HomeMy WebLinkAboutORDINANCE 6068113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Ordinance: 6068
File Number: 2018-0239
OXFORD BEND WATERLINE COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH BOB WEAVER FOR THE INSTALLATION OF
WATER MAIN ALONG A 370 FOOT PORTION OF OXFORD BEND ROAD, WITH THE ESTIMATED
AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $6,535.00, AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,307.00
WHEREAS, Bob Weaver will be building a single-family home on property located on Oxford Bend
Road and has requested that the City share in the cost of constructing an 8 -inch water main, rather than the
required 4 -inch water main, along Oxford Bend Road a distance of approximately 370 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the new single-
family structure to connect, will extend water service to an area that has never been served before, and will
also provide for ample future capacity for consumption and fire flow; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size that is larger than required to serve subdivisions when such excess size is
specified and required by the water and wastewater director for the general benefit of the water
system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Bob Weaver for the
Page 1 Printed on 615118
Ordinance: 6068
File Number- 2018-0239
installation of an 8 -inch water main along a 370 foot portion of Oxford Bend Road with the estimated
amount to be paid by the City of Fayetteville not to exceed $6,535.00, and further approves a project
contingency in the amount of $1,307.00.
PASSED and APPROVED on 6/5/2018
Attest:
Sondra E. Smith, City Clerk` re jj10 ,,,,,Zz,
op
r Gj • �
kAN`' .'.7 ■'
ri Iy�
el -11114111110 0
Page 2 Printed on 615118
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2018-0239
Agenda Date: 6/5/2018 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: B. 1
OXFORD BEND WATERLINE COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH BOB WEAVER FOR THE INSTALLATION OF
WATER MAIN ALONG A 370 FOOT PORTION OF OXFORD BEND ROAD, WITH THE
ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED
$6,535.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,307.00
WHEREAS, Bob Weaver will be building a single-family home on property located on Oxford Bend Road
and has requested that the City share in the cost of constructing an 8 -inch water main, rather than the required
4 -inch water main, along Oxford Bend Road a distance of approximately 370 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the new single-family
structure to connect, will extend water service to an area that has never been served before, and will also
provide for ample future capacity for consumption and fire flow; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and
required by the water and wastewater director for the general benefit of the water system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Bob Weaver for the
installation of an 8 -inch water main along a 370 foot portion of Oxford Bend Road with the estimated amount
to be paid by the City of Fayetteville not to exceed $6,535.00, and further approves a project contingency in
the amount of $1,307.00.
City of Fayetteville, Arkansas Page 1 Printed on 6/5/2018
City of Fayetteville Staff Review Form
2018-0239
Legistar File ID
5/15/2018
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 4/24/2018 WATER SEWER (720)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends the approval of a cost sharing agreement with Bob Weaver in the amount of $6,535.00 for a
waterline upgrade on Oxford Bend, and approval of a contingency in the amount of $1,307.00 for a total amount of
$7,842.00.
5400.720.5600-5808.00
Account Number
04039.1
Project Number
Budgeted Item? No
Does item have a cost? Yes
Budget Adjustment Attached? No
Purchase Order Number:
Change Order Number:
Original Contract Number:
Comments:
Budget Impact:
Water and Sewer
Fund
Water/Sewer Impact Fee Cost Sharing
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$
1,132,536.00
$
38,657.37
$
1,093,878.63
$ �-
7,842.00
$
1,086,036.63
Previous Ordinance or Resolution #
Approval Date:
180321
CITY OF
FAYETTEVILE
ARKANSAS
MEETING OF MAY 15, 2018
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: April 24, 2018
SUBJECT: Waterline Cost Share on Oxford Bend
CITY COUNCIL MEMO
RECOMMENDATION:
Staff recommends the approval of a cost sharing agreement with Bob Weaver in the amount of
$6,535.00 for a waterline upgrade on Oxford Bend, and approval of a contingency in the amount
of $1,307.00 for a total amount of $7,842.00.
BACKGROUND:
Mr. Weaver is requesting water service for a single-family home being constructed. Per policy,
he is responsible for installing main extension. Based on his projected usage, Mr. Weaver only
needs a 4 -inch water main.
