Loading...
HomeMy WebLinkAbout76-17 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 76-17 File Number: 2017-0146 ELLINGSON CONTRACTING CHANGE ORDER #4: A RESOLUTION TO APPROVE CHANGE ORDER NO. 4 TO THE CONTRACT WITH JBZ, INC. D/B/A ELLINGSON CONTRACTING IN THE AMOUNT OF $87,541.00 FOR RENOVATIONS TO THE SENIOR CENTER'S HVAC DUCTING AND CONSTRUCTION OF A NEW DRINK BAR AND PARKING LOT, AND TO APPROVE AN ADDITIONAL PROJECT CONTINGENCY IN THE AMOUNT OF $13,000.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 4 to the contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of $87,541.00 for renovations to the Senior Center HVAC ducting and construction of a new drink bar and parking lot, and approves an additional project contingency in the amount of $13,000.00. PASSED and APPROVED on 3/21/2017 Page 1 Attest: Sondra E. Smith, City Clerk T0 OW � ►T►��r� rITY ., ,G Printed on 3/22117 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File - File Number: 2017-0146 Agenda Date: 3/21/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A. 9 ELLINGSON CONTRACTING CHANGE ORDER #4: A RESOLUTION TO APPROVE CHANGE ORDER NO. 4 TO THE CONTRACT WITH JBZ, INC. D/B/A ELLINGSON CONTRACTING IN THE AMOUNT OF $87,541.00 FOR RENOVATIONS TO THE SENIOR CENTER'S HVAC DUCTING AND CONSTRUCTION OF A NEW DRINK BAR AND PARKING LOT, AND TO APPROVE AN ADDITIONAL PROJECT CONTINGENCY IN THE AMOUNT OF $13,000.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 4 to the contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of $87,541.00 for renovations to the Senior Center HVAC ducting and construction of a new drink bar and parking lot, and approves an additional project contingency in the amount of $13,000.00. City of Fayetteville, Arkansas Page 1 Printed on 312212017 City of Fayetteville Staff Review Form 2017-0146 Legistar File ID 3/21/2017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Connie Edmonston/Wade Abernathy Submitted By 3/3/2017 Parks & Recreation / _ Parks & Recreation Department Submitted Date Division / Department Action Recommendation: Staff recommends approval of Change Order Four to contract #2415 with Ellingson Contracting for a contract increase in the amount of $87,541 with an additional $13,000 in project contingency for the renovation and expansion of the Walker Park Senior Activity and Wellness Center. Budget Impact: 4470.520.8520-5315.00 Sales Tax Capital Improvements Account Number Fund 15010.1 Walker Park Sr Activity & Wellness Ctr Project Number Project Title Budgeted Item? Yes Current Budget $ 386,578.00 Funds Obligated $ 243,370.00 Current Balance 14 3,208,0 Does item have a cost? Yes Item Cost $ 100,541.00 Budget Adjustment Attached? No Budget Adjustment Remaining Budget Previous Ordinance or Resolution # 109-16 Original Contract Number: 2415 Approval Date: Comments: CITY OF Fay31 T1 P ARK�' ANSAS MEETING OF MARCH 21, 2017 TO: Mayor and City Council THRU: Don Marr, Chief of Staff CITY COUNCIL AGENDA MEMO FROM: Connie Edmonston, Parks and Recreation Director Wade Abernathy, Facilities Management & Building Construction Manager DATE: March 3, 2017 SUBJECT: Change Order Four to Walker Park Senior Activity & Wellness Center Kitchen Renovation and Expansion Project RECOMMENDATION: Staff recommends approval of Change Order Four to contract #2415 with Ellingson Contracting for a contract increase in the amount of $87,541 with an additional $13,000 in project contingency for the renovation and expansion of the Walker Park Senior Activity and Wellness Center. BACKGROUND: Senior citizen participation in recreation programs as well as the number of meals served has been increasing over the past years at the Walker Park Senior Activity and Wellness Center. The Center prepares meals for the seniors at the Center, Hillcrest Towers, Fayetteville Meals on Wheels program, and children at the Elizabeth Richardson Center. In 2016, 41,771 meals were delivered in the Meals on Wheels program on Monday through Friday and on weekends, which was a 26.7 percent increase over the meals prepared and delivered in 2015. The Center provided 15,087 lunch meals to mobile senior who come to the Center and 12,000 meals were served to children