Ordinance: 5974
File Number: 2017-0230
SOUTH BLOCK PARTNERS, LLC COST SHARE AGREEMENT:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH SOUTH BLOCK PARTNERS, LLC FOR THE
INSTALLATION OF A SEWER MAIN ALONG A PORTION OF SOUTH BLOCK AVENUE BETWEEN
WEST 4TH STREET AND WEST 5TH STREET, WITH THE ESTIMATED AMOUNT TO BE PAID BY
THE CITY OF FAYETTEVILLE NOT TO EXCEED $16,375.00, AND TO APPROVE A PROJECT
CONTINGENCY IN THE AMOUNT OF $3,347.00
WHEREAS, South Block Partners, LLC will be developing property located at the northeast corner of West
5th Street and South Block Avenue and has requested that the City share in the cost of constructing an 8 -
inch sewer main along a portion of South Block Avenue between West 5th Street and West 4th Street, a
distance of approximately 110 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will extend sewer service to
an area in the core of the City that has never been served before and provide for ample future capacity
which the City recognizes will be necessary for the area that is served by this sewer main; and
WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size larger than required to service subdivisions when such excess size is specified
and required by the water and wastewater director for the general benefit of the sewerage system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1 Printed on 5/17/17
Ordinance: 5974
ReMimber2017-0230
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement with
South Block Partners, LLC for the installation of an 8 -inch sewer main along a portion of South Block
Avenue between West 4th Street and West 5th Street with the estimated amount to be paid by the City of
Fayetteville not to exceed $16,735.00, and further approves a project contingency in the amount of
$3,347.00.
PASSED and APPROVED on 5/16/2017
Attest:
Sondra E. Smith, City Clerk TreasLIC
K.
�,,�•• c}T Y
:G
FgYC
�� 1.■■ ' J'L^ S RCS •A^'a,. -y
f�Ii '�dN 1ON'
Page 2 Printed on 5/17/17
113 West Mountain Street
City of Fayetteville, Arkansas
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2017-0230
Agenda Date: 5/16/2017 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Ordinance
Agenda Number: D. 1
SOUTH BLOCK PARTNERS, LLC COST SHARE AGREEMENT:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING
AND APPROVE A COST SHARE AGREEMENT WITH SOUTH BLOCK PARTNERS, LLC FOR
THE INSTALLATION OF A SEWER MAIN ALONG A PORTION OF SOUTH BLOCK AVENUE
BETWEEN WEST 4TH STREET AND WEST 5TH STREET, WITH THE ESTIMATED AMOUNT
TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $16,375.00, AND TO
APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $3,347.00
WHEREAS, South Block Partners, LLC will be developing property located at the northeast corner of
West 5th Street and South Block Avenue and has requested that the City share in the cost of
constructing an 8 -inch sewer main along a portion of South Block Avenue between West 5th Street and
West 4th Street, a distance of approximately 110 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will extend sewer service to
an area in the core of the City that has never been served before and provide for ample future capacity
which the City recognizes will be necessary for the area that is served by this sewer main; and
WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess
material cost of facilities of a size larger than required to service subdivisions when such excess size is
specified and required by the water and wastewater director for the general benefit of the sewerage
system"; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developer's project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional
situation exists in which competitive bidding is deemed not feasible or practical and therefore waives
the requirements of formal competitive bidding and approves a cost share agreement with South Block
Partners, LLC for the installation of an 8 -inch sewer main along a portion of South Block Avenue
between West 4th Street and West 5th Street with the estimated amount to be paid by the City of
Fayetteville not to exceed $16,735.00, and further approves a project contingency in the amount of
$3,347.00.
