HomeMy WebLinkAbout45-18 RESOLUTION�nYFrr.
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Resolution: 45-18
File Number: 2018-0050
MCCLELLAND CONSULTING ENGINEERS, INC.:
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE CONTRACT WITH
MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $66,545.27 TO ADD
ENGINEERING SERVICES FOR THE REPLACEMENT OF AN EXISTING 24 -INCH WATER MAIN
ADJACENT TO MORNINGSIDE DRIVE ASSOCIATED WITH UTILITY RELOCATIONS
NECESSARY FOR ARKANSAS DEPARTMENT OF TRANSPORTATION JOB 040579
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Supplemental
Agreement No. 1 to the contract with McClelland Consulting Engineers, Inc. in the additional amount
of $66,545.27 to add engineering services for the replacement of an existing 24 -inch water main
adjacent to Morningside Drive associated with utility relocations required for Arkansas Department of
Transportation Job 040579.
PASSED and APPROVED on 2/6/2018
Attest:
rir��
Sondra E. Smith, City Clerk Tre � 1 r:�L i III, 'r
y
� r �
f-AYFTTFV!( f
l_ N
�yy 4
off:AN`'�'
Page 1 Printed on 217118
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2018-0050
Agenda Date: 2/6/2018 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 11
MCCLELLAND CONSULTING ENGINEERS, INC.:
A RESOLUTION TO APPROVE SUPPLEMENTAL AGREEMENT NO. 1 TO THE CONTRACT
WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $66,545.27 TO
ADD ENGINEERING SERVICES FOR THE REPLACEMENT OF AN EXISTING 24 -INCH WATER
MAIN ADJACENT TO MORNINGSIDE DRIVE ASSOCIATED WITH UTILITY RELOCATIONS
NECESSARY FOR ARKANSAS DEPARTMENT OF TRANSPORTATION JOB 040579
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Supplemental
Agreement No. Ito the contract with McClelland Consulting Engineers, Inc. in the additional amount of
$66,545.27 to add engineering services for the replacement of an existing 24 -inch water main adjacent to
Morningside Drive associated with utility relocations required for Arkansas Department of Transportation Job
040579.
City of Fayetteville, Arkansas Page 1 Printed on 21712018
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2018-0050
Legistar File ID
2/6/2018
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
1/15/2018 Water & Sewer Maintenance /
Utilities Department
Submitted Date Division / Department
Action Recommendation:
Staff recommends a resolution approving Amendment No. 1 (Supplemental Agreement No. 1) to the engineering
contract with McClelland Consulting Engineers, Inc. in the amount of $66,545.27 to add engineering services for
the replacement of an existing 24 -inch water main along Morningside Drive between E. Huntsville Road and E. 15th
Street.
5400.720.5600-5314.00
Account Number
11011.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Previous Ordinance or Resolution # 205-17
Original Contract Number: 2017-32
Comments:
Budget Impact:
Water and Sewer
Fund
Water/Sewer Relocations - Bond Projects
Current Budget
Funds Obligated
Current Balance
Item Cost
Budget Adjustment
Remaining Budget
Project Title
$
887,121.26
$
107,144.55
$
779,976.71
$
66,545.27
$
713,431.44
Approval Date:
V20140710
CITY OF
FA►YETTEVILLE
a" ARKANSAS
,,r ,
MEETING OF FEBRUARY 6, 2018
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: January 15, 2018
CITY COUNCIL MEMO
SUBJECT: Amendment No. 1 to the Contract with McClelland Consulting Engineers,
Inc.
RECOMMENDATION:
Staff recommends a resolution approving Amendment No. 1 (Supplemental Agreement No. 1)
to the engineering contract with McClelland Consulting Engineers, Inc. in the amount of
$66,545.27 to add engineering services for the replacement of an existing 24 -inch water main
along Morningside Drive between E. Huntsville Road and E. 15th Street.
BACKGROUND:
The original contract with McClelland Consulting Engineers, Inc. (MCE) is dated October 3,
2017 and was approved by Resolution 205-17 in the amount of $107,144.55. The original
contract includes water and sewer relocations on E. 15t" Street from S. College to E. Huntsville
Road.
