Ordinance: 5998
File Number: 2017-0510
STARR DRIVE WATER COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH ROBERT MARTIN, ANDREW WILLIAMS, AND
NICK BANKS FOR THE INSTALLATION OF WATER MAIN ALONG A 1,520 FOOT PORTION OF
NORTH STARR DRIVE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED $23,950.00, AND TO APPROVE A PROJECT CONTINGENCY IN
THE AMOUNT OF $4,790.00
WHEREAS, Robert Martin, Andrew Williams, and Nick Banks will be developing property located on
North Starr Drive and have requested that the City share in the cost of constructing an 8 -inch water
main along a portion of North Starr Drive, a distance of approximately 1,520 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the development
to connect, will allow for a future secondary water loop to help prevent the possibility of residents losing
water service in the event of a water leak in the area, and provide for ample future capacity which will
facilitate future development; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size that is larger than required to serve subdivisions when such excess size is
specified and required by the water and wastewater director for the general benefit of the water
system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1 Printed on 1014117
Ordinance: 5998
it r' 1
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement
with Robert Martin, Andrew Williams, and Nick Banks for the installation of an 8 -inch water main along a
1,520 foot portion of North Starr Drive with the estimated amount to be paid by the City of
Fayetteville not to exceed $23,950.00, and further approves a project contingency in the amount of$4,790.00.
PASSED and APPROVED on 10/3/2017
Attest:
- La�� S .'�.�
Sondra E. Smith, City Clerk Treasurer
=3: F4YETTEVILLE;
✓ A .�
ff�� 11,1111110.1%
0
Page 2 Printed on 1014117
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2017-0510
Agenda Date: 10/3/2017 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: C. 2
STARR DRIVE WATER COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH ROBERT MARTIN, ANDREW WILLIAMS, AND
NICK BANKS FOR THE INSTALLATION OF WATER MAIN ALONG A 1,520 FOOT PORTION
OF NORTH STARR DRIVE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED $23,950.00, AND TO APPROVE A PROJECT CONTINGENCY
IN THE AMOUNT OF $4,790.00
WHEREAS, Robert Martin, Andrew Williams, and Nick Banks will be developing property located on North
Starr Drive and have requested that the City share in the cost of constructing an 8 -inch water main along a
portion of North Starr Drive, a distance of approximately 1,520 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the development to
connect, will allow for a future secondary water loop to help prevent the possibility of residents losing water
service in the event of a water leak in the area, and provide for ample future capacity which will facilitate future
development; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and
required by the water and wastewater director for the general benefit of the water system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Robert Martin, Andrew
Williams, and Nick Banks for the installation of an 8 -inch water main along a 1,520 foot portion of North Starr
Drive with the estimated amount to be paid by the City of Fayetteville not to exceed $23,950.00, and further
approves a project contingency in the amount of $4,790.00.
City of Fayetteville, Arkansas Page 1 Printed on 1014/2017
City of Fayetteville Staff Review Form
2017-0510
Legistar File ID
10/3/2017
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 9/13/2017
Utilities Director/
Utilities Department
Submitted By Submitted Date Division / Department
Action Recommendation:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE
AGREEMENT WITH ROBERT MARTIN, ANDREW WILLIAMS AND NICK BANKS FOR INSTALLATION OF A WATER
MAIN ALONG A PORTION OF NORTH STARR DRIVE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED $23,950.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF
$4,790.00 FOR TOTAL OF $28,740.00.
Original Contract Number: Approval Date:
Comments:
Budget Impact:
5400.720.5600-5808.00
Water/Sewer
Account Number
Fund
04039.1
Water/Sewer Impact Fee Cost Sharing Project
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$
1,230,231.00
Funds Obligated
$
233,484.29
Current Balance
$
996,746.71
Does item have a cost? Yes
Item Cost
$
28,740.00
Budget Adjustment Attached? No
Budget Adjustment
$
-
Remaining Budget
$
968,006.71_
V20140710
Previous Ordinance or Resolution #
Original Contract Number: Approval Date:
Comments:
CITY OF
_ FAYETTEVILLE
s j ARKANSAS
MEETING OF OCTOBER 3, 2017
TO: Mayor and City Council
THRU: Mayor Lioneld Jordan
Don Marr, Chief of Staff
Water and Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: September 13, 2017
CITY COUNCIL MEMO
SUBJECT: Cost Share Agreement with Robert Martin, Andrew Williams and Nick
Banks for a Water Line Upgrade on N. Starr Drive.
RECOMMENDATION:
Staff recommends approval of a cost -share agreement between the City of Fayetteville and
Robert Martin, Andrew Williams and Nick Banks., to share the costs of upgrading a waterline on
N. Drive. The estimated total cost of the project is $66,925.00. The City's portion of the cost
share in the amount of $28,740.00, which includes a 20% contingency of $4,790.00.
BACKGROUND:
Robert Martin, Andrew Williams and Nick Banks have requested that the City share in the cost
of upgrading the installation of waterline from 4 -inch to 8 -inch along a portion of N. Starr Drive,
a distance of approximately 1,520 feet, so that Robert Martin, Andrew Williams and Nick Banks
may develop their property -located at on N. Starr Drive.
DISCUSSION:
Upgrading this waterline to an 8 -inch will allow development of this property and will also
provide for a future secondary loop to help prevent the possibility of residents losing water
service in the event of a water leak in the area.
