Ordinance: 5995
File Number: 2017-0461
GARDEN DISTRICT TOWNHOMES, LLC:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH GARDEN DISTRICT TOWNHOMES, LLC FOR THE
INSTALLATION OF WATER MAIN ALONG A PORTION OF 9TH STREET BETWEEN SOUTH
COLLEGE AVENUE AND SOUTH WASHINGTON AVENUE, WITH THE ESTIMATED AMOUNT
TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $16,327.50, AND TO APPROVE
A PROJECT CONTINGENCY IN THE AMOUNT OF $1,632.75
WHEREAS, Garden District Townhomes, LLC will be developing property located at the corner of 9th
Street and South Washington Avenue and has requested that the City share in the cost of constructing a
6 -inch sewer main along a portion of 9th Street between South College Avenue and South Washington
Avenue, a distance of approximately 340 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will upgrade infrastructure
in the core of the City, improve service and fire protection for residents and business in the area, allow
for a secondary water loop to help prevent the possibility of residents losing water service in the event
of a water leak in the area, and provide for ample future capacity which will facilitate future
development; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size larger than required to service subdivisions when such excess size is specified
and required by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
Page 1 Printed on 916117
Ordinance: 5995
File Number 2017-0461
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement
with Garden District Townhomes, LLC for the installation of a 6 -inch water main along a portion of 9th
Street between South College Avenue and South Washington Street with the estimated amount to be paid by
the City of Fayetteville not to exceed $16,327.50, and further approves a project contingency in the
amount of $1,632.75.
PASSED and APPROVED on 9/5/2017
Attest:
Sondra E. 'Smith, City Clerk Treasurer sti1t�rrr►
FREr�s�i
OA -
ice, • ��
=U= y=p,YE�VILL
,,111111111110
Page 2 Printed on 916117
City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2017-0461
Agenda Date: 9/5/2017 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: C. 4
GARDEN DISTRICT TOWNHOMES, LLC:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH GARDEN DISTRICT TOWNHOMES, LLC FOR
THE INSTALLATION OF WATER MAIN ALONG A PORTION OF 9TH STREET BETWEEN
SOUTH COLLEGE AVENUE AND SOUTH WASHINGTON AVENUE, WITH THE ESTIMATED
AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE INOT TO EXCEED $16,327.50, AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,632.75
WHEREAS, Garden District Townhomes, LLC will be developing property located at the corner of 9th Street
and South Washington Avenue and has requested that the City share in the cost of constructing a 6 -inch sewer
main along a portion of 9th Street between South College Avenue and South Washington Avenue, a distance of
approximately 340 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will upgrade infrastructure in the
core of the City, improve service and fire protection for residents and business in the area, allow for a
secondary water loop to help prevent the possibility of residents losing water service in the event of a water
leak in the area, and provide for ample future capacity which will facilitate future development; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size larger than required to service subdivisions when such excess size is specified and required
by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on-site installing the line for the developer's projeFt.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Garden District
Townhomes, LLC for the installation of a 6 -inch water main along a portion of 9th Street between South
College Avenue and South Washington Street with the estimated amount to be paid by the City of Fayetteville
City of Fayetteville, Arkansas Page 1 Printed on 91612017
File Number: 2017-0461
not to exceed $16,327.50, and further approves a project contingency in the amount of $1,632.75.
City of Fayetteville, Arkansas Paye 2 Printed on 9/612017
4
City of Fayetteville Staff Review Form
2017-0461
Legistar File ID
9/5/2017
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 8/18/2017
Utilities Director /
Utilities Department
Submitted By Submitted Date Division / Department
Action Recommendation:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST
SHARE AGREEMENT WITH GARDEN DISTRICT TOWNHOMES, LLC FOR CONSTRUCTION OF A WATERLINE ON 9TH
STREET BETWEEN SOUTH COLLEGE AVENUE AND SOUTH WASHINGTON AVENUE, IN THE NOT -TO -EXCEED
AMOUNT OF $16,327.50, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,632.75 FOR A
TOTAL COST OF $17,960.25.
