry Stairs Project Title Current Budget $ 154,243.00 Funds Obligated $ 4,143.00 T Current Balance 150,1€10.00 Item Cost $ 205,300.00 Budget Adjustment $ 70,000.00 Remaining Budget I $ 14,800.00 V20160321 Purchase Order Number: Previous Ordinance or Resolution # 269-17 Change Order Number: Approval Date: Original Contract Number: Comments: CITY OF FAYETTEVILLE W4W ARKANSAS MEETING OF: 8/21/2018 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Paul Becker, Chief Financial Officer CITY COUNCIL MEMO FROM: Wade Abernathy, Facilities Management/Building Construction Manager DATE: 8/3/2018 SUBJECT: Request a bid waiver ordinance for a Contract for Town Center Entry Stair and Landing removal and Replacement RECOMMENDATION: Staff Recommends approval of a contract with Benchmark Construction to remove and replace the entry stairs and landing at the Fayetteville Town Center in the amount of $205,300 and an 8% contingency and approval of a Budget Adjustment. BACKGROUND: Because of the leaking chlorinated fountain water, the substructure of the stairs and landing have corroded resulting in settlement of the stairs. Resolution 269-17 authorized the approval of a Budget Adjustment for the engineering and construction of the deteriorating Stairs and Landing at the Town Center. Olsson Associates Engineering Firm was engaged to generate the removal and replacement construction drawings. The stairs have settled 3 inches since the previous ordinance was passed. To avoid further settling, time is of the essence for this repair. Therefore, approval will allow repairs to begin next week. DISCUSSION: Staff solicited 3 contractors and received 2 bids, and one non-responsive bid. Benchmark Construction submitted the lowest bid. The stairs and landing project will include lighted stair nosing's as well as lighted hand rails that will integrate with the new fountain pool lighting. The system used is a foam support structure that is light weight (considering existing deck loads). Corrosion will no longer be a concern. BUDGET/STAFF IMPACT: A budget adjustment has been requested in the amount of 70,000. This will include a contingency of $14,800. Staff will project manage this project and observe the construction. Attachments: Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Contract Bids City of Fayetteville, AR CITY O F Contract for: Emergency reconstruction of Town Center stairs FAY E T T E V I L L E Vendor: Benchmark Construction of NWA, Inc. ARKANSAS Term: Single Project: This contract executed this 21st day of August 2018, between the City of Fayetteville, Arkansas (City) and Benchmark Construction of NWA, Inc, (Benchmark) In consideration of the mutual covenants contained herein, the parties agree as follows: 1. Benchmark at its own cost and expense shall furnish all labor, materials, supplies, machinery, equipment, tools, supervision, bonds, insurance, tax permits, and all other materials and services necessary to complete work and repairs as outlined in the attached EXHIBIT A — FAYETTEVILLE TOWN CENTER STAIR RECONSTRUCTION DRAWINGS. ' 2 This turn -key project providing labor and materials shall be provided to the City for a not to exceed fee of $205,300 US Dollars. a, The City of Fayetteville shall pay Benchmark for completion of the project based on a percentage of work completed. At no point shall payment exceed the percentage of work completed, as determined by the City. b. Payments will be made after approval and acceptance of work and submission of invoice Payments will be made approximately 30 days after approval of invoice. The City of Fayetteville reserves the right to request receipts for materials purchased for the City of Fayetteville from suppliers, subcontractors, or other sources. The City of Fayetteville does not agree to any interest or penalty for "untimely" payments. c. The City shall withhold five percent (5%) retainage from all payments until project is completed in full. 3. The Contract documents which comprise the contract between the City of Fayetteville and Benchmark consist of this Contract and the following documents attached hereto, and made a part hereof: a. EXHIBIT A — FAYE17EVILLE TOWN CENTER STAIR RECONSTRUCTION DRAWINGS totaling seven (7) drawing sheets prepared and provided by the City's hired third -party Engineer, Olsson and Associates. / McGoodwin Williams and Yates, signed and dates May 23, 2018. 4. These Contract documents constitute the entire agreement between the City of Fayetteville and Benchmark and may be modified only by a duly executed written instrument signed by the City of Fayetteville and Benchmark. S. Benchmark shall not assign its duties under the terms of this agreement. 6. Benchmark, agrees to hold the City of Fayetteville harmless and indemnify the City of Fayetteville, against any and all claims for property damage, personal injury or death, arising from Rorchmark performance of City of Fayetteville, AR CONTRACT - Emergency Reconstruction of Town Center Stairs —08-03.18 Page 1 of 5 this contract. This clause shall not in any form or manner be construed to waive that tort immunity set forth under Arkansas Law. 7. Benchmark, shall furnish a certificate of insurance addressed to the City of Fayetteville, showing that he carries the following insurance which shall be maintained throughout the term of the Contract. Any work sublet, the contractor shall require the subcontractor similarly to provide worker's compensation insurance. In case any employee engaged in work on the project under this contract is not protected under Worker's Compensation Insurance,.Benclimark shall provide and shall cause each Subcontractor to provide adequate employer's liability insurance for the protection of such of his employees as are not otherwise protected. The premiums for all insurance and the bond required herein shall be paid by Benchmark, a. Workmen's Cpmpensation.: Statutory Amount b. Comprehensive General & AUtomobile Insurance: $500,000 for each person injured. c. B_ adily Injury Liability: $1,000,000 for each accident. d, Property Damage Liabilit : $1,000,000 aggregate, 8. Benchmark shall furnish proof of licensure as required by all local and state agencies 9. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25-19-101 et. Seq.). Only legally authorized photo coping costs pursuant to the FOIA may be assessed for this compliance. 10. Changes in scope or price: Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the Fayetteville City Council in advance of the change in scope, cost or fees. 11. Jurisdiction: Legal jurisdiction to resolve any disputes shall be Washington County, Arkansas with Arkansas law applying to the case. The City will not agree to be forced to mediate or arbitrate any dispute. 12. Interest char€ e!i for late payments by the Clt� The City of Fayetteville does NOT agree to any interest or penalty for "untimely" payments. The City will pay all invoices within 30 calendar days of accepted invoice. 13. Security; No later than 10 calendar days of contract award, a one hundred percent (100%) performance and payment bond shall be provided to the City after being file marked at the Washington County Circuit Clerk's Office. Benchmark shall warranty work performed under this contract for a period of one (1) full year from the date of final payment. 