HomeMy WebLinkAbout94-17 RESOLUTON113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 94-17 File Number: 2017-0180 BENCHMARK CONSTRUCTION OF NWA, INC.: A RESOLUTION TO APPROVE CHANGE ORDER NO. 2 TO THE CONTRACT WITH BENCHMARK CONSTRUCTION OF NWA, INC. IN THE AMOUNT OF $195,377.00 FOR THE CONSTRUCTION OF A BATHROOM AND STORAGE BUILDING AT THE FIRE DEPARTMENT TRAINING FACILITY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $29,306.55, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby Change Order No. 2 to the contract with Benchmark Construction of NWA, Inc. in the amount of $195,377.00 for the construction of a bathroom and storage building at the Fire Department Training Facility, and further approves a project contingency in the amount of $29,306.55. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 4/18/2017 r or •,�•, A- Attest: + ,� J• z"a" ✓ r�� Sondra E. Smith, City Clerk Treasurer Page 1 Printed on 4119117 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2017-0180 Agenda Date: 4/18/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: C. 1 BENCHMARK CONSTRUCTION OF NWA, INC.: A RESOLUTION TO APPROVE CHANGE ORDER NO. 2 TO THE CONTRACT WITH BENCHMARK CONSTRUCTION OF NWA, INC. IN THE AMOUNT OF $195,377.00 FOR THE CONSTRUCTION OF A BATHROOM AND STORAGE BUILDING AT THE FIRE DEPARTMENT TRAINING FACILITY, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $29,306.55, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby Change Order No. 2 to the contract with Benchmark Construction of NWA, Inc. in the amount of $195,377.00 for the construction of a bathroom and storage building at the Fire Department Training Facility, and further approves a project contingency in the amount of $29,306.55. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 411912017 David Dayringer Submitted By City of Fayetteville Staff Review Form City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 3/28/2017 Fire / Fire Department Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order #2 to the contract with Benchmark Construction for the Fire Training Grounds Project for a bathroom/storage building and approval of a budget adjustment in the amount of $224,684. This amount includes Change Order #2 in the amount of $195,377 and a 15% Contingency of $29,306.55. 4470.300.8300-5804.00 Account Number 17001.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? Yes Previous Ordinance or Resolution # Original Contract Number: Budget Impact: Sales Tax Capital Fund Fire Training Grounds Project Title Current Budget Funds Obligated Current Balance - Item Cost Budget Adjustment Remaining Budget $ 724,000.00 $ 641,141.45 Approval Date: 224,683.55 224,684.00 V20140710 Comments: There are upcoming infrastructure expenditures at the Fire Training Grounds including water, sewer, electrical, and information technology work that will utilize funds within this account. Due to this, there is the need to submit a budget adjustment to provide funding for the bathroom/storage building at the training grounds. CITY OF 7ay4 1� ARKAN5A5 MEETING OF APRIL 18, 2017 TO: Mayor Jordan and City Council FROM: David Dayringer, Fire Chief DATE: March 31, 2017 CITY COUNCIL AGENDA MEMO SUBJECT: Approval of Change Order #2—Fire Training Grounds and Approval of a Budget Adjustment RECOMMENDATION: Staff recommends approval of Change Order #2 to the contract with Benchmark Construction for the Fire Training Grounds Project for a bathroom/storage building and approval of a budget adjustment in the amount of $224,684. This amount includes Change Order #2 in the amount of $195,377 and a 15% Contingency of $29,306.55. BACKGROUND: In February 2015, the City Council designated 14.2 acres of land on Borick Drive to be developed by the Fire Department as their Training Grounds. The plan was to complete the project in several phases over several years. Later in 2015, the City Council authorized the Fire Department to apply for a Federal grant to purchase a Mobile Fire Training Simulator. The Fire Department was awarded the grant in 2016 and the council approved the usage of $747,000 