DISCUSSION:
The City is anticipating growth in that area in the future. Therefore, the City will require Mr.
Weaver to install an 8 -inch line instead of a 4 -inch line. The City will pay the difference between
the 4 -inch and 8 -inch lines.
BUDGET/STAFF IMPACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing project.
Attachments:
Cost Share Agreement
Letter from Jorgensen and Associates
Map of Area
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN INSTALLATION COSTS
Julie
This Agreement, made and entered into on this 5th day of df� 2018, by and between
the City of Fayetteville, Arkansas ("City") and Bob Weaver, witnesseth:
WHEREAS, Bob Weaver has requested that the City share in the cost of upsizing a 4 -inch
main to an 8 -inch water main along a portion of Oxford Bend Road between West River Rock
Circle and West Wilson Lane, a distance of approximately 370 feet, so that Bob Weaver may
construct a single-family dwelling; and
WHEREAS, constructing this segment of 8 -inch water main, rather than the 4 -inch main,
will allow construction of a single-family residence, will extend water service to an area that has
never been served before, and will also provide for ample future capacity for consumption and fire
flow, which the City recognizes will be necessary for a future area that will be served by this water
main; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size larger than required to service subdivisions when such
excess size is specified and required by the water and wastewater director for the general benefit
of the water system."
NOW, THEREFORE, the City of Fayetteville, Arkansas and Bob Weaver agree as
follows;
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Bob Weaver for the excess cost to upsize approximately 370 linear
feet of water main from 4 -inch to 8 -inch in the area identified in Exhibit "A"
up to a maximum not -to -exceed amount of $6535.00, as was estimated by the
builder's representative and shown on Exhibit `B", attached, along with any
contingency that may be approved by the City Council.
B. Payments due to Bob Weaver shall be remitted within sixty (60) days after
receipt of valid invoices.
2. Bob Weaver agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
Page 1 of 2
C; Pay for the water main installation (with reimbursement of the cast by the City -
at Payetterille in a not -to -exceed amount of 56,535.00 alarm with anal
contingency atiiount that r:tav he approv;tl h',' the City Cotancilj.
IN AGREEMENT 1'4''ITH ALL THE TERMS 4ND CONDITIONS ABOVE, WE
SIGN BELOW -
BOB WEAVER
J� 1
B - f
iiJB Ii B �VE ER
CITY OF FAYE'I'i`EDI I,E,
AT -FES T .
--u�B)" 4
t 1--llDU-LX ;t.-! SMITH. City Clark_
�Htit�rr�rrl
`<<++�SFtK
Y n't`A`��'�
;
9ti�
FAYETfEVILLE;`^!
0
%FS'"•'QkR NSP• ��'��•
Paye 2 of'2
124et Sunbridge Drive, Suite 5
JORGENSEN Fayetteville, AR 72703
Office: 479.442.9127
+ASSOCiATES Fax: 479.582,4807
April 16, 2018
City of Fayetteville
Development Services
113 West Mountain Street
Fayetteville, AR. 72701
Re: Weaver Waterline Extension
In regards to the waterline extension for Bob Weaver, we are kindly seeking a cost share with the city.
Attached please find the low bid from MH Backhoe. The difference between the 4" line and the 8" is $6535.00 which is the
amount that the city would pay.
Please review and contact me concerning any question you may have.
Thank you.
Sincerely;
rt
David L. lorgense, P.E.