14. Contractor's Representations: a. _Benchmark has examined and carefully studied EXHIBIT A. b. Benchmark has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. City of Fayetteville, AR CONTRACT - Emergency Reconstruction of Town Center Stairs — 08.03.18 Page 2 of 5 c. Benchmark is familiar with and is satisfied as to all federal, state, and local taws and Regulations that may affect cost, progress, performance, and furnishing of the Work. Benchmark has carefully studied all: A. Reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and B. Reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Contractor acknowledges that The City of Fayetteville and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or - indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the Site. Benchmark has obtained and carefully studied (or assumes responsibility of having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. f. Benchmark does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performing and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. g. Benchmark is aware of the general nature of work to be performed by The City of Fayetteville and others at the Site that relates to the Work as indicated in the Contract Documents. h. Benchmark has correlated the information known to Benchmark, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. i. Benchmark has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Benchmark has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Benchmark. j. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. k. Benchmark is responsible for obtaining all applicable permits; however, fees for the City issued permits shall be waived. City of Fayetteville, AR CONTRACT - Emergency Reconstruction of Town Center Stairs — 08.03.18 Page 3 of 5 L Any use of a third -party dumpster or roll off container shall be procured from the City of Fayetteville Recycling and Trash Collection Division. Use of a Non -City dumpster or roll off container is not allowed. 15�,I.lens�1�}p� liens against this construction project are allowed. Arkansas law (A.C.A. §§18.44-501 through 50$1,1).rohibits the Filing of any mechanics' of materialmen's liens in relation to this public construction .' project. 'Arkansas law requires, and the contractor promises to provide and file with the Circuit Clerk of Washingtoh County a bond in a sum equal to the amount of this contract, Any subcontractor or materials supplier may bring an action for non-payment or labor or material on the bond. The contractor promises to notify evkry subcontractor and materials supplier for this project of this paragraph and obtain their written apknowledgement of such notice prior to commencement of the work of the subcontractor or materials s4plier. 16. Contract Time: a. Time is of the essence: All time limits or milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. b. The Work shall be Substantially Completed within 90 calendar days after Notice to Proceed and final completion and ready for final payment in within 115 calendar days after Notice to Proceed. 17. Liquidated Damages: The City and Benchmark recognize time is of the essence of this agreement and The City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by The City of Fayetteville if the Work is not Substantially Completed on time. Accordingly, instead of requiring any such proof, The City of Fayetteville and Benchmark agree that as liquidated damages for delay (but not as a penalty) Benchmark shall pay The City of Fayetteville One Hundred Dollars ($100.00) for each calendar day that expires after the time specified for Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Benchmark shall neglect, refuse, or fail to ,complete the remaining Work within the time specified above for completion. 18. Pursuant to Arkansas Code Annotated §22-9-203 The City of Fayetteville encourages all qualified small, minority and women business enterprises to bid on and receive contracts for goods, services, and construction. Also, City of Fayetteville encourages all general contractors to subcontract portions of their contract to qualified small, minority and women business enterprises. WITNESS OUR HANDS THIS 21st DAY OF BENCHMAR O RUCi'I0:No A, INC. By:---� Signature ~ City of Fayetteville, AR CONTRACT - Emergency Reconstruction of Town Center Stairs — 08.03.18 Page n of 5 Printed Name & Title ATTEST (Signature) Company Secretary (Printed Name) If applicable Business Address: City, State & Zip Code — " (C' -, �� - S-.- - ATTEST: (Signature) ��{ll��llf/I��,,� ~ 10 Op Sondra E. Smith, City Cl�_Z■k,. reasurer • �ca� FA,I�TT�.VILI.�: z Business Address: :y'•9'�KANSQ.•J ■� o. 113 W. Mountain iy `QNB►►►��' Fayetteville, AR 72701 City of Fayetteville, AR CONTRACT - Emergency Reconstruction of Town Center Stairs — 08.03.18 Page 5 of 5 BENCHMARK CONSTRUCTION COMPANY, INC, STEPHEN SMITH T Telephone X179-251-1316 CEO fax 479-751-1319 333 WEST POPLAR STREET, Sle A FAYETTEVILLE, AR 72703 Email: bqU+ markconstgoil.nel June 18, 2018 Revised June 21 Re: Town Center Proposal for the Stair Reconstruction Wade, Per the bid documents dated 5-23-18, we propose to provide a turn -key project providing labor and materials in consideration of $205,300. The alternate pricing to omit the Luxrail LED handrail and provide a standard stainless steel handrail will result in a deduct in the amount of $8,600. Sincerely, Stephen Smith DC Sparks Construction, LL Building Futures City of FayetteN ille Town Center Exterior Stairs Remodel Attn: wade Abernathy 6/11/t8 17o62 Harmon Rd i Fayetteville, AR 72704 Office: 479-365-2889 Fax: 479-365-7014 Daniel.Sparks@desparkseonst.eonn tvww.dcsp arksconstructi on . com Supply all materials and labor per plans and specs for the remodel of the Totem Center stains, Includes demo, new construction, x-raying, testing, expansions, insurance and bonding. Total: $233,89o.00 Deductive Alternate: Furnish and install 1.90" OD sch 4o min. Stainless Handrails without integral LED lighting. $10,500 Bid valid fur 30 days DC Sparks employees are now trained & certified with a minimum in the following: OSHA Io & 30111', CPR, Ariel Liths, and Fnrk Lias. Abernathy, Waylon From: Jon Smith <jon@ellingsoncontracting.com> Sent: Wednesday, June 27, 2018 2:17 PM To: Abernathy, Waylon Cc: David Subject: Town Center Stairs Wade, I have had four electricians bail out on me for pricing this job. I am struggling to get anybody to get a number to me. I also fear that the only concrete number I was able to get will be way out of your budget range. We would really love to get a number to you for this, but don't want to drag you out any further. How badly do you need me to keep hunting for numbers or do you have coverage already? Thanks, Jon Smith j Ellingson Contracting I Project Manager 479.215.6582 1 lon@ellinesoncontracting.com Ceiiingson contracting salel9 iwep ympe-I' I - 6OS ioNo 8 ry W z z0 W UryV O~ 7U) ` O W0N �V _l W >ry W W Q U) LL SVSN HV NollOnalSN003H HIViS N31N30 NMOL 3111A3113.1Vd a 133HS2f3AOO D-_� ....w a�s� s osoaoa u.-s�.w..��,...s�� o�d rrc,•� wu. 