HomeMy WebLinkAbout163-18 RESOLUTION113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Resolution: 163-18
File Number: 2018-0385
RFQ #18-01 ON-CALL MATERIALS SERVICES:
A RESOLUTION TO AWARD RFQ #18-01 AND APPROVE MCCLELLAND CONSULTING
ENGINEERS, INC. AS PRIMARY PROVIDER AND MTA ENGINEERS, A DIVISION OF
MATERIALS TESTING OF ARKANSAS, INC. AS SECONDARY PROVIDER OF ON-CALL
MATERIALS SERVICES AS NEEDED THROUGH DECEMBER 31, 2018
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #18-01 and
approves McClelland Consulting Engineers, Inc. as primary provider and MTA Engineers, a division of
materials Testing of Arkansas, Inc. as a secondary provider of on-call materials services as needed
through December 31, 2018, for the rates set forth in the fee schedules attached to this Resolution.
PASSED and APPROVED on 8/7/2018
Attest:
L""Y'l, L. 1'&_
Sondra E. Smith, City Clerk Treasurer
!y. ,9
G�
Page 1 Printed on 818118
_ City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2018-0385
Agenda Date: 8/7/2018 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 7
RFQ #18-01 ON-CALL MATERIALS SERVICES:
A RESOLUTION TO AWARD RFQ #18-01 AND APPROVE MCCLELLAND CONSULTING
ENGINEERS, INC. AS PRIMARY PROVIDER AND MTA ENGINEERS, A DIVISION OF
MATERIALS TESTING OF ARKANSAS, INC. AS SECONDARY PROVIDER OF ON-CALL
MATERIALS SERVICES AS NEEDED THROUGH DECEMBER 31, 2018
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards RFQ #18-01 and
approves McClelland Consulting Engineers, Inc. as primary provider and MTA Engineers, a division of
materials Testing of Arkansas, Inc. as a secondary provider of on-call materials services as needed through
December 31, 2018, for the rates set forth in the fee schedules attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 8/8/2018
Matt Casey
City of Fayetteville Staff Review Form
2018-0385
Legistar File ID
8/7/2018
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
7/19/2018 Engineering /
Development Services Depa rtment
Submitted By Submitted Date Division / Department
Action Recommendation:
Approval of a resolution to award RFQ 18-01, Selection #7 to McClelland Consulting Engineers, Inc as primary
provider and MTA Engineers, a division of Materials Testing of Arkansas, Inc. as a secondary provider based on
rates provided and availability for on-call materials services as needed through December 31, 2018.
Account Number
Project Number
Budgeted Item? NA
Does item have a cost? No
Budget Adjustment Attached? No
Previous Ordinance or Resolution #
Original Contract Number:
Comments.
Budget Impact:
Fund
Project Title
Current Budget
Funds Obligated $ -
Current Balance $
Item Cost
Budget Adjustment
Remaining Budget $
Approval Date:
V20140710
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF AUGUST 7, 2018
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Garner Stoll, Development Services Director
Chris Brown, City Engineer
FROM: Matt Casey, Engineering Design Manager
DATE: July 19, 2018
CITY COUNCIL MEMO
SUBJECT: Approval of a resolution to award RFQ 18-01, Selection #7 to McClelland
Consulting Engineers, Inc as primary provider and MTA Engineers, a
division of Materials Testing of Arkansas, Inc. as a secondary provider
based on rates provided and availability for on-call materials services as
needed through December 31, 2018
RECOMMENDATION:
A resolution to award RFQ 18-01, Selection #7 to McClelland Consulting Engineers, Inc as
primary provider and MTA Engineers, a division of Materials Testing of Arkansas, Inc. as a
secondary provider based on rates provided and availability for on-call materials services as
needed through December 31, 2018.
BACKGROUND:
As part of each of the City's street, drainage, water and sewer projects, a materials testing lab
is contracted to perform materials testing for the construction. The testing includes asphalt,
gravel base, concrete and various other materials used during the construction of these
projects. The testing is done to insure that the materials and the installation meet the City
requirements and the project's specifications.