11'4 'teA-6Klq 6) C�
WEAVER WATERLINE EXTENSION
UNIT PRICE SCHEDULE
4JI
fFOR 4" LINE) g gll
Item
Description
I
Unit
Unit
Price
1
4" PVC, Water Main
370
LF
Am -
2
4" Gate Valve
EA
m
3
Blow -off
I
EA_
1AJ 15, op
4
5
Class 7 Backfill
Single Meter Set wiService
30
2
Ton
—EA
JW
6
4" Cap
I
LS
7
Clean & Test
1
LS
8
Bond
I
LS
9
Clear & Grub, Erosion Control, Final Cleanup
I
LS
imp R" i 1NF1
m
Description
unit
8" PVC, Water Main
Single Meter Set w/Service
4"x8" Reducer
r4" Cap
K1(
m
r
GENSEN
4 1/
WEAVER WATERLINE EXTENSION
UNIT PRICE SCHEDULE
(FOR 4" LINE)
224 W Suv b3 dg Drr sr , Svi(s=
S Fa cftvv%Lt c AR 72703
O f fizz: 479.442, 91-27
FaW.. 479.582.4807
Item
I
1
; Description Qty
_
4„ PVC, Water Main 370
! Llnit
__._EF
Unit
Price
2.3.•00
i Price
2
4" Gate Valve ( 1
EA
soloo
9, 50.0
3
Blow -off 1
I EA
'I Soca
So.
4
5
Class 7 Backfill 30
Single Meter Set w/Service 2
Ton
EA
x.00
05.40
flD.O
100,
6
4" Cap 2
LS
330.00
9
i7
Clean & Test 1
LS
ISOO.00
Clear & Grub, Erosion Control, Final Cleanup
i S
Bond 1
LS
.35r3.
_1.500.00
35c�.tiG
Clear & Grub, Erosion Control, Final Cleanup 1
LS
i 5�5.�3
I,
(FOR 8" LINE}
Item
Description
Qty
I
Unit Unit Price
Price
1
8" PVC, Water Main
370
? LF,31.00 C3
2
3
f
5
8" Gate Valve
Blow -cuff
Class 7 Backfill
I Single Meter Set w/Service
1
1
30
2
__E_A I�{so. 0.
EA 75I. 1-750.0
Tan,pp { C40,0
EA I Qc►t{Ip,
3 6
4"x8"' Reducer
"
1
_ __1
EA 9403.40t4f3.00
r 7
Cap
LS 42.0,0# 4 2.0, 00 ,
8
Clean & Test
1
L5 i SOO-00 I Spy-Oti
9
Bond _
1
LS ,3,50.00 SC.
10
Clear & Grub, Erosion Control, Final Cleanup
1
LS 1 $z%'03
r
d1 .� it
+• r
i-0
I4
s
}` it
Oxford Bend Waterline Cost Share
Water line to be extended
■
Iver Retk_C,i
t.4L.
Edi
A-
't .
RECEIVED
JUL Q 3 2018
Ordinance: 6068
NORTHWEST ARKANSAS CITY CF CLERK
E I��'ZENu,D B 2018-0239
WATE
CITY CLERK'S OF WORD BEND WATERLINE COST
SHARE:
®� �Vonettic
ORDINANCE TO WAIVE THE
REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND
APPROVE A COST SHARE
AGREEMENT WITH BOB WEAVER
:=..c =rl < ,,;^ lt? _ ,<re ,, *,„ FOR THE INSTALLATION OF WATER
MAIN ALONG A 370 FOOT PORTION
OF OXFORD BEND ROAD, WITH THE
ESTIMATED AMOUNT TO BE PAID BY
THE CITY OF FAYETTEVILLE NOT TO
AFFIDAVIT OF PUBLICATION EXCEED $6,N, AND APPROVE
COT
A PROJECT CONTINGENCY IN THE
AMOUNT OF $1,307.00
WHEREAS, Bob Weaver will be building a
I Cathy Wiles, do solemnly swear that I am the Legal Clerk of the single -family home on property located on
Oxford Bend Road and has requested that
Northwest Arkansas Democrat-Gazette, printed and published in the City share in the cost of constructing an
8-inch water main, rather than the required
Washington County and Benton County, Arkansas, and of bona fide 4-inch water main, along Oxford Bend
circulation, that from my own personal knowledge and reference Road a distance of approximately 370 feet,
and
to the files of said publication, the advertisement of: WHEREAS, the City of Fayetteville would
benefit from the cost share as it will allow
the new single -family structure to connect,
ITY OF FAYETTEVILLE will extend water service to an area that has
never been served before, and will also
Ord. 6068 provide for ample future capacity for
consumption and fire flow; and
WHEREAS, § 51.112 of the Fayetteville
City Code provides that "the City shall pay
the excess material cost of facilities of a
Was inserted in the Regular Edition on: size that is larger than required to Serve
subdivisions when such excess size is
specified and required by the water and
wastewater director for the general benefit
June 14, 2018 ofthe water system'; and
WHEREAS, waiving formal competitive
bidding will save time and cost by utilizing
Publication Charges: $ 137.80 the developer's contractor who will be on-
site installing the line for the developer's
project.