from the existing Fire Department CIP to fund the infrastructure work needed for the project. City Council approved on January 3, 2017 a contract with Benchmark Construction of NWA, Inc. in the amount of $485,058.00 for the construction of infrastructure and land development - necessary for the installation of the Fire Department Mobile Training Simulator. Due to the bid for this infrastructure work being much lower than anticipated the Fire Department moved forward with plans to construct the second phase of the development, a support building with bathrooms and storage. Change Order #1 was approved in February 2017 in the amount of $32,603.56 to allow for site work for the proposed support structure. DISCUSSION: Staff recommends Change Order #2 with onsite Contractor Benchmark for the support structure, resulting in Cost and Time savings. Change Order #2 is to provide for a 40'x100' Bathrooms and Storage Facility totaling $224,683.55 which includes a 15% contingency. Substantial cost savings can be realized for both change orders because Benchmark Construction is already mobilized on the site. The Original Contract with Benchmark for the project included set unit pricing for excavations, gravel, concrete slab and drill piers. These unit prices were included in the competitive bid of the original contract, and have been utilized and included in this and the previous change order. Mailing Address: 113 W. Mountain street wwww.fayetteville-ar.gov Fayetteville, AR 72701 Facilities Management has reviewed the pricing for the structure, erection, insulation, and plumbing rough in and has determined that the $42.00/sq.ft. is fair and competitive in today's market. This represents approximately half what it would cost for the same building as a free- standing project. For additional cost saving measures, the finish out of the restroom/showers will be completed in house by Facilities Management Staff. Approving this change order will expedite the completion of the support structure. It will allow Benchmark to begin immediately, with completion time of 90 days. BUDGET/STAFF IMPACT: The finances required for this change order will come from a Budget Adjustment moving funds from Fire Impact Fee Improvements into Project 17001.1 Fire Training Grounds. The Budget Adjustment will move funds for the Change Order #2 expenses and a 15% Contingency. No additional funds are being requested from the CIP for this project. The entire cost of Change Order #2 will come from existing Fire Department Impact Fees. Attachments: Change Order #2 Documents, Budget Adjustment i R E-� Cd c WA cli H 0 0 A N i " .b O b4 U O O CD O C v�i c CD o O 0 > a� ° U o m O1 o0 0 N 64 - sFi yNy b � � O c cog O N O O O U Ln c sos son O W � � 0 o 0 0 0 0 0 r� [� 00 O En bA 0 cV •-� 6R 69 •p � T d � 0000 O ~ x a `n W u O O O. O n c; a� 0 > a 'b _T Oa� Lr) N N O M a w a N _y � X N U � v a +U+ � G c 0 U c b 'O E R. U (Y7 • " .d y 'o 43 .d i O Z N N It N �D M 1� M n o 0 rn aI as iA- 1.4 C �c�Qo�o 0 Mn kn o in 06 iH n 00 on o �c n en O V7 llG M O, i rF e- in ei 11 M kn "4 1 b v U •;f7 ya V} &> 51s t i i� 3 r r N r r � w N F � a i N b '• O " w U. b 3 O ° i b°'n •• o O 'O b UIL)_U bA - v, aj LLU F U v DQ U" 0 Qj ,y C C CRC• C y� u.° a3'GvoU a U PU & ar C N U U y cd O Q " U��yry�� .0 b a� ca ca ° U o 5 U U a U'7 U HzPPpPg k .0 0 .. a F 0 z o` O r 04 A N LIm S* I City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division Adjustment Number /Org2 FIRE (300) 2017 Requestor: David Dayringer BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Approval of a Budget Adjustment moving funds from Fire Impact Fee Improvements into Project 17001.1 Fire Training Grounds. The Budget Adjustment will move funds for the Change Order #2 Benchmark Construction expenses and approval of a 15% contingency to provide funding for a bathroom/storage facility at the Fire Training Grounds. COUNCIL DATE: LEGISTAR FILE ID#: 4/18/2017 2017-0180 L i�, R atch"w 3/2V2017 4:58 PM Budget Director Date TYPE: DESCRIPTION: GLDATE: RESOLUTION/ORDINANCE I POSTED: J TOTAL 224,684 224,684 v.20161220 Increase / (Decrease) Project.Sub# Account