BUDGET/STAFF IMPACT:
Funds for the City portion of work are available in the Water Impact Fee Cost Sharing Project.
Attachments:
Cost -Share Agreement
Map of Area
Bids
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR.
COST SHARE OF WATER MAIN UPGRADE COSTS
This Agreement, made and entered into on this 3rd day of October, 2017, by and between
the City of Fayetteville, Arkansas ("City") and Robert Martin, Andrew Williams and Nick Banks
witnesseth:
WHEREAS, Robert Martin, Andrew Williams and Nick Banks (through Blew &
Associates, P.A.) received approval by the City's Engineering Department on August 25'x, 2017,
for a waterline project on Starr Drive; and
WHEREAS, increasing the size of this approximately 1,520 -foot segment from a 4 -inch
main to an 8 -inch main will allow the development to connect and also allow for a future
secondary water loop to help prevent the possibility of residents losing water service in the event
of a water leak in the area; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size that is larger than required to serve subdivisions when
such excess size is specified and required by the water and wastewater director for the general
benefit of the water system."
NOW, THEREFORE, the City of Fayetteville, Arkansas and Robert Martin, Andrew
Williams and Nick Banks agree as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Robert Martin, Andrew Williams and Nick Banks for the excess
cost to upgrade approximately 1,520 linear feet of 4 -inch water main in the
area identified in Exhibit "A" to 8 -inch main up to a maximum -not -to -exceed
amount of $20,475.00 as was estimated by the builder's representative and
shown on Exhibit "B", attached. Additionally, the City agrees to pay 50% of
the engineering cost of the project, which is $3,475.00. The total cost share is
$23,950.00 along with any project contingency that may be approved by the
Fayetteville City Council.
B. Payments due to Robert Martin, Andrew Williams and Nick Banks shall be
remitted within sixty (60) days after receipt of valid invoices.
2. Robert Martin, Andrew Williams and Nick Banks agree to.-
A.
o:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department,
per their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
C. Pay for the water main installation (with reimbursement by the City of
Fayetteville as set forth in this Agreement).
3. It is further understood that the contract for construction of the water main upgrade is
between Robert Martin, Andrew Williams and Nick Banks and their Contractor and
that the City has no contractual obligation with either the Contractor or the Engineer.
The City's only obligation shall be to participate in this agreement with a not -to -
exceed reimbursable amount of $23,950.00 for the water main upgrade, along with
any project contingency that may be approved by the Fayetteville City Council.
IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
-0
ROBERT A.RTIN
By:
`ANDREW WILLIAMS
By: f -'
NI ' NICS
WITNESS:
By: _5E _ R r7 -4C& P NOTAA I ig-W q<;
CITY OF FAYETTEVILLE,
ARKANSAS
By:
LIONELD JORDAN, Mayor
ATTEST:
M
SONDRA SMITH, City Clerk -Treasurer
State: Arkansas
County:
On this _ � `� day of ,. f _ before me the
undersigned, a Notary Public in and for said State, personally appeared
(known to me) to be the persons whose names are subscribed
to the foregoing instrument and acknowledged that they executed the same.
Witness my hand and official seal.
OFFICIAL SEAL
BRANDON HUMPHRIES
NOTARY PUBLIC. ARKANSAS
WASHINGTON COUNTY
COMMISSION N'12365994
COMMISSION EXP. 0511512018
(Reserved for official seal)
�Ai /
Signature
T
Name (typed or printed)
My commission expires:
State: Arkansas
County:
On this } day of _bN
i1 before me the
undersigned, a Notary Public in and for said State,
personally appeared
(known to me) to be the persons whose names are
subscribed
to the foregoing instrument and acknowledged that they
executed the same.
K- '� � � Witness my hand and official seal.
Signature
Name (typed or printed)
My commission expires: ` t
(Reserved for official seal)
BRANDY S. BILDERBACK
MY COMMISSION # 12402653
•
EXPIRES: September 23, 2024
Washington County
(Reserved for official seal)
Proposal
September 4, 2017
K2 Contracting LLC
P. O. Box 189
Tontitown AR 72770
479-957-2523
k2confr-clin a 1 @ a -r l cm
Submitted to:
Robert Martin
600 Overcrest
Fayetteville AR 72704
479-442-9470
We propose to complete the 8" water line extension on star road in Fayetteville Arkansas with the
following quantities and conditions:
We will provide labor and material to complete approximately 1507' of 8" water main and one blow off
assembly
Cleanup will be limited to backfill of the ditches (hand raking seed and straw not included)
Not responsible for Fayetteville tree ordnance (replacing removed trees) if trees have to be removed
No dirt will be removed from site
If rock is encountered (anything that a 40,000 Ib class excavator will not easily dig) it will be removed at
owners expense.
No impact fees, hook on fees, tap fees, or any such related fees will be paid by us
Invoices will be paid in full within 10 days.
Work as described above will be completed for the sum of fifty-nine thousand nine hundred seventy five
dollars $59,975.00
Robert Martin
Date
Ryan Krug Date
Proposal
September 4, 2017
K2 Contracting LLC
P. O. Box 189
Tontitown AR 72770
479-957-2523
k2C_onV&cting1 &aol.com
Submitted to:
Robert Martin
600 Overcrest
Fayetteville AR 72704
479-442-9470
We propose to complete the 3" water line extension on star road in Fayetteville Arkansas with the
following quantities and conditions:
We will provide labor and material to complete approximately 1507' of 3" water main and one blow off
assembly.