DISCUSSION:
An engineering selection committee selected McClelland Consulting Engineers, Inc. and MTA
Engineers to be used for on-call materials testing services for street, drainage and utilities
projects for the remainder of 2018
BUDGET/STAFF IMPACT:
Funds for the material testing have been budgeted in various capital projects with the Sales Tax
Capital Improvements Fund, the Transportation Bond Fund and the Water and Sewer Fund.
Attachments:
Testing Rate Schedules
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
MCCLELLAN❑ 1810 N. College Ave
P. O. Box 1229
NrE
CONSULTING Fayetteville, Arkansas 72702-1229
479-587-1303 Fax 479-443-9241
ENGINEERS, INC. MATERIALS LABORATORY www.mce.us.com
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
Soils Field Technician
January 2018
In -Place Compaction Test -Nuclear Gauge ASTM D 2922,
GENERAL:
Sample Pickup, or Stand-by Time
Laboratory Field Technician
$ 50.00 per hour
AHTD-Qualified Technician
50.00 per hour
Engineering Technician
80.00 per hour
Mileage
0.575 per mile
Consultation:
120.00 each
Engineering Technician
80.00 per hour
Geotechnical Engineer
135.00 per hour
Construction Observation
80.00 per hour
Project Engineer
135.00 per hour
Project Manager (Geotechnical Specialist)
85.00 per hour
Principal Engineer
160.00 per hour
Lab Report Preparation
65.00 per hour
AHTD-Qualified Technician II - IV'
50.00 per hour
Soils Field Technician
50.00 per hour
In -Place Compaction Test -Nuclear Gauge ASTM D 2922,
Price on Request
Sample Pickup, or Stand-by Time
50.00 per hour
Nuclear Density Gauge Fee: (per Density Test); [Minimum $12.00 per trip, per project] 12.00 each
Liquid Limit, Plastic Limit, Plasticity Index ( 3 point) ASTM D 4318
50.00 each
Sieve Analysis -Washed No. 200 (Wet) ASTM D 1140
40.00 each test
Sieve Analysis -Dry ASTM D 422
50.00 each test
Hydrometer Analysis ASTM D 422
120.00 each
Specific Gravity ASTM D 854
50.00 each
Soils Classification, Atterberg Limits & Gradation ASTM D 2487
110.00 each
Laboratory Maximum Compaction Test ASTM D 698 or AASHTO T 99
175.00 each
Laboratory Maximum Compaction Test ASTM D 1557 or AASHTO T 180
200.00 each
Potential Volume Change -Swell Pressure
100.00 each
California Bearing Ratio -CBR ASTM D 1883 (3 point) (Proctor curve additional)
300.00 each
Shrinkage ASTM D 427
50.00 each
Soil Bearing Capacity (Engineering Technician)
80.00 per hour
Non -ASTM Procedures Available On Request
Schmidt Hammer Testing (Engineering Technician)
Concrete Mix Design
Price on Request
Review Concrete Mix Design (Geotechnical Engineer)
135.00 per hour
Confirm Concrete Mix Design
Price on Request
Concrete Field Technician" (1 -hour minimum): [For any of the following 6 items:]
50.00 per hour
• Concrete Cylinder, Grout, Mortaror Beam Molding
• Concrete Cylinder or Beam Pickup
• Concrete SlumpTest ASTM C 143
• Concrete AirContentTest ASTM C 231 orC173
• Cement Mortar or Grout Sampling
• Stand-by Time
• Unit Weight and Yield of Freshly Mixed Concrete ASTM C 138
AHTD-Qualified Concrete Technician II - IV: [For any of the foregoing 7 items:]
50.00 per hour
Compressive Strength of Concrete Test Cylinders ASTM C 39 (pad cap)
(Incl. Processing, Storing & Curing)
20.00 each
Compressive Strength of Concrete Test Cylinders ASTM C 39 (sulfur capped)
(Incl. Processing, Storing & Curing)
35.00 each
Spare Cylinders Specimens Processed, Stored & Cured but not Tested
15.00 each
Schmidt Hammer Testing (Engineering Technician)
80.00 per hour
"ACI Grade I Concrete Field Testing Technician
Page 1 of 2
MCCLELLAND 1810 N. College Ave
P. O. Box 1229
CONSULTING Fayetteville, Arkansas 72702-1229
NEE479-587-1303 Fax 479-443-9241