Number Expense Revenue Project Sub AT Account Name 2300.300.9300-5801.00 (146,000) 07003 4- EX Fixed Assets - : 2300.300.9300-5802.00 (78,684) 07003 4 EX Vehicles & Equipment - base 2300.300.9300-7602.47 224,684 - 17001 .1 EX "Transfers To Funds - Capital Improvem( 4470.300.8300-6602.30 - 224,684 17001 1 RE "Transfer from Fund - Impact Fee 4470.300.8300-5804-.00 224,684 - 17001 1 EX Building Costs - Building Costs C:\Users\losmith\AppData\Roaming\L5\Temp\53a4c40b-0771-4927-a8d0-8313757642e8 1 of 1 Benchmark Construction CO #4 City of Fayetteville Staff Review Form I " , %t7 2017-0342 3 "c7 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item David Dayringer 6/16/2017 Fire / Fire Department Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order #4 and a 10% Contingency to the contract with Benchmark Construction for metal building changes: Relocate personnel doors and add four openings for doors and windows, add more insulation for roof and wall, add canopy, delete all liner panel for ceiling and relocate wall liners, ground snow load to meet 20 PSF. Concrete Changes that include adding a sidewalk on two sides of the facility to meet ADA requirements. Budget Impact: 4470.300.8300-5804.00 Account Number 17001.1 Project Number Sales Tax Capital Fund Fire Training Grounds Project Title Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Remaining Budget $ 940,684.00 $ 871,543.80 $ 69,140.20 $ 14,627.80 I $ 54,512.40 V20140710 Previous Ordinance or Resolution # #03-17/ 94-17 Original Contract Number: Approval Date: U - dd - i ' t Comments: City Council approved on January 3, 2017 through Resolution No. 03-17 awarding Bid Number 16-64 authorizing a contract with Benchmark Construction of NWA, Inc. in the amount of $485,058.00. Change Order #1 added $32,603.56 to the contract. Change Order #2 added $195,377 to the contract (Res #94-17(. Change Order #3 added $42,021 to the contract.* Change Order #4 will add $13,298. This will make the total contract amount with Benchmark $768,357.56 ®CITY OF FAYETTEVILLE STAFF MEMO ARKANSAS TO: Mayor Jordan FROM: David Dayringer, Fire Chief DATE: June 16, 2017 SUBJECT: Approval of Change Order #4—Fire Training Grounds and approval of a 10% Contingency RECOMMENDATION: Staff recommends approval of Change Order #4 and a 10% Contingency to the contract with Benchmark Construction for metal building changes: Relocate personnel doors and add four openings for doors and windows, add more insulation for roof and wall, add canopy, delete all liner panel for ceiling and relocate wall liners, ground snow load to meet 20 PSF. Concrete Changes that include adding a sidewalk on two sides of the facility to meet ADA requirements. BACKGROUND: City Council approved on January 3, 2017 through Resolution No. 03-17 awarding Bid Number 16-64 authorizing a contract with Benchmark Construction of NWA, Inc. in the amount of $485,058.00. Change Order #1 was approved in February,2017 in the amount of $32,603.56 for site work'and grading plan changes. Change Order #2 was approved in April,2017 in the amount of $195,377 plus a contingency of $29,306.55 utilizing IMPACT FEE funds for the metal training building. Change Order#3 was approved in June,2017 in the amount of $42,021 plus a contingency of $4,202.10 for a gravel access drive to river and irrigation for trees. The Proposed Change Order #4 is in the amount of $13,298 plus a contingency of $1,329.80. The funds for proposed Change Order #4 will come from the prior approved $29,306.55 IMPACT FEE contingency funds approved in Change Order #2 (Resolution 94-17). This will make the contract with Benchmark $768,357.56 ($485,058 +$32,603.56 + $195,377 + $42,021 + $13,298). DISCUSSION: Benchmark Construction has provided a cost for metal building changes which include the following: relocate personnel doors and add four openings for doors and windows, add more insulation for roof and wall, add canopy, delete all liner panel for ceiling and relocate wall liners, ground snow load to meet 20 PSF. Concrete Changes that include adding a sidewalk on two sides of the facility to meet ADA requirements. These changes total $13,298 plus a 10% Contingency. BUDGET/STAFF IMPACT: The finances required for this project are already budgeted in the Fire Sales Tax Project: Fire Training Grounds Attachments: Change Order #4 Document Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 i PROPOSAL FROM:..... BENCHMARK CONSTRUCTION COMPANY 333 WEST POPLAR STREET FAYETTEVILLE, AR 72703 PROPOSAL TO:.........MR. MATT CASEY MR. WADE ABERNATHY CITY OF FAYETTEVILLE PROJECT: ................ FIRE TRAINING FACILITY FILE REFERENCE NO. IA DATE: ...................... JUNE 3, 2017 REVISED JUNE 12, 2017 WE REQUEST AN INCREASE IN THE AMOUNT OF >>> $13,298 ALONG WITH AN EXTENSION IN TIME OF — DAYS. METAL BUILDING CHANGES: RELOCATE PERSONNEL DOORS AND ADD FOUR OPENINGS FOR DOORS AND WINDOWS ADD MORE INSULATION FOR ROOF AND WALLS ADD CANOPY DELETE ALL LINER PANEL FOR CEILING AND RELOCATE WALL LINERS GROUND SNOW LOAD TO MEET 20 PSF CONCRETE CHANGES: SLAB ON GRADE WILL BE UNIT PRICE PER ORIGINAL CONTRACT DRILLED PIERS ARE UNIT PRICE PER ORIGINAL CONTRACT TOTAL COST ............................................ $10.881 15 % OVERHEAD & PROFIT - 1632 SUB TOTAL ........................... :...... .. $12.513 0.02800 BOND 0.01500 BUILDING PERMIT 0.01000 OCP INS 0.00980 BLDRS RISK 0.06280 786 TOTAL CHANGE ORDER AMOUNT ..................... $13,298 SINCERELY Please s vibeloW o' clude the above changes into the scope of the contract. gr7Anuur cYMz6G June 13, 2017 of Faybe e signature Benchmark Construction signature I COST DETAIL: PROJECT: ................ FIRE TRAINING FACILITY DESCRIPTION METAL BUILDING NET ADD add canopy move liner panel add framing and trim doors and vandc delete ceiling liner panel ADDITIONAL INSULATION add roof insulation add wall insulation ERECTION LABOR ADD GROUND SNOW LOAD CHANGE C FILE REFERENCE NO. I :«UNIT PRICES» LABOR + 48% BURDEN, TOOLS MATERIALS + 9% ST UNIT :LABOR MAT SUB AND + SUBS + 1% LIA INS CONT EQUIP +TOOLS B EQUIP 1.00 LS 0 1.00 LS 3100.00 3379 1.00 SF wash 0 1.00 Is 321.50 350 -2400.00 SF 0.25 -654 0 0 1.00 SILVERCOTE 0 1728.00 sf 0.35 659 2380.00 at 0.45 1167 0 0 24.00 HRS 100.00 10.00 3792 0 1.00 LS 2006.00 2187 0 0 0 Benchmark Construction -Change Order #5 City of Fayetteville Staff Review Form 2017-0675 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item David Dayringer 11/17/2017 Fire / Fire Department Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order #5 to the contract with Benchmark Construction for additional fill - gravel material along with seed and straw that was required to finish the project. Budget Impact: i 4470.300.8300-5804.00 Sales Tax Capital t. Account Number Fund F t 17001.1 Fire Training Grounds Project Number Project Title Budgeted Item? Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment $ 1,033,138.00 $ 882,282.60 $ 150,855.40 $ 22,219.15 Remaining Budget I $ _ 3.28,636.25 V20140710 Previous Ordinance or Resolution # #03-17/ 94-17 Original Contract Number: Approval Date: I I -y--( q Comments: City Council approved on January 3, 2017 through Resolution No. 03-17 awarding Bid Number 16-64 authorizing a contract with Benchmark Construction of NWA, Inc. in the amount of $485,058.00. Change Order #1 added $32,603.56 to the contract. Change Order #2 added $195,377 to the contract (Res #94-17). Change Order #3 added $42,021 to the contract. Change Order #4 added $13,298. Change Order #5-$22,219.15.This will make the total contract amount with Benchmark $790,576.71 CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Jordan FROM: David Dayringer, Fire Chief DATE: November 17, 2017 SUBJECT: Approval of Change Order #5—Fire Training Grounds .STAFF MEMO RECOMMENDATION: Staff recommends approval of Change Order #5 to the contract with Benchmark Construction for additional fill -dirt gravel material along with seed and straw that was required to finish the project. BACKGROUND: Engineering miscalculated the amount of fill. dirt, gravel, sod, straw and seed for the Fire Training Grounds project. The amounts listed in the original bid were insufficient. Benchmark has submitted