Cleanup will be limited to backfill of the ditches (hand raking seed and straw not included)
Not responsible for city of Fayetteville tree ordnance (replacing removed trees) if trees have to be
removed
If rock is encountered (anything that a 40,000 Ib class excavator will not easily dig) it will be removed at
owners expense.
No dirt will be removed from site
No impact fees, hook on fees, tap fees, or any such related fees will be paid by us
Invoices will be paid in full within 10 days.
Work as described above will be completed for the sum of thirty-nine thousand five hundred dollars
$39,500.00
Robert Martin Date
Ryan Krug Date
MH BACKHOE SERVICE INC
Eagle Crest Circle
Springdale, AR 72762
Phone (479) 225-3184
ACL#0321310316
a:dVi
Attn: Robert Martin
RE: Starr Dr water main extension
Fayetteville, AR
Dear Robert,
I am pleased to offer my written quotation for the amount of SIXTY THOUSAND THREE HUNDRED
MINTY SEVEN DOLLARS ($60,397.00) to install a new water main at the above-mentioned project. My
quotation is based upon the civil drawings at standard bury depth.
Included in this quotation are the following
Providing and installing approximately 1,520' of 8" PVC Class 200 water main.
Provide and install a blow off assembly.
Provide and install 3 8" gate valves.
Provide P&P and maintenance bond.
Alternate -to install 4" PVC Class 200 water main in the amount of THIRTY-NINE THOUSAND ONE
HUNDRED FIFTY-SIX DOLLAS ($39,156.00).
This quote is valid for 45 days.
Please note the following exclusions: meters, meter vaults, backflows, surveyingerosion control,
landscaping, density testing, Rock excavation that cannot be removed In a timely mannerby a rubber
tired backhoe.
Mr. Martin, thank you for the opportunity to provide you with my quotation should you have any
questions or concerns please do not hesitate to contact me.
L10119 I i =--
Janeen Martin
Job Location: Starr Dr. Fayetteville, AR
Joh _De _Watgr Line ExLention
Install 8 inch water line and entire scope of project
NOTE Rock clause $350.00 per cubic yard
Bid Total: 1 $60,000-00
Install 4 inch water line and entire scope of project
NOTE: Rock clause $350.00 per cubic yard
Bid Total: $48,000.00 1
Contractor License # 0268880317
Frank Roughton
5315 Hayden Rd.
Pea Ridge, AR 72751
(479) 640-7527
-BLEW & ASSOCIATE'S, rA
CIVIL ENGINEERS 84 LAND SURVEYORS
September 6, 2017
ATTN: Tim Nyander
SUBJECT: Starr Dr. Waterline Extension for Mr. Robert Martin
Mr. Nyander,
The following are the engineering costs associated with the waterline extension on Starr Drive.
Qescdption of Services COST
Engi2eering Design________--- $3,700
Survey Staking (ESTIMATED) $1,250
On -Site Inspection (ESTIMA TED),-- $2,000
TOTAL: $6,950
Sincerely,
Jorge Qe;Ouesne, P. E.
6evj & Associates, P. A.
1 0 8 C, IR 0 S S V 1` I Z A V t': N 1! 1{ I, 0 NX? F 3, 1, A -R K -'' N S A S - 7 2 7 4
1) 11 ( - ) N 11, : 4% it I d 3 4 5 0 1'° A 4 7 9. 5 8 2 1 H 8 3
NORTHWEST ARKANSAS
Democrat IF tll�azefte
AFFIDAVIT OF PUBLICATION
I Karen Caler, do solemnly swear that I am the Legal Clerk of the
Northwest Arkansas Democrat -Gazette, printed and published in
Washington County and Benton County, Arkansas, and of bona fide
circulation, that from my own personal knowledge and reference
to the files of said publication, the advertisement of:
CITY OF FAYETTEVILLE
Ord. No. 5998
Was inserted in the Regular Edition on:
October 12, 2017
Publication Charges: $ 144.30
Karen aler
Subscribed and sworn to before me
This 1-1 day of CC5�- , 2017.
(?6tK
Notary Public I
My Commission Expires:
Ci CATHY WILES
Arkansas - Benton County
�.i Notary Public - Comm# 12397118'
My Commission Expires Feb 20, 2024
**NOTE**
Please do not pay from Affidavit.
Invoice will be sent.
OCT 20 2017
CITY OF FAYETTEVILLE
CITY CLERK'S OFFICE
Ordinance: 5998
File Number: 2017-0510
STARR DRIVE WATER COST SHARE:
AN ORDINANCE TO WAIVE THE
REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND
APPROVE A COST SHARE
AGREEMENT WITH ROBERT MARTIN,
ANDREW WILLIAMS, AND NICK
BANKS FOR THE INSTALLATION OF
WATER MAIN ALONG A 1,520 FOOT
PORTION OF NORTH STARR DRIVE,
WITH THE ESTIMATED AMOUNT TO
BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED
$23,950.00, AND TO APPROVE A
PROJECT CONTINGENCY IN THE
AMOUNT OF $4,790.00
WHEREAS, Robert Martin, Andrew
Williams, and Nick Banks will be
developing property located on North Starr
Drive and have requested that the City share',
in the cost of constructing an 8 -inch water
main along a portion of North Starr Drive, a
distance of approximately 1,520 feet; and
WHEREAS, the City of Fayetteville would
benefit from the cost share as it will allow
the development to connect, will allow for a
future secondary water loop to help prevent
the possibility of residents losing water
service in the event of a water leak in the
area, and provide for ample future capacity
which will facilitate future development;
and
WHEREAS, § 51.112 of the Fayetteville
City Code provides that "the City shall pay
the excess material cost of facilities of a
size that is larger than required to serve
subdivisions when such excess size is
specified and required by the water and
wastewater director for the general benefit
of the water system"; and
WHEREAS, waiving formal competitive
bidding will save time and cost by utilizing
the developers contractor who will be on-
site installing the line for the developer's
project.