'w. s. 'r. •mc sr ... �M°a •wnrrrna�d-ti-u�o�ioxa-iocscwn�� ..+nir K•�u•W4.�'.K.rlw•w�w���n-4ao.o.-m...,w.r.,..rr, r.s ii_„F..�...a :-......u,....�..r. .,b •m -r vnc.xu-�o.o•.. E%157INGCONCRETE PLANTER wAll (TO REMAIN - PROTECTIN. UAMAGE) NOT EXI(10 REMACN PROTECT IIINTALt W OL G< -CE) [.•�Itw ewnm snu wioeAa�, ��[vv rrc a+.-, - �.artr•++1�ywr I�oLaLuaa .ni.ti71O rM WA•Cua lQ IM A*riR]. L9V:Y A` a :a rFIVII r1. i'R WtavpA. mw1. Ex15T� T4,y�,�fL,'T-� a�A�R UTILITY DISCLASMER' Ir.nrcn [.nao s ZA rAc [Ie1 .u..Ai 4L RI1cullm+ A i.'T- u�Ls r`4 II a Sr.jILIlF1�L w Ir: VLCury `J '•t v/rX TC KrraMn.11A[w Ar[ 11EC.R0'OY TK ymA1L+aS ONLr LS'AiK 3A.R11 egM51YyLM[ AC.u1WSj .ro -.t [.ttAFr +ILAe sno' :.dw,rlsl lus Lou r•s[ .Iw.n[ m DR u.. Ex1S .L I, [IWI'rp[ t.CK .w e•. EI{ MQ.Fp[elY1.R.R I.{1q h uD piA.." U Sa ort .[LII.G. a. OIC L71Nrr[R[6 OF 17IN G. Ex15T NC BUSH {. IVa.AI�l.'d � /Lo�n� " CG.i.LiAC9S >W[Pr 6 ia.p.Sp•79rLwID EXIs11NGF LE rS1 KTa1,n .:I 0I6CLi16SER• :. I `.( !`-(. rrQm LraALn .w[o.rctr r rr alrmas 7RMm !r 1.1y EXIST 111 c O.ry IN I'll 0 PN ne E D FOGNIAIN IaooLj J lNr. LRETRE w L ExaN no FROM DAMAGE) flf. El. 912e.32L3 'L N^Lrw .X}I[ MOVE AN DI POSE OF C�1wG • /,->ff Ex STN. EXPANSON JOINT INSIDFO EER 101 AL L, " TOO EXISTING JI -D IDE L K51 IILL rBa A .L LEGEND LINE -_ _-FG.CUEIN[ R11171ON r Nrrr LL_ UTLINYOEAS-U. LD El, 1170�IK [aslwc - CCYitoU4 ..Srw10 MAJOR CONTOUR MIM: M.Ir tarlprt -r1m- `E . sc'i+mv Ytn.oYr Oso- Lnat.XL IM[A.VIK rM g wL SA wawa Sro+n SNE El STING Cl LIKE [ms.mo sfi..a r[.cc iXIs+IKc DVERHEAD ELECTR.c >sa� u'eE�dko tircnrc C....xu. i IREI w encs[ \ .owl f++rl / EXISTING BUILDING'I / (PROTECT EXISTING BUILDING / DEMOLITION OF EXISTING FI / INDICATED TO BE RE EXISTING TOWN CENTER rw�.Lp nmx 11M.1 xo (FIELD VERIFY) DEMOLITION P LAN SCAL EXIETNG r CONDUIT IN TOPMNG SLAB. (To REMAIN- Do NOT DAMAGE) ARx UTILITY DISCLASMER' 1. ITN Ex-EINC POWER POLE w/L CHI i.'T- u�Ls r`4 II a Sr.jILIlF1�L w Ir: VLCury `J '•t v/rX TC KrraMn.11A[w Ar[ 11EC.R0'OY TK ymA1L+aS ONLr tmprwe mr t.+[ .ro -.t [.ttAFr +ILAe sno' :.dw,rlsl lus Lou r•s[ .Iw.n[ m DR u.. Ex1S .L I, [IWI'rp[ t.CK .w e•. EI{ MQ.Fp[elY1.R.R I.{1q h uD piA.." U Sa ort .[LII.G. a. OIC L71Nrr[R[6 OF 17IN G. Ex15T NC BUSH {. IVa.AI�l.'d � /Lo�n� " CG.i.LiAC9S >W[Pr 6 ia.p.Sp•79rLwID EXIs11NGF LE E x15TING WATER 'ETEC 0I6CLi16SER• EIsTNSANER VALVE rrQm LraALn .w[o.rctr r rr alrmas o >as*+N.a veru.+w.i.x t Gu tKarwa STQer wL[• ewmloaml K *K Ir[o rwr An/a'm Is Leraxxa a. I -n 1puµ+ o.Kevrl alw froew a. TK AL.>.a om +wnn cAvsL EXISTING POSH M 01904 ,S I.rarlll W r!l nl.AL19 %K a.0 Ea e< (� smrnla u[oavoos c 2,ea w rrarLQrslsc sas7 a orslv+w sl,Imwlms EXISTING TREELIKE a slr[ .C.RIRY, Wi1.OTa. tWtu Ca.Silr w5. Emattpe ,AS •misrL rent. Snrcsrov ncraoL ....r ...+ warluwM +v Tee rlAw[• o. v[src. ars ENCNEER DISCLAIMS RESIONCIEUITY FOR ANYACTIONS TAKEN BY NNE CONTRACTOR NON IN COMPLIANCE WITH THE ASOVE- 1W DRAINAGE SYSTEM TO SEAR Y4 EXISTING BRICK PAIERS ON MORTAR BED W/REDw00D � EOxISNOT PLANTING AREA - E.117 NOT DISTURB LA17I [m.rwQ ax cic -oI r.0 119 mr1.w _ F.rul sw r.v. v.M+ar TW- . 1129,80d GSTEEL HANDRAIL AND POSTS (REQ ANG DISPOSE OF. EE fIIrdIkOR.II OCM DISPOSE V STA (RESEEMDETAIL OlE o/} FOR EXIS)IING CONSTRUCTION E%Wt.}L50S SURVEYING NOTES C mrN t N07ES t. aLS5011 .SSCIGNUS 4WL k l K IRI rdk KR .r.K O U% a, ooIIS[.aCm1 A.CnrOQL 1CW cl. %=n � Cm F.01%QUri1 Im I S.Cr, 1.CC.y"oo .* wWU w OCrIrSaA}I 11TI. T,AIQLL[ Im0 w.l,, ro..[ rLwa, Q m1m.c+w1'-UK 0 rE.91. txl *o•I1 m Aa[a7.A.y[ K1I. " Cael..yT CONKmTi ALsdl tlW Wac rr.LL'Lrol t K>arorA�; rw. va .ux mr,.Ix ^'[ •G?i v a. alwr°rcITm.s':cll°pR � b.r �iar7i. �r:y��"`a rr[a�n�iu o wnau, } nIF .rt.arre >. .c�wo.r�=-ua+K earr.,es aansvm Wryr ACS +MSCI usMcKRM vr`iry it/I,e�[NwO'Lfi ]tiIR+�>: CWWSYI. Y'.La N I/ACS urWv' ^•p N?r1+'N ? •cif( 4+a=.CSIS LAmy K �C*ice sM.�ML,4dttQ + • �� � •S ral 10 ERLEIn A. +Ht w.+.+tia w�l fq[p .l'+9M 91.[TIywS sc• ep rdA 9u:s [r.wrEa ' eAerEera ITS w� ,s � sua.tc mal..s ••o isca-rr_ Nae .r � �.x .Trac LCNCK IL a.YJCC [ I„[w0 7Ai✓.0 S ap wiC.W. d CQMS+SIiCA.'Ir 9.]rIV p aBiirst WC.ttA ar x� RAe; ..+Sfe ak TrQ Av.xA7t[ •LLCM MAK TrLP pAkT+[wi 'QAY I CBAr.1•Sm k •F,, E'i PLL((. ne.wy- - Ca0-AlK1SMI gE,'.we} 4915 rrNL I f� M1m IIIn f ISYI Yr wRNSEIG 1[LCe'+t WYtlf:ml. 4G. 9 Iasras+as a +Lr. cao.ow.rr .>a CCIGTIII 9T m M -ITS rs o.wv •look T [K V- a< [L.1olloa LLIo B.raa.nl[ [.[ ftW W a .4 [r OEV -E% salnnaa 10. CON, Ta IISlut rPrr C.ISTw0-Qh.TpS Al 9CCP•:1 is •[xVrr ..1 'SIS i tq Ao. W�'l,Ata� t'Pp.i.' y YIb [ [C==tK .vF IEICM►YG[S 0. 1, pAnt-fpk VfLt 9Ip9/r 4�w[[• V ay Br1CKR.KSS V G/L2K ITar0 n. L+4^.F CaIDI•r7Y5 ap\Im ME ..OLCI 13. N0.[Cr 0C1411[A6 a ILWa Q7 rm+ hvY M �L'w-'1 i1H[iS, w., p ori{. pCCyl[p p yl[C r� �+CJY AP..`3E'A a.Cr CrW ` m rc.xl* ;;•. IIIIvM :•uc° i.°�rnu :c��.�cc IeYra•[ w � wfovpx n rD Ills p.I0•1Y W.q .Y K iT"•.LLc fo P.pt•lr CA•S•!: t}. EilrlAti7. 11uLL pyY{{[ 7 ASS Cb6:iE>",:G. ID[iR4p'.wYS., 0 µ1C[ YATVa a1 9K r ACCa.pwCr'/B. ALL CRY. SIA#. AM CI9i14 IX. Cm5r.C6 tc ITFLR YCtftb I. -7,Y or- o1 STi . [. • ]DCO .91 ,s. [Carer" Kw.ova.a.sna Aaw.91x V= w. ,B '[ISM C OII LC.I^ srwra rlyHo.c[a Kma MA.a [.a* SL xm Ho." roo.r a S+..CA1.[ . Moos r Lrx :71na 177'asr.•[.aIA(IpV,.{tSA0arIl+.ulL c csvuvC v.oktsuo- ra nr 17. ca:aE+cNR sm.Lit ..950.'I P+nlw Is[µ, KrmaPM, AIn VDIIW fQ A(MM D^W co.artt Scww. to AMP[ Yw,<1 }n iN ..:WAws +.L w k M ly.ar sl iB11tlGNm.L .vsi [-wore km od .(.aS C< [WI i.Slb[IS yIAY I[ Krr?.ta H Hw �I[[��• CP1PKm. SLEIe1 SC• +MWS Wolk .asv¢.s'sP •ut.a 1.01E Ti¢ SrrY[iWR SUR 1B. Z tIUI.tICS iR,LL Lp[Att a.AS W. W6e ff[C [AIL[S ,b RGwOrCM [ .rrLr.0. 10.8 a K-RwI 6 17 .E W.[W[C wse 'NE nAMClUII Iro[i fi]wenfb . Nkri IIAq. M AAS I.tI,1.6 a x.Aas 20..a ya R [ JFDID• +LL .T. -*Z n+0 CAR a Lr![ I1tlrt�if ry �.Ta 0 ![ArW4 'K "K ' YA. V LC.RC SCIIM.Ifa L6W Cr% CMF1'ar. ISAI. 3000 LBS. ] W,Arll.r MygOµ .TQC L9A� S -O E= SOurrltwT: 2000 LBS. SCW AAAI UR," WK:.S' .! M -194f -N Hr PEDESTRIAN LOADING. CONTRACTOR SHALL 107 STORE EOU'PME17 OR MATERIALS OF CONSTRUCTION ON THE EXISTING PLA3A. 1. WiiriG'-LIM .. rL �IQM ,11E BASED ON FINISH FLOG EVA71ON A THE 1 M K.CA1L7 4 :XC -ILABLE L E TDANORD LCENTERRATL ELEVATION x LIIgqQL1ffYp���1 w}.FOWL w T CONTROL POINTS UPON S CONTRACTORS I 3 iPl [µjf}C/w�w 1p�CS%�pagr �TI[ [Yi��Pgr1 M0¢4w� W WCC 4NW{L u>ti>+�'l.+m ',yaaDtS+hn RMLMr11 oF'Oca�vllQ buYE1' �A�MS Sr.UCrMKS AS M1N•9R0 !r �[ C/IV'd [.W I.hll.. /IrID iWKrs� Li oi1�911 A.s wPraxwFs� mniaa[ IScxrarn ra aL[vxaw a A- °i.[ro`riL w1+io so.�im.%m.�k' H eO1ilunXn°AcvA�� a r00L Frani a[ v�Errc�ivm� 1*I"er m y'±�w rs`'in"+t+ilvcW'u°Eswt'swa i .[.A.m' e. KnAao w rNc CMT.ACTprt Ar ws dQ'C 31[ SHEET 2 of 7 r � s PROTECT EXISTING BUILDING DURING = OEu0UTI0N OF EXISTING FACILITIES 1 (VARIES AT ADJACENT WALL LOCATIONS - SEE PLAN) r I:plplt 15� DISPOSE OF EXISTING ; • y� RV�IT GEC x1[0.' f1[Ll siu0 wqus SPACED pt WL[ 4tl Em•p1Y 8/ [TaEIYO AT N' Q.i. wx p40� TYL a.