an.invoice for the additional material. The funds for proposed Change Order #5 will come from the prior approved IMPACT FEE contingency funds approved in Change Order #2 (Resolution 94-17) and remaining Contingency funds approved in Resolution 03-17. This will make the contract with Benchmark $790,576.71 ($485,058 +$32,603.56 + $195,377 + $42,021 + $13,298+ $22,219.15). DISCUSSION: Benchmark Construction has provided a cost for changes which include the following: additional fill -dirt gravel material along with seed and straw that was required to finish the project. These changes total $22,219.15 over the current contract amount. BUDGET/STAFF IMPACT: The finances required for this project are already budgeted in the Fire Sales Tax Project: Fire Training Grounds Attachments: Change Order #5 Documents Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 PAY ESTIMATE #08 City of Fayetteville Fire Training Facility Construction Period: 7/31/2017 - 10/31/2017 Date of Estimate: 10/31/2017 NTP Issued: 1/17/2017 137% Contract Time Used Substantial Completion: 8/15/2017 103% Work Complete (% of Contract $'s) 210 Cal. Days Submitted By: Benchmark Construction of NWA, Inc. The contractor certifies that (1) title to all Work, materials, and equipment incorporated in the work, or otherwise listed in or covered by this and all previous Pay Estimates will pass to the Owner at time of payment free and and clear of all liens, claims, security interests and encumbrances (except such as are covered by Bond acceptable to Owner indemnifying Owner against any such lien, claim, security interest or encumbrance), and (2) all Work covered by this Pay Estimate is in accordance with the Contract Documents and is not defective. Contractor: Benchmark Construction of NWA, Inc. 10/31 /17 Signature and Date Approved By: City of Fayetteville (Engineering Division) 91 10/31/17 Signature and Date Original Contract Amount: IS 485,058.00 Approved Change Orders: 1 $ 283,299.56 Current Contract. Amount: 1 $ 768,357.56 Total Work to Date: $ 790,576.71 Materials on Nand: Less Materials Used: $ Subtotal: $ 790,576.71 Amount Due: 1 $ 790,576.71 Retaina a Previous Periods Pay Est. #1 $ 8,071.91 Pay Est. #2 $ 17,805.80 Pay Est. #3 0 Pay Est. #4 0 Pay Est. #5 $ 11,875.27 Retaina a This Period $ - Less Total Retaina a 10% of first 50% $ 37,752.98 Previous Payments Pay Est. #1 $ 76,614.70 Pay. Est. #2 $ 1.56,284:73 Pay Est. #3 $ 232,685.96 Pay Est. #4 $ 10,236.60 Pay. Est. #5 $ 22.725.61 Pay Est.#6 $ 21,311.93 Pay Est, #7 $ 141;86520 Less Total Previous Payments $ 661 724.73 Due and Pa able This Period: 1 $ 91,099.00 PAY ESTIMATE ##08 City of Fayetteville Fire Training Facility Cont. ITEM p FAY. ITEM rr ITEM DESCRIPTION UNITS UNIT PRICE PLAN OTY EXTEND. PRICE PREY. OTY I OTY. THIS EST OTY. TO DATE EARNED I TO DATE % OF PLAN EARNED THIS EST 1 Mobilization (Not to exceed 5% of total bid) LS $ 6,800.00 1 S 6.800.00 1.00 1.00 $ 6.800.00 100% S 2 Insurance and Bonding LS $ 9.200.00 1 $ 9.200.00 1.00 1.00 $ 9.200.00 100% $ 3 Trench & Excavation Safe Systems LS $ 300.00 1 $ 300.00 1.,00 1:00 $ 300.00 100% S 4 Clearing, Grubbing & Demo LS $ 3.200.00 1 $ 3200.00 1.00 1.00 $ 31200.00 100% S 5 Unclassllled Excavation Plan Quantity) CY $ 10.45 4818 $ 50.348.10 4,818.00 4,818.00 $ 50,348.10 100%1 S 6 Select Embankment Plan Quantity) CY $ 13.92 4318 $ 60.1106.56 4.468.00 4,468.00 $ 62 194.56 103 % $ 7' Su o rade Preparation Plan Ouanlit SY $ 2.32 5577 S 12,938.64 5.577.00 5.577:00 $ 12,938.64 1001k S a 4' To soil SY $ 4.74 2300 10 902.00 2.300.00 2,300.00 $ 10.902.00 100% 5 9 Undercut and Stone Backfill CY $ 18.90 too $ 1,890.00 107.00 107.00 $ 2,022.30 107% S 10 18" RCP Under Pavement Class IV LF $ 53.00 20 $ 1,060.00 20.00 20.00 $ 1.060.00 100% $ 11 18" RCP Class III LF $ 44.00 140 $ 6,160:00 140.00 140.OD $ 6.160.00 100% $ 12 24" RCP Class III _ LF $ 55.00 50 $ 2,750.00 50.00 50.00 $ 2.750.00 100% $ 13 14 18" CP FES_ _ _ 24" RCP FES� EA $ 660.00 _ 1 $ 660.00 1.00 1.00 $ 660.00 t00% $ EA $ 800.00 2 $ 1,600.00 2.00 2.00 $ 1.600.00 100% S 15 Detention Pond Outfall Structure _ EA _ $ _ 1 $ 3.175.00 1.00 