Budget Impact:
5400.720.5600-5808.00 Water/Sewer
Account Number Fund
04039.1 Water/Sewer Impact Fee Cost Sharing Project
Project Number Project Title
Budgeted Item? Yes Current Budget $ 1,230,231.00
Funds Obligated $ 189,228.15
Current Balance x<z i;CxS
Does item have a cost? Yes Item Cost $ 17,960.25
Budget Adjustment Attached? No Budget Adjustment $ -
Remaining Budget
Previous Ordinance or Resolution #
Original Contract Number:
Comments:
Approval Date:
CITY OF
FAYETTEVILLE
ARKANSAS
MEETING OF SEPTEMBER 5, 2017
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: August 18,-2017
CITY COUNCIL MEMO
SUBJECT: Cost Share Agreement with Garden District Townhomes, LLC for
Construction of a Waterline on 9th Street -
RECOMMENDATION:
Staff recommends approval of a cost share agreement between the City of Fayetteville and
Garden District Townhomes, LLC to share the costs of constructing a waterline on 9'h Street,
between South College Avenue and South Washington Avenue in the not -to -exceed amount of
$16,327.50, and approval of a project contingency in the amount of $1,632.75 for a total cost of
$17,960,25.
BACKGROUND:
Garden District Townhomes, LLC has requested that the City share in the cost of designing and
constructing a 6 -inch waterline along a portion of 9►h Street between South College Avenue and
South Washington, a distance of approximately 340 feet, to facilitate the lot splits in the area
and increase population density.
DISCUSSION:
Installing this approximately 340 -foot segment of 6 -inch main will alleviate the current water
volume deficiency, allow the development to connect and also allow for a secondary water loop
to help prevent the possibility of residents losing water service in the event of a water leak in the
area.
BUDGET/STAFF IMPACT:
Funds for the City's portion are available in the Water Impact Fee Cost Sharing Project,
Attachments:
Cost Share Agreement
Exhibit A — Map of Area
Exhibit B — Cost Detail
Exhibit C — Engineering Costs
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF WATER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this 5-kt day of September 2017, by and
betwecn the City of Fayetteville, Arkansas ("City") and Garden District Townhomes, LLC.,
witnesseth:
WHEREAS, Garden District Townhomes, LLC received approval by the City's Planning
Department on April 11, 2016, for lot splits at the corner of 9th Street and South Washington
Avenue; and
WHEREAS, Garden District Townhomes, LLC has requested that the City share in the
cost of constructing a 6 -inch water main along 91h Street between South College Avenue and South
Washington Avenue, a distance of approximately 340 feet, to facilitate the lot splits and increase
population density.
WHEREAS, installing this approximately 340 -foot segment of 6 -inch main will alleviate
the current water volume deficiency, allow the development to connect and also allow for a
secondary water loop to help prevent the possibility of residents losing water service in the event
of a water leak in the area; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will upgrade
the infrastructure in the core of the city, providing improved service and fire protection for
residents and business in the area, and will facilitate future development; and
WHEREAS, the Fayetteville City Plan 2030, adopted in 2011 as the City's comprehensive
land use plan, lists infill development as one of its top two goals.; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size that is larger than required to serve subdivisions when
such excess size is specified and required by the water and wastewater director for the general
benefit of the water system."
NOW, THEREFORE, the . City of Fayetteville, Arkansas and Garden District
Townhomes, LLC agree as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Garden District Townhomes, LLC for 50% of the cost to design and
install approximately 3401inear feet of 6 -inch water main in the area identified
in Exhibit "A" up to a maximum -not -to -exceed amount of $16,327.50 as was
estimated by the builder's representative and shown on Exhibit "B", attached.
B. Payments due to Garden District Townhomes, LLC. shall be remitted within
sixty (60) days after receipt of valid invoices.
2. Garden District Townhomes, LLC. agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department,
per their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
C. Pay for the water main installation (with reimbursement of 5001c of the cost by
the City of Fayetteville in a not -to -exceed amount of $16,327.50 with a
contingency fund not -to -exceed $1,632.75).