NOW, THEREFORE, BE IT ORDAINED
BY THE CITY COUNCIL OF THE CITY
OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City
of Fayetteville, Arkansas hereby determines
an exceptional situation exists in which
competitive bidding is deemed not feasible
or practical and therefore waives the
requirements of formal competitive bidding
and approves a cost share agreement with
Robert Martin, Andrew Williams, and Nick
Banks for the installation of an 8 -inch water
main along a 1,520 foot portion of North
Starr Drive with the estimated amount to be
paid by the City of Fayetteville not to
exceed $23,950.00, and further approves a
project contingency in the amount
of$4,790.00.
PASSED and APPROVED on 10/3/2017
Lioneld Jordan, Mayor
Attest:
Sondra E. Smith, City Clerk Treasurer
74303330 Oct. 12, 2017
Starr Drive Cost Share Agreement
City of Fayetteville Staff Review Form
2018-0001
Legistar File ID
• N/A
City Council Meeting Date-Agenda Item Only
N/A for Non-Agenda Item •
Tim Nyander 12/28/2017 Utilities Director/
Utilities Department
Submitted By Submitted Date Division/Department
Action Recommendation:
Staff recommends the approval of the use of contingency funds in the amount of $4,790.00 for a cost share
agreement with Robert Martin,Andrew Williams and Nick Banks for a waterline upgrade on Starr Drive.
Budget Impact:
5400.720.5600-5808.00 Water/Sewer
Account Number • Fund
04039.1 Water/Sewer Impact Fee Cost Sharing Project
Project Number Project Title
Budgeted Item? Yes Current Budget $ 1,230,231.00
Funds Obligated $ 276,440.84
Current Balance $ 953,790.16
Does item have a cost? Yes Item Cost $ 4,790.00
Budget Adjustment Attached? No Budget Adjustment $ -
Remaining Budget $ 949,000.16
V20140710
Previous Ordinance or Resolution# Ord. 5998
Original Contract Number: Approval Date:
Comments:
•
CITY OF
FAYETTEVILLE STAFF MEMO
ARKANSAS
•
TO: Mayor Lioneld Jordan
THRU: Don Marr, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: , December 28, 2017
SUBJECT: Approval of the Use of Contingency Funds for a Cost Share on Starr Drive
RECOMMENDATION:
Staff recommends the approval of the use of contingency funds in the amount of$4,790.00 for a
cost share agreement with Robert Martin, Andrew Williams and Nick Banks for a waterline
upgrade on Starr Drive.
BACKGROUND:
Robert Martin, Andrew Williams and Nick Banks requested that the City share in the cost of
upgrading the installation of waterline from 4-inch to 8-inch along a portion of N. Starr Drive, a
distance of approximately 1,520 feet, so that Robert Martin, Andrew Williams and Nick Banks
may develop their property located on N. Starr Drive. Ordinance 5998, which was passed on
October 3, 2017, approved the cost share agreement with Robert Martin, Andrew Williams and
Nick Banks for the waterline upgrade on Starr Drive.
DISCUSSION:
During construction of the waterline, the contractor encountered large amounts of rock.
Removal of this rock added unexpected costs to the construction project. The entire
contingency is needed in the amount of $4,790.00 to cover the unexpected costs. The total
payment including the contingency will be $28,740.00.
BUDGET/STAFF IMPACT:
Funds are available in the Water/Sewer Impact Fee Cost Sharing project.
Attachments:
Invoice from Robert Martin
Ordinance 5998
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Robert E. Martin - ENL INVOICE
600 Overcrest
Fayetteville,AR 72703 INVOICE#100
DATE: 12/27/17
TO: SHIP TO:
Tim Nyander
City of Fayetteville
113 W. Mountain St.
Fayetteville,AR 72701
SALESPERSON P.O. NUMBER REQUISITIONER SHIPPED VIA ' F.O.B. POINT TERMS
Due on
receipt
QUANTITY DESCRIPTION UNIT PRICE TOTAL
1 Starr Drive Waterline Cost Share 28,740.00 , 28,740.00
I ,
SUBTOTAL 28,740.00
SALES TAX -
SHIPPING& HANDLING -
.
TOTAL DUE 28,740.00
THANK YOU FOR YOUR BUSINESSI
R'xta'ai�^
113 West Mountain Street
Fayetteville,AR 72701
(479)575-8323 .