�� lrt+� ote�.s r a>w Z: 0: _ -1/D} DIA- PANTED STEEL PIPE R TIONS SE NAN AI ( OCA - E PLAN) CONCRETE SLAB LE" a "rlw 1 4' CONCRETE • ]Doo PSI. DESIGN) cozllu A. L�pl m pf yy oNT'F EE PL w/5x6-w29vw39 wWE % ruD f{' OC,IAXuW (FIELD VERIFY) GIL�RACK ir9Q K.1V OP ONG [»�PL wTCV/O "miEY G �• fit (FIELD WET—) EXISTING BRICK ON NOSETTING VERs EI STIIHEC ALLI STEEL DECK BED ! .yp gypg[ r x (FIELD xi�fl' X LOPE 7TA. STEELC{ sTUDCwALLs w/Mlo TEN �P•Irc R1p 14Ua1L Yi ys ace I,a[1T [><-aaK.6 EX STING P4r1W N. •7BF CONCRETE .STAIRS REINFORCED 11 _ rAL x '� 'ti['S AE Y(MiLi EA, """Ell SE v. R14 Tq'1 � 't • I Y '+,' i PLATE _ rvl1C[D ti A�/A+ES,L7 r IR ESAB TELT ExISnNL PLAZA DRAINAGE a - E vLary LqB/BRICK (FIELD VERIGv) �,v Rs. Bwn7ERVRGOFIll (FIELD VERIFY) 5 't (FIE '. i.t : _ E• 4 w LE ruC •] M .rl py(f� CYSTEM MATER REMOVE EXISTING BF Ow nDO AIiEMGur.G VERIFY)D 11 •?:5u.. r.Y � WR.Yy p + 7 iT>?•dE I NOT GA.Al.E ou[ocMASPwN. ' mmT v.Ar.x aawc DWN N N.s Ir IrMa•ra u :vrr. L I 7 JJ �.s Tµ m1lRSbT 0.C[ [u51pG .1 a+EL �u+vcl•w In .ErTI Mll;{r�-�7 I I flEMOVE ANO DISPOSE OF EXISTING EXISTING LALv STUDS AiTALRED V.LI• ' pL ma of G1NLf[ rbl T.YIL! CALV. 51EEL LECA 9/15' LEEP (3B LA) TO POST TENSION NIST) DECK j �yyr�jG Ay p(ka I EOsI Icrwe. ux I REuO AND Ex sPNG WRIUDWEl A17EIIRSFF i R'vE"CLT VSOTEELCSIUO lr I I NELX "B ONSAM AoeM I I GALV SAW AxALBELSPACEO POWER DRIVEN FASTENERS FOO AE ll 0 oW EXISTING REMDVAL uF ExISnNL `qE7 rR K REUOVE ZNDGDISPOSE OF EkISTINL , aTEEL STUD I OU DO NOT 1 (DO uOr c[- rrP) [pyxygg pSR p ) LANDINcu TExlsrlliL STEEL sTuO waLL — E.aB90ID 'rTD 9(rLL "4 FB50.[rtNERs AL BIDING AT �l� ALL DIRECTIONS (W/aLTERN4iE IN Z + r[NDON (DO Nor OlsTua B) c0 - ON -s/e, C.LpR6 :W"AL: TO pll[1f CM• BRACE SLOPE DIRECTION) T — I20 S K txvY LRSL iiLyi li lu% C [•Sip" TKEEvEe FOG -0r IS, OS Mac uC C.L+r DE ] g EXISTING STAIR SECTION 2JOI ; Erae .aBn} rr.1..Fa T � I a laK •rp uYCsr r -Aq Mut s.rc T 1PY 10 Tk MC/ID u Up"CION JOGNDO N07 D STRUCTURAL SLAB/wALL. 11[ypyl[ •V3 05nyT r [IVSrIIG REMOVE AND DISPOSE OF EXISTING V REMOVE ANO DISPOSE �� '�' OFBRICK EXISTING REMOVE EXIS7 LK O %flS10C. -0REMAINDO aLUW11LIM t1r1N[ry =T PAN b! GWO[ (yp1B16 EkNS[IML BRICK STRMClLR4 AN�'ry.La E ER O D(PROTECT)5 LUMINUM EXPANSION JOINT PAN. EJ COVER AND ALUM 00 NIT DAMAGE /IIIAINL RFyit W1 W EACH GEIGEE`OF TENT.STRUCTURAL MA TRUCTURAL s[Aa/WALL pu C ANELS PAVERS I' TR RED .00C STRIPS (a�ryq"ry DA MAGE yn w [Y SIAISVR+[ i+r %E 3w 5LAB/WA �' 1Vp GMSC V E REMOVE AND DISPOSEPAVERS �tl0.5. +.@ jidR�[ EXISTING BRICK REMOVE AN POSE CATION OF Ek15TING BR CK r �V. 1p�y6 REMOVE AND DISPOSE OF RY `0 E%ISTINL MORTAR VUR STG PLAN FOR LOCATION. AVERS SEE PLAN FOR LOCATION- OCATION- AVERS SEE PLAN FOROF LOCATION - SEL Y TION IGp CONCRETE REMOVE OFMEk STING CONCRETE REMOVE AND DISPOSE LFMEX ST NLO CO'NLREr OF EXIETTIC 5T TRUCTURAL SLAB, 00 lAB [ N _ LOGAl10NE P_ ILA & SEE PLAN LOCATION. LA SEE PLAN GORE PABX SEE P AN"FGRTE LOCATION LDCATION. _ NOT DAMAGE. - R =PF \6 LOW[E[� DRA NAG PSYsi EM oL J w Z W DO NOT DAMAGE- TE1�j hLL DO NOT W W�� p iR1EC1DM1 Alil/WL N0i LAUA LE. Q U U •LMyF[ bwK- M: NAT 9w.rCC ti w0 z BRICK EXISTINGORR BED AND MORTAR BFO NOTES: 1, NOTIFY ENGINEER IF STRUCTURAL SLAB BECOMES DAMAGED. NOTES: L STORE EXISTING PAVERS AFTER REMOVAL FOR Z Q z REINSTALLATION. 2 DISPOSE OF EXISTING REDWOOD STRIPS REMOVED, 1. EIIIINI 111 SYSTEM BE OMEE DAMAGED , NO AREPLACE 'W f W O - DU ENGINEER AND SIMILAR R YSTEM. O > c � w OEtAL DETAIL A1;1 1;;X.K ED K ra E s sr sr• .. 1 ED 'a m DO z Of Of Li w w DO DOG SHEET 3 O( 7 FYICTINr.. TOWN CFNTFR PLAZA EXISTING PLAZA CONCRETESLABON DRAINAGE SYSTEM 010 REMAIN DO Nor DAMAGE TOPPING SLAB AND (PROGCC* EV3T qqAAjj 1 WHITES RAINALE SYSTEMA LINE UP NEW SJ CcMMIG ti.A L[Y?ihpE iNC �2 EXISTING BRICK P VERS ON MORTAR BED W/ EDWDOD EXISTING BRICK VENEER PLANTER WALL 1IlH E. SJ 'AMLP/E+.'1'JM MiIVI[S} EGTE STRIPS (TO REMAIN - DO NOT DAMAGE BRICK (TO REMAIN - PRDECT WALL FROM DAMAGE)I PAVERS AND WOOD EDGE STRIPS) I.M.f AND INSTILL NEI 11(TO IN AL . NEA V 7NOTE E20 _ RE H!M] A CH f%. O SEE MOTE Ti 278 I FURNISH AND INSTALL NEI ST E%PANSION DONT LOVER L E i SEE DETAIL 6 SHEET 5, WALL SEE MAT.9B3 MATCH E% t B9' . T%WA LA"MUTES r. ( E t4}1503 STEEL HANDRAIL SFE u.TE ED_ / f� M FURNISH AND 1 N VE SfR1o� E%PIN3i0N J01NT COVER H 12E_AL JOINT FRO. AL EXPANSION JOINT I i, SJ iL5 PAN TO VERTICAL WALL. SCE NOTE 20 dp 1 E TaD' [4T/EfOu 1LIaY LEDTLH LED y JE/LILLFA{ DN 73 EXTS1WGTWiRJC ER G MATCH rX. FINISHED FLOOR 1+}{pyl y ENISTING CONCRETE SLAB (P - DO NOT DAMAGE ERIB (FIELD VERIFY) I 2 SD' � RJ0. NG R pUR1NL REMOVAL OF BRICK) 300' SEE WDQ 1]. PLACE NEW CONCRETE MOPPING SLAB. 111 AWO ice+ Rj 5 1.2L.e� rmTro,u >r.TwP [K- I D3 f(L6 1{4X' ar 112900 i' EXP. JO INT Y-AnE M ft(i NEWS FAIR PLA cN REINFORCED CONCRETE TESTING NOTES: I THE TESTING AGENCY SHALL BE RCTANCD BY THE OWNER 2 LRCTE TE ONE COMPOSITE SAMPLE FOR EACH 50 CUBIC YPRDS OR FR i HEREOFYOF EACH CO CRETE MIX PLACED EACH DAY FREQUENCY OFC [ VIDE FEWER TH FIVE COMPRESSVE STRENGTH WHEN 'OR EICI CONCRETE INLL SHALL BE CONDUCTED FROM AT LEAST FIVE RANDOMLY SELECTED BATCHES OR FROM EACH BATCH IF FEWER 1111 FIVE IRE USED, 3 PERFORM THE FOLOWIC TESTS A SLUMP ONE TCSi AT PONT OF PLACEMENT FOR EACH COMPOSITE MVLE.ABUT NOl ALESS TH NONE TEST FOR EACH DAYS POUR OF EACH CONCRETE III PERFORM ADDITIONAL TESTS WHEN CONCRETE CONSISTENCY PP EARS TO CIANG CONTENT:1. AIR 1 IEC2]1, PRSURE M CONCRETE. ONE TEST OR EACH COUPOGTESAMPLE?I. NOT L155 THAN DUE TEST FOR 'AD. DAYSFOUROF EACH CONCRETE M CONCRETE UUE TEST 1111LY -11 AIR C TEMPERATURES TOT CEG FA 0 BEILYA AND WHEN BO DEL F ANO A.... ANO ONE TEST RHQ SITE SIMPLE. i WEIGHTLA TMC7111;ONE TEST AT POINT OF PLACEMENT FOR EACH LE T NOl LESS 1. AN ONE TEST FOR EACH DAYS POUR OF EACH OCONCRETE PM E DOTEST C ]t: C LABORATORY CURE OC SET OF FIVE STACARDLLVLNDERSSPECI.ENS FOR EACHCO OSITE SAMPLE. PRESSIVE STRCULIH TESTS: ASTM C 39, TEST 1W. LABORATORY CURED SPECIMENS Al 7Q2S DAYS, RESERVE ONE CYLINDER FOR FURTHER TESTING IF YN ICES... y. AT CONSTRUCTION LOADING NOTES: I MAXIMUM LOADED EQUIPMENT LOAD ON EXISTING PLAZA: 3000 LBS 2 MAXIMUM NCIVIDUAL WHEEL LOAD OE LOADED EQUIPMENT: 200D LBS 3 EQUIPMENT LOADS SHALL N07 BE COINCIDENT WITH ANY PEDESTRIAN LOADING 9 CDNTlAC7CR SHALL NOT STORE EQUIPMENT OR MATERIALS OF CON57RUCTION ON THE EXISTING PLAZA. GENERAL NOTES 1 OLSSION ASSOCIATES SHALL NOT BE RESPONSIBLE FOR, FOR HAVE CHARGE OF. CONSTRUCTION N MEANS, ONTVMETHODS, SEOUENCES, OR PROCEDURES FOR HE ETV PRECAUTIONS AND PROGRAMS CON O JECT AND SHALL NOT BE RESPONSIBLE FOR CONTRACTOR'S FAILURE TO CARRY OUT HIS WORK IN ACCORDANCE 'HIS THE 2 OLOPSON ASSOCIATES SHALL NO]_CTOGIU BE RESP.NGBLE FOR, NOR HAVE CONTROL OVER• THE ACTS OR DMIO 0 THE WORK, OR QFOR THHEQ AILURE OF ANYY OFF III THE MR TOGENTS OR CARRY OUTTHEYWOR•K N ACCORDANCE WITH LATHE PERFORMING I THE CONTRACT DOCUMENTS. THE CONTRACT SHALL PROVIDE AND BE RESPONSIBLE FOR ALL TEMPORARY SHORING AN RACING REQUIRED FOR THE CONSTRUCTION OF THIS PROJECT, AL NG ANO BRACING MEMBERS AND CONNECTIONS SHALL BE OF SUFFICIENT STRENGTH TO SUPPORT THE IMPOSEDLIAll, A ED Fl LOQ MODIFICATIONS TO ANY STRUCTURAL COMPONENTS SHALL BE MADE WITHOUT PRIOR APPROVAL BY THE STRUCTURAL ENGNEER. 