1.00 $ 3.175.00 100% S 16 Rio Rap with Fitter Blanket 1' de th SY _3.175.00 $ 85.00 15 $ 1,275.00 15.00 15.00 $ 1.275.00 100% S 17 8" Aggregate Base Course (Class 7) SY $ 10.38 5577 $ 57.889.26 6,302.00 6.302.00 $ 65,414.76 113 % $ 18 Seeding and Mulch _ SY " $ _ _ 0.60 2300 S 1.380.00 4,739.00 4.739,00 $ 2.843.40 206% $ 19 Solid Sod _ SY $ 2.67 _ 1200 S 3.204.00 1,783.00 1,783.00 $ 4,760.61 1499/6 $ 20 Erosion Control LS $ 3.560.00 1 $ 3,560.00 1-DO 1.00 $ 3.560.00 10D°/ IS 21 Tree Protection Fencing, _ » _ _ LF $ 3.48 1 350 $ 1.218.00 508.00 508.00 $ 1,767.84 145P/ $ 22 6' Thick Wire Reinforced Concrete SY $�_ _4_7.00_ 3682 S 173.054.60 3,859.40 3,859.40 $ 181 391.80 105*4 S 23 6" Thick Concrete (Driveway) SY $ 51.00 1165 59.415.00 1 1.165.00 1,165.00 S 59,415.00 100*/ $ 24 IT Diameter Reinforced Concrete Pier _ VF $ 71.00 600 S 42.600.00 613.70 613.70 S 43.572.70 102°/ S 25 Detention Pond LS $ 1,400.00 1-.-- S 1,400.00 1.00 1.00 $ 1,400.00 100% $ 26 Water Quality Feature (Bioretention Basin) LS $ 2.760.00 _ _ 1 S 2.760.00 1.00 1.00 $ 2,760.00 100% $ 27 Water Oualit Feature Bioretention Foreba 1 LS $ 3,300.00 1 $ 3.300.00 1.00 1.00 $ 3.300.00 100% $ 28 Plantanus Occidentalis (Sycamore) EA $ 221.00 21.--. S 4.641.00 21.00 21.00.$ 4,641.00 1OD% $ 29 Ouercus Rubra (Red Oak), EA $ 221.00 21 $ 4.641.00 21.00 21.00 $ 4,641.00 100% $ 30 Acer Saccharum (Sugar Maple).__. EA $ 221.00 21 $ 4,641.00 21.00 21.00 $ 4,641.00 100% $ 31 2" Sch. 40 Electrical Conduit LF $ 11.00 175 S 1,925.00 138.OD 13B.00 $ 1,518.00 79 % $ 32 Additional Clearing, Grubbing and Demo for Change Order 1 LS $ 1.080.00 1 $ 1.080.00 1.00 1.00 S 1.080.00 100% $ 33 Ditch Grading on West Side of Pad Addition for Change Order 1 LS $ 1.440.00 1 $ 1.440.00 1.00 1.00 $ 1.440.00 1OD'/ $ 34 Additional Bonding and Insurance for Chanoe Order 1 LS $ 1.275.00 1 $ 1.275.00 1.00 1.00 $ 1,275.00 1OD*/, $ 35 Additional Construction Staking for Chan a Order 1 LS $ 350.00 1 S 350.00 1.00 1.00 $ 350.00 100% $ 36 Pre -Engineered Metal Buildi40'x100' CO2 LS $ IB2,198.00 1 $ 182.198.00 0.50 0.50 1.00 $ 182,198.00 100% $ 91,099.00 37 Mobilization CO2 LS $ 2.000.00 1 $ .2.000.00 1.00 1.00 $ 2,000.00 1 OD% $ 38 Gravel Access Drive to River CO3 LS $ 24.535.00 1 S 24.535.00 1.00 1.00 $ 24.535.00 100% $ 39 Additional Concrete Pier Pads CO3 LS 1.956.00 1 $ 1.956.00 1.00 1.OD $ 1,956.OD 1009% $ 40 Irrigation for Trees CO3 LS $ 15.530.00 1 $ 15 530.00 1.00 1.00 $ 15.530.00 10D % $ SUBTOTAL, SCHEDULE 1 .4 768;3S7S6' 1 " S '7111WI.71 I g 91,099.00 David Dayringer Submitted By Ob lQ City of Fayetteville Staff Review Form 2018-0078 Legistar File ID N/A City Council Meeting Date - Agenda Item Only' N/A for Non -Agenda Item 1/22/2018 Fire / _ Fire Department Submitted Date Division / Department Action Recommendation: W (L� 94-11 Staff recommends approval of Change Order #6 to the contract with Benchmark Construction for sidewalks, steps, concrete, and landings at training building. Budget Impact: 4470.300.8300-5804.00 Sales Tax Capital Account Number Fund 17001.1 Fire Training Grounds Project Number Project Title Budgeted Item? Yes Current Budget $ 1,033,138.00 Funds Obligated $ 925,210.39 Current Balance $ 107,927.61 Does item have a cost? Yes Item Cost $ 11,547.00 Budget Adjustment Attached? No Budget Adjustment Remaining Budget r$ 96,380.61 V20140710 Previous Ordinance or Resolution # #03-17/ 94-17. Original Contract Number: Approval Date: Comments: Resolution No. 03-17 awarded Bid Number 16-64 authorizing a contract with Benchmark Construction of NWA, Inc. in the amount of $485,058.00. Change Order #1 added $32,603.56 to the contract. Change Order #2 added $195,377 to the contract (Res #94-17). Change Order #3 added $42,021 to the, contract. Change Order #4 added $13,298. Change Order #5-$22,219.15. Change Order #6--$11,547. This will make the total contract amount with Benchmark $802,123.71 CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Jordan FROM: David Dayringer, Fire Chief " ? "d� DATE: January 22, 2018 SUBJECT: Approval of Change Order #6—Fire Training Grounds STAFF MEMO RECOMMENDATION: Staff