DISCUSSION:
Based upon age and corrosion leaks, staff requests to replace the 24 -inch water main adjacent
to Morningside Drive from East Huntsville Road to East 15th street. Adding this 24 -inch water
main replacement to the work proposed on E 15t'' Street is anticipated to reduce costs
compared to a new or stand-alone project. The proposed amendment is based upon actual
hours and a not -to -exceed price.
The proposed amendment received a recommendation for approval at the Water and Sewer
Committee on January 9, 2018.
BUDGET/STAFF IMPACT:
Funds are available in the Water System Rehabilitation/Replacement project.
Attachments:
Supplemental Agreement No. 1
Fee Estimate
Map
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Supplemental Agreement No. 1
Highway 16 Utility Relocations
Date:
WHEREAS, the CITY OF FAYETTEVILLE and McClelland Consulting Engineers, Inc.
(ENGINEER) entered into an Agreement for Professional Engineering Services
(AGREEMENT) on October 3, 2017; and,
WHEREAS, the CITY OF FAYETTEVILLE has requested that ENGINEER perform additional
services outside of the scope of the AGREEMENT.
NOW THEREFORE, the following modifications will be made to the AGREEMENT to
include the additional services requested:
MODIFICATIONS:
1. Section 2.1.1 –the additional scope of services are included in the attached
Appendix "A-1".
2. Section 5.1 – the maximum not -to -exceed amount is increased from $107,144.55 to
$173,689.82. Modifications to compensation are included in the attached
Appendix "B-3".
IN WITNESS WHEREOF, the parties execute this Supplemental Agreement No. 1, to be
effective on the date set out above.
McClelland Consulting Engineers, Inc. City of Fayettgville, Arkansas
17
BY: _/_� _�/� � —
Daniel Barnes, PE
President, Fayetteville Office
Jordan
APPENDIX A — SCOPE OF ADDITIONAL SERVICES
SUPPLEMENTAL AGREEMENT NO. 1— 24" WATER MAIN RELOCATION FROM HUNTSVILLE RD
TO HIGHWAY 16 (1ST" ST)
1.1 General
The scope of additional services includes design surveys, Preliminary Design, and Final Design services
related to the replacement of approximately 2,600 linear feet of 24 -inch cast iron water main, located
along the east side of Morningside Drive between Huntsville Rd and Highway 16 (15th St). The design
plans and technical specifications for this additional work will be incorporated into the water/sewer
relocation plans for the Highway 16 corridor previously authorized by the City, and bid out as one
complete package. The proposed alignment is planned for the east side Morningside Drive; therefore,
coordination will be needed with the design consultant completing the subdivision on the east side of
Morningside Drive. In addition, it is assumed that approximately 1,000 LF of existing 6" sewer main
along the east edge of Morningside Drive will need to be relocated to accommodate the new 24" water
main. The design associated with the sewer main relocation is included in this scope of additional
services.
1.2 Design Surveys, Preliminary Design, Final Design and Bidding Services
1.2.1 Design Surveys
MCE will complete a detailed topographic survey along Morningside Drive (between west curb
line and approximately 30 ft east of east right-of-way line) from Huntsville Rd to Highway 16.
Details will include (but are not limited to): contours, flowlines, utility poles and pedestals,
structures, roads, sidewalks, storm water and sanitary sewer manholes, and utility marks
provided by a utility locating service. MCE will also conduct research and make physical ties
sufficient to locate the eastern right-of-way of Morningside Drive along the project limits, for
the purpose of defining the extent of the right-of-way, not for transfer of title.
1.2.2 Preliminary Design
Preliminary plans for the 24" water main relocation shall be submitted to the City of Fayetteville
for the purpose of confirming the final design scope of work, including the extent of the new
water main, the location of interconnections, adjacent utility relocations, necessary easement
requirements, anticipated right-of-way conflicts, coordination of shut downs with industries in
the industrial park, and a preliminary estimate of construction costs.