5. MATERIALS AC EEQUIPMENT H LL BE STORED AND TRANSPORTED N A MANNER 50 IS NOT 10 EXCEED THE ALLOWIELE C UIPME A CE OF 1H aT STRUCTURE. T E. L eHC iJWT4ACTC11 11iPEl /hlOn LIF![CY OA[I/Y]NS PLP. m SOI fC/li NAW WS 7. EMBEDDED ITEMS, SUCH AS PIPE SLEEVES. CONDUITS. AC INSERTS, 5All BE IN PLACE BEFORE LONCRETC IS POURED S. EXISTING DIMENSIONS PND MATERIALS OF CONSTRUCTION SHOWN OR 071ERISE INDICATED ON THE PLANS ARE BASED ON THE AVAILABLE RECORD P='S-" LANS TE - FAYETTEVILL WN CF EXHIBIT ALL• AYEiTEVILLE, IF, ANSAS CONSTRUCTION DRAWINGS ISSUE SET, WE- JOB NuuBER 95D59. OaTE. APRR 5, 1999 BY YATIENI ERG, DELONY W 9. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES WITH OWNER PRIOR 10 THE START OF CONSTRUCTION AND HROUGHOUT 71E ENTRETY OF HEP R OJECT UNTIL C0IPLETION 10. CONTRACTOR SHALL FIELD VERIFY EXISTING ELEVATONS 15 REQUIRED TO PERFORM THE WORK SHOWN ON THE PLANS PRIOR DOCUMENTS0STARTAC FDE TRC71ON AND N071FY ENGINEER OF INY DISCREPANCIES OR CONFLICTS FOUND EN HE CONTRACT 11. TUR SALL NOTIFY ENGNEER OF ANY DISCREPANCIES OR CONFLICTS FOUND IN EXISTING CONDITIONS DURING THE PRO.,EC . 12 PROJECT CONDITIONS: DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION S PROTECTION OF E%ISTINO IMPROVEMENTS: PROVIDE PROTECTIONS NECESSARY TO PREVENT DAMAGE l0 EXISTING IMPROVEMENTS IN DELATED TO ROMAN EN PLACE, ES70RE DAMAGED OVEMENTS TO THEIR ORIGINAL CONDITION. AS ACCEPTABLE To PROPERTY OWNERS 13. CONTRAC70E IA SHtLLDISPOSE OF ALL STATE. AND L RETULTIONS CONSTRUCTION DEBRIS, "wk%WGWIAq(• ORGANICS. AND WASTE MATERIAL OFF SITE IN nP.•LOCA RETE E CEMENT TVP, ASTM C ISO PORTLAND TYPE 1/II C AGGREGATES ASTM C 33 THE LESION L'_ESRENOEC oENGTABSEu EA ORS OFR DELETERIOUS EXPANSION EPORTS FIR SET. FINEAOF CONCRE END DOLASEA DUEE TO PRGGRpPOSEO FOR USE IN ALA-ALOREOATE-REI CTIVITY. E• AIR AST �ETTRAN.ENT MKC 2. CONCRETE uIM DESIGN FOR STAIRS AND SLABS: CONCRETE STRENGTH ("� O 2B GOXS) -000 151 2 MAXIMUM WATER 10 LEMENTITIOUS MATERIAL RA7110 (W/C RATIO): O 12 3 NOW NAL wX. I.GLETAE SIZE: NCH I. EUEME CONTENT 510 PONES OF PORTLAND CEMENT 5 MI%DESIGN SHALL 107 INCLUDE FLYAS. 6. SLUMP LIMIT: A INCHES, 3 INCH 7, AIR CONTENT: 5-I/2 PERCENT. 3 PERCENT G CONCRETE MI% DESCN FOR 10I1T COVER INFILL: 1. CONCRETE STRENGTH (1'c0 28 cy) 10 MAX WATER TO CEMEN11110Us MATERIAL RA710 (W/C RATIO): 010 JI NOMI'ALH =ACGRECAIE SIZE: J/B -INCH 4. MINIMUM CONTENT BID POUNOS OFPORTLAID CEMENT 5 % DESIGN SL H LNOT ENGLUCC ELvISH 7. AIR CONTENT: I5 INCHES, 31 5 PERCENT 1. O URINC COMPOUND: CLEIAR, wAERSOURNELIW-c MMa11B U' 1Y [ 4w .•.PH;, L cvm o 01f63LA» EI IFO.. NO STEEL Ai615, GRA WELDED VA RE LEINFORCEUENT ASTDE B OETpwfEO M A 1GSA, NMr% l.6JIT TWE, ROLL TYPE IS NOT ACCEPTABLE 1. PREFORMED EVAR.XPANSION JO T ISMASTM 1 1751 I SH_M MASONRY MORTARABED RASTM CE E270 TYPE NS a 15. SPECIFIED DESIGN LOADS (FROM REFERENCED RECORD PLANS SHEET S1.0) DEAD LOADS WEIGHT E STRUCTURE - FLOOR B� LIVELROUNOa SNOW LDA.: Z - PLAZA/iERRACES/E%HIBIL HILL G 1�.'LLM[R.1CID11a411 NLOFCi[LC6D(iG fILPPl RIffOXNl0. lA9 Cp0L111 >9 RP111N 'JMWEIe (f111Iq[WH'f..6>• 'TyP IJ EMBED.EDOINTOH THE STRUCTU AQL 1051 TTENSIONED SLABS LPRIOR QTO AllREINFEPLLNGRCINIF OFC LABSOLIS OR REB1R IS TO BE I O GINATE WITH THE --EER TQ ACCEPTABLE WO SCHEDULE WHEN THE WORK WELL BE B PERFORMED SET AWORK HOURS NO DAYS OF i E WEEK IT IS ALCEVTABLE TO PERFORM HE WORK, 19. BE- ESTALL E%ISTING PAINTED STEEL HANDRAIL AT RAMP IN SAME LOCATION. CONTINUOUSLY WELD REMOVED SECTION TO EX KISTING SECTION AND GRIND SMOOTH AL AROUND. RE -PAINT REMOVE. EXISTING SECTION TO MATCH EXISTING HACRAIL ON RAMP NOT REMOVED DURING CONIIRUDTl CN OF NEW STAIRS 2. FURNISH AID INSTALL CRAY HF -200 SERIES FOR 2[WIDE EXPANSION JOINT BY CONSTRUCTION SPECIALTIES (CONTRACTOR TD FIELD VERIFY ACTUAL JOINT WIDTH) PREPARE EXPANSION JOINT SURFACES AID INSTALL NEW JOINT COVER MATERIAL 11 ACCORDANCE 1171 THE MANUFACTURER'S WRITTEN RECO..ENDATEWS. t. CONTRACTOR SHALL CORRECT AND DEFICIENCIES IN THE WORK 22, DO NOT PLACE ADJACENT SECTIONS OF CONCRETE UNTIL THE INITIAL CONCRETE PLACED HAS CURED FOR 3 DAYS MINIMUM 21 NEW CONCRETE SLAB AND STAIR TREADS TO RECEIVE LIGHT 9ROOI FIIGH. 21, GROUT RUB STAIR TRE10 RISERS AFTER FORM REIOVAL WHEN CONCRETE 15 STILL GREEN 251 AEIIBLR DETAILING AND ACC SSORES 0 BE FUINSIEDD EIAOR CNFORM TO THE DETAIL IN THE LATEST ACI S1AlEIlG JIS D TUT AN L AND CRSJE EXCEPT AS 0 HERWISE 107ED SPECIFIED. 25. ALL HOOKS SHALL BE "STANDARD' HER ACI SPECIFICATIONS. 27, CORNER BARS MATCHING HORIZONTAL BARS SHALL BE PROVIDED AT CORNERS AND INTERSECTICES :E KL /@-wSTAUID ANPac15 i iWdR[KG 4fq 1X111 X P.SEAUED V CEM V LPO' s w 51w] WAYatiAMt nEi i1! wIWAMW[R'9 W16WLAtCA Iv.MRCeOI+f- 7. SHEET H aINSTALL IL SS HANDRAIL NOTES FURNISH IND .90' O D. SCI 40 CHIN) STAINLESS STEEL HANDRI'L t 1 90' GC. LU%RIIL STAINLESS STEEL OUT INTEGRAL LED LGH LING HNLED LLIN,INC EI LDOPER INDUSTRIES WITH PROTECT EXISTING BUILDING DURING I -- 99 2. DWNERATO SELECT FINISH OF RAIL. LIGHT DISTRIBUT`O q, AND IALL EEDLECTRIC ALD CO CONDUCTORS.AND CONTROLS CONSTRUCTION OF NEI FACILITIES LORTCOLOR CONTRA 10 PROVIDE SAMPLES A IA IT L LIGHTED sT LESS SEEL HANDRIIL uIN AID DR DINaTCO WITH Ru All ALL NEW t 0 1 IS TEEI PLAN �. B = C CONTROLS FOR L TNG LIGHT STRIPS ).�. Y-!• RYP (v 5 AT ADJACENT WALL LOCATIINIs - Au) PPf HANDRAILN(3 LO[A>t0us9 p NOS L [ 4N) E _ LED -FOAM FILL NOTES ( )• S• M" A> N LL EPS -15 (11D PST) EDAM CONTROLdD LC0�0 uTUDT pBt1 ITRUlIURAL FOAM FILL BY: IGARI 5"I.C.1010, lGlIll 10 E E%PANSSONND NNETCOVERIL EW SEE Rµ - Z� AR- USA, 12111 PI 501-915-1114 - A DOWELS m 19" OC MAX EMBED Q 1/1v to Lm .. 2 WALLINTO 101 w/HILTI Hli OCONCRETE v 300. Q„ J/0 — — — - - - - • ] NTPFIL ER ANpNSEALANT Y•'• JOINT SCS Cp� L4 BENT BARS o 1B" OC AP 2' WITH WWT V 5' C, nnnn rmLuc rnNcan � 6o-LpL ro+oj Eri:R C § r BRICK W�lH. W IIlnrw BEO o 4 .' {• -.. _� "• h'NTELY BELOWTD PING LIB/B IC = r4` 1 1Jb!! YCOf'.•, SYVTEM BXATE TOPPING SLABT BRICK _ Tf'rm ERPgooF1N0 sysEM // / - s f _ L BEOLOw DRAIupGE MATERIA LAYER: ] DIA WAEEPS CAST IN W t6' BETA■ C/IK RAY }��Lk'i Cc DRAT PP Nc SLAB / Y-C81VGG-' �y p'NLY� Iµ 1 - i T'll.f�9� NOT MAGE DURING DRAINAGE SYSTEM - .1 'K 4TlUCkT/L .illy CCONSTRUCTION ACTINTIES - •_ %, ff IDT �uEWR WlLNy LACE NEI 6"3 CONE �H 0!Y �T�' lY r- K:OF�A4 3TWK r CONC DO NOT M _ ��.� s TOPPING SLAB WHERERL` TryL11pF rCTN*[i SHOWN -SEE PLAN. H �' r `iia `:{ �;� . � / •.. _ — _ — .µ..,■ M6 L .•nC n AW IRAI/PEOW PRIOR TOPLACING ( i I 1 3 OC MOTS GEOEOAM S RUCNRaL IIIIN M I ] FOAM FILL x F e mwM�!worac AND TENDONS T RC NOT (DO NOT DA AGE. TYP) l 1 M r EXISTING POsi ENSIOVED 1 XP CED C.0 ows W ` ] f� Lac /STARS) ] 0 REMAIN- CLEAN EkICTINc ARE TENDON (DO NOT gSNRB) PRIORTD PLACINGNE LGN R TE J g DETAIL xw vr.Lr 4 II •_B � f INFILL EJ PAN W/3/e' INFILL EJ PAN W/3/8" CONE. MI% AFTER EJ [pLtt'lIRF: CONE MIX AFTER EJ CNEER DD NOT COVER INSipLLATION MAGE LOVER INSTALLATION CONCRETE INFILL BETWEEN EJ COVER NEW CONCFETE TOPPING SLAB -SEE TURN I'l TALL IND BLDG EXTERIOR WHERE FURNISH AND M1SE11 PLAN FOR LOCATION BA SEALAH 7 TYVICALA REOUIREO. 