3. It -is further understood that the contract for construction of the water main upgrade is
between Garden District Townhomes, LLC and its Contractor and that the City has no
contractual obligation with either the Contractor or the Engineer. The City's only
obligation shall be to participate in this agreement with a not -to -exceed reimbursable
amount of $16,327.50 for the water main upgrade, with a contingency fund not -to -
exceed $1,632.75.
IN AGREEMENT WITH ALL THE TERMS -AND CONDITIONS ABOVE, WE
SIGN BELOW:
GARDEN DISTRICT CITY OF AYETTEVILLE,
TOWNHOMES, LLC AS
By: By
I A ft. NIEDERMAN, Li NE RDAN, Mayor
M! ging Member
ATTEST: ATTEST:
By:
1
dol
DRM 0'EW C CAMPBELL
Notary Public - Arkansas
Washington County
Commission # 12698556
My Commission Lxpues lul 1 2026
By: Zne4,1_ � G
SONDRA SNQTH, City Clerk
4
Exhibit - A
p
I
�
i
t
• i
F
q
I
I
f0
'
IN
I
'L, rh
x
i
QIL
W,
LF)
I
al
C7
u
W; _
E gTH 51
_
_Proposod6"_PVC 340:��._
H10914
_
"A.
LIC
BLUE
•z
_
i
I Z
•
V T
C'7
�
Q
<9
iv
I
N �
r.
a
i3
-8' PVC 214
�
LJ
m +
a
�t
1? 5?5 Y,1 75 1p0 '
FC9!
City of Fayetteville, AR
Exhibit - A
WESWETSER CONSTRUCTION. I C
cl Vl It �1 crlvi 1a,�rarnts . Lu:f.n�r u • rr`st al.0
..-,I hl 1\ E � I i\>i'! 114 • I \1 1 1 11 1 11 1 I - 114 '!7115
11 1 rl'Nl1\1 IJ 7111 4ai-A-12 , • 1 A\ 1-4.91.1 P`411 Ill
9th Street Water Line
for Z. Niederman
8/4/2017
Item aM
Descrlptlon
Ouantkv
Unit
Unit Prke
Amount
1
MTappiniz Sleeve & Valve
2
EA
S4.000.00
S
S 000.00
2
ivdrant Assembly
2
EA
Sk400.00
S
8.800.00
3
:itfinp
1
tS
S4,450.00
S
4AS0.00
4
Oeter As mblies
3
EA
SI350.00
S
4.050.00
5
: CL350 CL DI Pioe
310
1 LF
S 48.00
S
14.11M.00
6
nd & Mobilization
ILS
S1,275.00
S
1,275.00
_
7
aking
1
LS
800.00
S
800.00
8
emove Hydrant Assemblies
2
EA
S 800.00
S
1600.00
Old To
S 43 S.00
NOTE: iha prion does not kKkide an1NfK 4r topwii, seed, &straw. -ad- cl O&ok
w pwmft that may be regimsd.
Items Removed:
2. Hydrant Assemblies $8,800.00
3. Meter Assemblies $4,050.00
Remove 2 Hydrant
Assemblies
$1,AUU.00
$14,450.00
New Balance $29,405.00
Exhibit B
Exhibit C
Bates and Associates
■
10 7230 S. Pleasant Ridge Drive
Fayetteville, AR 72704
Bill to:
Zara Niederman
P.O. Box 472
Fayetteville, AR 72702
Invoice
Date
Invoice #
5/23/2016
15-21303
Invoices are due upon receipt! A late fee will be applied for payments over 15 days Thank
you for your prompt attention
Phone # Fax #
479-442-9350 479-521-9350
e -ZN Sates and Associates
Al■
■ 7230 S. Pleasant Ridge Drive
'"l„ -2 Fayetteville, AR 72704
Bill to
Zara Niederman
P O Box 472
Fayetteville, AR 72702
Invoice
Date
Invoice #
8/17/2016
15-21304
Invoices are due upon receipt! A late fee will be applied for payments over 15 days. Thank
you for your prompt attention
Phone # Fax #
479-442-9350 479-521-9350
Bates and Associates
■
■ 7230 S. Pleasant Ridge Drive
Fayetteville, AR 72704
Bill to:
Zara Niederman
P O Box 472
Fayetteville, AR 72702
Invoice
Date
Invoice #
9/2/2016
15-21305
Invoices are due upon receipt! A late fee will be applied for payments over 15 days. Thank
