HomeMy WebLinkAboutORDINANCE 5956113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5956 File Number: 2017-0109 JMSH, LLC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND TO APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC. FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00 WHEREAS, City staff recommends that we utilize the JMSH, LLC's engineer and construction team to enlarge a water main for about 160 feet of a water main and for about 275 feet of a sewer main that JMSH, LLC needs to build in a smaller dimension for its proposed development; and WHEREAS, anticipated growth in this area will need the larger dimensional water and sewer mains which will be an improvement to our water and sewer system's capacities; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with JMSH, LLC. for the installation of water and sewer mains along a portion of North Assembly Drive north of East Maple Street with the estimated amount to be paid by the City of Fayetteville not to exceed $31,800.00, and further approves a project contingency in the amount of $6,360.00 for a total Page 1 Printed on 3/8/17 Ordinance: 5956 File Number.' 2017-0109 of $38,160.00. PASSED and APPROVED on 3/7/2017 Attest: Sondra E. Smith, City Clerk Trea��r�t���! FAYE= EVIU E Az •• 9 5 .' Page 2 Printed on 3/8/17 EXHIBIT A Per aL-��- J C-7tr , 27 f \ 10 `►` LOT LT N E �y , -4 -r �.. 'STT cr.. S"+per vaLvv_��,! 5 R E`r� cjvl. IPV L 412 i ANJi OL*7 Gray ihw6Lr,peg C -Ta nsr �L. l r V 0100 vpvi pvc PeR call -ris Zr*,A�' i.s cinT — L &TE.,R..AI,-L GTS TA"Ps-i*& ` 07 t" C;iy-)flr�ovkoville. 1R J20:16 WATER AND SEWER IMPROVEMENT CONCEPT PLAN 412 NORTH ASSEMBLY DRIVE - FAYETTEVILLE, ARKANSAS ALL IMPROVEMENTS TO BE IN ACCORDANCE WITH CITY OF FAYETTEVILLE STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES. SCALE 1" = 60' 8����17 co EXHIBIT B S&K Dirtworks, LLC Rogers, Arkansas 72758 I Name /Address I Baumann & Crosno Project Quote Date Quote# 2/8/2017 016-113 Signature Phone # 479-631-7400 Project 412 N. Assembly Wa... Description Qty Cost Total Tap 8" PVC water main per city detail W14 with pavement repair 1 5,600.00 5,600.00 8" C-900 DR 14 PVC per city detail W2 160 100.00 16,000.00 8" Gate valve per city detail W5 2 2,000.00 4,000.00 8" Cap and plug per city detail W19 2 800.00 1,600.00 New service and double meter box per city detail W1 1 1,050.00 1,050.00 New service and single meter box per city detail W1 l 1 950.00 950.00 Testing 1 3,000.00 3,000.00 8" SDR -26 PVC per city detail S2 (4'-6' depth) 275 72.00 19,800.00 4' diameter sanitary sewer manhole per city detail S4 2 3,000.00 6,000.00 Service lateral per city detail S15 2 1,000.00 2,000.00 Testing 1 3,600.00 3,600.00 NOTE: Baumnn & Crosno will be responsible for all staking and layout. Total $63,600.00 Signature Phone # 479-631-7400 City of Fayetteville, Arkansas 113 West Mountain Street 4 Fayetteville, AR 72701 (479) 575-8323 I' !S Text File `~--' File Number: 2017-0109 Agenda Date: 3/7/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 2 JMSH, LLC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND TO APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC. FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00 WHEREAS, City staff recommends that we utilize the JMSH, LLC's engineer and construction team to enlarge a water main for about 160 feet of a water main and for about 275 feet of a sewer main that JMSH, LLC needs to build in a smaller dimension for its proposed development; and WHEREAS, anticipated growth in this area will need the larger dimensional water and sewer mains which will be an improvement to our water and sewer system's capacities; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with JMSH, LLC. for the installation of water and sewer mains along a portion of North Assembly Drive north of East Maple Street with the estimated amount to be paid by the City of Fayetteville not to exceed $31,800.00, and further approves a project contingency in the amount of $6,360.00 for a total of $38,160.00. City of Fayetteville, Arkansas Page 1 Printed on 3/8/2017 I City of Fayetteville Staff Review Form Leistar File ID 3/7/2,017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 2/16/2017 Utilities Director/ Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00. Original Contract Number: Comments: Approval Date: Budget Impact: 5400.720.5600-5808.00 Water/Sewer