9I ACSEALAN i A�1L1p4C4 S 4/+" PROVIDE 5" NR DOWN ON THIS SDE CP W/APOST TENSIONED o _ CABLESODANO - i LL. CONCRETE SCREWS TO THIS WILL. E%. STEEL PIPE RAIL TO RfMAIN x i� C°cI IDC OF AN TIROUGHLY CLEAN EXISTING CONI- EACH SIDE OF ✓tiFl LL BLOCK OUT vnTH SUBSTRATE AHD APPLY BONDING INFILL BLOCK OUT vnTH I INISH AND INSTALL NEW AL INFILL NON -SHRINK OUT NCEUT PRIOR 0 PLACING CONCRETENON-SHRINK GROUT EXPANSION JO' COVER 55RW-300 (PROTECT) 1 E% WALL IA3t,50t / IG rl ll ILL BY CONSTRUCTION SPECIALTIES W/FIRE C BLOCK As REO'.. INSTALL ACCORDING y FURNISH A INSTAL 3" WIDE . THICK NEW CONCRETE SLAB WW 10 MANUFACTURER'S WRITTEN CLEAN E%IS11NG EMBED FURNISH ANO INSTALL NEW eL C%PeNs10N III STRUCTIONS W/SS CONCRETE NEW CONCRETE SLAB R NEOPRENE RUBBER (RUBBERROSTRIP ONDER NEw 2-3i IEIC 3/1' S5 PHILLIPS ID' IS PLATE, ATTACH RUBSTRIP TO E%ISTINL Ln HEnO iAPCON CONCRETE DO WITH CONSTRUCTION AOSESI LATE i0 SSPC-SP6 JONi COVER SSR -ZOO By COuE—CT10N FASTENERS OMUEROI4 a BWAST OR SPECIALTIES W/FIRE BLOCK A5 REO -D. EXISTING CONCRETE INSTILL A—POING TO EMBED SCREWS (TAPERED IEADH INSTALL ND1CAiiACWALL Ew HEAD FLUSH W PLATE. H ED RENE TO PLATE IMS IDE Of Wi 1Q x p! fir• F%I$TING EXPANSION JOINT EXISTING A NG STRULTOftaL SL CSEAN NGSAu WRITTEN INSTRUCTIONS w/55 CONCRETES LEAN TO WITH ZINC. RI MEq 2 Lam' FASEUC ONMEERCIp55PL-SP6 T[R LL[ANING EF<Sp H1Ilx] B a OR DO NOT DAUIGE.B SSPC-SPS POWER Ti00L URUISH p INET L 3' WIDE x iHICH P A FURNISH AND NS t6IS ROME L ,I INT NEOPRENE RU BEERA(60 DU TE]q) UNDER NEW PLATE EXPANSIONT JO COVER OVER Q DO Z CONCRETE GLEANING AND LO CxISTUGRtpF'L DOR 107CAR—SLATH ZN RICH RIDER AFTCR CLEANINGP E LATE. A T RUBOBfR Si tP TO "'NO P WALL CRETE WALL>M ON ACHE IA 0 FASTENING PLATE TTTOLWILL - I S SIDE F W O Z O W H U O W+E'e E]ETAI1 T COOLOR OF E Cw SSR-3D0`s5R-200w ALUMINUM E%PANSIDN STAT ANDCOVE T • DEAL ! Xyy }I••I'y E D BY OWNER ROM M UFALiURER's RANGEOF ; ]R•Ar� ONLY I_ FURNISH AND INSTILL VF 2. EXPANSION IDI 1S. O COVER BY CDNSTXRDU C7UR ECC WRIS• INSTALL AC CRJL TO NOF LTURCR'S WIEITTEN CPRIOR Z O f Z ; H O U) Z 2 ASL OALS ALU MIUMM SURFACES IN CONTACT WIT. CONCRETE GROUT, , OR ETALS SIALL BE PROTECTED WITH BITUMINOUS NT,E OXY COATING, OR OTHER A VEO MATERIAL, INFILI EI PAN I/3/B EXISTING BRIC'OF sEALANI 10 BE SELECTED ByOWNERFROM MI—ACTURER 5 [ CJ 3 COLOR ! �LLIt rYA DIVOLE 0 R�NVE OT STANDARD COLORS rlFNISl IND IN 29PROVIDERIMER L MPLINGG wlil s PC -PAINT 20 OR SSPC-PAINT COROTHANECI GA LVIPAC ZINC P IMER BVSSHERWIN WILUAME FURNISH AND INSTALL AT 200 IEHRINKC pE TURN DO INSTOR 11 SIDES' wv ON SURFACES TO RECEIVEAEPDXVLANES1 oEAN 10 UT NISH ANO INSTALL BICKER ROp OEPIHE w�LL OTO<0 E BOTTOMS OF WALL ON SOU SH H sEALLANT ALONG EDGE OF PLATE SIDE- -COI ICAC HIS SDE OF EJ L i TENSIONED 0* Ex LONG W I/APOS CABLES CONCRETE DO GO ZO U O > D.' W k Q W 4 LSEAI ANT TVP EACH ON -SHRINK GROUT MaY Ai USCDO IN PUL4CAEOOF ]' CONE a%. COLOR OF E%PINSION JONT COVER BY S C H uON GROUT TOM R F ACENT CONCRETE- CONSTRUCTION SPECIALTIES, INSTALL _ SCREWS i OO TISIWALL. Z lai N 'I ll ORDINO TO MANUEXCTURREF'S NFI I LL BLOC' OUT WRT7EN INSTRUCTISIS OUGILY CONCRETE aG TD L 2 WIDM PRENE RUBBAECH(]RJ TUN R NEw NE GREE AND INSTA R E TOE Q Y NON -SH K GROUT [LEAN U vs IIA L WI wS•ILL Nt`R RECEIVE EPDXv AOIESIVE RIOR TO APPLICATION OF AOHfSVf. ] SS PLATE RUBBERUBER sT P TO EXISTING KM TTLRCM CONCAC11i 1LM1K CONCRETE WALL WITH CONSTRUCTION ADHESIVE. DO KE Q LU BY CONSTRUCTION SPEGALTIES w%FIRE BLOCK AS REO D. INSTALL ACCORDING iHROULHLY CONCRETE 's 14>+CpX[RTl NOT ATTACI EOPRENE TO PLATE THIS SIDE DT Imo© �4) Em' S ,mm EXISTING EXPANSION JOINT 1slT/y yY ft F r- , !E!p }' OLLREA' NEW CONCRETE SLAB i0 MANUFALTUFEE WR TEN iLAi INS7RUCIt/ OHESIVE PRIOR WIVE W 55 CONCRETE SU REACES T EEEIVE OPO%v LIGATION p FASTENERS O S ADHESVE NL EMBED - CLAN EXISTING EMBED A ■f �TG^ K V. p WALL TURN 51 ANP NET NEW ss KI�L'E WETCM if�r Nw MPm LAE EX,T YEP OVER TIRm Epp' a u R 'Id*NL%'Jn'. VERTICAL FA LST TING I' AtNA21.60t > F F LaTEE TO SSPC-SP6 ei• tbKwC PLATE TO SSPC-SPE E MM RCIAL BL ST OR _ STRUCTURAL SLAB DMMERc1AL BLAST OR EXISTING AL SLAB STRUCTURAL B 00 NOT PC-SP3 POWER TOOL T DO NOT DAMAGE SSPC-SPS POWER ToDAMAGE 2(FIELOXVERIOY 'S'a nINW 1•Frf lL''n' �6 fOL LT ABOVE E% WALKWAv�Al EL ry G 04.Y. FURNISH AND INSTALL 2 IHOE + +" THICK W LL EA AND COp i LEANING AND CORPT NZ UC gILH IMER ^S ) ITH ZINC RICH MER �rLp! p[A1YYC AGER CLEANING NORUBBER (60 OUROMfER) UNDER NEW SECTIQN_ BE PLATE ATTACH RUBBER STRIP i0 EXISTING CRETE WALL WITH CONSTRUCTION AD DRIVE PRIOR TO FASTENING PLATEi0 WALL - THIS SIDE ONLY. nsr]�I� C� SHEET 5 of 7 CE EXISTING BRICK P'YERS ON NEW MOR4ED COUCPLACE TOPPING SPNISH AND INSTALL w ERC INDICATEDp5Tu REDWOOD DEMOLITION LB CURALNOTUOAIAGE.SLAB DDOOxlSilpc P 101 DAMG EAGE. IIOTE `: CX15TING ORAINAGE SYSTEM BECOMES DAMAGEO. NOTIFY ENGINEER AND REPLACE ITT SIMILAR DRAINACE SYSTEM TDETAR TE OR BELE DEAL OW'NTNER. LADJACENT C D ER. r OR BEAM, AB. WALL ¢711 JONT FILLER u:iRIili [Aui TT_ 'Ss ` E 61ANSION JOINT DETAIL EJ) • M w... L ET FOR POST EMBED HOLENIBD OWITOSNON IN -SHRINK GROUT PVC CDNGUIT R LEO HANDRAIL POWER AID CONTRWHEREELAPPLORS APPLICABLE NOTES NEEODING ux 15 LO M. 1R'G YJRT t DETAIL 2 mcI ren. o�L�p�itNI. KNISH ,,US. -N td w C1`1C OWNE, F sr" creo eY � ED FACEE 4. 4' 0 ACKER BI DETAIL r.3• T MOTH ' r ` BEINI - SEE BECTON MR-pROPILE DETAIL NOTES: 1. STAIq RISER HEIGHT 5 -INCHES TYPICAL. HEIGHT OF FIRST PLAN 2. RISER LAIIES E DOE LEDNEON LIGHTING STRIPS AT LOCATDNS SHOWNqTE LIGHTING WHERE MISER HEIGHT SHAT"""MOR LESSNIu NSTALL RGB LED NEON LILHTNG SR IPS WITH SS SELF-LOCKING TING CLIPS Pa T NUMBER F -T- [ELNN Lk `M/ML EROM ACERY BD-INLHEE ON CENTER AND -ICH- DVIOE AMDIST"LTIVE MARKING STRIPE IN THS BOTTOM ST NOSING WITH LIP RESISTANT SURFACE N -INCH MIN WIDE BUT NOT MORE THAN 2 INCHES IN WDLL. SEALANT COLOR SELECTED UC NEW - SEE JONiRCNG NTCJ`E SE4AND, UE DLu SEALANT. SE CTE By ALAN CONCRETE LOCATION OCA TIONP NL SLAB RPACNLL6.6 - wS Br WBSEJ W/SEALANT CONCRETE STRUCTUR ALSLAB O NTDCE SYSTEM,EXISTINGDO NOT DAMAGE DAMAGE. 0 NO "T" - SLAB N1 A L lMb AMTS SHALL BE SAME pW N 52 THICKNESS .0 v L+41GRETE IL CEMENT W JOINT SHALL BE LMT 1[A:LL♦tE AND T uE. DINT LOCATIONS LLT JOPNT FOR ACCORDING TO THE MANUFACTURERS WRITTEN INSTRUCTIONS. SA JOINT DETAIL ISA GENERAL RAILING SPECIFICATIONS: 1C RGT ON, FOR 117. INTEGRAL EMeEOOEO-u cETE O o1CRR MAsOENR *ELCVER SUCH EIiEMS TO 11111CT 11 1LUYAFToB11L1,1IR PLANS, DA LEE EDURES ANO PCRSDNNCIL ACCORDING To AWS DITB/GRD IS. -STRUCTURAL ORE 5—EMENCTS! ARIGVRACTUALF LO R [ONSIRu[T0N CO17GUOUS .11H UETIL ,E, FAERGAR "S BY FIELD "T"ENT' BEFORE 'ON 1.1 1-171 IF -11 LOADS AID 7TE FOLLOWING LIAH IND ITIBBSAI .1111N UNITS — UNDER CONDITIONS ,DCITED LBF "ANDA UNIFYRM LOAD OF 1. PPLIED 11 All DgEITIGN INIGNM AN. I—E—Al. L.ADS NEED N.1 .1 ASSUNID TO AD' RRENRY. B S1C[l R+DE N+u ES SGINIAROT+INS. DISCDLOft+nOISI OR BLEMISHES wITXOU SE OGLE TUB DE UT UINI 312/A 31TM, GRAD 7 316L 1 1151 NIS AST. A X3/A 10/A F2 J16L 9 UNEREE AN As NERE E POSCO FASTEN[R5 .7H FINISH MATCHING APPEARANCE, INCLUDNB COLOR AND TEXTURE. OF e- II57ENEIS FOR AICTORNI TO OTHER CO.SIIUCIION; SELECT IIS7ENE15 IF TYPE. GRADE, AND GLASS 'Ell 11 ` 71 .... DE CONNECTIONS IIIIABLE [-17—T ON IND 1AND—ING BA UAGS 1. DIER -BS OF 11CONNECnAID AN D uGPRAUIUBLFCOUPON—S LR E9Gu LOAD, WOE GO AILING COMPONENTS AND FOR ATTACHING TIEI 11 OTTER YORK. UNLESS OTHERWISE ROID— SLAB WITH SINGLE LAYER E SEE SECTIION NG FOR SIZE AND SIMILAR SPACING ■ CW JDNTwr c:s • wLn NAv.P THE A TO OTIBB OSEDEFASTEUEASUANEAVNAVONLAURE Oa ARE THE STA NO AND 1vEIDEu tAMaER�WxESI51AN71 IA, FLAT EAO `EXCIAACHINE SONE.1 FOR EXPOSED FASTENERS UNLESS 10 WELDING A AN BAR EL Roofs: SELECT OZ/c I PBOM. T PEUFlCALLY RECOMUEUDED BY MANUFACTURER FOR 1-101 AND E171RlIR IPPLIGA1111 D M , 1EGLIRE0 70 SUPPORT 13 LOILS DETAILS FINISH. ANCxOftAGE. BIT cCURAIELV. REMOVEABURRS AND EASE EOcfs TO RAN A R OIUS MATELY N/J2 MNCHL OTH UNLESS ERWISE INDICATED REMOVE 1111 OR ROUGH AREAS 01 EXPDSED PABt RE EXPDSED TO WEATHER 11 A MANNER THAI EXCLUDES WATER. PROIUE COONNECTO So FAERIICATO `711E III IRAILINMAYGS WITH EITHER MELDED OR NONWELDED CDNNEC110NS UNLESS OTHERWISE INICITEI USE MATERIALS AND PWELD ALL ARGLNG AT GGNNG7GAE UEE1o0S THAT WNUIZE DIS111TION AND DEVELOP STRENGTH AND CORROSION FUSIONIEISIAICE OF EASE II .7AN UNDERCUT OR OVERLAP, RE—FLU IMMEDIATELY. 