NOW, THEREFORE, BE 1T ORDAINED
BY THE CITY COUNCIL OF THE CITY
OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City
Cathy Wiles of Fayetteville, Arkansas hereby determines
an exceptional situation exists in which
competitive bidding is deemed not feasible
or practical and therefore waives the
requirements of formal competitive bidding
Subscribed and sworn to before me and approves a cost share agreement with
Bob Weaver for the installation of an 8-inch
This Z!, day of , 201 8. water main along a 370 foot portion of
Oxford Bend Road with the estimated
amount to be paid by the City of
Fayetteville not to exceed $6,535.00, and
further approves a project contingency in
the amount of $1,307.00.
jAVVv ?. S-. � PASSED and APPROVED on 6/5/2018
U/Vtt �^�f tiatar;ru�t!c—A.r��rs2s Approved:
Notar Public % on = Lioneld Jordan, Mayor
y ����/ C u7i ici 1 Attest:
My Commission Expires: r Cx _ Sondra E. Smith, City Clerk Treasurer
74562566 June 14, 2018
**NOTE**
Please do not pay from Affidavit.
Invoice will be sent.
COF-Water Sewer -WATERLINE COST SHARE WITH BOB WEAVER ON
OXFORD BEND
City of Fayetteville Staff Review Form
2018-0472
Legistar File ID
N/A
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 8/27/2018 WATER SEWER (720)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends the approval of the use of contingency funds in the amount of $900.00 for a cost sharing
agreement with Bob Weaver for a waterline upgrade on Oxford Bend.
G - 1 .68 211- as
Account Number
04039.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Budget Impact:
Water and Sewer
Fund
Water /Sewer Impact Fee Cost Sharing
Project Title
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
$ 1,132,536.00
$ 45,192.37
$ 1,0$7,343.63
$ 900.00
$ 1,086,443.63
V20180321
Purchase Order Number: 2018-000000462 Previous Ordinance or Resolution # 6068
Change Order Number: Approval Date:
Original Contract Number:
Comments:
' CITY OF
FAYETTEVILLE
ARKANSAS
TO: Mayor Lioneld Jordan
THRU: Don Marr, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: August 27, 2018
STAFF MEMO
SUBJECT: Approval of the Use of Contingency Funds for a Waterline Cost Share on
Oxford Bend
RECOMMENDATION:
Staff recommends the approval of the use of contingency funds in the amount of $900.00 for a
cost sharing agreement with Bob Weaver for a waterline upgrade on Oxford Bend.
BACKGROUND:
Mr. Weaver requested water service for a single-family home being constructed. Per policy, he
was responsible for installing the main extension. Based on his projected usage, Mr. Weaver
only needed a 4 -inch water main. The City is anticipating growth in that area in the future.
Therefore, the City required Mr. Weaver to install an 8 -inch line instead of a 4 -inch line. Per
Ordinance 6068, the City agreed to pay the difference between the 4 -inch and 8 -inch lines.
DISCUSSION:
Mr. Weaver has completed construction on the project and is requesting reimbursement. During
construction, it was determined that an anchor collar was needed for the waterline. The City
offered to pay half the cost of the anchor collar in the amount of $900.00. The total payment to
Bob Weaver will be $6,5350.00 plus $900.00 of the contingency for a total of $7,435.00.
BUDGETISTAFF IMPACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing project.