recommends approval of Change Order #6 to the contract with Benchmark Construction for sidewalks, steps, concrete, and landings at training building. BACKGROUND: Benchmark has submitted an invoice for the additional work. The funds for proposed Change Order #6 will come from the prior approved contingency funds approved in Resolution 03-17. This will make the contract with Benchmark $802,123.71 ($485,058 +$32,603.56 + $195,377 + $42,021 + $13,298+ $22,219.15+$11,547). DISCUSSION: Benchmark Construction has provided a cost for changes which include the following: sidewalks, steps, concrete around 3 hydrants and 2 landings at training building. These changes total $11,547 over the current contract amount. BUDGET/STAFF IMPACT: The finances required for this project are already budgeted in the Fire Sales Tax Project: Fire . Training Grounds Attachments: Change Order #6 Documents Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 PAY ESTIMATE #09 City of Fayetteville Fire Training Facility Construction Period: 11/1/2017 - 12/31/2017 Date of Estimate: 10/31/2017 NTP Issued: 1/17/2017 166% Contract Time Used Substantial Completion: 8/15/2017 101 % Work Complete (% of Contract $'s) 210 Cal. Days Submitted By: Benchmark Construction of NWA, Inc. The contractor certifies that (1) title to all Work, materials, and equipment incorporated in the work, or otherwise listed in or covered by this and all previous Pay Estimates will pass to the Owner at time of payment free and and clear of all liens, claims, security interests and encumbrances (except such as are covered by Bond acceptable to Owner indemnifying Owner against any such lien, claim, security interest or encumbrance), and (2) all Work covered by this Pay Estimate is in accordance with the Contract Documents and is not defective. Contractor: Benchmark Construction of NWA, Inc. ,dam,.... ,�..r�6c 1-16-18 Signature and Date Approved By: City of Fayetteville (Engineering Division) Wry 1 /23/18 Signature and Date Original Contract Amount: $ 485,058.00 Approved Change Orders: $ 305,518.71 Current Contract Amount: $ 790,576.71 Total Work to Date: $ 802,123.71 Materials on Hand: Less Materials Used: $ - Subtotal: $ 802,123.71 Amount Due: 1 $ 802 123.71 Retaina a Previous Periods Pay Est. #1 $ 8,071.91 Pay Est. #2 $ 17,805.80 Pay Est. #3 0 Pay Est. #4 0 Pay Est. #5 $ 11,875.27 Retaina a This Period $ - Less Total Retaina a 10% of first 5% $ - Previous Payments Pay Est. #1 $ 76,614.70 Pay Est. #2 $ 156,284.73 Pay Est. #3 $ 232,685.96 Pay Est. #4 $ 10,236.60 Pay Est. #5 $ 22,725.61 Pay Est. #6 $ 21,311.93 Pay Est. #7 $ 141,865.20 Pay Est. #7 $ 91,099.00 Less Total Previous Payments $ 752 823.73 Due and Payable This Period: 1 $ 49,299.98 PAY ESTIMATE #09 City of Fayetteville Fire Training Facility Cont. ITEM # FAY. ITEM # ITEM DESCRIPTION UNITS UNIT PRICE PLAN QTY EXTEND. PRICE PREV. QTY QTY. THIS EST QTY. TO DATE EARNED TO DATE % OF PLAN EARNED THIS EST 1 Mobilization Not to exceed 5% of total bid LS $ 6,800.00 1 $ 6,800.00 1.00 1.00 $ 6,800.00 100% $ 2 Insurance and Bonding LS $ 9,200.00 1 $ 9,200.00 1.00 1.00 $ 9,200.00 100% $ 3 Trench & Excavation Safety Systems LS $ 300.00 1 $ 300.00 1.00 1.00 $ 30D.00 100% $ 4 Clearing, rubbin& Demo LS $ 3,200.00 1 $ 3,200.00 1.00 1.00 $ 3,200.00 100% $ 5 Unclassified Excavation Plan Quantity) CY $ 10.45 4818 $ 50,348.10 4,818.00 4,818.00 $ 50,348.10 100% $ 6 Select Embankment Plan Quantity) CY $ 13.92 4318 $ 60,106.56 4,468.00 4,468.00 $ 62,194.56 103 % $ 7 Subgrade Preparation Plan Quantity) SY $ 2.32 5577 $ 12,938.64 5,577.00 5,577.00 $ 12,938.64 100% $ 8 4" Topsoil SY $ 4.74 2300 $ 10,902.00 2,300.00 2,300.00 $ 10,902.00 100 % $ 9 Undercut and Stone Backfill CY $ 18.90 100 $ 1,890.00 107.00 107.00 $ 2,022.30 107 % $ 10 18" RCP Under Pavement Class $ 53.00 20 $ 1,060.00 20.00 - 20.00 $ 1 060.00 100% $ - 11 ---------------------------------IV ---------------------------------- 18" RCP Class III -----LF------ ------------------ -------------- 6,160.00 140.00 140.00 $ 6,160.00 100% $ ----C--C--s-- 24" ls ----LF----- -$- -----------44--.