1. AT EXPOSED 101NECTO.S. FINISH EllOSE1 11KICE1 SMOOTH AND " AFTERFACE MAT1111 CONTOURS OF BLENDEDSO USURFACESNESS UeExsno D FrtTIN- UCE RUSH, END— 11ID.. —LINE IGI IT, FOR REPEn11VEINAIGC0uFIGURA'. RE1 IIRE171 MADE BY D FITTIGS TO OCa05S SECTOIGI 11 PRODUCE LE MEMBER 1HROUGIOU7 ENTRE BEND CRACKING, oR 1-11SE DEFORMING EXPOSED SURFACED OF COMPONENTS SURFACEB GRIND AID POLISH 5 TOO PRODUCE­ RODUCTE U - S. DIREGTICNALLY TEXTES OR INTO URED, RGUSHEO FINISH INDICATED. FREE OF CBGBS BA7C.. C STAINLESS STEELTUBINGFNISIES: SELECTED BY OWNER FROM MANUFACTURER'S IAUPLEI 9 A ad. arirr D AxGULIMED BY 11111 TO A I'll FINISH a9/A n A OWNER FROM u-NUFA[IUPERs SAMPLES HIGH LUSTER FINISH: AS7M A e0 /A - E. "Il PILl"111 11 1111 1A.1 uD RINSE SURFACES REMOVE EMBEDDED FOREIGN MATTER CL I N. IEASU.ED F.. ESTABLISHED LINES AND LEVELS AND E 11 C I I THAI IRE CIATED OR AFTER muGUOgAgAIT UINDRIII E-..0 ­FOR FIELD cONNEcnoN ev uECHANCAL OR OTHER MEANS WITHOUT SET POSTS `LUNE "T"AOF 1/16 INCH IN I FEET C. ALIGN RAILS SO D A/Xv RALLEL WITH 'AND1 ANSTEPSUSEA*.yg LED . ,MTS FORSPERUAUENELVECONNECnNCHRAlu14FCOMPONENTS v1111 REOUI1EW11TS FOR WELDED CONNECTIONS Iu WHETHER WELNNG Is PERFORMED IN THE SHOP OR 11 71E F NOTESDEEPD J/A POSTS I CRETE SCLEANUNEI:s OF LOOSE MATERIAL POST AID CONCRETE 'T IDIS.- 101WETAILIC GWOUT, MIXED 116 PLACED 10 COMPLY WT. AN11-11 MATERIAL IN1FCTU F—DE OF uEUSM 3 21, u STAINLESSS STEELRBY 11 WASHING THOROUGHLY — CLEANETAL AS SWATERATTA AND SOAP AND RISN4 wIC1. CLEAN WATER 2 ES OF RAILINGS FROM D—SE DURING COUSTRUPROCT GI PERIOD WTH TEMPORARY PROTECTIVEDOWILEDON zz� O EE F- O N I Z SO GOJ U z WK kDO U ¢ W Q N Z LL LNG SHEET 11 EXISTING TOWN CENTER PLAZA (P [tT L "Mr W1IA FWOIITIES � ` EXISTING i- CONDUIT IN 70PPIN4 R 4 TTION BxY Y SLAB- III REMAIN- DD 117 DAMAGE) C R4Ii - M M EXPLANTING AREA - • DISTINGD NOT msYUge ......._ E IE'J Y. 4— i4Ac irr! WWSr[ NfOLT �e - ..L"vo'n .zLnls • RETE WALLu,LTof e x _ Ex1(TGNREMPROTECT FROM OM - :V -f'F✓ .n4y pAMIcE) {i0'61Yrv11-�- ��• •'.N�11L1PI LY: �•�� R'li Mi LUIGGT STRRUPEREua.uFACNIND ER SU WRITTEN D PEACE y,r� - _ ECOMMENOATIONS c00D NATE LAYOUT 0 EYISTING (PROIECIR FO _ �'A LED STAIR NOSING LICXTINLIWTXOEOUIPMENTF AND FOUNTAIN IF MANUFACTURER PRIOR i0 INSTALLARR. IF 7 TER 1— LED STRIP LIGHIS 6" FROM �L �: L, •• i ADJACENT WALL (UNO) `L_. Kip S���.IIi� - Flf Eyy;� ( DL VA - .F SH ANp TALL NON-NGTALLIC .�� EXISTING 1'-0- VIDE REINS. CONCRETE W NELECTRICAL B XES IN 0 _ (TO REMAIN - PROTECT WALL FROM DAM RIsTRREFIGF R `:vT.w j ncEl EWccTGIB CA EATYER ON ARD CON L NEw .{ - ..- I• '!J + A LED UGHTNG AT STAIR NOSIN65 LRE DRILL EXISTING WALL BELOW STAIR ELEVATION FOR TYPICAL AT CONNECTION OF I f Y EL pCTRICAL CROUI7 INSTALLATION -INSTALL BACKER RO STRIP RUN �'{•—L�TW CEN JOINT SEALANT AROIND ANNULAR SPACE SETREEN� pUli AND EXISTING CONCRETE WA CLEAR SPACE �\ L'M i BETWEEN MULTIPLE CRE DRILLED HOLES SHALL BE Z" M A T/WALL I • C , UNLESS NOTED OTIERWISE (UNO). PROWCE A i0 SCALE E%. taZB}ZB 1 DRAwNC OF PROPOSED CORE TDRICLL HOLE LOCATIONS TO f ENGNEER FOR E— PRIOR 0 RE DRILLING EXISTING 5�11'WC I I , FURNISH WALL,AND INSTALL WEATHERPROOF JUNCTION BOX. ��- la7S p[y - T — FL -----------L"" I. -- -i—""'•• SIZEDANDRNUMBER OF CODE CONDUITREQUIRED THE APPROPRIATE ETD aN.w],�,w_ '.-[+L _ -J.n 'HER_ G LCD STTIR LCHTNG AT NpsE AL 1127 B ANORAL. 'TT.R E%ISTINC CONCRETE W L. vc ELECTRICAL CONDUIT SIZED PER —^I~ VY •fes- ' — OPEN TO BELOW ELECTRICAL CODE FOR THE APPROPRIATE •� INSTALL REUIT IN _ .�N� SALLS UCI ORS I STRUCTURAL FOAM FILL BELOW 1 •^ E%W1A3t.503 IZE AND BOR ENERGIZING ADD VAPOR RETARDER AND CDC N CONTROLLING LED A STARE LIGHTING A NOSE SLAB 1 AND HA N THE UMP ROOM 11 N ELECTRICAL PANEL RIN THE P 1 IGALI, ELECTgICIL CONDUIT PO AND AND RUN UNDEER E1eEVATNED SLAB FURNISHINS ALL SIZE ER EWAeED BY CODE FOR THE REQUIRED NG f' EDNDDT IN TOPPING ' I NTCH ItRE E SPZDIU NO NUMBER TO GHTIRGIIE AND CONTROL SLAB E(To REMAIN- 00 NOT DAMAGE) 4 1 T.96t N TANS �ECIFIGIITIED LING STAIRED LIGHTING IMTH PRODUCT PERS E%15nNGYpwN CEMNA FINSHEC FLGR (FIELD GENERAL NOTES: 29 1 NO FIELD MODIFICATIONS TO ANY STRUCTURAL COMPONENTS SHALL BE MADE WTHOUT PRIOR APPROVAL BY THE STRIC71RAL ENGINEER. _ ] BEFORE EcGNCRETESIBCPGUR'DPE SLEEVES- .1CU171 AND INSERTS. SHALL BE IN PLACE 3- - R 1 GnSIwTY INDICATED srwt OF TIE n Ya 'REBASED O THEAVAILABLERECORD C C PLANS NE BASED ON THE CABLE REEORD PLANS CINI " TOWN ENTER OB BNUMB H - RUCTION ER 95059. DATED APRIL 5. 1999 BY wITTENBERC. oc�o.vpe 10<vosorr� HE - _ -' ; a' 1. A. WaTR SCTOR SHALL FE D vERPRIOR I. START OFnC10N ANYTHEPLANS DONETRUC111 AS RE IRANOTNG'PY ENGINEER OF HDISCREPANCIES R CONFLICTS FOUND IN THE CONTRACT DOCUMENTS AND FIELD CONDITIONS Z O; LA + e � : . 5. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES OR CONFLICTS FOUND IN L/B� J EXISTING CONDITIONS DURING THE PROJECT 6 CONTRACTOR LB ATE ATOP MAP POST TE CABLES AND IF O • R? �$ SHALL INION A BE EMBEODEO 0 THE STRUCTURAL POS cuSIONED AL 'DO' SLABS PRIORY TO ANY ILL NC OF SLABS OR CORING OF 'ILLS ]. CONTRAACRTOR`HONLS CRORDINATEN ALL N TANSTRVECTIa IETIVITIIET WITH OWNER PRIOR TD C E ST O C T ON DIS LLAT N E ASSOCIATED ELECTRICAL 77VVV/,,, - B GDNTRAETUR ESHALL CDORGRATE LED LIGHTING LAYOUT IT' LIGHTING EQUIPMENT 9. ONTRACIR SHILL SUBMIT LED LIGHTING LAYOUT PLAN PRIOR TO INSTALLATION OF ELECTRICAL COMPONENTS TO BE INSTALLED UNDER EMBEDDED IN TIE NEW CONCRETE STAIRS AND LANDING. iO CONTRACTOR NECESSARYY FORA ALCONPEETE INSTALLATION OFROPRIATIONS OLIGHTNCL AND RAALL GING IF LICHIIRE OiNGNOR PRO DUCT A LIMES ARE EXTENSIVE. Oi0 i CONTRACT R RGVIR ELECIRIIOF,II LIRTIUGAT THE CONROL IIPABI LI11 THAT ALLOW THE 1 NO IS TIE ADIACE 7AIL. CONFAieOE ETH 71EHEXIS71IG LEDNSTRP LIGHTING STAIINNICE PEACE FOUNTAIN HATA OABOVE REFERENCED LIGHT SYSTEMS MAY BE CONTROLLED THROUGH ONE USER E - )I T ! r EPjRYC MCMC wnac SJ L EXISTING SJ TEX1N0IIPCONSCRUGT0Nor FACLTIES) - I tI30 00 WILL NEW GALL CONDUIT CONDUIT CMU 'ALL (BURIEwi IND F` TD EXISTING N I. STAR U, NEAR EXISTING COR OrT ARKINGPTIOUC. FD,TE NEI CONDUIT DOWN TO PUUP F Z ROOM ON BOTTOM 0 R PARKING SITU RE TRAC OR MAY DSC EXISTING Z W O FNENTPIN P ANO LIGHTING ELECTRICAL CONTROL PANEL FOR ELECTRIFICATION F NTROLs FOR NEW LED LILHTINC ALONG STAIR N O LEO HN NTHE CFSTINL LO N H CAPACITY N.NC A Z uEEEiSACURRENT ELECT IOC TOOE Ul AID NEI `EDUIREMENTS AlASIF EXISTING PANELDOESNOi 3 ADEOCAT[ SPACER ODES NOT MEET CURRENT ELECTRICAL CODE ofpuREMEN 00 FDIRwiE L 41 N IF NEI ELECTRICALLRIAL CONTROL PANEL F O r~J9 REQUIRED, c R HI w rA PAN L = J O WNER J -O