you for your prompt attention
Phone # Fax #
479-442-9350 479-521-9350
I. .
1 l lilf.,l1 1I( A � 1 ►' ►
m
D. E. f Aq_-T_k.,._P �I�. �!_ v Y ,�.... :1�, .�e ....se, ... .i.,;!
AFFIDAVIT OF PUBLICATION
I Karen Caler, do solemnly swear that I am the Legal Clerk of the
Northwest Arkansas Democrat -Gazette, printed and published in
Washington County and Benton County, Arkansas, and of bona fide
circulation, that from my own personal knowledge and reference
to the files of said publication, the advertisement of -
CITY OF FAYETTEVILLE
ORD. 5995
Was inserted in the Regular Edition on:
September 14, 2017
Publication Charges: $ 157.30
Karen aler
RECEIVED
SEP 2 9
Ordinance: 5995
CITY OF FAYE er. 2017-046I
CITY CLERK'DISTRICT TOWNHOMES,
AN ORDINANCE TO WAIVE THE
REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND
APPROVE A COST SHARE
AGREEMENT WITH GARDEN
DISTRICT TOWNHOMES, LLC FOR
THE INSTALLATION OF WATER MAIN
ALONG A PORTION OF 9TH STREET
BETWEEN SOUTH COLLEGE AVENUE
AND SOUTH WASHINGTON AVENUE,
WITH THE ESTIMATED AMOUNT TO
BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED
$16,327.50, AND TO APPROVE A
PROJECT CONTINGENCY IN THE
AMOUNT OF $1,632.75
WHEREAS, Garden District Townhomes,
LLC will be developing property located at
the comer of 9th Street and South
Washington Avenue and has requested that
the City share in the cost of constructing a
6 -inch sewer main along a portion of 9th
Street between South College Avenue and
South Washington Avenue, a distance of
approximately 340 feet; and
WHEREAS, the City of Fayetteville would
benefit from the cost share as it will
upgrade infrastructure in the core of the
City, improve service and fire protection for
residents and business in the area, allow for
a secondary water loop to help prevent the
possibility of residents losing water service
in the event of a water leak in the area, and
provide for ample future capacity which
will facilitate future development; and
WHEREAS, § 51.112 of the Fayetteville
City Code provides that "the City shall pay
the excess material cost of facilities of a
size larger than required to service
subdivisions when such excess size is
specified and required by the water and
wastewater director for the general benefit
of the sewerage system"; and
WHEREAS, waiving formal competitive
bidding will save time and cost by utilizing
the developer's contractor who will be on-
site installing the line for the developer's
Subscribed and swornto before me
project.
This P'S -day of 2017,
NOW, THEREFORE, BE IT ORDAINED
BY THE CITY COUNCIL OF THE CITY
0
OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City
of Fayetteville, Arkansas hereby determines
an exceptional situation exists in which
competitive bidding is deemed not feasible
or practical and therefore waives the
requirements of formal competitive bidding
and approves a cost share agreement with
Notary PUb11C
Garden District Townhomes, LLC for the
My Commission Expires: 4?--v
installation of a water main along a
/
Street
portion of 9th Street between South College
Avenue and South Washington Street with
the estimated amount to be paid by the City
_
of Fayetteville not to exceed $16,327.50,
CATHY VVld_ES
and further approves a project contingency
(',
r�i �3iiS�a i2 lir �ppOly
in the amount of $1,632.75.
PASSED and APPROVED on 9/5/2017
R0 a r y 101ibiiC Gfimn, f 12397118 �
Approved:
IMy commission imXpim Feb 20, 2024 �?�
Lioneld Jordan, Mayor
**NOTE**
st
Attest:
Sondra E. Smith, City Clerk Treasurer
Please do not pay from Affidavit.