ENGINEERS, INC. MATERIALS LABORATORY www.mce.us.com
CONSTRUCTION MATERIALS LABORATORY
FEE SCHEDULE
January, 2018
CONCRETE (Continued):
Flexural Strength of Concrete Beams ASTM C 78 or C 293 (Incl. Processing,
Storing & Curing)
50.00 each
Spare Beam Specimens Processed, Stored & Cured but not Tested
40.00 each
Compressive Strength of Grout Cubes (Incl. Processing, Storing & Curing)
40.00 each
Compressive Strength of Cement Mortar Cubes (Incl. Processing, Storing & Curing) 25.00 each
Concrete Coring (3" or 4"):
Sample Pickup
Core Machine & Lab Technician 1
90.00 per hour
Compressive Strength of Concrete Cores (3" or 4")
40.00 each
Other Core Sizes
Price on Request
Aggregate Sieve Analysis:
AC Content Ignition Oven and Aggregate Gradation
Dry Sieve ASTM C 136
8.00 each
Wet Sieve ASTM C 117
40.00 each
Fineness Modules
25.00 each
Decantation
35.00 each
Deleterious Materials
60.00 each
Specific Gravity and Absorption of Aggregate ASTM C 127 & C 128
90.00 each
Dry Rodded Unit Weight of Aggregate ASTM C 29
150.00 each
r ul or P11agncociu n 6..If.,+n So indnnnr. (5 r c!oc) ASTM C 04
350.00 02ch
Additional Cycles
50.00 each
ASPHALT:
Asphalt Mix Design (Marshall Design Method)
Price on Request
Review Asphalt Mix Design (Geotechnical Engineer)
135.00 per hour
AHTD Asphalt Field Technician
In -Place Compaction Test -Nuclear Gauge (Lab Technician)
50.00 per hour
Sample Pickup
50.00 per hour
Superpave Laboratory Analysis of Plant Mixed Pavement
600.00 each
Marshall Test including Stability, Flow, Laboratory Density, Percent Air Voids,
Percent Voids in Mineral Aggregate (3 specimens per test)
500.00 each
AC Content Ignition Oven and Aggregate Gradation
1000.00 each
Laboratory Density of Cored Plugs including Thickness Measurement
35.00 each
Asphalt Coring (3" or 4"):
Core Machine & Lab Technician
90.00 per hour
FIREPROOFIN:
Unit Weight, Bonding Strength, Thickness and Sampling
(Actual time required for Lab Technicians) 80.00 per hour
Tech Report Preparation (Geotechnical Engineer) 130.00 per hour
STRUCTURAL STEEL:
Bolt Torque Testing: Engineering Technician(s) 80.00 per hour
Project Engineer 135.00 per hour
Pneumatic Torque Wrench Calibration (twice per day) 50.00 each
Visual Weld Inspection Project Engineer 135.00 per hour
Certified Welding Inspector 100.00 per hour
Services Not Listed are Available on Request
All prices are subject to revision each year
Page 2 of 2
nA
MITA ENGINEERS a division of Materials Testing of Arkansas, Inc.
P.O. Box 23715 • Little Rock, AR 72221 812 Morris Ave • Springdale, AR
Ph. 501.753.2526 • Fax 501.753.5747 Ph. 479.756.0061 • Fax 479.756.9254
P.O. Box 17393 • Jonesboro, AR 7209
mtaengincers.com Ph. 870.530.8380 • Fax 870.972.0237
2018 Laboratory and Field
Testing Fees
Solis and Aggregates Lab Testing:
Sieve Analysis -Fine (SM -1) $83.95
Sieve Analysis- Coarse (up to 1 %: " Max.) $93.95
Sieve Analysis- Coarse (1 % "Plus) $111.95
Modified Proctor T-180 $210.50
Standard Proctor T-99 $185.60
Atterberg Limits (Liquid and Plastic Limits) $104.95
Proctor, PI, And Sieve (completed together) $405.00
Aggregate Gradation- Class 7 $110.50
Specific Gravity -Fine
$104.95
Specific Gravity -Coarse
$98.95
Los Angeles Abrasion Test
$450.00
Sodium Sulfate Soundness
$500.00
Moisture Content Test
$23.45
Concrete Testiny,:
Cylinder Molds (per box) $47.00
Concrete Core: Compressive Strength $29.15 per core
Concrete Beam: Flexural Strength $58.00 per test
Cylinder, Prism, Cube: Compressive Strength $16.95 per test
Concrete Mix Designs: *AHTD, PCCP $758.00
*Class S, SAE, and A $620.00
*ACI $620.00
Concrete Aggregate Gradation (Fine and Coarse) $195.00 per test
NA T
MTA ENGINEERS a division of Materials Testing of Arkansas, Inc.
