Loading...
HomeMy WebLinkAbout173-18 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 173-18 File Number: 2018-0397 FAYETTEVILLE MOBILITY PLAN: A RESOLUTION TO APPROVE AND AUTHORIZE MAYOR JORDAN TO PROCEED WITH IMPLEMENTATION STRATEGIES AND TASKS - 2018 AND 2019 OF THE FAYETTEVILLE MOBILITY PLAN DEVELOPED BY NELSON/NYGAARD CONSULTING ASSOCIATES, INC. WHEREAS, Resolution No. 68-16, which was passed on March 15, 2016, authorized a contract with Nelson/Nygaard Consulting Associates, Inc. for the development of a Transportation Master Plan; and WHEREAS, over a two-year period, the consultant developed a multi -modal plan and recommendations for transportation projects and policies, including a proposed master street plan and typical cross sections; recommendations for operational changes; revisions to policies and regulations related to development of transportation infrastructure; and a project selection and prioritization tool for use in developing capital plans for all types of project; and WHEREAS, the proposed list, a copy of which is attached to this Resolution, includes seven general strategies with detailed action items for each strategy. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes the Mayor to proceed with "Implementation Strategies and Tasks - 2018 and 2019" of the Fayetteville Mobility Plan developed by Nelson/Nygaard Consulting Associates, Inc., copies of which are attached to this Resolution and made a part hereof. Page 1 Printed on 818118 Resolution: 173-18 7 �.Ir 2018-0397 PASSED and APPROVED on 8/7/2018 Annroved: Attest: Sondra E. Smith, City Clerk Treasurer Page 2 Printed on 818118 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2018-0397 Agenda Date: 8/7/2018 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: D. 7 FAYETTEVILLE MOBILITY PLAN: A RESOLUTION TO APPROVE AND AUTHORIZE MAYOR JORDAN TO PROCEED WITH IMPLEMENTATION STRATEGIES AND TASKS - 2018 AND 2019 OF THE FAYETTEVILLE MOBILITY PLAN DEVELOPED BY NELSON/NYGAARD CONSULTING ASSOCIATES, INC. WHEREAS, Resolution No. 68-16, which was passed on March 15, 2016, authorized a contract with Nelson/Nygaard Consulting Associates, Inc. for the development of a Transportation Master Plan; and WHEREAS, over a two-year period, the consultant developed a multi -modal plan and recommendations for transportation projects and policies, including a proposed master street plan and typical cross sections; recommendations for operational changes; revisions to policies and regulations related to development of transportation infrastructure; and a project selection and prioritization tool for use in developing capital plans for all types of project; and WHEREAS, the proposed list, a copy of which is attached to this Resolution, includes seven general strategies with detailed action items for each strategy. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves and authorizes the Mayor to proceed with "Implementation Strategies and Tasks - 2018 and 2019" of the Fayetteville Mobility Plan developed by Nelson/Nygaard Consulting Associates, Inc., copies of which are attached to this Resolution and made a part hereof. City of Fayetteville, Arkansas Page 1 Printed on 8/8/2018 City of Fayetteville Staff Review Form 2018-0397 Legistar File ID 8/7/2018 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Chris Brown 7/20/2018 ENGINEERING (621) Submitted By Submitted Date Division / Department Action Recommendation: Approval of a resolution adopting the Fayetteville Mobility Plan Implementation Strategies and Tasks for 2018 and 2019 Account Number Project Number Budgeted Item? No Does item have a cost? No Budget Adjustment Attached? No Budget Impact: Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Fund Project Title Remaining Budget $ V20140710 Previous Ordinance or Resolution # Original Contract Number: Approval Date: Comments CITY OF FAYETTEVILLE ARKANSAS MEETING OF AUGUST 7, 2018 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Garner Stoll, Development Services Director FROM: Chris Brown, City Engineer DATE: July 20, 2018 CITY COUNCIL MEMO SUBJECT: A resolution approving the Fayetteville Mobility Plan Implementation Strategies and Tasks for 2018 and 2019 RECOMMENDATION: gfoff rcrnmmcndF onnrnNtal of W)hility Plan ImnIAmPntntinn StratPniPc nnrt TaSkS ?C rlPtailPrl by the spreadsheet attached. BACKGROUND: In 2015, a selection committee consisting of City staff members and City Council Member Matthew Petty selected the team of Nelson Nygaard Consulting Associates, Inc. and Garver, Inc. to provide consulting services for the Transportation Master Plan; the City Council approved the contract with the consulting team in March 2016. Over a two-year period, the consultant developed a multi -modal plan and recommendations for transportation projects and policies, including a proposed master street plan and typical cross sections, recommendations for operational changes, revisions to policies and regulations related to development of transportation infrastructure, and a project selection and prioritization tool for use in developing capital plans for all types of projects. