Loading...
HomeMy WebLinkAboutORDINANCE 5975113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5975 File Number: 2017-0229 MILLSAP DRAINAGE COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH SOUTHERN STAR ENTERPRISES, LLC FOR THE INSTALLATION OF DRAINAGE IMPROVEMENTS ALONG A PORTION OF EAST MILLSAP ROAD WITH THE CITY OF FAYETTEVILLE'S SHARE OF THE COSTS NOT TO EXCEED $49,070.40, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,000.00 WHEREAS, Southern Star Enterprises, LLC receives offsite storm water runoff from adjacent developments that appears to be damaging its parking area located at 509 N. Millsap Road and desires to install an underground drainage collection system to connect the new improvements to the City's downstream collection system; and WHEREAS, Southern Star Enterprises, LLC has requested that the City share in the cost of constructing drainage improvements along East Millsap Road as part of Southern Star's commitment to improve its parking area; and WHEREAS, § 170.05 of the Fayetteville Unified Development Code allows for cost sharing and states "If it is determined that offsite drainage improvements are required, and that such specific off-site drainage improvements are consistent with the city's current and established priorities, then cost sharing will be in accordance with "Required Off-site Improvements;" and WHEREAS, City engineers explored various options to alleviate the drainage problems in this area and have determined that the proposed offsite drainage improvements in the City's right of way are required and, further, that these improvements are consistent with the City's priorities; and WHEREAS, the City's Transportation Division is unable to work this project into its 2017 program year and waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the privately -owned drainage improvements. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Page 1 Printed on 5/17/17 Ordinance: 5975 File Number: 2017-0229 Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Southern Star Enterprises, LLC for the installation of drainage improvements along a portion of East Millsap Road, with the City of Fayetteville providing the 30 -inch corrugated plastic pipe necessary for the project at a cost of $7,200.00 and paying the portion of the construction costs for the improvements within the City's right of way in an amount not to exceed $41,870.40, and further approves a project contingency in the amount of $5,000.00. PASSED and APPROVED on 5/16/2017 Attest: d Z.,& - Sondra E. Smith, City Clerk Treasurer ez KMA 44 TOtA " Page 2 Printed on 5/17/17 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2017-0229 Agenda Date: 5/16/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: D. 2 MILLSAP DRAINAGE COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH SOUTHERN STAR ENTERPRISES, LLC FOR THE INSTALLATION OF DRAINAGE IMPROVEMENTS ALONG A PORTION OF EAST MILLSAP ROAD WITH THE CITY OF FAYETTEVILLE'S SHARE OF THE COSTS NOT TO EXCEED $49,070.40, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,000.00 WHEREAS, Southern Star Enterprises, LLC receives offsite storm water runoff from adjacent developments that appears to be damaging its parking area located at 509 N. Millsap Road and desires to install an underground drainage collection system to connect the new improvements to the City's downstream collection system; and WHEREAS, Southern Star Enterprises, LLC has requested that the City share in the cost of constructing drainage improvements along East Millsap Road as part of Southern Star's commitment to improve its parking area; and WHEREAS, § 170.05 of the Fayetteville Unified Development Code allows for cost sharing and states "If it is determined that offsite drainage improvements are required, and that such specific off-site drainage improvements are consistent with the city's current and established priorities, then cost sharing will be in accordance with "Required Off-site Improvements;" and WHEREAS, City engineers explored various options to alleviate the drainage problems in this area and have determined that the proposed offsite drainage improvements in the City's right of way are required and, further, that these improvements are consistent with the City's priorities; and WHEREAS, the City's Transportation Division is unable to work this project into its 2017 program year and waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the privately -owned drainage improvements. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: $ction 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives City of Fayetteville, Arkansas Page 1 Printed on 511712017 File Number: 2017-0229 the requirements of formal competitive bidding and approves a cost share agreement with Southern Star Enterprises, LLC for the installation of drainage improvements along a portion of East Millsap Road, with the City of Fayetteville providing the 30 -inch corrugated plastic pipe necessary for the project at a cost of $7,200.00 and paying the portion of the construction costs for the improvements within the City's right of way in an amount not to exceed $41,870.40, and further approves a project contingency in the amount of $5,000.00. City of Fayetteville, Arkansas Page 2 Printed on 511712017 City of Fayetteville Staff Review Form 2017-0229 egistar File 1D 5/x.6/2017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Chris Brown 3/17/2017 Engineering / Development Services Department Submitted By Submitted Date Division / Department Action Recommendation: Approval of cost share for drainage improvements along E Millsap Rd in the amount of $41,870.40 (City's share) as well as an additional $7,200 to purchase pipe material to help alleviate drainage issues along the street and at 509 E Millsap Rd and approve a $5,000 contingency. 4470.621.8810.5817.00 Budget Impact: 4470 -Sales Tax Capital Improvements Account Number Fund 02108.1 Bridge and Drainage Improvements Project Number Project Title Budgeted Item? Yes Current Budget $ 271,431.00 Funds Obligated $ - Current Balance Does item have a cost? Yes Item Cost $ 49,070.40 Budget Adjustment Attached? No Budget Adjustment # Remaining Budget v�aaaoraa Previous Ordinance or Resolution # Original Contract Number: Approval Date: Comments: CITY OF Tay` V., —Vlie ARKANSAS MEETING OF MAY 16, 2017 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Chris Brown, City Engineer FROM: Alan Pugh, Staff Engineer DATE: April 24, 2017 STAFF MEMO SUBJECT: Approval of cost share for drainage improvements along E Millsap Rd in the amount of $41,870.40 (City's share) as well as an additional $7,200 to purchase pipe material to help alleviate drainage issues along the street and at 509 E Millsap Rd and approve a $5,000 contingency. RECOMMENDATION: Approval of cost share for drainage improvements along E Millsap Rd in the amount of $41,870.40 (City's share) as well as an additional $6,500 to purchase pipe material to help alleviate drainage issues along the street and at 509 E Millsap Rd and approve a $5,000 contingency. BACKGROUND: In 2015 the City of Fayetteville was approached by the property owner of 509 E Millsap to -discuss drainage issues across their parking area. The drainage from the development and surrounding areas is routed through an asphalt swale in the parking area. This swale has experienced water damage and been repaired several times of the last few years. There are also concerns with the patrons- of the building having to walk through the swale that is damaged and full of water during rain events. This runoff also currently drains into Millsap from the driveway into the property. This drainage then runs down Millsap and to an inlet downstream. During heavy rain events, this can create a large spread of water into Millsap. After discussion with the property owner, staff performed a drainage analysis for the area. The drainage area, although not extremely large, does include portions of the surrounding developed area. Given the current situation, several options were explored. While the owner desired an underground system, staff also investigated the option of a drainage swale such that the drainage would continue to be overland flow. However, this did not address the property owners concern that the patrons would continue to walk through several inches of water to access the building. This option would also do nothing to address the water running into Millsap from the parking area. An option to try and pipe the water from the parking area and drain it into the flume on the NW portion of the property was also explored. However, there was not enough elevation difference in order to daylight a piping system into the flume and again this did not address the water flowing into Millsap. It would only divert that water slightly closer to the existing inlet system. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Lastly, a piping system was developed along Millsap that would pick up the drainage improvements in the parking area and divert this runoff downstream. This would help to address the runoff draining into Millsap as well as provide an opportunity for the owner to tie into this system with a private drainage system within their parking area. This system is represented on the attached exhibit. DISCUSSION: Due to current workload, it does not appear the transportation division could work this into the 2017 program year. Therefore, the property owner has requested that the City participate in the cost of the improvements within the City right-of-way. The attached agreement represents the scenario in which the City would reimburse the owner for expenses incurred to install the system within City right-of-way. As a part of the agreement, the City would also purchase the pipe materials to be used within the right-of-way utilizing our annual bid prices and suppliers as well as replace the sidewalk at a later date with our own_ forces. Although the City did request additional quotes from contractors, all declined due to the size of the project and their current workload. Therefore, the cost share appears to be the most efficient way to complete this project in a timely fashion. BUDGET/STAFF/IMPACT: As stated the total cost of the City's portion of the project would be $49,070.40 with the property owner's portion within their parking area exceeding that figure. This would be proposed to be funded from the Engineering Divisions sales tax capital improvement budget for drainage improvements. Attachments: Proposed Agreement with Owner Drainage Improvement Exhibit City/Owner Cost Breakdown CONTRACTUAL AGREEMENT FOR COST SHARE OF DRAINAGE IMPROVEMENT COSTS This Agreement, made and entered into on this 10�day of AV4, 2017, by and between the City of Fayetteville, Arkansas ("City") and Southern Star Enterprises, LLC ("Southern Star"), witnesseth: WHEREAS, Southern Star receives offsite storm water runoff from adjacent developments that appears to be damaging their parking area located at 509 N Millsap Road; and WHEREAS, if Southern Star desires to install an underground drainage collection system said storm drain is necessary in order to connect the new improvements to the downstream collection system; and WHEREAS, Southern Star has committed to improving their parking area located at 509 N Millsap Road and requested that the City share in the cost of constructing drainage improvements adjacent to N Millsap Road, west of Plainview Avenue, a distance of approximately 190 feet, so that Southern Star may can complete those improvements; and WHEREAS, § 170.05 of the Fayetteville Unified Development Code allows for cost sharing and states "If it is determined that offsite drainage improvements are required, and .that such specific -off-site drainage improvements are consistent with the city's current and established priorities, then cost sharing will be in accordance with "Required Off-site Improvements.'' NOW, THEREFORE, the City of Fayetteville, Arkansas and Southern Star Enterprises, LLC agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Southern Star Enterprises, LLC for $41,870.40 which represents the cost to install approximately 328 linear feet of 30 -inch storm drain along with the installation of four inlet boxes in the area identified in Exhibit "A", attached. B. Payments due to Southern Star Enterprises, LLC, shall be remitted within sixty (60) days after receipt of valid invoices. C. Expose the, utilities at strategic locations chosen by a contractor engaged by Southern Star and the City. Ilowever, after the exposure of the utilities by the City, Southern Star and/or the contractor engaged by Southern Star would be responsible for any damage to existing lines. D. Provide 30 -inch corrugated plastic pipe to be installed by Southern Star or the contractor engaged by Southern Star. Pagel of 2 2. Southern Star Enterprises, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable storm drain installation per the City of Fayetteville :Standard Specifications for Street and Drainage Construction. B. Provide a copy of the invoices from the Contractor upon City approval of the storm drainage installation. C. Pay for the storm drainage installation (with reimbursement of $41,870.40 of the cost by the City of Fayetteville). 3. It is further understood that the contract for construction is between Southern Star and his Contractor and that the City has no contractual obligation with either the Contractor or any agent for Southern Star. The City's only obligation shall be to participate in a contractual agreement with a not -to -exceed amount of $41,870.40 for the drainage improvements. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: SOUTHERN STAR ENTERPRISES, LLC B -N-- Lloyd Trichell, Reg. Agent CITY OF FAYETTEVILLE, ATTEST: ATTEST: By/ + � _ B : Y .�~ I CA.,vv�.,•Ca,+` Gt: r1 � SONDRA SMITH, City Clerk ,� '��11ttT 8��Y1111111t. .