Ordinance: 5998
File Number: 2017-0510
STARR DRIVE WATER COST SHARE:
•AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH ROBERT MARTIN, ANDREW WILLIAMS, AND
NICK BANKS FOR THE INSTALLATION OF WATER MAIN ALONG A 1,520 FOOT PORTION OF
NORTH STARR DRIVE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED $23,950.00, AND TO APPROVE A PROJECT CONTINGENCY IN
THE AMOUNT OF $4,790.00
WHEREAS, Robert Martin, Andrew Williams, and Nick Banks will be developing property located on
North Starr Drive and have requested that the City share in the cost of constructing an 8-inch water
main along a portion of North Starr Drive, a distance of approximately 1,520 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the development
to connect, will allow for a future secondary water loop to help prevent the possibility of residents losing
water service in the event of a water leak in the area, and provide for ample future capacity which will
facilitate future development;and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size that is larger than required to serve subdivisions when such excess size is
specified and required by the water and wastewater director for the general benefit of the water
system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1 Printed on 10/4/17
•
I
Ordinance: 5998
file Number' 2017-0510
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement
with Robert Martin, Andrew Williams, and Nick Banks for the installation of an 8-inch water main along a
1,520 foot portion of North Starr Drive with the estimated amount to be paid by the City of
Fayetteville not to exceed $23,950.00,and further approves a project contingency in the amount of$4,790.00.
PASSED and APPROVED on 10/3/2017
Approved: / Attest:
/
ZAL2ell ice �� ,41-42/'
Lion-Id Jordan, yor Sondra E. Smith,City Clerk Treasurer
.�c, . \1 ' Oi •.G��..
-)
h7 . 0. .KA
Page 2 Printed on 10/4/17
,
Y rtert: City of Fayetteville, Arkansas
,,,,,,',.. %
. ��,,_ 113 West Mountain Street
4 *f, Fayetteville,AR 72701
•
r �. (479)575-8323
,�
}`t Text File
R.K`
File Number: 20174510
Agenda Date: 10/3/2017 Version: 1 Status:Passed
In Control:City Council Meeting File Type:Ordinance
.
Agenda Number:C.2
STARR DRIVE WATER COST SHARE:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH ROBERT MARTIN, ANDREW WILLIAMS, AND
NICK BANKS FOR THE INSTALLATION OF WATER MAIN ALONG A 1,520 FOOT PORTION
OF NORTH STARR DRIVE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED $23,950.00, AND TO APPROVE A PROJECT CONTINGENCY •
IN THE AMOUNT OF$4,790.00
•
WHEREAS, Robert Martin, Andrew Williams, and Nick Banks will be developing property located on North
Starr Drive and have requested that the City share in the cost of constructing an 8-inch water main along a
portion of North Starr Drive,a distance of approximately 1,520 feet;and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will allow the development to
connect, will allow for a future secondary water loop to help prevent the possibility of residents losing water
service in the event of a water leak in the area, and provide for ample future capacity which will facilitate future
development;and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and
required by the water and wastewater director for the general benefit of the water system";and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE,ARKANSAS: •
Section I: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Robert Martin, Andrew •
Williams, and Nick Banks for the installation of an 8-inch water main along a 1,520 foot portion of North Starr
Drive with the estimated amount to be paid by the City of Fayetteville not to exceed $23,950.00, and further
approves a project contingency in the amount of$4,790.00.
City of Fayetteville,Arkansas Page 1 Printed on 10/4/2017
City of Fayetteville Staff Review Form
2017-0510
Legistar File ID
10/3/2017
City Council Meeting Date-Agenda Item Only
N/A for Non-Agenda Item
Utilities Director/
Tim Nyander 9/13/2017
Utilities Department
Submitted By Submitted Date Division/Department
Action Recommendation:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE
AGREEMENT WITH ROBERT MARTIN, ANDREW WILLIAMS AND NICK BANKS FOR INSTALLATION OF A WATER
MAIN ALONG A PORTION OF NORTH STARR DRIVE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED $23,950.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF
$4,790.00 FOR TOTAL OF$28,740.00.
Budget Impact:
5400..720.5600-5808.00 Water/Sewer
Account Number ' Fund
04039.1 Water/Sewer Impact Fee Cost Sharing Project
Project Number Project Title
Budgeted Item? Yes Current Budget $ 1,230,231.00
Funds Obligated $ 233,484.29
Current Balance 1 $ 996,746.71
Does item have a cost? Yes Item Cost $ 28,740.00
Budget Adjustment Attached? No Budget Adjustment $ -
Remaining Budget $ 968,006.71 j
V20140710
Previous Ordinance or Resolution#
Original Contract Number: Approval Date:.
Comments:
•
k CITY OF
FAYETTEVILLE CITY COUNCIL MEMO
ARKANSAS
MEETING OF OCTOBER 3, 2017 •
TO: Mayor and City Council
THRU: Mayor Lioneld Jordan
Don Marr, Chief of Staff
Water and Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: September 13, 2017
SUBJECT: Cost Share Agreement with Robert Martin,Andrew Williams and Nick
Banks for a Water Line Upgrade on N. Starr Drive.
RECOMMENDATION:
Staff recommends approval of a cost-share agreement between the City of Fayetteville and
Robert Martin, Andrew Williams and Nick Banks., to share the costs of upgrading a waterline on
N. Drive. The estimated total cost of the project is $66,925.00. The City's portion of the cost
share in the amount of$28,740.00, which includes a 20% contingency of$4,790.00.
BACKGROUND: •
Robert Martin, Andrew Williams and Nick Banks have requested that the City share in the cost
of upgrading the installation of waterline from 4-inch to 8-inch along a portion of N. Starr Drive,
a distance of approximately 1,520 feet, so that Robert Martin, Andrew Williams and Nick Banks
may develop their property located at on N. Starr Drive.
•
DISCUSSION:
Upgrading this waterline to an 8-inch will allow development of this property and will also
provide for a future secondary loop to help prevent the possibility of residents losing water
service in the event of a water leak in the area.