Y > GO NEW STAIR PLAN -LIGHTING LAYOUT W GHQ^ suLE I -s a m w a �GO N oeR.r �� m• a a z DEDUCTIVE ALAE r FURNISH AND 'STALL I BD 0 E. SCH 10 (MIN) STAINLESS STEEL HANDRPIL vATHOUi INTEGRAL LEO LIGHTING W 1. T ILL ELECTRICAL CONDUIT, CONDUCTORS. AND CONTROLS ASSOCIATED 1171 LED LIGHTED STAINLESS STEEL HANRAIL. > W F SHEET of 7 City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 FACILITIES MANAGEMENT (140) 2018 Requestor: Wade Abernathy BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approve a budget adjustment for $70,000 for the removal and repair of the entry stairs and landing at the Town Center COUNCIL DATE: LEGISTAR FILE ID#: 8/21/2018 2018-0421 L ilk }f ],tache*' 8/6/2018 4:48 PM Budget Director Date TYPE: DESCRIPTION: GLDATE: RESOLUTION/ORDINANCE POSTED: TOTAL 70,000 70,000 v.20180627 Increase / (Decrease) Proiect.Sub# Account Number Expense Revenue Project Sub AT Account Name 1010.090.6600-5315.00 70,000 - 17012 1 EX Contract Services - : 1010.001.0001-4999.99 - 70,000 RE Use Fund Balance - Current H:\Budget\Budget Adjustments\2018_Budget\CITY_COUNCIL\2018-08-21 \2018-0421 BA Town Center -Benchmark Construction] of 1 RECEIVED SEP I 1 2018 NORTHWEST ARKANSAS CITY CLER OFFICE Democrat X kazette AFFIDAVIT OF PUBLICATION I Cathy Wiles, do solemnly swear that I am the Legal Clerk of the Northwest Arkansas Democrat -Gazette, printed and published in Washington County and Benton County, Arkansas, and of bona fide circulation, that from my own personal knowledge and reference to the files of said publication, the advertisement of - CITY OF FAYETTEVILLE Ord. 6082 Was inserted in the Regular Edition on: August 30, 2018 Publication Charges: $ 137.80 Cathy Wiles Subscribed and sworn to before me This to day of �' , 2018. J n - Notary Public My Commission Expires: TAV%lYRUSHER Notary Public -Arkansas Washington County Commission R' 12703120 EV N1y Commission Expires Feb 12. 2028 **NOTE** Please do not pay from Affidavit - Invoice will be sent. Ordinance: 6082 File Number: 2018-0421 BENCHMARK CONSTRUCTION - AN ORDINANCE TO WAIVE TI IL' REQUIREMENTS OF FORMAI. COMPETITIVE BIDDING AND AUTHORIZE A CONTRACT FORT HE IMMEDIATE= REMOVAL AND REPLACEMENT OF TI IE ENTRY STAIRS AND LANDING AT THE FAYETTEVILLE TOWN CENTER BY BENCHMARK CONSTRUCTION OF NWA, INC IN THE AMOUNT OF 5205,300.00, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF S 14,800.00, AND TO APPROVE A BUDGET ADJUSTMENT WHEREAS, leaking chlorinated fountain water has caused the substructure of the stairs and landing at the Fayetteville ]'own Center to corrode resulting in settling; and WHEREAS, on December 19, 2017, the City Council, passed Resolution No. 269-17 authorizing funding for the engineering design and construction of [lie necessary repairs and Olsson Associates Engineering Finn was engaged to generate the construction drawings; and WHEREAS, since Ilio passage of Ilial resolution the stairs have settled an additional three inches and it is important to prevent liuther settling as quickly as possible; and WHEREAS, staff solicited three contractors and received two bids for the project and, as time is of the essence for this repair, stalf recommends awarding the contract to the lowest responsive bidder. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby determines that the facts shown above establish Ihat an exceptional situation exists in which competitive bidding is not feasible or practical and therefore waives the requirements of formal competitive bidding and author izes Mayor Jordan to sign a contract for the immediate removal and replacement of the entry stairs and landing at the Fayetteville Town Center by Benchmark Construction of N WA, Inc in the amount of $205,300.00, and Further approves a project contingency in the amount of S 14,800.00, Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjusunent, a copy of which is attached to the staff review memo, in the amount of 570,000.00. PASSED and APPROVED on 8/21/2018 Approved: Lioneld Jordan, Mayor Attest: Sondra E. Smith, City Clerk Treasurer 74656045 Aug. 30, 2018 Benchmark Construction Change Order#1 City of Fayetteville Staff Review Form 2019-0295 Legistar File ID • N/A City Council Meeting Date-Agenda Item Only N/A for Non-Agenda Item Wade Abernathy 5/9/2019 FACILITIES MANAGEMENT(140) Submitted By Submitted Date Division/Department Action Recommendation: Approval of change order#1 with Benchmark Construction in the amount of$1,963 to the Town Center Plaza Stair replacement contract to integrate the step lighting with the peace fountain lighting controls. Budget Impact: 1010.090.6600-5314.00 General Miscellaneous Account Number Fund 17012 Town Center Entry Stairs Project Number Project Title Budgeted Item? Yes Current Budget $ 215,334.00 - Funds Obligated $ 205,300.00 Current Balance $ 10,034.00 Does item have a cost? Yes Item Cost $ 1,963.00 Budget Adjustment Attached? NA Budget Adjustment Remaining Budget $ 8,071.00 V20180321 Purchase Order Number: 2018-00000636 Previous Ordinance or Resolution# 6082 Change Order Number: 1 Approval Date: 5/13/19 Original Contract Number: Comments: Project included$16,424 contingency. CITY OF FAYETTEVILLE STAFF MEMO Pip ARKANSAS TO: Mayor Lioneld Jordan THRU: Don Marr, Chief of Staff Paul Becker, Chief Financial Officer FROM: Wade Abernathy, Facilities & Building Projects Manager DATE: May 9, 2019 SUBJECT: Approval of Change Order to the contract with Benchmark construction for the Town Center Stair replacement project. RECOMMENDATION: Staff recommends approval of a Change Order in the amount of$1963.00 to the contract for integrating the step lighting with the fountain lighting controls. BACKGROUND: In August of 2018, Council approved ordinance 6082 for a contract with Benchmark Construction for the removal and replacement of the Town Center Stairs. DISCUSSION: The integration of the step lighting with the fountain lighting controls provides the town center staff many options of lighting display. Such as, different colors, scroll colors at different intervals, light the stairs and rails with the fountain, or light them independent. BUDGET/STAFF IMPACT: There is a project contingency of$16,424, and there are unencumbered project funds available for this Change Order. Attachments: Change Order Document Mailing Address: 113 W.Mountain Street www.fayetteville-ar.gov Fayetteville,AR 72701 PROPOSAL FROM• BENCHMARK CONSTRUCTION COMPANY 333 WEST POPLAR STREET FAYETTEVILLE,AR 72703 PROPOSAL TO• WADE ABERNATHEY PROJECT: TOWN CENTER STAIR RENOVATIONS FILE REFERENCE NO.1A DATE MAY 9,2019 DEAR MR.ABERNATHEY WE REQUEST AN INCREASE IN THE AMOUNT OF- ->>> $1,963 ALONG WITH AN EXTENSION IN TIME OF-DAYS. ADD CONTROLS WORK PERFORMED BY MULTI CRAFT CONTRACTORS TOTAL COST $1,963 15 %OVERHEAD&PROFIT NO CHARGE SUB TOTAL $1,963 0.02800 BOND 0.00000 BUILDING PERMIT 0.02100 OCP INS 0.01500 BLDRS RISK 0.06400 NO CHARGE TOTAL CHANGE ORDER AMOUNT $1,963 SINCERELY COST DETAIL: PROJECT: TOWN CENTER STAIR RENOVATIONS FILE REFERENCE NO. 1A :« UNIT PRICES » LABOR+48%BURDEN, TOOLS MATERIALS+9.75%ST DESCRIPTION Q UNIT :LABOR MAT SUB AND +SUBS+1%LIA INS CONT EQUIP +TOOLS&EQUIP 0 0 MCC CONTROLS 1.00 LS 1963.00 1963 0 0 0 0 0 0 0 0 0 0