Attachments:
Invoice from Bob Weaver
Ordinance 6068
Supporting Documentation — Invoice from MH Backhoe
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
INVOICE FOR COST SHARE ON WATER LINE AT 851 OXFORD BEND RD
TO: CITY OF FAYETTEVILLE
FROM: BOB WEAVER
TOTAL COST $23,260.00
COST SHARE $6535.00 PLUS $900.00 ADDITIONAL FOR ANCHOR COLLAR
TOTAL COST SHARE $7,435.00
REMIT TO: BOB WEAVER
867 N FOX HUNTER RD
FAYETTEVILLE, AR. 72701
ALL SUPPORTING DOCUMENTS INCLUDED
,Ot; f't.Y;Gw.7ff
tk
113 West Mountain Street
Fayetteville, AR 72741
(479) 575-8323
Ordinance: 6068
__...._._..............._........._.._....... .........__... .
File Number: 2018-0239
OXFORD BEND WATERLINE COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH BOB WEAVER FOR THE INSTALLATION OF
WATER MAIN ALONG A 370 FOOT PORTION OF OXFORD BEND ROAD, WITH THE ESTIMATED
AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $6,535.00, AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,307.00
WHEREAS, Bob Weaver will be building a single-family home on property located on Oxford Bend
Road and has requested that the City share in the cost of constructing an 8 -inch water main, rather than the
required 4 -inch water main, along Oxford Bend Road a distance of approximately 370 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the new single-
family structure to connect, will extend water service to an area that has never been served before, and will
also provide for ample future capacity for consumption and fire flow; and
WHEREAS, § S1.112 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size that is larger than required to serve subdivisions when such excess size is
specified and required by the water and wastewater director for the general benefit of the water
system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby detennines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Bob Weaver for the
Page 1 Printed on 615118
Ordinance: 8088
File. Number. 2018-0239
installation of an 8 -inch water main along a 370 foot portion of Oxford Bend Road with the estimated
amount to be paid by the- City of Fayetteville not to exceed $6,535.00, and further approves a project
contingency in the amount of $1,307.00.
PASSED and APPROVED on 615/2018
Approved:
Lioneld
Attest:
Oil. iiGOM a
Sondra E. Smith, City Clerk
Y
Page 2 Printed an 6!5118
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479)575-8323
Text File
File Number: 2018-0239
....._.. ......... _ __ .. ... _.......
Agenda Date: 6!5!201$ Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: B: 1
OXFORD BEND WATERLINE COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH BOB WEAVER FOR THE INSTALLATION OF
WATER MAIN ALONG A 370 FOOT PORTION OF OXFORD BEND ROAD, WITH THE
ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED
$6,535.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,307.00
WHEREAS, Bob Weaver will be building a single-family home on property located on Oxford Bend Road
and has requested that the City share in the cost of constructing an 8 -inch water main, rather than the required
4 -inch water main, along Oxford Bend Road a distance of approximately 370 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the new single-family
structure to connect, will extend water service to an area that has never been served before, and will also
provide for ample future capacity for consumption and fire flow; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and
required by the water and wastewater director for the general benefit of the water system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Sectioii::I: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Bob Weaver for the
installation of an 8 -inch water main along a 370 foot portion of Oxford Bend Road with the estimated amount
to be paid by the City of Fayetteville not to exceed $6,535.00, and further approves a project contingency in
the amount of $1,307.00.
City of Fayetteville, Arkansas Page 1 Printed on 6/512018
City of Fayetteville Staff Review Form
aln'. MR
Legistar File ID
5/15/2018
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 4/24/2018 WATER SEWER (720)
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff recommends the approval of a cost sharing agreement with Bob Weaver in the amount of $6,535-00 for a
waterline upgrade on Oxford Bend, and approval of a contingency in the amount of $1,307.00 for a total amount of
$7,842.00.
trr r .rr :r•rr
Account Number
04039.1
Project Number
Budgeted Item? No
Does item have a cost? Yes
Budget Adjustment Attached? No
Purchase order Number:
Change order Number:
Original Contract Number:
Comments:
Budget Impact:
Water and Sewer
Fund '
Water/Sewer Impact Fee Cost Sharing
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$ 1,132,536.00
$ 38,657.37
$ 1,093,878.63
$ 7,842.00
Previous ordinance or Resolution #
Approval Date:
1,086,036.63
V20180321
MEETING OF MAY 15,2018
TO: Mayor and City Council
THRU: Don Marr, Chief ofStaff
FROM: Tim Nyander.Utilities Director
DATE: April 24.2D18
SUBJECT: Waterline Cost Share on Oxford Bend
CITY COUNCIL MEMO
RECOMMENDATION: '
Staff recommends the approval of a cost sharing agreement with Bob Weaver in the amount of
$5.535.00for owaterline upgrade onOxford Bend, and approval cf acontingency inthe amount
of$1.3U7.00for ototal amount of$7.842.UO.