BUDGET/STAFF IMPACT:
Funds for the City portion of work are available in the Water Impact Fee Cost Sharing Project.
Attachments: • •
Cost-Share Agreement
Map of Area
Bids
•
Mailing Address:
113 W.Mountain Street www.fayettevllle-ar.gov
Fayetteville,AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN UPGRADE COSTS
This Agreement,made and entered into on this 3rd day of October,2017,by and between
the City of Fayetteville,Arkansas("City")and Robert Martin,Andrew Williams and Nick Banks
witnesseth:
WHEREAS, Robert Martin, Andrew Williams and Nick Banks (through Blew &
Associates,P.A.)received approval by the City's Engineering Department on August 25i6, 2017,
for a waterline project on Starr Drive;and
WHEREAS, increasing the size of this approximately 1,520-foot segment from a 4-inch
main to an 8-inch main will allow the development to connect and also .allow for a future
secondary water loop to help prevent the possibility of residents losing water service in the event
of a water leak in the area;and
WHEREAS, § 51.112 of the Fayetteville City Code provides that"the City shall pay the
excess material post of facilities of a size that is larger than required to serve subdivisions when
such excess size is specified and required by the water and wastewater director for the general
benefit of the water system."
NOW, THEREFORE, the City of Fayetteville, Arkansas and Robert Martin, Andrew
Williams and Nick Banks agree as follows:
•
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Robert Martin, Andrew Williams and Nick Banks for the excess
cost to upgrade approximately 1,520 linear feet of 4-inch water main in the
area identified in Exhibit"A" to 8-inch main up to a maximum-not-to-exceed
amount of$20,475.00 as was estimated by the builder's representative and
shown on Exhibit "B", attached. Additionally, the City agrees to pay 50% of
the engineering cost of the project, which is$3,475.00. The total cost share is
$23,950.00 along with any project contingency that may be approved by the
Fayetteville City Council.
B. Payments,due to Robert Martin, Andrew Williams and Nick Banks shall be
remitted within sixty(60)days after receipt of valid invoices.
2. Robert Martin,Andrew Williams and Nick Banks agree to:
A. Provide the necessary and normal project management,inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department,
per their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
C. Pay for the water main installation (with reimbursement by the City of
Fayetteville as set forth in this Agreement).
3. It is further understood that the contract for construction of the water main upgrade is
between Robert Martin, Andrew Williams and Nick Banks and their Contractor and
that the City has no contractual obligation with either the Contractor or the Engineer.
The City's only obligation shall be to participate in this agreement with a not-to-
exceed reimbursable amount of$23,950.00 for the water main upgrade, along with
any project contingency that may be approved by the Fayetteville City Council.
IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
CITY OF FAYETTEVILLE,
ARKANSAS •
B : otitrut gym
ROBERT 'IA.RTIN 10 ' LD JO' ;•'',Mayor
BY:
ANDREW WILLIAMS
• r' ATTEST:
NW! lI .N KS BY: fOilditeC & c�
SONDRA SMITH,City Clerk-Treasurer
olito unit
WITNESS: ��GERK/ TNi���
ems.
By:_SEE ATTAcNEANOW(Zf-riQN+5 ^�QFAYE7?EVl<<E;';°—
W:1;:1 •
,,;G`�N"p``•
•
State:Arkansas County: i ij<r 1,
On this (Y S day of 5'(//if,-40,. , 2.01? before me the
undersigned,a Notary Public in and for said State,personalty appeared
Aotird
A 6,16-
(known to me)to be the persons whose names are subscribed
to the foregoing instrument and acknowledged that they executed the same.
Witness my hand and official seal.
Signature
OFFICIAL SEAL
BRANDON HUMPHRIES.
NOTARY PUBLIC.ARKANSAS f}
WASHINGTON COUNTY /)
�' COMMISSION#'12365994
coMMIsSIONEXP 05l15!2oIO Name(typed or printed)
My commission expires:. S I i 5 I/
(Reserved for official seal)
State:Arkansas
County:
l On this 4+h day of^ ) , bk.ao I f). ItkIAl,1a�f on before me the
undersigned,a Notary Public in and for said State,
personally appeared
• &oki 1i i o &s
(known to me)to be the persons whose names are
subscribed
to the foregoing instrument and acknowledged that they
executed the same.
Witness my hand and official seal.
Signature
1l'lVl ,'.,: ;^: BRANDY S.BILDERBACK
• • MY COMMISSION k 12402653
Name(typed ''f"`' '_
or printed)) : -.tw<• : EXPIRES:September 23,2024
"'jge,t!' Washington County
My commission expires: \
(Reserved for official seal)
3 ,� d Q *:1:i'
€? " ,`•. d"- �}K 'u ''',„,1 ,:=
' "mss 'Y(..774' :''S6>� v lJ t C},#:AO''..
lir d.a+ d v. �i r",id{7G.r ,� & + - j � '
_ n"d .,,w1,„..: ^rJ,w r x aI
L'il:t' gg�,,,�"y: ”WL'''.,,ittrGS ','s °��* 'x.i'�
n �.�,, ice .
44
2 i .. S iD A E t ,r ,� 115 :,r!-,,,,i-/4
e 435 I tom. +41, •„,,,i•,•••-•:,,,
'n ,,i,':, •'•• >4k a °°' t 571G2
I:78 r r. .r 'r:t ....�. i c`$ � t., t -4,4,11°,k,•4_4: -Po-it'''',
k xo- a,' < ,�, , :r g t' a °
) r� ; �8C -. n .�5 1a va + 'A"v.t6. ,� .1 `t`3;, ;1 '��" :w'tWO�€A. ,.