%%%% ,,,�i ,%(y��I• i s ��J ♦ttix, • • • r .ernf� p wl 11481111001 Page 2 of 2 TOMLINSON ASPHALT CO., INC. PROPOSAL Rev #5. Job Name: Millsap Medical Office 4/25/17 CI IRMITTFr) Tn. rlr- Trirhall/ ritv of Favetteville ITEM # IDESCRIPTION I QTY JUNIT J.UNITCOST AMOUNT Storm drain Improvements Dr. Trichell Portion 1 30".RCP with Full Depth Base Backfill 144 LF $ 122.18 $ 17,593.92 2 24" RCP with Full Depth Base Backfill 52 LF $ 125.00 $ 6,500.00 3 18" RCP with Full Depth Base Backfill 160 LF $ 112.50 $ 18,000.00 4 Neenah 4999-1-6 Trench Grate 20 LF $ 420.00 $ 8,400.00 5 Curb Inlet: #92,103 2 EA $ 4,300.00 $ 8,600.00 6 Area Drains: #97,104,95,99,105 5 EA $ 4,600.00 $ 23,000.00 7 Concrete Drainage Swale: Includes 7" Class -7, 5" Concrete 3,500 psi Concrete 2,960 S.F. $ 7.46 $ 22,081.60 8 General Expenses: Final Clean up, Traffic Control, Job Maint_ 1 EA $ 3,000.00 $ 3,000.00 Total Cost for on-site portion of project Sulu -total $ 107,175.52 1 30" CPP with Full Depth Base Backfill **CPP PROVIDED BY THE CITY** 328 LF $ 86.80 $ 28,470.40 2 Junction Boxes: #94,92,91,90 4 EA $ 2,850.00 $ 11,400.00 3 General Expenses: Final Clean up, Traffic Control, Job Maint. 1 EA $ 2,000.00 $ 2,000.00 Total Cost for Off-site portion of project sub -total $ 41,870.40 PRICE SUMMARY TOTAL $ 149,04532 K:\Floodplain and Stomwater\Drainage\Investigations\157225— Millsop Rd; 577; Trichell Medical Offices\577 Millsap Cost Pugh, Alan Share.dwg AAT ,k- It VIE. 4,1T r V d ..f gnu 4 If M "lip 17 r a y 1V 'L"4 ;yam 17 vi -17 Y 1 r' -S s _ ► �p■ �' ' ,,l �$,, PROJECT ENGINEERING DIVISION MILLSAP DRAINAGE IMPROVEMENTS 577 MILLSAP DR, FAYETTEVILLE, AR. �';3 1,S W. MOUNTAIN STREETTa%vw-e-"vV NORTHWEST .ARKANSAS Vemoctat 0A.Zefte &O _,.iii AY_i, ys1.1fE,. R; .2702 ,9.442 .0C_, FAX: 479l 5 1 �t', ��:?r� �,•!F1 _.. ...,L_,x AFFIDAVIT OF PUBLICATION I Karen Caler, do solemnly swear that I am the Legal Clerk of the Northwest Arkansas Democrat -Gazette, printed and published in Washington County and Benton County, Arkansas, and of bona fide circulation, that from my own personal knowledge and reference to the files of said publication, the advertisement of: CITY OF FAYETTEVILLE Ord. 5975 Was inserted in the Regular Edition on: May 25, 2017 Publication Charges: $ 17 60 Kar Caler Subscribed and sworn to before me This ':N day of/*, 2017. CAZX, WX& Notary Public ' My Commission xpires: Z RECEIVED JUN 0 5 2017 CITY OF FAYETTEVILLE CITY CLERK'S OFFICE Ordinance: 5975 File Number: 2017-0229 MILLSAP DRAINAGE COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH SOUTHERN STAR ENTERPRISES, LLC FOR THE INSTALLATION OF DRAINAGE IMPROVEMENTS ALONG A PORTION OF EAST MILLSAP ROAD WITH THE CITY OF FAYETTEVILLE'S SHARE OF THE COSTS NOT TO EXCEED $49,070.40, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $5,000.00 WHEREAS, Southern Star Enterprises, LLC receives offsite storm water runoff from adjacent developments that appears to be damaging its parking area located at 509 N. Millsap Road and desires to install an underground drainage collection system to connect the new improvements to the City's downstream collection system; and WHEREAS, Southern Star Enterprises, LLC has requested that the City share in the cost of constructing drainage improvements along East Millsap Road as part of Southern Star's commitment to improve its parking area; and WHEREAS, § 170.05 of the Fayetteville Unified Development Code allows for cost sharing and states "If it is determined that offsite drainage improvements are required, and that such specific off-site drainage improvements are consistent with the city's current and established priorities, then cost sharing will be in accordance with "Required Off-site Improvements;" and WHEREAS, City engineers explored various options to alleviate the drainage problems in this area and have determined that the proposed offsite drainage improvements in the City's right of way are required and, further, that these improvements are consistent with the City's priorities; and WHEREAS, the City's Transportation Division is unable to work this project into its 2017 program year and waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the privately - owned drainage improvements. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Southern Star Enterprises, LLC for the installation of drainage improvements along a portion of East Millsap Road, with the City of Fayetteville providing the 30 -inch corrugated plastic pipe necessary for the project at a cost of $7,200.00 and paying the portion of the construction costs for the improvements within the City's right ofway in an amount not to exceed $41,870.40, and further approves a project contingency in the amount of $5,000.00. PASSED and APPROVED on 5/16/2017 Approved: Lioneld Jordan, Mayor Attest: Sondra E. Smith, City Clerk Treasurer 74144819 May 25, 2017