74266666 Sept. 14, 2017
Invoice will be sent.
GARDEN DISTRICT TOWNHOMES, LLC
City of Fayetteville Staff Review Form
2017-0733
Legistar File ID
N/A
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 12/11/2017 Utilities Director /
Utilities Department
Submitted By Submitted Date Division / Department
Action Recommendation:
APPROVAL TO USE CONTINGENCY FUNDS IN THE AMOUNT OF $1,064.59 FOR THE COST SHARE AGREEMENT WITH
GARDEN DISTRICT TOWNHOMES, LLC FOR A WATER AND SEWER COST SHARE ON 9TH STREET.
Budget Impact:
5400.720.5600-5808.00 Water/Sewer
Account Number
Fund
04039.1 Water/Sewer Impact Fee Cost Sharing Project
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$ 1,230,231.00
_
Funds Obligated
$ 275,376.25
Current Balance
$ 954,854.75
Does item have a cost? Yes
Item Cost
$ 1,064.59
Budget Adjustment Attached? No
Budget Adjustment
$ -
Remaining Budget
$ 953,790.16
V20140710
Previous Ordinance or Resolution # Ord. 5995
Original Contract Number: Approval Date: `a_ Iq_ I q
Comments:
CITY OF
i�rk-
FAYETTEVILLE
Ad
ARKANSAS
TO: Mayor Lioneld Jordan
THRU: Don Marr, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: December 11, 2017
STAFF MEMO
SUBJECT: Approval of the use of contingency funds for the Cost Share Agreement
with Garden District Townhomes, LLC
RECOMMENDATION:
Staff recommends approval to use contingency funds in the amount of $1,064.59 for the cost
share agreement with Garden District Townhomes, LLC for a water cost share on 91h Street.
BACKGROUND:
The cost share agreement with Garden District Townhomes, LLC was approved on September
5, 2017 by Ordinance 5995. The cost share project was for the installation of water mains along
a portion of 91h Street between S. College Ave. and S. Washington Ave. The agreement was for
a not -.to -exceed amount of $16,327.50, with a project contingency of $1,632.75.
DISCUSSION:
Due to the increases in project costs, the utilization of a portion of the contingency is needed in
the amount of $1,064.59 to pay Garden District Townhomes, LLC. The total invoiced amount
that is due to Garden District Townhomes, LLC is $17,392.09.
BUDGET/STAFF IMPACT:
Funds are available in the Water & Sewer Impact Fee Cost Sharing Project.
Attachments:
Invoice from Garden District Townhomes, LLC
Ordinance 5995
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
Garden District Townhomes
849 S Washington Ave
AR 72701
Bill To
City of Fayetteville Cost Share - 9th Street
Invoice
Date Invoice #
12/5/2017 1
P.O. No.
Terms
Project
Waterline
Quantity
Description
Rate
Amount
330
1
Waterline Construction 50%
Engineering 50%
47.021 15
1,875.11
15,516.98
1,875.11
Total $17,392.09
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Ordinance: 5995
File Number: 2017-0461
GARDEN DISTRICT TOWNHOMES, LLC:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH GARDEN DISTRICT TOWNHOMES, LLC FOR THE
INSTALLATION OF WATER MAIN ALONG A PORTION OF 9TH STREET BETWEEN SOUTH
COLLEGE AVENUE AND SOUTH WASHINGTON AVENUE, WITH THE ESTIMATED AMOUNT
TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $16,327.50, AND TO APPROVE
A PROJECT CONTINGENCY IN THE AMOUNT OF $1,632.75
WHEREAS, Garden District Townhomes, LLC will be developing property located at the corner of 9th
Street and South Washington Avenue and has requested that the City share in the cost of constructing a
6 -inch sewer main along a portion of 9th Street between South College Avenue and South Washington
Avenue, a distance of approximately 340 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will upgrade infrastructure
in the core of the City, improve service and fire protection for residents and business in the area, allow
for a secondary water loop to help prevent the possibility of residents losing water service in the event
of a water leak in the area, and provide for ample future capacity which will facilitate future
development; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size larger than required to service subdivisions when such excess size is specified
and required by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
Page 1 Printed on 916117
Ordinance: 5995
File Number: 2017-0461
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement
with Garden District Townhomes, LLC for the installation of a 6 -inch water main along a portion of 9th
Street between South College Avenue and South Washington Street with the estimated amount to be paid by
the City of Fayetteville not to exceed $16,327.50, and further approves a project contingency in the
amount of $1,632.75.