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 DISCUSSION: The attached list of implementation tasks summarizes the action steps to be taken to implement the recommendations of the Mobility Plan. 7 general strategies are listed, with detailed action items identified for each strategy. In some cases, the tasks are further broken down into subtasks. Schedules for task completion are also provided. The level of scheduling detail for each item varies as noted; scheduling detail will continue to evolve as implementation proceeds. Completion of all tasks (except for those noted as ongoing) is expected by 2019. At that time, the schedule may be updated to reflect additional implementation efforts. BUDGET/STAFF IMPACT: There are no direct budgetary implications tied to this action, other than staff time necessary to complete the various tasks. Rather, the cost of implementation will be imbedded in future budget and workplan decisions, and/or will be approved by the City Council when contracts or outside consultants, ordinance revisions, etc. are needed. Attachments: Implementation Strategies and Tasks Spreadsheet Fayetteville Mobility Plan Implementation Strategies and Tasks -2018 and 2019 Strategy Action Item Summary Task Detail Completion Timeframe Construct comfortable sidewalks (with adequate width gandgreenspace) on at least one side of all streets, and on b C=_tailed in Item 6 Ongoing streets in downtown areas, and on arterials 1,2 Replace substandard sidewalks, particularly on key pedestrian routes, to provide an adequate buffer, sufficient widths, and shade Cetailed in Item 6 Ongoing 1.3 1.3.1 C7nsolldate List of Traffic Calming Requests Complete 1.3.2 Cevelop prioritization method/policy and list of priorities 3rd Qtr. 2018 1 Increase walkability in downtown and other high pedestrian areas Add Traffic Calming in Residential Areas 1.3.3 neighborhood input on solutions at selected locations 4th Qtr. 2018 1.3.4 Inplementation of 2018 projects 1st Qtr. 2019 1.3.5 P-ogram future projects Ongoing 1.4 Ensure adequate maintenance of pedestrian ways, including 1.4.1 C rdinance Revisions to strengthen code related to sidewalk maintenance Complete vegetation maintenance and identification of trip hazards. 1.4.2 Implementation of Code Enforcement SOP and Education Program Ongoing Invest in sidewalk amenities that improve the safety and 1.5 attractiveness of the walk environment, such as lighting, street 1.5.1 11 cluded with all sidewalk projects as appropriate Ongoing trees, furniture, etc. Install crosswalk markings at high pedestrian traffic locations to 2.1.1 luventory of existing crosswalks 3rd Qtr 2018 2.1 provide indications of pedestrian crossings to motorists and to slow down vehicular traffic with visual elements 2.1.2 Identify priority locations Dec. 2018 2.1.3 histallation as budget allows/as part of street overlay program 2019/Ongoing Improve Pedestrian Safety and 2 Comfort at Intersections and Crossing Locations 2.2 Install auto recall functions for pedestrian crossing signals along high activity corridors and/or intersections. 2.2.1 Identify priority locations Dec. 2018 2,2,2 Install new functionality as workload allows 2019/Ongoing Increase pedestrian walk phase time and/or upgrade to 2.3.1 Ilentify phority locations Dec. 2018 2.3 countdown pedestrian heads at high pedestrian areas 2.3.2 I stall new heads at priority locations as budget allows 2019/Ongoing 2,4 Add Pedestrian Refuge Islands where crossing lengths are 2.4.1 Fs Part of Overlays or Other Improvements Immediate/Ongoing excessive 3.1 Re -design ORT Transit Routes around BRT Route 3.1.1 City Staff Design Workshop Complete 3.1.2 1 nplement selected route design Fall 2018 3.2 dentify, purchase land for, and construct transit stations in key locations 3.2.1 I lentify budget level in bond program 2019 3 Enhance Access to Transit Services 3.3 Enhance pedestrian accessibility to transit stops 3.3.1 1 iclude transit stops in prioritization criteria for sidewalk projects Ongoing 3.4 Identify sustainable long-term transit funding 3.4.1 Fegional Funding Discussion TBD Fayetteville Mobility Plan Implementation Strategies and Tasks -2018 and 2019 I Task Detail Strategy Action Item Summar Completion Timeframe Pursue federal, state, and private grant funding opportunities to Review draft project plans with funding partners (ArDOT, UA, private funding 4.1.1 3rd Qtr, 2018 4.1complete prioritized projects. sources, etc.) to determine interest in particular projects 4.1.2 Apply for and manage grants TBD by Project Consider jurisdictional swaps/transfers with ArDOT in exchange for 4'2'1 Meet with ArDOT discuss priorities, schedules, funding availability 3rd Qtr. 2018 4.2 capital improvements. 