Account Number Fund 04039.1 Water/Sewer Impact Fee Cost Sharing Projects Project Number Project Title Budgeted Item? Yes Current Budget $ 1,230,231.00 Funds Obligated $ 103,665.15 Current Balance � Does item have a cost? Yes Item Cost $ 38,160.00 Budget Adjustment Attached? No Budget Adjustment Remaining Budget V20140710 Previous Ordinance or Resolution # Original Contract Number: Comments: Approval Date: CITY OF Fay% —lle ARKANSAS MEETING OF MARCH 7, 2017 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Water & Sewer Committee FROM: Tim Nyander, Utilities Director DATE: February 17, 2017 CITY COUNCIL AGENDA MEMO SUBJECT: Cost Share Agreement with JMSH, LLC RECOMMENDATION: Staff recommends approval of a cost share agreement between the City of Fayetteville and JMSH, LLC to share the costs of installing a water and sewer main in North Assembly Drive north of East Maple Street. The estimated total cost of the project is $63,600.00 The City's portion of the cost share is 50% of the estimated project cost, in the amount of $31,800.00. A 20% contingency fund ($6,360.00) will be added to account for unexpected costs, to make the total value of the cost share $38,160.00. BACKGROUND: ' JMSH, LLC has requested that the City share in the cost of installing an 8 -inch water line -and an 8 -inch sewer line along a portion of Assembly Drive. North of -Maple Street, a distance of approximately 160 feet of water line, and 275 feet of sewer line, so that JMHS, LLC may develop the property located near the intersection of Assembly Drive and Vinson Avenue. DISCUSSION: Constructing these segments of 8 -inch water and sewer main will allow development of these properties and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main. BUDGET/STAFF IMPACT: Funds for the City portion of work are available in the Water and Sewer Impact Fee Cost Sharing Project. The final actual cost is based on the bids received by the developer of this project. Attachments: Staff Review Form Cost -Share Agreement Exhibit A - Map of Area Exhibit B - Project Quote Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL AGREEMENT FOR COST SHARE OF WATER AND SEWER MAIN INSTALLATION COSTS This Agreement, made and entered into on this 13 stay of March, 2017, by and between the City of Fayetteville, Arkansas ("City") and JMSH, LLC, witnesseth: WHEREAS, JMSH, LLC has requested that the City share in the cost of constructing approximately 160 feet of 8 -inch water main and approximately 275 feet of 8 -inch sewer main along a portion of North Assembly Drive north of East Maple Street so that JMSH, LLC may develop the property located near the intersection of North Assembly Drive and -North Vinson Avenue; and WHEREAS, constructing this segment of 8 -inch water main and 8 -inch sewer main will allow development of this property, will extend water and sewer service to an area of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by the water and sewer mains; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system." NOW, THEREFORE, the City of Fayetteville, Arkansas and JMSH, LLC agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse JMSH, LLC for 50% of the cost to install approximately 160 linear feet of 8 -inch water main, and approximately 275 linear feet of 8 -inch sewer main in the area identified in Exhibit "A" up to a maximum -not -to -exceed amount of $31,800.00 with a contingency fund not -to -exceed $6,360.00, as was estimated by the builder's representative and shown on Exhibit `B", attached. B. Payments due to JMSH, LLC, shall be remitted within sixty (60) days after receipt of valid invoices upon completion of the project. Page 1 of 2 2. JMSH, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water and sewer main installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Submit all required plans and specifications to the City and receive approval from the City's Engineering and Utilities Departments prior to commencing work on the project. C. Provide a copy of the invoices from the Contractor upon City approval of the water and sewer main upgrades. D. Pay for the water and sewer main installation (with reimbursement of 50% of the cost by the City of Fayetteville in a not -to -exceed amount of $31,800.00 with a contingency fund not -to -exceed $6,360.00). IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: JMSH,LLC By: SATE _6 HAMILTON, Managing Member ATTEST/WITNESS: MICHAR LOUDEN Notary Public-ArkansaG Washington County My Commission Expires 09-01-x026 Commission )2698672 CITY OF FAYETTEVILLE, ATTEST: By: 4.,�r4 SONDRA SMITH, s fj� 1.