PASSED and APPROVED on 9/5/2017
Attest:
4"W"'C' U3, Z'a
Sondra. Smith, City Clerk Treastirer `JA,ii�11/11111
op
Page 2 Printed on 916117
;yam City of Fayetteville, Arkansas 113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2017-0461
Agenda Date: 9/5/2017 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: C. 4
GARDEN DISTRICT TOWNHOMES, LLC:
f
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH GARDEN DISTRICT TOWNHOMES, LLC FOR
THE INSTALLATION OF WATER MAIN ALONG A PORTION OF 9TH STREET BETWEEN
SOUTH COLLEGE AVENUE AND SOUTH WASHINGTON AVENUE, WITH THE ESTIMATED
AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE tNOT TO EXCEED $16,327.50, AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,632.75
WHEREAS, Garden District Townhomes, LLC will be developing property located at the corner of 9th Street
and South Washington Avenue and has requested that the City share in the cost of constructing a 6 -inch sewer
main along a portion of 9th Street between South College Avenue and South Washington Avenue, a distance of
approximately 340 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will upgrade infrastructure in the
core of the City, improve service and fire protection for residents and business in the area, allow for a
secondary water loop to help prevent the possibility of residents losing water service in the event of a water
leak in the area, and provide for ample future capacity which will facilitate future development; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost
of facilities of a size larger than required to service subdivisions when such excess size is specified and required
by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor
who will be on-site installing the line for the developer's projeFt.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the
requirements of formal competitive bidding and approves a cost share agreement with Garden District
Townhomes, LLC for the installation of a 6 -inch water main along a portion of 9th Street between South
College Avenue and South Washington Street with the estimated amount to be paid by the City of Fayetteville
City of Fayetteville, Arkansas Page 1 Printed on 91612017
File Number: 2017-0461
not to exceed $16,327.50, and further approves a project contingency in the amount of $1,632.75.
City of Fayetteville, Arkansas Page 2 Printed on 9/8/2017
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
2017-0461
Legistar File ID
9/5/2017
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
8/18/2017 Utilities Director /
Utilities Department
Submitted Date Division /Department
Action Recommendation:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST
SHARE AGREEMENT WITH GARDEN DISTRICT TOWNHOMES, LLC FOR CONSTRUCTION OF A WATERLINE ON 9TH
STREET BETWEEN SOUTH COLLEGE AVENUE AND SOUTH WASHINGTON AVENUE, IN THE NOT -TO -EXCEED
AMOUNT OF $16,327.50, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $1,632.75 FOR A
TOTAL COST OF $17,960.25.
Original Contract Number:
Comments:
Approval Date:
Budget Impact:
5400.720.5600-5808.00
Water/Sewer
Account. Number
Fund
04039.1
Water/Sewer Impact Fee Cost Sharing
Project
Project Number
Project Title
Budgeted Item? Yes
Current Budget
$
1,230,231.00
Funds Obligated
$
189,228.15
Current Balance
Does -item have a cost? Yes
,
Item Cost
$.