BACKGROUND:
Mr. Weaver is requesting water service for a single-family home being constructed. Per policy,
he is responsible for installing main extension. Based on his projected usage, Mr. Weaver only
needs e4-inchwater. main.
,
DISCUSSION: _
The City isanticipating growth iwthat area inthe future. Therefore, the City will require Mr.
Weaver to install an 8 -inch line instead of a 4 -inch line. The City will pay the difference between
the 4-inohand 8-inchlines.
BUDGET/STAFF|K8PACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing project.
Attachments:
Cost Share Agreement
Letter from Jorgensen and Associates
Map ofArea
' - -
Mailing Address; - -
-
nsvummwntamstreet
wwv^fayetuwx|e'avoov
CITY OF
FAYETTEVI'LLE
ARKANSAS
MEETING OF MAY 15,2018
TO: Mayor and City Council
THRU: Don Marr, Chief ofStaff
FROM: Tim Nyander.Utilities Director
DATE: April 24.2D18
SUBJECT: Waterline Cost Share on Oxford Bend
CITY COUNCIL MEMO
RECOMMENDATION: '
Staff recommends the approval of a cost sharing agreement with Bob Weaver in the amount of
$5.535.00for owaterline upgrade onOxford Bend, and approval cf acontingency inthe amount
of$1.3U7.00for ototal amount of$7.842.UO.
BACKGROUND:
Mr. Weaver is requesting water service for a single-family home being constructed. Per policy,
he is responsible for installing main extension. Based on his projected usage, Mr. Weaver only
needs e4-inchwater. main.
,
DISCUSSION: _
The City isanticipating growth iwthat area inthe future. Therefore, the City will require Mr.
Weaver to install an 8 -inch line instead of a 4 -inch line. The City will pay the difference between
the 4-inohand 8-inchlines.
BUDGET/STAFF|K8PACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing project.
Attachments:
Cost Share Agreement
Letter from Jorgensen and Associates
Map ofArea
' - -
Mailing Address; - -
-
nsvummwntamstreet
wwv^fayetuwx|e'avoov
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this' 5th day of Julie
MV]f 2018, by and between
the City of Payetteville, Arkansas ("City") and Bob Weaver, witnesseth:
WHEREAS, Bob Weaver has requested that the City share in the cost ofupsizing a 4 -inch
main to an 8 -inch water main along a portion of Oxford Bend Road between West River Rock
Circle and West Wilson Lane, a distance of approximately 370 feet, so that Bob Weaver may
construct a single-family dwelling; and
WHEREAS, constructing this segment of 8 -inch water main, rather than the 4 -inch main,
will allow construction of a single-family residence, will extend water service to an area that has
never been served before, and will also provide for ample future capacity for consumption and tire
flow, which the City recognizes will be necessary for a future area that will be served by this water
main; and
WHEREAS, § 51,112 of the Payetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size larger than required to service subdivisions when such
excess size is specified and required by the water and wastewater director for the general benefit
of the water system."
NOW, THEREFORE, the City of Fayetteville, Arkansas and Bob Weaver agree as
follows: ,
1. The City of Fayetteville, Arkansas agrees to, .
A. Reimburse Bob Weaver for the excess cost to upsize approximately 370 linear
feet of water main from 4 -inch to 8 -inch in the area identified in Exhibit "A"
up to a maximum not -to -exceed amount of $6535.00, as was estimated by the
builder's representative and shown on Exhibit "B", attached, along with any
contingency that may be approved by the City Council,
B. Payments due to Bob Weaver shall be remitted within sixty (60) days after
receipt of valid invoices:
2. Bob Weaver agrees to:
A. Provide the necessary and normal project maniigement, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
Page 1 of 2
C. Payffu I'**: themain n instai I atiot 1: 1, r6mbursiin�4*.ofthc cost
-City
ft�y the ,
a,
avetteville In a of $6;535 00 along any
ibgencv amount that may be appromed b. -y C' V. Council}:
cont' y It
IN AGREEMENTWITJI ALL T14E TERMS AND CONDITIONS ABOVk, WE
SIGN BELOW -
BOB WEAVER CITY OF FAYETTEVILLE.