at the Elizabeth Richardson Center in 2016. Recreational and exercise services provided to the senior community in 2016 hit an all-time high of 27,813 participants. The City has been dedicated to making improvements to the Walker Park Senior Activity and Wellness Center in phases to meet these growing needs. The highest priority was to expand the parking lot, kitchen and storage area. In 2015, the parking lot was expanded and deMx Architecture, P.A. was contracted to design improvements to the kitchen and food storage area. In June of 2016, a contract was entered with Ellingson Contracting in the amount of $233,740 and a project contingency of $30,153 for expansion and renovations to the kitchen. The contract was value engineered reducing the project amount by $53,560 to be within the budget. The Walmart Foundation donated $25,000 for this project. DISCUSSION: Community Development Block Grant (CBDG) funds have provided $85,207 to purchase kitchen furnishings of which some were included in the original contract. Equipment included a convection oven, range, countertop griddle, exhaust hood, dishwasher, walker -in freezer, reach - in refrigerator, pizza preparation refrigerator, electric fryer, work tables, and heated mobile Mailing Address: 113 W. Mountain Street www.fayetteville-aLgov Fayetteville, AR 72701 cabinet, all which make the kitchen more efficient to serve the increasing number of meals prepared. Due to the savings from the assistance of CBDG funds, Change Order Four will add back into the contract renovations for HVAC Ducting and a new drink bar. In addition, this change order will construct 11 additional parking spaces located on the south side of the existing parking lot. This parking lot expansion was eliminated from the original parking lot expansion project in 2015 due to limited funding. Parks Horticulture Staff will plant the parking lot's bio swale for this project. BUDGET/STAFF IMPACT: Total cost for Change Order Four is $87,541 plus a fifteen percent contingency in the amount of $13,000 for a total project of $100,541. Funds are available in project 15010.1 Walker Park Senior Activity and Wellness Center. Attachments: Change Order Four Resolution 109-16 a Document G701" - 2001 Change Order PROJECT: (Name and address) Fay. Senior Center Renovation Fayetteville, AR CHANGE ORDER NUMBER; 004 DATE: 2/28/17 ARCHITECT'S PROJECT NUMBER: 34415 C3` NER % ARCHITECT N. ,3()NTRAGTCR 50 TO CONTRACTOR: (Name and address) FIFILD l i Ellingson Contracting CONTRACT DATE. 6 7 7016 OTHER p PO Box 7202 CONTRACT FOR; General Construction Siloam Springs, AR 72761 The Contract is changed as follows: (Include, where applicable, any undisputed amount attributable to previously executed Construction Chmge Directives) See attachments provided by Ellingson Contracting (COR #S - Hood and HVAC Ducting, COR #9 - Drink Bar, COR #10 - Puking Lot - U -V -28) The original (C ontracl Surn) rias - $ 297 300 The net change by previously a=<,thorized Change Orders $ 29,836 The (Contract Sum) prior to this ctlarige Order was 5 25.8.264 The (Contrack Sum) will lie (ic rc<sed) by citis.Change Order in the amount of- 87,541 I'lre r;ew (Carltract Suer) , inl-hiding tlris Ci;a- qe Order, will be S 345,805 Tire Contract Time will be (un hwiged) by Zero { 0 ) days, Tlhc dam of Substantial t: ompleb an M aC the dace of this C hangT Order, lirerefore. is :unchanged (NOTE This Change Girder does not mchfdL- changes in the Coruroct Surra, 6-h ocr rime or { uaroweed ! 1=imum Price that hurlw been outhori_ed by, t"r,rrsre'rirtion ( hongv Oira• clovr trout/ rhe rom and tare have brew agreed upan by both the Owner and contractor, in rvlrrch erase a C"'sang'? Or d§> "- !s v-cectrtedlo superes'ede the C'orfs(ruction Change Direcirve) NQY VAL1id UNTIL SIGNED SY f A CWECT, CONTRACTOR AND OWNER. — — deNIX 01i of faxetmeville ARr".tfT'-CT Tirm CON 'PAC7CR ft ant atone) OWNER fF irrrr mwiet 104 N. East Ave. PO Brox 7202 10 4 West kWunt lin simct Fayetteville, AR 72701 � :� tr= s; rings, :AR 72761 Payettew' le, Alt 717(1 i a�t:�d RE5II&- "� [� _ #R?BES R 6Y "S!+ )!,..rwv) BY (Signature) ! gooMrel Timothy W. Maddox, Principal David Ellingson, President Lioneld fur n, NI, 7r (TYPed name) (Typed name) %Typedrt:rrnP) 1-1"7 PATE: ? OAT'; DATE A€A Dosuomant 0701 �qp1, Ca} yri¢g8}s i9%9. 