HomeMy WebLinkAbout2018-04-10 - Agendas - FinalCITY OF
FAYETTEVILLE
ARKANSAS
MEETING AGENDA
Water, Sewer, and Solid Waste Committee
April 10', 2018
5:30 P.M.
(Or immediately following Equipment Committee Session)
City Hall - Room 326
Committee: Chairman Mark Kinion; Council Member Sarah Marsh, Council Member Sarah
Bunch, Council Member John LaTour
Alternates:
Copy to: Mayor Lioneld Jordan; Sondra Smith, Don Marr, Paul Becker, Susan Norton, Chris
Brown, Alan Pugh, Terry Gulley, Brian Pugh, Jeff Coles, Mark Rogers, Jim
Beavers, Aaron Watkins, Greg Weeks, Mayo Miller, Tim Luther
From: Tim Nyander, Utilities Director
CALL TO ORDER
ROLL CALL
OLD BUSINESS/UPDATES:
NEW BUSINESS:
Update on Damage Claims
3395 W. Mount Comfort Road. On January 10th, a 12 -inch water line split, causing a
large rush of water which caused extensive damage to outside areas around the
Pathway Baptist Church, including the parking lot, landscape, retention ponds, and an
air conditioning unit. The claimed cost is $11,854.50, and is a legitimate claim.The City is
currently waiting to see what the claimant's insurance will pay.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR
CONSIDERATION FOR APPROVAL
1168 Oaks Manor Drive. On February 26, 2018, a water leak on a 6 -inch main flooded
the home at 1168 Oaks Manor Drive. The amount claimed is $14,518.19, and it is a
legitimate claim.
STAFF REQUESTS THIS BE FORWARDED TO THE CITY COUNCIL FOR
CONSIDERATION FOR APPROVAL
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
1010 N. Eastwood Drive. On January 12th, a 6 -inch water leak resulted in water entering
the basement of this vacant home at 1010 Eastwood Drive. Approximately 3 inches of
water resulted in damage. We are currently waiting on the cost of actual damages. The
owner is from out of state. This is a legitimate claim.
2805 N Sheryl Ave. On February 26, 2008 a water leak on a 6 -inch line resulted in water
damage to carpeting and drywall in the basement. The claimed amount is $2,247.26,
and is legitimate.
2365 W. Eiffel Crossing. A water leak occurred around the dates of January 25 — 31,
where a service caused the claimant's yard to become saturated. Extremely cold
temperatures froze the water, causing cracks in the sidewalk. This claim is legitimate,
and the claimant is currently obtaining bids.
2. Pump Rebuild Kit for the Hamestring Lift Station
Discussion surrounding the need for the rebuild kit.
Capital Projects Update
Number
Project Description
Contractor
Cost
Complete
1
Dinsmore Trail Water Line Replacement (Design)
MWY
$53,144
100%
2
Masters Lift Station Removal (Design)
Hawkins -Weir
$71,820
98%
3
Gregg, Poplar and Easy Street Sewer Improvements -Design
In -House Design
j $500,000
j 99%
4
Huntsville, MLK & Garden Park Apartments Water Line
Replacements - Construction
Goins Enterprises
$1,919,872
70%
5
Screen Repair at West Side WWTP
In -House
$35,253
50%
6
Mechanical Blower Repair West Side WWTP
Blocker & Wallace
$31,355
100%
7
Fulbright/Gregg Sewer Main Replacement (Design)
In -House Design
$1,000,000
50%
8
Kitty Creek Sewer Line Project (Design)
McClelland Engineering
j $250,793
j 50%
9
Goshen/Benson Mtn. Water Tank Improvements (Design)
Hawkins -Weir
$133,980
25%
10
Water & Sewer Outbuildings Construction
Benchmark Const.
$366,000
70%
11
Utility Relocates Hwy 16 (Design)
McClelland Engineering
$117,859
15%
12
Electrical Improvements for the Noland WWTP
Allgeier, Martin
$480,049
5%
13
Lake Sequoyah Access Road Basin 3
81 Construction Inc.
13
10%
PRESENTATIONS