JORGENSEN'
+ASSOCIATES
4 OtA:: 5 b�;
April 16, 2018
City of Fayetteville
Development Services
113 West Mountain Street
Fayetteville, AR. 72701
Re: Weaver Waterline Extension
12A W Sunhridge DrKe, Suite S
Fayetteville, AR !2703
Office: 479.442.9127
Fax: 473.582,41307
In regards to the waterline extension for Bob Weaver, we are kindly seeking a cost share with the city.
Attached please find the low bid from MH Backhoe. The difference between the 4" line and the 8" is $6535.00 which is the
amount that the city would pay.
Please review and contact me concerning any question you may have.
Thank you.
Sincerely;
David L. Jorgensen; P.E.
WEAVER WATERLINE EXTENSION
UNIT PRICE SCHEDULE
(FOR,4" LINd-
Item
EtescripY art
city,
Unit
Unit
Price
Price
1
4" PVC, Water Main
370
LF
4" Gate Valve
I
EA
DOZ
3
Blow. -off
EA
4
Class 7 Backfill
30
Ton
.,00
4 too
5
Single Meter i,i Set vi/Service
2
EA
:00
ROD
I
LS
7—
Clean.& Test.,
LS
.8
'Bond
LS
A
I ^L4j
9
Clear &'Grub, Erosion Control, Final.Cleanup
I
L$
Alm—
kft-
;11 In
JOR,GENSEN
+ ASSOOTES
�ilHtl• r::,. �1t,±.�ffYl.tl� .$t+i'yt?j{„*
WEAVER WATERLINE EXTENSION
UNIT PRICE SCHEDULE
(FOR 4" LINE)
124 w svwvbrivEse, o i,ru, Sw w
S Fc-ti&He,.-hies, AR, 72703
Cjyi.cG.. 4 79.442..9 j.2 7
FaW 479.582.4807
Item
Description
Qty
Unit
Unit
Prig
1
8" PVC, Water Main
370
( LF
Price
1
4" PVC, Water Main
370
LF
yip,
2
4" Gate Valve
1
EA
950.00
50«0
3
I
Blow -off
1
EA
SO.00
I"? 50.
4
I Class 7 Backfill
30
Ton
F;Uw.00
I r.00.00
S
Single Meter Set w/Service
2
EA
4gp pp
10.
6
4 Cap
1
LS
3Za,0o
70.40
7
Clean & Test
1
LS
S Soo.00
I SW -00
8
Bond
1 i
LS
09.go
1,500.00
Grub, Erosion Control, Final Cleanup
1
LS
58.00
350,00
9
Clear & Grub, Erosion Control, Final Cleanup
1
LS
) 525.W
I SZ S.o
. A
Y
(FOR 8" LINE)
Item
Description
Qty
Unit
Unit
Price
Price
1
8" PVC, Water Main
370
( LF
1 2
V8" Gate Valve
1
£A:{�.
yip,
3
ow -off
1
[ EA
3 7SD.00
i 150.
4
Class 7 Backfill
30
Ton
0.00
600.Ll0
5
Single Meter Set wjService _
2
EA
,ri Q5440
iW.Ot
6
4"x8" Reducer
1
EA
1900.00g00«4t1
7
lrs Cap
1
i 142.0.00
410,00
8
C
Clea&Gest
1
LS i
S Soo.00
I SW -00
I 9
10
Bone
Clear &
1 i
LS
350.00
So. oo
Grub, Erosion Control, Final Cleanup
1
LS it
Sz:,oQ
t SSS.
I
>'5` �0�
4/7Y- RYI-.-303
r,