� 611Y 0,�.'•G r: X47 � •�' : FAYMEVILLE ; "- E r� �'TkANS�'•�•� 0�111f►�'1 Page 2 of 2 I EXHIBIT A WATER AND SEWER IMPROVEMENT CONCEPT PLAN 412 NORTH ASSEMBLY DRIVE - FAYETTEVILLE, ARKANSAS ALL IMPROVEMENTS TO BE IN ACCORDANCE WITH CITY OF FAYETTEVILLE STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES. SCALE 1" = 60' EXHIBIT B S&K Dirtworks, LLC Rogers, Arkansas 72758 I Name /Address I Baumann & Crosno Project Quote Date Quote# 2/8/2017 016-113 Signature Phone # 479-631-7400 Project 412 N. Assembly Wa.. Description Qty Cost Total Tap 8" PVC water main per city detail W14 with pavement repair 1 5,600.00 5,600.00 8" C-900 DR 14 PVC per city detail W2 160 100.00 16,000.00 8" Gate valve per city detail W5 2 2,000.00 4,000.00 8" Cap and plug per city detail W19 2 800.00 1,600.00 New service and double meter box per city detail W11 1 1,050.00 1,050.00 New service and single meter box per city detail W 11 1 950.00 950.00 Testing 1 3,000.00 3,000.00 8" SDR -26 PVC per city detail S2 (4'-6' depth) 275 72.00 19,800.00 4' diameter sanitary sewer manhole per city detail S4 2 3,000.00 6,000.00 Service lateral per city detail S15 2 1,000.00 2,000.00 Testing 1 3,600.00 3,600.00 NOTE: Baurmm & Crosno will be responsible f6r all staking and layout. Total $63,600.00 Signature Phone # 479-631-7400 NoRTHWESTARKANsAs Democrat IF aze#e ".i,. BOX' AFFIDAVIT OF PUBLICATION I Karen Caler, do solemnly swear that I am the Legal Clerk of the Northwest Arkansas Democrat -Gazette, printed and published in Washington County and Benton County, Arkansas, and of bona fide circulation, that from my own personal knowledge and reference to the files of said publication, the advertisement of - CITY OF FAYETTEVILLE Ord. 5956 Was inserted in the Regular Edition on: March 16, 2017 Publication Charges: $ 135.20 Karen Caler 'v Subscribed and sworn to before me This 20 day of XAA 12017. W.� Notary Public My Commission Expires: 4aVI-414-- 1 t . nil * *NOTE* * Please do not pay from Affidavit. Invoice will be sent. APR 0 3 2017 CITY OF FAYETTEVILLE CITY CLERK'S OFFICE Ordinance: 5956 File Number: 2017-0109 JMSH, LLC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND TO APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC. FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00 WHEREAS, City staff recommends that we utilize the JMSH, LLC's engineer and construction team to enlarge a water main for about 160 feet of a water main and for about 275 feet of a sewer main that JMSH, LLC needs to build in a smaller dimension for its proposed development; and WHEREAS, anticipated growth in this area will need the larger dimensional water and sewer mains which will be an improvement to our water and sewer system's capacities; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on- site installing the larger line for the developers project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1; That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with JMSH, LLC. for the installation of water and sewer mains along a portion of North Assembly Drive north of East Maple Street with the estimated amount to be paid by the City of Fayetteville not to exceed $31,800.00, and further approves a project contingency in the amount of $6,360.00 for a total of $38,160.00. PASSED and APPROVED on 3/7/2017 Approved: Lioneld Jordan, Mayor Attest: Sondra E. Smith, City Clerk Treasurer 74059432 March 16, 2017 I Tim Nyander JMSH, LLC /WAT___ AND SEWER COST SHARE ON NORTH ASSEMBLY DRIVE/Ord 5956 City of Fayetteville Staff Review Form 2017-0471 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 8/24/2017 Utilities Director / Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: APPROVAL TO USE CONTINGENCY FUNDS IN THE AMOUNT OF $6,360.00 FOR THE COST SHARE AGREEMENT WITH JMSH, LLC FOR A WATER AND SEWER COST SHARE ON NORTH ASSEMBLY DRIVE. Comments: Budget Impact: 5400.720.5600-5808.00 Water/Sewer Account Number - Fund 04039.1 Water/Sewer Impact Fee Cost Sharing Project Project Number-' Project Title Budgeted Item? Yes Current Budget $ 1,230,231.00 Funds Obligated $ 214,414.00 Current Balance �$ 1,015,817, 0{ Does item have a cost? Yes Item Cost $ 6,360.00 Budget Adjustment