1.2.3 Final Design
Based on review comments from Preliminary Design, the Final Design and Project Specifications
for the 24" water main relocation shall be completed and incorporated into the overall design
package. Design deliverables shall be the same as included in the Original Agreement dated
October 3, 2017.
Appendix A-1— Scope of Additional Services Page 1 of 2
24" Water Main Relocation — Huntsville Rd to Highway 16 (15th St)
1.2.4 Bidding Phase
As mentioned in Section 1.2.3 above, the design plans and specifications will be incorporated
into the overall design package for the Highway 16 water/sewer relocations and bid out as one
complete project. Additional effort related to responding to bidder questions and issuance of
addenda is anticipated for the 24" water main relocation.
1.3 Property Surveys, Property Mapping, Easement Mapping and Easement Preparation Services
As mentioned in Section 1.2.1, the Design Surveys shall include physical ties sufficient to locate
the eastern right-of-way for Morningside Drive. It is assumed that the 24" water main will be
relocated to either (1) within the Morningside Drive right-of-way, or (2) within a permanent
easement adjacent to the eastern right-of-way line, which will be dedicated by plat for the
future development. As such, no additional scope or costs for property surveys, mapping, and
easement preparation are included in this Supplemental Agreement.
1.4 Storm Water Pollution Prevention Plan Services
The Storm Water Pollution Prevention Plan shall include the work associated with the 24" water
main relocation.
1.5 Geotechnical Services
Perform up to three (3) rock soundings at critical locations along the project corridor. Prepare
summary report and logs, which will be included in the Project Specifications.
1.6 Construction Phase Services
The scope of Construction Phase Services will be added with a future amendment to this
agreement.
1.7 Extra Work
The following items are not included under this agreement but will be considered as extra work:
1. Redesign for the City's convenience or due to changed conditions after prior approval or
conflicting direction from the City or from ARDOT.
2. Submittals or deliverables in addition to those listed in Section 1.2.3.
3. Environmental Assessment.
4. Work related to environmentally or historically (culturally) significant items.
Extra Work will be as directed by the City of Fayetteville in writing for an additional fee as
agreed upon by the City of Fayetteville and MCE.
1.8 Schedule
The same schedule as defined in the Original Agreement dated October 3, 2017 will be
maintained.
Appendix A-1— Scope of Additional Services Page 2 of 2
24" Water Main Relocation — Huntsville Rd to Highway 16 (15th St)
Appendix B-3 Fee Proposal - Supplemental Agreement No. 1
Appendix B-3
Design Surveys, Preliminary Design,
Final Design, SWPPP Servies and Bidding Assistance
In Conjunction with the Highway 16 Water and Sewer Relocation
AHTD Job No. 040579
Fayetteville, Arkansas
Manhours
Labor Classification
Time/Hours
Labor Rate
Extended
Principal Engineer
16.00
$65.00
$1,040.00
Sr Project Manager V
136.00
$60.00
$8,160.00
Project Designer III
144.00
$35.00
$5,040.00
Chief Draftsman
144.00
$24.00
$3,456.00
Survey Tech. II
30.00
$22.00
$660.00
Reg. Land Surveyor IV
14.00
$36.50
$511.00
Field Survey 1 -Man
72.00
$27.00
$1,944.00
Office Admin
4.00
$21.50
$86.00
Direct Labor Subtotal
$20,897.00
Overhead 164.03%
$34,277.35
Subtotal
$55,174.35
Fixed Fee
$6,620.92
Subtotal Labor Costs
$61,795.27
EXPENSES
Estimated Reimbursable Expenses
Amount
Mileage
$50.00
ArkUps
$1,000.00
Printing
$100.00
ADH Review Fee*
$0.00
Rock Soundings (up to 3 locations)
$3,600.00
Total Estimated Reimbursable Expenses
$4,750.00
Total Costs - Design Surveys, Preliminary Design, Final Design, Bidding
Phase, and SWPPP Services
* ADH Review Fee of $500 included in Original Agreement
$66,545.27
1/4/2018
FEE ESTIMATE
'Supplemental Agreement No. 1 - 24" Water Main Relocation
Date: 01- Fee Estimate
Dale: 01-04-2018
■+/ MCCiI !lNi?