City of Fayetteville, Arkansas Page 1 Printed on 5117/2017
File Number: 2017-0230
City of Fayetteville, Arkansas Page 2 Printed on 5/17/2017
4
Tim Nyander
Submitted By
City of Fayetteville Staff Review Form
20.7-0230
Legistar File ID
5/16/2017
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
4/25/2017 Utilities Director/
Utilities Department
Submitted Date Division / Department
Action Recommendation:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND TO APPROVE A COST
SHARE AGREEMENT WITH SOUTH BLOCK PARTNERS, LLC FOR THE INSTALLATION OF A SEWER MAIN ALONG A
PORTION OF SOUTH BLOCK AVENUE BETWEEN WEST 4TH STREET AND WEST 5TH STREET WITH THE ESTIMATED
AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $16,735.00, AND TO APPROVE A PROJECT
CONTINGENCY IN THE AMOUNT OF $3,347.00 FOR ATOTAL OF $20,082.00
5400.720.5700-5815.00
Account Number
04039.1
Project Number
Budgeted Item? Yes
Budget Impact:
Water/Sewer
Fund
Water/Sewer Impact Fee Cost Sharing
Current Budget
Funds Obligated
Current Balance
Does item have a cost? Yes Item Cost
Budget Adjustment Attached? No Budget Adjustment
Remaining Budget
Previous Ordinance or Resolution #
Original Contract Number:
Comments:
Project Title
$ 1,230,231.00
$ 67,928.00
z 0>, t)0
$ 20,082.00
J
Approval Date:
V20140710
CITY OF
Faye��
RKANSAS
A
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
Water & Sewer Committee
FROM: Tim Nyander, Utilities Director
DATE: April 24, 2017
CITY COUNCIL AGENDA MEMO
SUBJECT: Cost Share Agreement with South Block Partners, LLC
RECOMMENDATION:
Staff recommends approval of a cost -share agreement between the City of Fayetteville and South
Block Partners, LLC, to share the costs of installing a sewer main in South Block Avenue between
West 411 and West 51h Streets. The estimated total cost of the project is $35,270.00 The City's
portion of the cost share is approximately 50% of the estimated project cost, in the amount of
$16,735.00, with a 20% contingency of $3,347.00.
BACKGROUND:
South Block Partners, LLC has requested that the City share in the cost of installing an 8 -inch
sewer line along a portion of South Block Avenue between West 41h and West 51h Streets,
approximately 110 feet, so that South Block Partners, LLC may develop the property located at
the NE corner of West 5th Street and South Block Avenue.
DISCUSSION:
Constructing this segment of 8 -inch main will allow development of these properties and will
also provide for ample future capacity which the City recognizes will be necessary for the area
that is served by this sewer main.
BUDGET/STAFF IMPACT:
Funds for the City portion of work are available in the Water/Sewer Impact Fee Cost Sharing
Project.
Attachments:
Staff Review Form
Cost -Share Agreement
Map of Area
Bid Estimates
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
CONTRACTUAL AGREEMENT FOR
COST SHARE OF SEWER MAIN INSTALLATION COSTS
This Agreement, made and entered into on this ( WA-kday of May, 2017, by and between
the City of Fayetteville, Arkansas ("City") and South Block Partners, LLC ("South Block"),
witnesseth:
WHEREAS, South Block has requested that the City share in the cost of constructing an
8 -inch sewer main along a portion of South Block Avenue between West 4"' Street and West 50'
Street, a distance of approximately 110 feet, so that South Block may develop the property located
at the northeast corner of West 5a' Street and South Block Avenue; and
WHEREAS, constructing this segment of 8 -inch sewer main will allow development of
this property, will extend sewer service to an area in the core of the City that has never been served
before, and will also provide for ample future capacity which the City recognizes will be necessary
for the area that is served by this sewer main; and
WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the
excess material cost of facilities of a size larger than required to service subdivisions when _such
excess size is specified and required by the water and wastewater director for the general benefit
of the sewerage system."
NOW, THEREFORE, the City of Fayetteville, Arkansas and South Block Partners, LLC
agree as follows:
1:. The City of Fayetteville, Arkansas agrees to:
A. Reimburse South Block Partners, LLC for 50% of the cost to install
approximately 110 linear feet of 8 -inch sewer main in the area identified in
Exhibit "A" up to a maximum -not -to -exceed amount of $16,735 with a
contingency fund not -to -exceed $3,347.00, as was estimated by the builder's
representative and shown on Exhibit `B", attached.