17,960.25
Budget Adjustment Attached? No
Budget Adjustment
$
1
Remaining Budget
V20140710'
Previous Ordinance or Resolution #
Original Contract Number:
Comments:
Approval Date:
4
.f��, CITY OF
2X711 FAYETTEVILLE
ARKANSAS
MEETING OF SEPTEMBER 5, 2017
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
CITY COUNCIL MEMO
DATE: August 18,2017
SUBJECT: Cost Share Agreement with Garden District Townhomes, LLC for
Construction of a Waterline on 9th Street
RECOMMENDATION:
Staff recommends approval of a cost share agreement between the City of Fayetteville and
Garden District Townhomes, LLC to share the costs of constructing a waterline on 91h Street,
between South College Avenue and South Washington Avenue in the not -to -exceed amount of
$16,327.50, and approval of a project contingency in the amount of $1,63.2.75 for a total cost of
$17,960.25.
BACKGROUND:
Garden District Townhomes, LLC has requested that the City share in the cost of designing and
constructing a 6 -inch waterline along a portion of 91h Street between South College Avenue and
South Washington, a distance of approximately 340 feet, to facilitate the lot splits in the area
and increase population density.
DISCUSSION:
Installing this approximately 340 -foot segment. of 6 -inch main will alleviate the current water
volume deficiency, allow the development to connect and also allow for a secondary water loop
to help prevent the possibility of residents losing water service in the event of a water leak in the
area.
BUDGET/STAFF IMPACT:
Funds for the City's portion are available in the Water Impact Fee Cost Sharing Project.
Attachments:
Cost Share Agreement
Exhibit A — Map of Area
Exhibit B — Cost Detail
Exhibit C — Engineering Costs
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
r
CONTRACTUAL AGREEMENT FOR
,COST SHARE OF WATER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this V�4� day of September 2017, by and
between the City of Fayetteville, Arkansas ("City") and Garden District Townhomes, LLC.,
witnesseth:
WHEREAS, Garden District Townhomes, LLC received approval by the City's Planning
Department on April 11, 2016, for lot splits at the corner of 9` Street and South Washington
Avenue; and
WHEREAS, Garden District Townhomes, LLC has requested that the City share in the
cost of constructing a 6 -inch water main along 9'h Street between South College Avenue and South
Washington Avenue, a distance of approximately 340 feet, to facilitate the lot splits and increase
population density.
WHEREAS, installing this approximately 340 -foot segment of 6 -inch main will alleviate
the current water volume deficiency, allow the development to connect and also allow for a
secondary water loop to help prevent the possibility of residents losing water service in the event
of a water leak in the area; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will upgrade
the infrastructure in the core of the city, providing improved service and fire protection for
residents and business in the area, and will facilitate future development; and
WHEREAS, the Fayetteville City Plan 2030, adopted in 2011 as the City's comprehensive
land use plan, lists infill development as one of its top two goals.; and
WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size that is larger than required to serve subdivisions when
such excess size is specified and required by the water and wastewater director for the general
benefit of the water system."
NOW, THEREFORE, the . City of Fayetteville, Arkansas and Garden District
Townhomes, LLC agree as follows:
1. The City of Fayetteville, Arkansas agrees to:
A. Reimburse Garden District Townhomes, LLC for 50% of the cost to design and
install approximately 340 linear feet of 6 -inch water main in the area identified
in Exhibit "A" up to a maximum -not -to -exceed amount of $16,327.50 as was
estimated by the builder's representative and shown on Exhibit "B", attached.
B. Payments due to Garden District Townhomes, LLC. shall be remitted within
sixty (60) days after receipt of valid invoices.
2. Garden District Townhomes, LLC. agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable water main installation, including
submittal of plans and specifications to the City's Engineering Department,
per their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
C. Pay for the water main installation (with reimbursement of 5001c of the cost by
the City of Fayetteville in a not -to -exceed amount of $16,327.50 with a
contingency fund not -to -exceed $1,632.75).
3. It -is further understood that the contract for construction of the water main upgrade is
between Garden District Townhomes, LLC and its Contractor and that the City has no
contractual obligation with either the Contractor or the Engineer. The City's only
obligation shall be to participate in this agreement with a not -to -exceed reimbursable
amount of $16,327.50 for the water main upgrade, with a contingency fund not -to -
exceed $1,632.75.