4957 Z]i q std 20::9 b1 he Aco r n Inrfil of Amn 4autw. Ail rIVhtA rai5a v". fl dncurnent was c;r�rWm on G2v71�'7:r 17 4.9 ,.ce-.'ha :stuns of A[r? Jvo,am�4�ts- �!-Dcrna!sd"' otdor 1102CO95baU49 end is na!'ur dnrurrent by Tho Arrenean ;niMuo atAmhitecte for ane-4r.se uaa ors;y and my nol de reptrduced prar to os oampie!lon Ellingson Contracting ellingson contracting PO Box 7202 Siloam Springs, AR 72761 CHANGE ORDER REQUEST Date: February 8th, 2017 To: Tim Maddox or Seth Spradlin DeMx Architects Re: Fayetteville Senior Center Kitchen Addition 945 S. College Ave Fayetteville, AR 72701 Change Order Request #8 Description of Proposed Change: Installation of grease duct, changing out exhaust fan, modifying curb with adapter, increase make-up air fan speed, providing air conditioning ducts and grills as shown. (See quote attached) . Work excludes providing hood or exhaust fan, and excludes mounting hoods. The total cost of this proposal is as follows: Labor $360.00 Material $50.00 Equipment $0.00 Subcontractors $14,377.42 Sub Total $14,787.42 Bond (2.6%) $384.47 OH & P (12.5%) $1,848.43 Lump Sum Total $16,636 Upon your approval, we intend to make this change/addition immediately. If you have any questions please feel free to contact me. Sincerely, �� ►moi. ��.� David R. Ellingson Acceptance of Change Ellingson Contracting Name Mobile: 479-215-6889 Signature Date •.. ...� ..., t.. �. . .� ,r,. fi JD 5 Air Codditioning, Heating F &Solar I (479)530-9526 February 4"-2017 Filinpun Contracting 1'ayettevliie Seoifar Center Project JDS Air Cunditionlaag, lierating anti Solar Froin the plans provldO and the scope of work to bre performcdz I- Purchase, fabrication slid installation of all said egplpmcQt sod material need�d (excluding hoods) ans 2- All hanging strap,rcrewx. to d duct sealant � Also Excluding Exhaust by 1i �. pa anExhaust Fans Provided by City, � 3- Fabricate new lb gauge grease duct per plains Installed by Contractor, �) ,i- Tie now 1+6 [gauge weldcd grease duct Into existing grime duct fff DRE, EC 5- Change exinting Exhaust fan to new larger exhaust fan Ci- Build and install curb adapter to accommodate new larger exitatist No '% Increase nisjkt up air fait speed to supply hoth olid and new kkehen hoods make-up air 8- Re work supply air duct in mechanical merranine for make-up sir 9- Connect to existing supply air duct allowing ror3110" duct rens for conditioned air into new kitchen 10• All grecs-e duct will have layers of fire wrap having overlapping joints on the seams 1i- All air ducts for condittoning air will have 2" foil back duct wrap 12- Cutting ofexisting well above anti around new hoods to atlow for all duct Grease duct, make-up air duct and supply conditioned air educt to be properly installcd Exclusions: 1- Any roof work retiuiring cutting of roof that would also require &waling of roof 2- Any electrical work The grand to rad and including tax, tabor and lyr l4bor warranty comes to. $19,137.67 Price Without Exhaust Fans is: Please call with any quest€ons you may have. Jaswtt $14,377.42 -DRE, EC '. ilk SIGNATURE MATE A • t Ellingson Contracting ellingson contracting PO Box 7202 Siloam Springs, AR 72761 CHANGE ORDER REQUEST Date: February 7th, 2017 To: Tim Maddox or Seth Spradlin DeMx Architects Re: Fayetteville Senior Center Kitchen Addition 945 S. College Ave Fayetteville, AR 72701 Change Order Request #9 Description of Proposed Change: Add back New Drink Bar work from Original Scope. Original credit of $20,300 was omiting the New Drink Bar and Demo of the Existing Drink Counter. This COR #9 only adds back the New Drink Bar work, and excludes demo, caping lines, or patching at the Existing Drink Counter, The total cost of this proposal is as follows: Labor $0,00 Material $0.00 Equipment $0.00 Subcontractors $16,500.00 Sub Total $16,500.00 Bond (2.6%) $429,00 OH & P (12.5%) $2,062.50 Lump Sum Total $18,563 Upon your approval, we intend to make this change/addition immediately. If you have any questions please feel free to contact me. Sincerely, ra� David R. Ellingson Ellingson Contracting Name Mobile: 