B. Payments due to South Block Partners, LLC, shall be remitted within sixty (60)
days after receipt of valid invoices.
2. South Block Partners, LLC agrees to:
A. Provide the necessary and normal project management, inspection, and testing
as necessary for a complete and acceptable sewer main installation, including
submittal of plans and specifications to the City's Engineering Department, per
their standard procedures.
B. Provide a copy of the invoices from the Contractor upon City approval of the
water main upgrade.
Page 1 of 2
C, Pay for the sewer main arms ation (with reimbursement of 50% €efthe ccssi by
tlse CiAy of Faye€tevi.l.le in a not-to-mcced anioun of $16,735.00 with a
€;ontiWncy fund of-to-xcef-A $3,347,
IN AGREEMENT WITH AIA, THE TERMS AND CONDITIONS ABOVE, WE
SIGN BELOW:
SOUTH BLOCK PARTNERS, LLC
KILBRIDE, Partner
011 *U
, Mayor
c �N
By:
SONDRA SMITH, City Clerk
Page 2 of 2
41TRE
I rl►���.r
�v• FAYE�EVILLE;
11
•
S
"..
LALIRC-14 ESATTJV'ZIA,
STATE Of 3E7 -AS J
J ,*'•
i.E'l��i'"R�
SLIT 4 sL _ �91't• l
L'tf. iYyW IJ. TE{l�11
, Mayor
c �N
By:
SONDRA SMITH, City Clerk
Page 2 of 2
41TRE
I rl►���.r
�v• FAYE�EVILLE;
11
•
S
VV -1021077
Fxhiblt A
SWEETSER CONSTRUCTION, INC
GENERAL CONTRACTORS » LICENSED • INSURED
590 WEST 110111 AK . FAYk;1-FFV ll_LI;. All 72703
TEI.1-:IIHONE. W9) 443-3026 • FAX (479) 442-0119
SEWER EXTENSION
For SHADDOX
UNIT PRIVE SCHEDULE
March 20, 2016
Item #
Description
Quantity
Unit
Unit Price
Amount
1
Manhole
2EA
$ 3,800.00
$
7,600.00 _
2.
8" Sanitary Sewer
107
_ LF
$ 38.00
$
$
4,180.00
600.00
3
4"X8" Sanitary Sewer Wye 2
EA $ 300.00
4
4" Sewer Service
60
LF
$ 30.00
$
1,800.00 ,
5
Class 7 Base
170
Ton
$ 32.00
$
5,440.00
_ 6
7
Repair Street
16" Steel Encasement
50
1
SY
$ 135.00.
$
6,750.00
LS $ 2,400.00
$
2,400.00
8
Traffic Control
1
LS
$ 2,800.00
$
2,800.00
9
Sawcut Existing Asphalt
1
LS
$ 1,700.00
$
1,700.00
10
Bond & Mob
1
EA
$ 2,000.OD
$
2,000.00
Bid Total
I $
35,270.00
Notes: 1) SB -Z Backfill is for full depth backfill for water and sewer mains only (not
services). Full depth backfill for services shall be included in the price
of the service crossing.
2) Price for water and sewer mains shall include bedding, detection tape, and
tracer wire.
Charles W. Miller
Sweetser Construction, Inc.
charlie@5wet,tserconstruction.c_om
Phone: (479) 443-3026
Fax: (479) 44Z-0119
4
,- General Construction Solutions, Inc.
rg
1fl51 EleciricAvenue.
Springdale, Ar 72764
i.Y.�__ Phone: 479751.8666
FAX 479.751 7650 1
Page:
Date: 1/17/2017 Job M
Project Name: Shaddox Sewer F_xteneion � City Specs: Fay1ttav111c, AR
Owner Name: Jim ha Qx '957-13tr7 � Phone #f:
Engineer. Jorgenson Phone M.
GCS Estimator, SBM
onstruc ran: itn a Ox xtension 1117M
asT
PRII-
.