-0-0- $ -----1-4--0------ 50 $ 2 750.00 50.00 50.00 $ 2,750.00 100% $12 - 13 ------------------------------------------------------------------- 18" RCP FES ----------- EA ---------------- $ 660.00 --------- -----$ 1 $ 660.00 1.00 1.00 $ 660.00 100% $ 14 15 24" RCP FES ---------------------------------------------------------------------- Detention Pond Outfall Structure EA ----------- EA $ 800.00 ---------------- $ 2 -------------- 1 $ 1,600.00 $ 3,175.00 2.00 1.00 2.00 1.00 $ 1,600.00 $ 3,175.00 100% 100% $ $ 16 _ _ _ _ _ _ _ Rip Rap with Finer Blanket it_depthl _ _ _ _ _ _ _ _ - -- _ -- ----SY----- _ _3,175.00 - $ _ _ 85.00 - _ _ 15 - ------------ $ 1,275.00 15.00 15.00 $ 1,275.00 100% $ 17 8" Aggr�ate Base Course (Classy _ _ _ - _ _ _ SY $ _ _ 10.38 5577 _ $ 57,889.26 6,302.00 6,302.00 $ 65,414.76 113% $ 18 Seedingand Mulch _ _ ---------- ------------------ - _ SY $ _ 0.60 2300 _ - $ 1,380.00 4,739.00 4,739.00 $ 2,843.40 206% $ 19 Solid Sod SY $ 2.67 1200 $ 3,204.00 1,783.00 - 1 783.00 $ 4 760.61 149 % $- 20 ------------------------------------------------------------------ Erosion Control ----------- LS ------------------ $ 0 560,3560.0 -------------- 1 $ 3,560.00 1.00 1.00 $ 3,560.00 100% $ 21 -------------------------------------------------------------------- Tree Protection Fencing _ _ _ --------------------- ---------------------------- ----------- --- LF ------- $ 3.48 ------------- ------------- _350 - $ 1,218.00 508.00 508.00 $ 1,767.84 145% $ 22 6" Thick Wire Reinforced Concrete SY $ 47.00 3682 $ 173,054.00 3,859.40 3,859.40 $ 181,391.80 105 % $ 23 ----------------------------------------------------------------- 6" Thick_Concrete(Drivewayt-_____-_____________--________ ----------- ___SY___ ------------------ $ _ - 51.00 ------------ 1165 - $ 59,415.00 1,165.00 1,165.00 $ 59 415.00 100 % $ 24 2' Diameter Reinforced Concrete Pier VF $ 71.00 600 $ 42,600.00 613.70 613.70 $ 43,572.70 1021/6 $ 25 --------------------------------------------------------------------- Detention Pond ----------- LS ------------------- $ 1,400.00 -------------- 1 $ 1,400.00 1.00 - 1.00 $ 1,400.00 100% $ - 26 --------------------------------------------------------------- Water Quality Feature iBioretention Basing ------------------------------------ ----------- --- LS ___ ------------------ $ 2,760.00 --------------- -------------- 1 -------------- $ 2,760.00 1.00 1.00 $ 2,760.00 100 % $ 27 Water Quality Feature iBioretention ForebayZ_ _ _ ----------- --------------- --- LS $ 3,300.00 --------------- 1 -------------- $ 3,300.00 1.00 1.00 $ 3,300.00 100% $ 28 Plantanus Occidentalis1SycamoreL _ _ _ _ _ _ _ _ EA $ _ 221.00 _ 21 _ $ 4,641.00 21.00 21.00 $ 4,641.00 100% $ 29 Quercus RubraiRed Oak) _ _ _ _ _ _ _ _ EA $ _ _ 221.00 _ 21 _ $ 4,641.00 21.001 21.00 $ 4,641.00 100% $ 30 Acer Saccharum t u�ar Maples _ _ _ _ - _ _ -------- -- -- - - -- FJ� ---- ------ $ _ _ 221 00 - - -------- 21 - - - ------ -- $ 4,641.00 21.00 21.00 $ 4,641.00 100 % $ 31 2" Sch. 40 Electrical Conduit LF $ 11.00 175 $ 1,925.00 138.00 138.00 $ 1,518.00 79% $ 32 Additional Clearing, Grubbing and Demo for Change Order 1 LS $ 1,080.00 1 $ 1,080.00 1.00 1.00 $ 1,080.00 100% $ 33 Ditch Grading on West Side of Pad Addition for Change Order 1 LS $ 1,440.00 1 $ 1,440.00 1.00 1.00 $ 1,440.00 100% $ 34 Additional Bonding and Insurance for Change Order 1 LS $ 1,275.00 1 $ 1,275.00 1.00 1.00 $ 1,275.00 100% $ 35 Additional Construction Staking for Change Order 1 LS $ 350.00 1 $ 350.00 1.00 1.00 $ 350.00 100% $ 36 Pre -Engineered Metal Building 40'xl00' CO2 C04 LS $ 182,198.00 1 $ 182,198.00 1.00 1.00 $ 182,198.00 100% $ 37 Mobilization CO2 LS $ 2,000.00 1 $ 2,000.00 1.00 1.00 $ 2,000.00 100% $ 38 Gravel Access Drive to River CO3 LS $ 24,535.00 1 $ 24,535.00 1.00 1.00 $ 24,535.00 100% $ 39 Additional Concrete Pier Pads CO3 LS $ 1,956.00 1 $ 1,956.00 1.00 1.00 $ 1,956.00 100% $ 40 Irrigation for Trees CO3 LS $ 15 530.00 1 $ 15,530.00 1.00 1.00 $ 15,530.00 100% $ Chan a Order 5 LS $ 11,547.00 1 $ 11,547.00 1.00 1.00 $ 11,547.6-0-1 100% $ 11,547.00 RI IRTnTAIjRrHFDI II,Fj1 {����� 4na� �� [g=f3n?42-4171J �103% I$M1 j i5a7,nn1