CONSULTING
�E
ENGINEERS INC.
Task Dasrriptbn
principal
1141-1
St Project
Manager V
Projecl
Qesfylfel III
Chlel
Clra}[swan
Strrvvy;erh.
II
Reg.tgnd
Survcryor IV
Floid Survey
4f lice Admin
1 -Man
Qesi Survc
Reviewdesi n plans
Establish vertical and horizontal control
Coordinate with Arkups
2.00
Complete map in of surface features
'Complete mapping of clftled utilities
K400
IDraftin
30.00
Qualitycontrol
4900
Finglect Moragement
8.010
Sub lural Manhwrrs/ Fee
0.00
0.00
0.00
0.00
30.00 14.00
72.40 0.00
Review AtDOT E!DmlnM roadway plans
IReview New Subdivision Plans for Subdivision Currently
Under Construction East of Proposal Alignment
4,00
6.00
Coordinate with Developer's Engineer on Potential
Conflicts
8.00
Copdu<t bell evaluation
6.00
600
Identify affected utilities
4.00
16.00
I'repareprellminar water main relocation design
3.00
12.00
16.00
Pre ark tlreliRtlnary [ewer main relocation dmign
1.00
4.00
4.00
DoWtop estimate of poobalk construction costs
i,00
X1.00
Develop estimate of qualifying/nonqualifying utilities for
reimbursement from ArDOT
Prepare preliminary water main plan sheets
4.00
12.00
32,00
Prepare preliminary sewer main plan sheets
2.00
4.00
8.00
Project Management
2.00
8-00
Sub total lvlanhours/Fee
Final Desien
6.00
54.00
66,00
40.00
0.00 0.00
0.00 0-00
Adjust horizontal alignment
2.00
10.00
12.00
16..00
Prowe Vertical alignment
4.00
16.00
20.00
48.00
Prep are sewer ma In relmda. OnnLprolle sheets
2.00
4.00
8,00
MOO
Coordinate with Developer's Engineer on Potential
Conflicts
8.00
Preoare construction plan notes
Prepare recommendation for se Vence of construction
4 00
800
Dor nate wi 1n ustt es Sn nsustrla Park for
Shutdowns
--
4 00
IReview final right of way and construction plans from
.AfDOT
'Coordinate easement requirements
(Develop erosion control plans
2.00
4 00
Prepare non standard construction detail�
4.00
8.00
16.00
Prepare non standprd comulnuclion tppe,
4.00
8.00
400
@evelot quantityand bol for rtt
1 2 00
Assemble Project Manual
Owner submittal preparation
ArDOT submittal preparation
Update estimate of qualifying/nonqualifying utilities for
reimbursement from ArDOT
1 00
2 00
Prepare permit a pliation to Corps of Engineers
Prepare estimate of,probable construction cost
Submit to ADH for review/approval
Reply to ADH comments
200
ArDOT coordination
IJtili[ coordination
_ 4.00
lVectintils with Owner
_
Project mono amen[
2.00
12,00
Sub total Minh ours/Fee
SWPPP SeflAcat
10,00
73.00
70..00
100.00
0.00 ,10:00
OW 6.00
Complete SWPPP
1900
4 -OD
4 -OD
Prepare NOI 1
11
Sub total Manhours/Fee
Riddle Ph
0.00
1.00
4.00
4.00
0.00 0.00
0.00 0.00
Respond to Questions duri2i bidding_
6.00
Prepare/Issue Addenda
2.00
4.00
Pre-bid meetin
Bid Openln
Bid T.T.lation and recommendation
Sub total Manhours / Fee 0.04 8.00 4.1ta 0.00 0.00 0.00 0.00 0.00
Page 1 of 1
Highway 16 Utility Relocations
V- , -
Original Contract
Proposed Amendment
t �
1
n
{r
L!7
r
CL
C
o ,
CCs
V- , -
Original Contract
Proposed Amendment