1
Ip
Bond
Cur Gutter (Remove Replace
12
1
12
Traffic Control Barracades
Lot C Report To 6nglneerj
1
13
field Locate and Wer6fy
1
14
Concrete Washout
1
15Trench
Safety
13,076.73
Total Site Cost
***Bid is based on the road being closed.
288.00
E)rcfv ion
2,076.00
$
Fees, permits, Camera Testing
$
552.00
Materials Testing
1.00
Staking
Respectfully Submitted,
Wes Taylor
479-530-3577
SY
5
LS
$
2,076.00
LS
$
325.00
LS
$
552.00
LS
$ ,
1.00
5
11,2 0.00
$
9,753.57
218.00
4,438.80
805.40
389.00
2,495.75
13,076.73
,849,00
1,300.00
288.00
$
2,076.00
$
325.00
$
552.00
$
1.00
$49,828.25
SEWER EXTENSION
For 514ADDOX
UNIT PRICE SCHEDULE
Item #
1
_2
3
A
Description
Manhole2
8" Sanitary Sewer _ _ —
4"x8" Sanitary Sewer Wye
4" Sewer Service
—
Quantity
111
2
60
Unit I
EA
LF
EA
LF
Unit Price
115D5t).
*T,_ 30
j too0 '0
�
Amount
ti nlaD
v,
�'�OC .00
S O
�
5 Clean & Test Sewer
ILS
- —
F1
6
7
8
s��'
10
Rock Excavation
Class 7 Base
Repair Street -
Bond
90
55
LS
Ton
SY
--
�.
aG v
51 0.00
1
Y
— 1
LS
1 EA
�
Nates: i) SB -2 Backfill is for full depth backfill for and sewer mains only (not services). Full depth
backfill for services shall be Included in the price of the service crossing.
2) Price for water and sewer mains
shall include bedding, detection tape and
tracer wire.
I
�`r
10
-7M
NORTHWESTARKANSAS
Demomt IF One&
.'.jJ. �,..t. 60 .� _ 3. `�. ti .1.< -iii x/9 x.95 17u a ,x.x ,VNW.ADG. ,
AFFIDAVIT OF PUBLICATION
I Karen Caler, do solemnly swear that I am the Legal Clerk of the
Northwest Arkansas Democrat -Gazette, printed and published in
Washington County and Benton County, Arkansas, and of bona fide
circulation, that from my own personal knowledge and reference
to the files of said publication, the advertisement of:
CITY OF FAYETTEVILLE
Ord. 5974
Was inserted in the Regular Edition on:
May 25, 2017
Publ' a on Charges: $ 1
PT0
Karen 12yaler
Subscribed and sworn to before me
This 3( day of�Gtp,�,, 2017.
6 C
VV
Notary Public /
My Commission Expires:
Please do not pay from Affidavit.
Invoice will be sent.
JUN 0 5 2017
CITY CLERKS OFFICE
Ordinance: 5974
File Number. 2017-0230
SOUTH BLOCK PARTNERS, LLC COST
SHARE AGREEMENT:
AN ORDINANCE TO WAIVE THE
REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND
APPROVE A COST SHARE
AGREEMENT WITH SOUTH BLOCK
PARTNERS, LLC FOR THE
INSTALLATION OF A SEWER MAIN
ALONG A PORTION OF SOUTH
BLOCK AVENUE BETWEEN WEST
4TH STREET AND WEST 5TH STREET,
WITH THE ESTIMATED AMOUNT TO
BE PAID BY THE CITY OF
FAYETTEVILLE NOT TO EXCEED
$16,375.00, AND TO APPROVE A
PROJECT CONTINGENCY IN THE
AMOUNT OF $3,347.00
WHEREAS, South Block Partners, LLC
will be developing property located at the
northeast corner of West 5th Street and
South Block Avenue and has requested that
the City share in the cost of constructing an
8 -inch sewer main along a portion of South
Block Avenue between West 5th Street and
West 4th Street, a distance of approximately
110 feet; and
WHEREAS, the City of Fayetteville would
benefit from the cost share as it will extend
sewer service to an area in the core of the
City that has never been served before and
provide for ample future capacity which the
City recognizes will be necessary for the
area that is served by this sewer main; and
WHEREAS, § 51.113 of the Fayetteville
City Code provides that "the City shall pay
the excess material cost of facilities of a
size larger than required to service
subdivisions when such excess size is
specified and required by the water and
wastewater director for the general benefit
of the sewerage system"; and
WHEREAS, waiving formal competitive
bidding will save time and cost by utilizing
the developer's contractor who will be on-
site installing the line for the developers
project.