P.O. Box 23715 • Little Rock, AR 72221 812 Morris Ave • Springdale, AR
Ph. 501.753.2526 • Fax 501.753.5747 Ph. 479.756.0061 • Fax 479.756.9254
mtaengineers.com
Asphalt Test:
Aggregate Specific Gravity -Fine
Aggregate Specific Gravity -Coarse
P.O. Box 17393 • Jonesboro, AR 7209
Ph. 870.530.8380 • Fax 870.972.0237
$104.95
$98.95
Coring, Minimum Charge (Hourly Rate Applies Over 3 Hours) $187.15
Cutting, Measuring Cores (per core) $19.00
Super -Pave Mix Design, Per Mix $4,750.00
This includes all cost associated for approval by the AHTD
(*Excluding Rutting Susceptibility)
Marshall Mix Design, Per Mix $3,250.00
(*Includes determination of optimum asphalt content and Marshall Stability and Flow)
Luaded Wheei iesL iui RuLiing Suscepiibiiiiy
Set of 6 Prepared cylindrical samples $585.00
Set of 6 cylindrical samples requiring batching & mixing $935.00
Vacuum Extraction $400.00
Ignition Extraction $175.00
Profilograph (Quoted Upon Request)
Quality Control (Daily Minimum Rate) $750.00 per day
Rolling Patterns $59.50 per hour
Field Tests:
Field Densities (Certified Technician) $59.95 per hour
Field Density Test $11.00 per test
Concrete QC Field Testing (ACI-CTTP Certified) $59.95 per hour
Picking Up Samples $59.95 per hour
CTTP ARDOT Certified Technician $65.00 per hour
Technician. Inspector and Eneineerina Rates:
Field Technician
$59.95 per hour / $700,00 day rate
Inspector/Observer
$85.00 per hour
IBC Special Inspector
$99.00 per hour
Field Engineer
$79.50 per hour
Project Engineering
$100.50 per hour
Professional Engineer
$155.00 per hour
MI
M ?
A
mtaengineers.com
NGINEERSa division of Materials Testing of Arkansas, Inc.
P.O. Box 23715 • Little Rock, AR 72221 812 Morris Ave • Springdale, AR
Ph. 501.753.2526 • Fax 501.753.5747 Ph. 479.756.0061 • Fax 479.756.9254
P.O. Box 17393 • Jonesboro, AR 7209
Ph. 870.530.8380 • Fax 870.972.0237
Trip Charge:
Benton/Washington Counties
Outside of Benton/Washington Counties
Special Equipment:
Rebar Locator
Ultrasonic Weld Inspection Equipment
Magnetic Particle Inspection Equipment
Liquid Penetrant Inspection Materials
Office and Reports:
Report Review and Submittal Fee
Clerical (Previously sent out reports)
1 Hour Minimum on Weekdays
3 Hour Minimum on Weekends
Hourly rates will be charged for field reports, inspector
reports and engineering reports.
We request a 24-hour notice when scheduling
If additional licensing is required for the transport and use of
our nuclear density gauges onsite, we will charge at cost plus
20%.
$14.00 per trip
$0.74 per mile
$210.00 per day
$415.00 per day
$55.00 per day
$2.20 per inch/weld maximum
$14.00 per report
$50.00 per hour
If you have any questions, or if we can be of further assistance, please call us at 501-753-2526
Visit our website: www.mtaengineers.com