479-215-6889 Signature Date Acceptance of Change Ellingson Contracting ellingson contracting PO Box 7202 Siloam Springs, AR 72761 CHANGE ORDER REQUEST Date: February 28th, 2017 To: Tim Maddox or Seth Spradlin DeMx Architects Re: Fayetteville Senior Center Kitchen Addition 945 S. College Ave Fayetteville, AR 72701 Change Order Request #10 Description of Proposed Change: Add additional parking lot. Includes limited existing curb demo, dirt work, grading, gravel, curb and gutter, drainage flume, 2" asphalt paving, lot striping, backfull curbs with topsoil, and seed & straw mutch exposed topsoil. Pricing includes 20 CY of bioswale soil matrix material. Also demo and pave 4'x24' asphalt section, and demo and repour 8'x8' concrete pad. The total cost of this proposal is as follows: Labor $650.00 Material $720.00 Equipment $0.00 Subcontractors $45,156.00 Sub Total $46,526.00 Bond (2.6%) $1,209.68 OH & P (12.5%) $5,815.75 Lump Sum Total $52,342 Upon your approval, we intend to make this change/addition immediately. If you have any questions please feel free to contact me. Sincerely, David R. Ellingson Ellingson Contracting —Name Mobile: 479-215-6889 Signature Date Acceptance of Change OIVLIN50N SPI-I, L Teo.. INC cr PROPOSAL Tomlinson Asphalt Co., Inc. 1411 W. Van Asche Dr. Fayetteville, Ar 72704 PH: (479)521-3179 FX: (479)521-6539 WEB: tomlinsonasphalt.com Submitted To: David Ellingson Const. Job Name: Fay. Sr. Center- parking addition Street Address: Job Location: S. College st., Fay. AR City: Date: February 16, 2017 State: The following items of work are required to complete the parking addition per plan: Item 1) Demo and mobilization..........................................................................._.... $ 4,112.00 Item 2) Common Excavation with offsite import ........................................................... $ 12,337.00 Item 3) Fine grading of subgrade............................................................................. $ 1,850.00 Item 4) 6" class 7 base course under pavement and gravel drive extension ................... I....... $ 6,677.00 Item 5) Standard 2' type A concrete curb and gutter ......................................................$ 3,978.00 Item 6) 2" thick Asphalt paving on approx. 3500 sf....................................................... $ 6,347.00 Item -7) Backfill curbs with onsite topsoil, seed and straw mulch ....................................... $ 2,988.00 Item 8) Erosion Control with tree protection fencing....................................................... $ 1,476.00 Item 9) Concrete drainage flume ........................................... - ... ,.......................... $ 700.00 Item 10) Pavement Markings .................... --.............. ,...... .............. ....................... $ 400.00 Total Cost $ 40,865.00 No stakeout included. No testing included. Ark. Contractor's lis. no. 0040940817 Price good for 60 days. We herby propose to furnish materials and labor — complete and in accordance with the above specifications for the sum of Forty thousand eight hundred sixty five and nol100 dollars ( $40.865.0(} ) with payment to be made as follows: Within 45 days of completion. All materials guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. Submitted by:Mwi. Mahaffey PE Authorized Signature: If proposal is acceptable, please sign and return the original so that the work can be scheduled. Acceptance of Proposal The above prices, specificati`oift-a df conditions are satisfactory and are h—ereby accepted -You are authorized to do the work as specified. - Accepted By: Signature: Date: IVA NVA MW 3 NOISNVdX3 101 MOM NOS17a" 7ZI 8113 N 10 JN3�C3 com a ,b 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 109-16 File Number: 2016-0269 BID #16-23 JBZ, INC. D/B/A ELLINGSON CONTRACTING: A RESOLUTION TO AWARD BID # 16-23 AND APPROVE A CONTRACT WITH JBZ, INC. D/B/A ELLINGSON CONTRACTING IN THE AMOUNT OF' $287,300.00 FOR THE CONSTRUCTION OF KITCHEN RENOVATIONS AT THE FAYETTEVILLE SENIOR CENTER; TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $30,153.00; TO APPROVE CHANGE ORDER NO. 1 TO REFLECT VALUE ENGINEERING ITEMS AND REDUCE THE CONTRACT AMOUNT BY $53,560.00; AND TO APPROVE A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid # 16-23 and approves a contract with JBZ, Inc. d/b/a Ellingson Contracting in the amount of $287,300.00 for the construction of .kitchen renovations at the Fayetteville Senior Center, and further approves a project contingency in the amount of $30,153.00. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 1 to the contract with JBZ, Inc. d/b/a Ellingson Contracting to reflect value engineering items and reduce the contract amount by $53,560.00. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. PASSED and APPROVED on 6/7/2016 Page f Printed on 618116 Resolution: 109-16 File Number: 2016-0269 Attest: 0,40 Sondra E. Smith, City Clerk Treasurer ����, u r ut trir✓ �F�►�g,Y� ► 7F?l^ j✓r r ' fi�ri t r N fes+' 'f • � i� S klflWI rfr�r�ii ilii i ! �*L� Page 2 Printed on 618116 ELLINGSON CONTRACTING CHANGE ORDER #5 7 &-l7 City of Fayetteville Staff Review Form 2017-0398 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Connie Edmonston/Wade Abernathy 7/17/2017 PARKS & RECREATION (520) Submitted By Submitted Date Division / Department Action Recommendation: Staff recomends approval of Change Order #5 to contract #2415 with Ellingson Contracting for a contract increase of $18,440 for the addition of staff restroom at Walker Park Senior Activity and Wellness Center 4470.520.8520-5315.00 Account Number 15010.1 Project Number Budget Impact: Sales Tax Capital Imporvements Fund Walker Park Sr. Activity & Welness Ctr. Project Title Budgeted Item? . Yes Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? NA Budget Adjustment Remaining Budget $ 29,018.43 I $ 29,018.43 $ 18,440.00 $ 10,578.43 V20140710 Previous Ordinance or Resolution # 1170A tDWO Res 76-17 Original Contract Number: Comments: 2415 Approval Date: {—I� CITY OF FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Don Marr. Chief of Staff STAFF MEMO FROM: Connie Edmonston, Parks and Recreation Director Wade Abernathy, Facilities Management & Building Construction Manager DATE: July, 17, 2017 SUBJECT: Change Order #5 to Walker Park Senior Activity & Wellness Center Kitchen Renovation and Expansion Project RECOMMENDATION: Staff Recommends approval of change Order #5 to contract #2415 with Ellingson Contracting for a contract increase of $18,440 for the addition of staff restroom at Walker Park Senior Activity and Wellness Center. BACKGROUND: At the meeting of June 7, 2016, Council Approved a Contract with Ellingson Contracting for Phase 1 in 2016 and Phase 2 in 2017. In October of 2016, Legistar Id.# 2016-0514 was approved recognizing $95,000 of CDBG funds and change order #2, for site drainage. In January of 2017, Legistar Id# 2017-0002 was approved recognizing $25,000 for a Walmart Grant and change order #3 for concrete roofing tiles and gutters. In March of 2017, Legistar Id# 2017-0146 was approved for Chage Order #4 to add a parking lot, and Value Engineer items back into the project. DISCUSSION: Change Order #5 includes the adding of a staff toilet to the Sr. Center. Currently the staff share restroom facilities with the Public. The proposed Staff restroom will be centrally located for access of both Administrative Staff, but also Kitchen Staff. The new plumbing will also provide a accessibly mop sink for the kitchen. BUDGET/STAFF IMPACT: The'Chahge Order amount of $18,440 will come out of the project contingency fund. Attachments: AIA Contract Change Order Supporting Change Order Documentation Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Document G701T" - 2001 Change Order PROJECT: (Nance and address) CHANGE ORDER NUMBER: 005. OWNER Fay. Senior Center Renovation DATE: 6/302017 Fayetteville. AIR ARCHITECT TO CONTRACTOR: (Name and address) Ellingson Contracting PO Box 7202 Siloam SDrinRs. AR 72761 ARCHITECT'S PROJECT NUMBER: 34415 CONTRACT DATE: 6/72016 CONTRACT FOR: General Construction CONTRACTOR FIELD ❑ OTHER ❑ The Contract is changed as follows: (include. where applicable, any undisputed amount attributable to previously execided Construction Change Directives.) See attachments provided by Ellingson Contracting (COR BI 1 - Added Restroom). Phis includes relocating the existing mop sink 10' to