NOW, THEREFORE, BE IT ORDAINED
BY THE CITY COUNCIL OF THE CITY
OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City
of Fayetteville, Arkansas hereby determines
an exceptional situation exists in which
competitive bidding is deemed not feasible
or practical and therefore waives the
requirements of formal competitive bidding
and approves a cost share agreement with
South Block Partners, LLC for the
installation of an 8 -inch sewer main along a
portion of South Block Avenue between
West 4th Street and West 5th Street with
the estimated amount to be paid by the City
of Fayetteville not to exceed $16,735.00,
and further approves a project contingency
in the amount of $3,347.00
PASSED and APPROVED on 5/16/2017
Approved:
Lioneld Jordan, Mayor
Attest:
Sondra E. Smith, City Clerk Treasurer
74144808 May 25, 2017
Tim Nyander
Submitted By
59 -7
SOUTH BLOCK PARTNERS, LLC
Change Order
City of Fayetteville Staff Review Form
2017-0378
Legistar File ID
N/A
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
7/6/2017 Utilities Director/
_ Utilities Department
Submitted Date Division / Department
Action Recommendation:
APPROVAL OF A CHANGE ORDER TO THE COST SHARE AGREEMENT WITH SOUTH BLOCK PARTNERS, LLC IN
AMOUNT OF $1,260.00 FOR PAYMENT OF.A PORTION OF THE PROJECT CONTINGENCY FOR THE SEWER
SHARE PROJECT ON SOUTH BLOCK AVENUE
Budget Impact:
5400.720.5700-5815.00 Water/Sewer
Account Number - Fund
04039.1 Water/Sewer Impact Fee Cost Sharing
Project Number Project Title
Budgeted Item?
Yes
Current Budget
$ 1,230,231.00
Funds Obligated
$ 187,968.15
Current -Balance
$ 1,042,262.85
Does item have a cost?
Yes
Item Cost
$ 1,260.00
Budget Adjustment Attached?
No
Budget Adjustment
$ -
Remaining Budget
$ 1,041,002.85
V20140710
Previous Ordinance or Resolution H
Ord. 5974
Original Contract Number:
.
Approval Date:
Comments:
CITY OF
FAYETTEVILLE
ARKANSAS
TO: Mayor Lioneld Jordan
THRU: Don Marr, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: July 6, 2017
STAFF MEMO
SUBJECT: Change Order to the Agreement with South Block Partners, LLC
RECOMMENDATION:
Staff recommends approval of a 'change order to the cost share agreement with South Block
Partners, LLC to utilized a portion of the project contingency in the amount of $1,260.00 for
the sanitary sewer cost share project on Block Avenue.
BACKGROUND:
Ordinance 5974 was passed on May 16, 2017 that approved a cost share agreement with
South Block Partners, LLC for a sanitary sewer cost share on South Block Avenue. The
agreement was for a not -to -exceed amount of $16,375.00, with a project contingency in the
amount of $3,347.00.
DISCUSSION:
South Block Partners, LLC has sent an invoice in the amount of $17,635.00, which requires
the city to utilize $1,260.00 of the approved contingency.
BUDGET/STAFF IMPACT:
Funds are available in the Water & Sewer Impact Fee Cost Sharing project.