�'+,- ;,,,34,..,-,i,,,,
�'T�a"'r y:�n,�"�,-3" �P r .� +tea'" ib� � ,y �' �`k f`" v +44.:4'. � :t ;
a '"ff- ,d. ,'10°i 13R s x t" iti t,,,.!....,.- „,„-
'�� ,K;�` r R ¢ f - ;
130G i' , - ,:;w a ' a „ ,.r.,„ S r..„ a 16; r '$ g !.,',;',.: ,..,,,,*,:,,i1_1--.-: .A
s`s 7. r.,,€ rx� , •�" dQ3A�3 • r,#' ° •ir�„$�z S, � E # + #
} ��^a�ai,�kS , C- �;w1EA027 >:. A i ,/,,„,,,-,,,,,,444ke r •r A :.:4':,..81„,,I•
e +-,. a ,:t`4,-;;,,
'r'# �.tO.t;VV .. � -,;41117 ,; Al '11°,2-',,-,--
ti 'to, .'r 1,-f:'1,:,4,..4,„,#:;,,'-,,,W"r ,,.- a
� 1z a -4` - y. -�. w=4G3G ' 4 4G2 - r # •a yr c'1 ",t e `::
:�. 7� � f 2,t i �r° r- a 4+a �� t('s} �, t r+ "�_� r°�: x
r +r ?a'�i. ` tU. t &q: ` ; ys,p''q..a�g, +'iii , igA'E ti4-4,;.'....'
L
", ,<" «>' at^ ` SQ4d s` `F r h"'. t ++RRa 'k
y ''',--‘.'.0.4''
;�'f .��^:: r { $ �:� 4 1 •x.. - E " �`,:;�` rt gs .o� ? • fi __.
7 '� ¢I`'"` < a $ •re 40nal4 ^":i7 +m� • iw (s` > $,- ,� .i .t• ,.
f •.- m� " TE° fes " .yy.Ey "iK a f•vS Ts`"
•
ot.
�" ._...›.•'' _ ,Y•, Y�, a 1-551 ` , •L► '- !.:,,°'...,;4:t...-.„,1,,,..,,�, � rs�"y4 M.y
it
' '}, {�i „9t ,,.� • -a y r M ?i775QiZt.,4, . v...
.n 3/C t(i�J7A _ aL1i - »s '4,0 ,v 4 t €A,x '10'
- $
' ['C1FT.al .t �Y. A633 ; :e + * K 2r 'Z'.le t c t> x
a �3T71.6 9ii t,s •wZv1* ',n.4. _"��s�Y n. "0 ' '
d`... x+ 11�r V.. • iia x' 7 I. 't �•)'s' tr.,, s`
31
es
iti
r 83 iii S, *4'4&'
z t* � a s g .
1 i} ;v ,t • ,tom i . A ✓ ( .:t 1P i' � g"fr ''' ;
fit
:414—
,-
V.,1:11's >l*" ,a1,-4",
x37 F Z-:, y�, *i. * '• 4
ie,,,,,,,,,„, � x r�S ';v car w1��kl • °.���� � ,��� r.��'1'�get°^ #,: •� �,�hr�� <
§ `k� 1" 535 � $'- '- ,`" y n a w v a a Y
,,,,,'.1.41,,., 3 FF j 11,, !,r ,y t ,i. e,,, ,4•.,:-
+jf,tni°, , L:.k ,:',14.'+�•: .,Z.
,:.
a w ,- / O R w 9 a 7,V "" . 4,-,•„:,,,•,.: `:i'may x F.s. $
4 t A do , 0 ; a t ry x t 3 .P;g '� .- ice' ,, f - d
'ar >s r, ��. 7� � �� „;,,,,q....,-,.,5,20 � �'-�s*��s r 1 r,�7��y����M,��t'�' x� ��',0-tt''r: f'+ �e r - ; izi- { ',`...4:4k ••44 - i q s f . `x dt r„v€'.^ ,, �, > x . 1 .r }
e , :ter, s*4 of' c •`> 'i .�_ r./F.z 4, 'B .-ar• 3 ,r+,@�'Mr,r,„„,9,-,_,,,,
,�..
-Nk
4,5 i , •--,:-..p,:',-.-V4,,,. ! l,w rx. `x'4}t41%.„.v.
3'a` a y"t#f"
+i'l 380 b � $ �E6 Z#a {'t ' €• -' . 8,a i•,+, ,.-R .s i•�n.+.t °x '*y,�r",,,w °t w
4.i3 .• ,.^ 4,; y.47v, 74'.4"-:.t'--,; t „ 5>r}+''. d��i` °'' �, `',:.r v D"7 ,AaeA w
Y"a``� � 3r4� 3$� r �3 48Q :, ;r . ..i'4',
�i 3„ 1 i -.•,..„4-',:-e---•1•- #.�Y'�; es�.�. '� 1.�r `�'°�+.�ca�4va��w
S :ilttk � .� �• ,. �, to ,y Legend
:L ' _ F # Proposed 8 inch Water Main
F, iii:;.67,.#,-T477,,,2,.490
Existingic
Pressurized Water Main
J 125 250 son 750 1'000di 41
a ,��, 'nano d,777 4o r Existing Pressurized Water
Main
a
rrrr 250 rrnr.�P��, i"�C, ... ',1/ -„..,„1,,,„,,,T.,,,,,:4.cx , i,'�'M r. •x �• g v >
1,' ..r. .a-.--,—ar.>•;�a. :--rs&° ,..; LI ..;, d�< " . ., 391.;°.�%a ` s x: `' ,.� .