the east for $350. The original (Contract Sum) was $ _ _287,300. The net change by previously authorized Change Orders $ _ _ _ -.58,505 The (Contract Sum) prior to this Change Order was $ __345,805 The (Contract Sum) will be (increased) by this Change Order in the amount of $ The new (Contract Sum) , including this Change Order; will be It 364,245 The Contract Time will be (unchanged) by Zero ( 0 ) days. 1'he date of Substantial Completion as of the date or this Change Order, therefore, is unchanged. (NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Marinnon Price that have been outhorired by Construction Change Directive until the cost card time have been agreed upon by both the Avner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.) NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. deMx architecture ARCHITECT (Firm name) 104 N. East Ave. Fayetteville. AR 72701 ADDRESS _ BY Timothy W. Maddox, Principal f' (Typed name) DATE Ellingson Contracting __ CONTRACTOR (Firm ionic) PO Box 7202 Siloam Springs, AR 72761 ADDflESS David Ellingson, President_ (Typed name) 6/30/17 DATE City of Fa etteville OWNER (Firm name) 113 West Mountain Street Faye ille, A 2701 0o s_ B (Signature) Lion_eld an, Mayor (TYPedname) "60 _. DATE AIA Document G701w — 3001. Copyright 01979, 1987, 2000 and 7001 by The American Institute of Architects. All rights reserved. WARNING: This AIA Documont Is protected by V S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or aey ponlon at it may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was created on 06r2g/2017 17:11:05 under the terms 01 AIA Documents -on -Demand— order no. 2009642503 and is not for resale. This document is licensed by The Amencam Institute of Architects for one-time use only, and may not be reproduced prior to its completion Cellingson contracting CHANGE ORDER REQUEST Date: 5/9/2017 To: Tim Maddox or Seth Spradlin DeMx Architects 104 North East Avenue Fayetteville, AR 72701 Re: Fayetteville Senior Center Kitchen Addition 945 S. College Ave Fayetteville , AR 72701 Change Order Request N 11 Description of Proposed Change: Ellingson Contracting PO Box 7202 Siloam Springs, AR 72761 Pricing for the following scope includes sectioning of the existing storage room and convert to a restroom. Framing will be to the bottom of the ACTgrid and new restroom fixtures as shown in the drawing would be provided with accessories including (1) TP Holder, (1) napkin dispenser, (1) PT holder, (1) Soap Dispenser and (1) Mirror. One new recessed light fixture will be installed and anew exhaust fan with ductwork will be installed. Base price assumes trenching no more than 15 LF and pourback. Flooring is to be sealed concrete. ***See the alternate for avoiding all trenching and installing a pump that will tie into an existing vent line. ••' The total cost of this proposal is as follows: Labor Material Equipment $3,446.40 $1,555.00 $444.64 Subcontractors $10,386.90 Sub Total $15,832.94 Sales Tax $152.00 Bond (3%) $522.00 OH & P (10%) $1,583.00 Lump Sum Alternate - DEDUCT for pump to vent line Upon your approval, we intend to make this change/addition immediately. If you have any questions please feel free to contact me. (3,970.00) To Relocate Mop Sink approximately 10' east down the wall. ADD $350 DRE -EC otal Added Restroom 518,0 -ump Alternate Plumbing Credit 1 Scaning Credit i Concrete Trench Credit - 1 Concrete Pourback Credit t otal Pump Alternate Bond Contractor Fee On Package I - 1-11-100/d 13%I -$1516 Supervision Temp Toilet GPR Saw Cutting Concrete Pourback Door Wall Framing/Drywall Drywall Finishing Sealed Concrete Painting Accessories Plumbing HVAC Electrical Equipment Rental Total Restroom 1 IT 540 200 _ 1,000 1,220 1 IT �1 1 IT _ IT 2 - ---1 - -1 CY - EA �. IT 1,084 - - — 790 1,640 1 IT 1,410 1 _ IT 492 1 1 1 IT IT -- IT 800 558 --------� 3,875 1 1 t IT 900 _ - IT 980 IT 345 _ - Subtotal Estimated Costs $15,833 Sales Tax Contractor Fee On Package Bond 1 1 IT 10%$1,583 3152 $522 1 3% otal Added Restroom 518,0 -ump Alternate Plumbing Credit 1 Scaning Credit i Concrete Trench Credit - 1 Concrete Pourback Credit t otal Pump Alternate Bond Contractor Fee On Package I - 1-11-100/d 13%I -$1516