4.2.2 Est. budgets for capital investments vs. cost of long term maintenance 2018 4 Maximize Available Transportation _ 4.2.2 Establish agreements with ArDOT for identified priorities TBD Determine budget allocation for cost sharing projects through bond program or Funding Pursue cost sharing opportunities on development projects to 4.3.1 other funding sources 2018 Identify opportunities to complete improvements identified in Transportation 4.3 complete identified priority projects 4.3.2 Division programs and the bond program as part of development projects Ongoing Identify new technologies, materials, and construction methods to Staff training on thin lift asphalt, sealant technologies, smart traffic signals, and 4.4 reduce Capital and maintenance costs 4.4.1 other emerging technologies Ongoing 5.1 Develop Project Scoring Tool using metrics that reflect City values, Collect data and develop GIS map with all data to be used for scoring projects goals and objectives 5.1.1 using metrics identified during Mobility Plan development Complete Use the scoring tool to develop a preliminary list of priority 5.2.1 Score projects identified in the Mobility plan June 2018 5.2 projects from the Mobility Plan Report and other projects 5 Develop a Capital Project Plan that identified by the City Council and Administration Program and estimate costs for identified projects and establish benefit cost considers all modes and users. 5.2.2 ratio for each Aug, 2018 5.3 Implement a public involvement process to inform the public and 5.3.1 Preliminary Review by Transportation Committee Sept_ 2018 to receive input on the priority list 5.3.2 Develop presentation map to allow for public review and comment Sept. 2018 5.4 Final Capital Plan 5.4.1 Finalize project list for city council approval to be funded by upcoming bond issue Dec. 2018 Procure contractor and manage project to inventory pavement condition, ' 6.1.1 sidewalks, and ADA ramps. Sept. 2018 Use sidewalk inventory data and project selection tool to score and 6.1 DevelopMulti-Year Sidewalk and Overlay Programs V g 6.1.2 prioritize sidewalk projects. Dec. 2018 Implement a data -based approach to Use pavement condition inventory to develop multi-year pavement management development of Transportation 6.1.3 program g Dec. 2018 6 Division sidewalk and trail construction 6.1.4 Implementation of sidewalk and overlay plans per budget Ongoing Evaluate 5 Year Trails Program using the project scoring tool 6.2.1 Score projects on existing 5 year plan 2nd Qtr. 2019 and pavement overlay programs 6.2 6.2.2 Adjust plan per scoring results Dec.2019 Develop infrastructure plan map to integrate all infrastructure 6.3 plans, for presentation to the public and for use by staff for project 1st Qtr. 2019 planning. Fayetteville Mobility Plan Implementation Strategies and Tasks -2018 and 2019 Strategy Action Item Summary Task Detail Completion Timeframe 7.1.1 F nalize typology map and correlate with Land Use Update Aug. 2018 7.1.2 F nalize cross sections Oct. 2018 7.1 Update of Master Street Plan using Mobility Plan framework 7.1.3 Approval of master street plan update Cec. 2018 Update Minimum Street Standards to match new master street plan cross sections and to more closely align with National 7.2 Association of City Transportation Officials (NACTO) Guidelines, 2019 7 Ensure City Policies and Ordinances further Mobility Plan Goals and including contextual guidance for bike facilities for all ages and abilities. Develop and maintain inventory of ADA compliant travel ways and Objectives 7.3 curb ramps, and ensure steady progress toward complete accessibility compliance; develop policy for accessibility upgrades 2019 on street overlay projects 7.4 Incorporate street trees into sidewalk and street projects when feasible Immediate/Ongoing 7.5 Ensure designs for in-house sidewalk projects meet the guidelines of the Master Street Plan and Minimum Street Standards Immediate/Ongoing �7.6 Update Street and Right of Way Excavation Policy and Ordinance Ito ensure qualityand time) .street repairs 2019