Attachments:
Invoice from South Block Partners, LLC
Ordinance 5974
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
SOUTH BLOCK PARTNERS, LLC
INVOICE
Date: July 6, 2017
INVOICE>1
To The City of Fayetteville, AR
113 West Mountain Street
Fayetteville, AR 72701
(979)575-8281
Attn: Accounting
South Block Avenue Sewer Extension -50% Cost Share Agreement $17,635 $17,635
Subtotal $17,635
Sales Tax
Total $17,635
Make all chocks parable to South Block Partners, LLC
Pomona kealtr, LLC 1 X38 Oak I:aWn, Suite I(PI, Dallas, TX 73219 1 (219) 722-7576
APPLICATION AND CERTIFICATE OF PAYMENT
TO (OWNER).SHADDOX, JIM
FROM (CONTRACTOR): Sweetser Construction, Inc.
590 WEST POPLAR
FAYETTEVILLE, AR 72703
CONTRACTOR'S APPLICATION FOR PAva1F.NT
PROJECT: JIM SHADOOX SEWER EXTENSION
ecl p
(Architti
CHANGE ORDER SUMMARY
Change Orders approved in
previous months by Owner
TOTAL Thre CO#
ADDITIONS
DEDUCTIONS
Approved this
Month
3. CONTRACT SUM TO DATE
s 35,270.00
No.
Dale Approved
S 35270.00-' -
TOTALS
s 0.00
(Sa+51b)
Net change by Change Orders
Contractor certifies that to the best of the Contractors knowledge, information and belief
the Work covered by this Application for Payment has been completed in accordance
with the Contract Documents, that all amounts have been paid by the Contractor for Work
for which previous Cenificau s for Payment were issued and payments received from the
Owner, and that current payment shown herein is now due.
CONTRACTOR: Sweelser Construction, Inc.
By: Date:
ARCHITECT'S CERTIFICATION FOR PAYMENT
In accordance with the Contract Documents, based on m -site observations and the data
comprising the above application, the Architect certifies to the Owner that to the best of the
Architect's knowledge. information and belief the Work has progressed as indicated. the
quality of the Work is in accordance with the Contract Documents. and the Contractor is
entitled to payment of the AMOUNT CERTIFIED.
ARCHITECT:
By: Dale:
a.
ENDING:
COMMENCEMENT DATE:
ORIGINAL CONTRACT PERIOD:
EXTENDED CONTRACT PERIOD:
CONTRACT COMPLETION DATE:
EXPIRED FROM COMMENCEMENT
Application is made for Payment, as shown below• in connection with the Contract
Continuation Sheets are attached.
03/31)2017
03101/2017
0
0
1. ORIGINAL CONTRACT SUM
S 35,270.00
2. Net change by Change Orders -
$0.00
3. CONTRACT SUM TO DATE
s 35,270.00
(1 .2)
4. TOTAL COMPLETED 8 STORED TO DATE
S 35270.00-' -
5. TOTAL RETAINAGE:
s 0.00
(Sa+51b)
a. 0% of Completed Work 5 0.00
b. 0% of Stored Material $ 0.00
6. TOTAL EARNED LESS RETAINAGE
S 35,270.00
(4-5)
7. LESS PREVIOUS CERT. FOR PAYMENT
$0.00
8. CURRENT PAYMENT DUE
5,35270_:00
(6.7)
9. BALANCE TO FINISH (INCLUDING RETAINAGE)
S 0.00
(3.7.8)
,1fOA'f.TRRI'YROGRESS: 100%
1711F PROGRESS:
Slate of: county of:
Pre/nregaing in.nrunmm -m or6u.v7cd cd b yi re me ee, _.
&
9
HeAhr is permna7/p brmen m me.
Notary:
My Commission Expires:
AMOUNT CERTIFIED: S 35,270.00
OWNER:
By:
Date:
50202 JIM SHADDOX SEWER EXTENSION
SCHEDULE OF VALUES
Application and Certificicate for Payment, containing
Contractors signed Certification is attached.