•
Proposal
September 4,2017
K2 Contracting LLC
P.0.Box 189
Tontitown AR 72770 •
479-957-2523
k2contracting1@aol.com
Submitted to:
Robert Martin
600 Overcrest
Fayetteville AR 72704 •
479-442-9470
We propose to complete the 8"water line extension on star road in Fayetteville Arkansas with the
following quantities and conditions:
We will provide labor and material to complete approximately 1507'of 8"water main and one blow off
assembly
Cleanup will be limited to backfill of the ditches(hand raking seed and straw not included)
Not responsible for Fayetteville tree ordnance(replacing removed trees)if trees have to be removed
No dirt will be removed from site
If rock is encountered(anything that a 40,000 lb class excavator will not easily dig)it will be removed at
owners expense.
No impact fees,hook on fees,tap fees,or any such related fees will be paid by us
Invoices will be paid in full within 10 days.
Work as described above will be completed for the sum of fifty-nine thousand nine hundred seventy five •
dollars$59,975.00
Robert Martin Date •
Ryan Krug Date
•
Proposal
September 4,2017•
K2 Contracting LLC ••
P.O.Box 189
Tontitown AR 72770
479-957-2523
k2contractingl @aol.com
Submitted to:
Robert Martin
600 Overcrest
Fayetteville AR 72704
479-442-9470
We propose to complete the 3"water line extension on star road in Fayetteville Arkansas with the
following quantities and conditions:
We will provide labor and material to complete approximately 1507'of 3"water main and one blow off •
assembly.
Cleanup will be limited to backfill of the ditches (hand raking seed and straw not included) •
Not responsible for city of Fayetteville tree ordnance(replacing removed trees)if trees have to be
removed
If rock is encountered(anything that a 40,000 lb class excavator will not easily dig)it will be removed at
owners expense.
No dirt will be removed from site
No impact fees,hook on fees,tap fees,or any such related fees will be paid by us
Invoices will be paid in full within 10 days. .
Work as described above will be completed for the sum of thirty-nine thousand five hundred dollars
$39,500.00
•
Robert Martin Date
Ryan Krug Date
MH BACKHOE SERVICE INC
Eagle Crest Circle
Springdale, AR 72762
Phone (479) 225-3184
ACL#0321310316
9-6-17
Attn:Robert Martin
RE:Starr Dr water main extension
Fayetteville,AR
Dear Robert,
I am pleased to offer my written quotation for the amount of SIXTY THOUSAND THREE HUNDRED
NINTY SEVEN DOLLARS($60,397.00)to Install a new water main at the above-mentioned project. My
quotation is based upon the civil drawings at standard bury depth.
Included in this quotation are the following
Providing and installing approximately 1,520'of 8"PVC Class 200 water main.
Provide and install a blow off assembly.
Provide and install 3 8"gate valves.
•
Provide P&P and maintenance bond.
Alternate-to install 4"PVC Class 200 water main in the amount of THIRTY-NINE THOUSAND ONE
HUNDRED FIFTY-SIX DOLLAS($39,156.(0).
This quote is valid for 45 days.
Please note the following exclusions:meters,meter vaults,backflows,surveying,erosion control,
landscaping,density testing,Rock excavation that cannot be removed in a timelymanner by a rubber
tired backhoe.
Mr.Martin,thank you for the opportunity to provide you with my quotation should you have any
questions or concerns please do not hesitate to contact me.
Bid Sheet
Janeen Martin
Job Location:Starr Dr. Fayetteville,AR
Job'Description:_Water Line Extention
Install 8 inch water line and entire scope of project
NOTE: Rock clause $350.00 per cubic yard
Bid Total, j $60,000.00 •
Install 4 inch water line and entire scope of project
NOTE: Rock clause $350.00 per cubic yard
•
Bid Total: $48,000.00
ti 1
Contractor License # 0268880317
Frank Roughton
5315 Hayden Rd.
Pea Ridge, AR 72751
(479)640-7527
pt
, .
BLEW &,ASSOCIA'I'ES, P. A.
CIVIL ENGINEERS& LAND SURVEYORS
•
September 6,2017
ATTN:Tim Nyander
SUBJECT:Starr Dr.Waterline Extension for Mr.Robert Martin
•
Mr.Nyander,
The following are the engineering costs associated with the waterline extension on Starr Drive.
, .
. .
Description of Services COST
[
EngineeringDesign
Survey Staking (ESTIMATED) . $1250
On-Site Inspection
ectiun (ESTIMATED) . . $3,700
,
$2,000
_....
„...___ TOTAL: $6,950
--... .
. •
Sincerely, •
.
)/ / :, ' ." •
7 r. /,/:j
i,ii f.' ':r
Jo;ge D9-Quesnei••E.
0!ew !Associates,P.A. •
• it i
, .
.........._
U8 cRossov [.: _R AvkNI, I'. • I. C) w P. Li. i 3 B. K 3 N 9. A S • 7 2 7 4 5
P 11 0 N i . : 4 7 9 . 4 4 3 4 s 1) 6 • I, A >: : 4 7 9 . 5 8 2 . I U 8 3
•