IN AGREEMENT WITH ALL THE TERMS .AND CONDITIONS .ABOVE, WE
SIGN BELOW:
GARDEN DISTRICT CIAYETTEVILLE,
TOWNHOMES, LLC AS
By-
ZAR . NIEDERMAN, LI NE RDAN, Mayor
MV/ging Member
ATTEST:
By::�`7�`k
iL
DREW C CAMPBELL
Notary Public - Arkansas
Washington County
Commission M 1269655B
My Commission txpues (id r 2026
ATTEST:
By:
SONDRA SNUTH, City Clerk
�tiitttttirr;�
���: F'I�YEI"fEVfLlt ;
��. C,
4
i
t
'i
i
i
l
Y
i
1
IpD�
y N
0.
V U 1
i
1
1 1
1
.7A I t I
W
W�
U
M: ..
.. _ E aThr ST, Proposed 6: P.VC 340'
i
H10914
} BLUE 1 Ur'
f l
1 '
Vd-B" PVC 214 W g
t ir;
I
of +"
.1
M 'S
I
� a
U.
H `
0 12 525 50 75 ,QD,
GCllF
i
City
of Fayelleville, AR
Exhibit -A
4
5�k SWEETS6R CONSTRUCTION. INC
f•I NI INSL M -.I)
\Il•1\1111111111-111:'!7'15
t I 1 11.1111\I 1J i'il Jas -.Y 17.f,.1 -\\'a:41 •11_••111 l'1
9th Street Water Line
for Z. Niederman
8/4/2017
item a
DescripUal
Unit
Unk Prkn
Amount
1
Valve
X6 Tapping Sleeve & Valv
EAEA
$4,000.00
00
S 8 0.00
2
rant AssemblyEA
rz
54,400,00
S 8,800.00
3
S4450,00
S 4ASU.00
4
eter As mblies
EA
$1,350.00
S 4950.00
5
WSW CL DI Fioe
310
LF
S 49.00
$14.990.00
6
nd & Mobilization
1
LS
S 1,275.00.
$ 1,275.00
7
aking
1
LS
S 800.�43
8
emove Hydrant Assemblies
2
EA
S 800.
Bid Total
MUTE: TAa prim does not kldude snMbfR for tops*K seed, A straw, ermdw omb L
or perp t tint mrry be rngti0d. '
Items Removed:
2. Hydrant Assemblies $8,800.00
3. Meter Assemblies $4,050.00
Remove 2 Hydrant
Assemblies
$1,600.00
$14,450.00
New Balance $29,405.00
Exhibit B
Exhibit C
�o
Bates and Associates
. P 1 7230 S. Pleasant Ridge Drive
Fayetteville, AR 72704
Bill to:
Zara Niederman
P:O. Box 472
Fayetteville, AR 72702
Invoice
Date
Invoice #
5/23/2016
15-21303
you for your prompt attention,
Phone # Fax #
479-442-9350 479-521-9350
4-Z :Bates and Associates
—D 7230 S. Pleasant Ridge Drive
Fayetteville, AR 72704
Bill to:
Zara Niederman
P,O, Box 472
Fayetteville, AR 72702
Invoice
Date
Invoice #
8/17/2016
15-21304
.Bates Project# Terms
15-213 Due on receipt
Description i Amount
Plan Revisions to 6" Main- 9th Street & Washington Ave, Fayetteville, AR 500.00
Reimbursable Expense for Arkansas Department of 1-lealth Water Extension Plan 80.00
Reimbursable Expense for UPS Overnight- Arkansas Department of Health 16,12
Total
Invoices are due upon receipt! A late fee will be applied for payments over 15 days. Thank
you for your prompt attention,
Phone # Fax #
479-442-9350 479-521-9350
$596.12
Bates and Associates
7230 S. Pleasant Ridge Drive
Fayetteville, AR 72704
Bill to:
"Lara Niederman
P,0_ Box 472
Fayetteville, AR 72702
Invoice
Date
Invoice #
9/2/2016
15-21305
Invoices are due upon receipt! A late ree will be applied for payments over 15 days. Thank
you for your prompt attention.
Phone # Fax #
479-442-9350 479-521-9350