Page 1 o/ 1
APPLICATION NUMBER: 01
APPLICATION DATE: 3131/2017
Item #
Code
Description of Work
LION
Contract
Unit Price
This Period
This Period
To Date
To Date
°h
03
03090-000
4" X 8" SEWER WYE (EA)
EA
Ory
I
I
Ory
Value
Ory
Value
Complete
01
02
03080-000
03040.000
MANHOLE (EA)EA
B" SANITARY SEWER (LF)
LF
2.00
110.00
3,800.00
38.00
2.00
110.00
7,600.00
4,180.00
2.00
110.00
t 7,600.00
4,180.00
100% j
100%
03
03090-000
4" X 8" SEWER WYE (EA)
EA
2.00
300.00
2.00
600.00
2.00
600.00.
100% 1
04
103078-000
4" SEWER SERVICE (LF)
LF
60.00
30.00
60.00
1,800.00
60.00
I 1,800.00
100%
05
1 03210-000
CLASS 7 BASE (TON)
TON
170.00
32.00
170.00
5,440.00
170.00
I 5,440.00
100% i
I 06
03828.000
REPAIR STREET (SY)
SY
50.00
6,750.00
100%
50.00
135.00
50.00
6,750.00
...
07
_ _....
03110-000 I76"
_ _ _ _...-_
STEEL ENCASEMENT (EA)
EA
1.00
2,400.00
....
1,00
._... _.__ _ __
2,400.00
_ _..
1.00
� � 2,400.00
_
100°�
i 08
12112-01
_
TRAFFIC CONTROL (EA)
_ ____
EA
_____.
1.00
_
2,800.00
.. ..---
1.00
2,800.00
1.00
2,800.00
100%
09
03828-000
SAWCUT EXISTING ASPHALT (EA)
EA
1.00
1,700.00
1.00
1,700.00
1.00
I 1,700.00
100%
10
02820-000
BOND & MOBILIZATION (EA)
EA
1.00
2,000.00
1.00
2,000.00
1.00
2,000.00
I 100%
Contract Total 398.00 398.001-,36;270.00 " 398.00 36,270.00
113 West Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Ordinance: 5974
File Number: 2017-0230
SOUTH BLOCK PARTNERS, LLC COST SHARE AGREEMENT:
AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND
APPROVE A COST SHARE AGREEMENT WITH SOUTH BLOCK PARTNERS, LLC FOR THE
INSTALLATION OF A SEWER MAIN ALONG A PORTION OF SOUTH BLOCK AVENUE BETWEEN
WEST 4TH STREET AND WEST 5TH STREET, WITH THE ESTIMATED AMOUNT TO BE PAID BY
THE CITY OF FAYETTEVILLE NOT TO EXCEED $16,375.00, AND TO APPROVE A PROJECT
CONTINGENCY IN THE AMOUNT OF $3,347.00
WHEREAS, South Block Partners, LLC will be developing property located at the northeast corner of West
5th Street and South Block Avenue and has requested that the City share in the cost of constructing an 8 -
.inch sewer main along a portion of South Block Avenue between West 5th Street and West 4th Street, a
distance of approximately 110 feet; and
WHEREAS, the City of Fayetteville would benefit from the cost share as it will extend sewer service to
an area in the core of the City that has never been served before and provide for ample future capacity
which the City recognizes will be necessary for the area that is served by this sewer main; and
WHEREAS. § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material
cost of facilities of a size larger than required to service subdivisions when such excess size is specified
and required by the water and wastewater director for the general benefit of the sewerage system'; and
WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's
contractor who will be on-site installing the line for the developers project.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Page 1 Printed on 5/17/17
Ordinance: 5974
File Number. 2017-0230
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an
exceptional situation exists in which competitive bidding is deemed not feasible or practical and
therefore waives the requirements of formal competitive bidding and approves a cost share agreement with
South Block Partners, LLC for the installation of an 8 -inch sewer main along a portion of South Block
Avenue between West 4th Street and West 5th Street with the estimated amount to be paid by the City of
Fayetteville not to exceed $16,735.00, and further approves a project contingency in the amount of
$3,347.00.
PASSED and APPROVED on 5/16/2017
Attest:
Sondra E. Smith, City Cler
Page 2 Printed on 5117/17