Attached? No Budget Adjustment $ - Remaining Budget $ 1,009,457.00 V20140710 Previous Ordinance or Resolution # Ord. 5956 Original Contract Number: Q Approval Date: Comments: CITY OF FAYETTEVILLE IARKANSAS TO: Mayor Lioneld Jordan THRU: Don Marr, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: IAugust 24, 2017 STAFF MEMO SUBJECT: Approval of the use of contingency funds for the Cost Share Agreement with JMSH, LLC RECOMMENDATION: Staff recommends approval to use contingency funds in the amount of $6,360.00 for -the cost share agreement with JMSH, LLC for a water and sewer cost share on North Assembly Drive. BACKGROUND: The cost share agreement with JMSH, LLC was approved on March 7, 2017 by Ordinance 5956. The cost share project was for the installation of water and sewer mains along a portion of North Assembly Drive north of East Maple Street. The agreement was for a not -to -exceed amount of $31,800.00, with a project contingency of $6,360.00.. DISCUSSION: Due to the increases in project costs, the utilization of ,the entire contingency is needed to pay JMSH, LLC in the amount of $6,360.00. The total invoiced amount that is due to JMSH, LLC is $38,160.00. BUDGET/STAFF IMPACT: Funds are available in the Water & Sewer Impact Fee Cost Sharing Project. Attachments: Invoice from JMSH, LLC Ordinance 5956 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 J MSH LLC Invoice Architect & Engineer Architect & Engineer Survey Lot Split Off -Site Imp. Off -Site Imp. Off -Site Imp. Architect & Engineer Total Costs 50% of Costs Actual Cost Sharing Amount Project Contingency Total Due from City Civil 4/1/2017 $ 3,000 Civil 4/20/2017 $ 2,000 Survey 8/2/2017 $ 3,467.50 Utilities Wo 6/20/2017 $ 29,760.00 Utilities Wo 7/7/2017 $ 27,740.00 Utilities Wo 8/10/2017 $ 14,732.00 Civil 8/10/2017 $ 3,059.09 $ 83,759 $ 41,879.30 $ 31,800.00 $ 6,360.00 $ 38,160.00 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5956 File Number: 2017-0109 JMSH, LLC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND TO APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC. FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION - OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00 WHEREAS, City staff recommends that we utilize the JMSH, LLC's engineer and construction team to enlarge a water main for about 160 feet of a water main and for about 275 feet of a sewer main that JMSH, LLC heeds to build in a smaller dimension for its proposed development; and WHEREAS, anticipated growth in this area will need the larger dimensional water and sewer mains which will be an improvement to our water and sewer system's capacities; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of -facilities of a size that is larger -than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL- OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines - an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with JMSH, LLC. for the installation of water and sewer mains along a portion of North Assembly Drive north of East Maple Street with the estimated amount to be paid by the City of Fayetteville not to exceed $31,800.00, and further approves a project contingency in the amount of $6,360.00 for a total Page 1 Printed on 3/8/17 Ordinance: 5956 File Number. 2017-0109 of $38,160.00. PASSED and APPROVED on 3/7/2017 I Attest: Sondra E. Smith, City Clerk Trea`pill pFr� ��o • GST Y per' =U: �L• kAN`ry Paget Printed on 3/8/17 EXHIBIT A WATER AND SEWER IMPROVEMENT CONCEPT PLAN 412 NORTH ASSEMBLY DRIVE - FAYETTEVILLE, ARKANSAS ALL IMPROVEMENTS TO BE IN ACCORDANCE WITH CITY OF FAYETTEVILLE STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES. SCALE 1" = 60' 0 �d j 17 EXHIBIT B S&K Dirtworks, LLC Rogers, Arkansas 72758 I Name/Address Baumann & Crosno Project Quote Date Quote# 2/8/2017 016-113 Signature Phone # 479-631-7400 Project 412 N. Assembly Wa... _ - Description Qty Cost Total Tap 8" PVC water main per city detail W14 with pavement repair 1 5,600.00 5,600.00 8" C-900 DR 14 PVC per city detail W2 160 100.00 16,000.00 -8" Gate valve per city detail W5 2 2,000.00 4,000.00 8" Cap and plug per city detail W19 2 800.00 1,600.00 New service and double meter box per city detail Wl l 1 1,050.00 1,050.00 New service and single meter box per city detail W I 1 - 1 950.00 950.00 Testing - __ .. 1 3,000.00 3,000.00 8" SDR -26 PVC per city detail S2 (4'-6' depth) 275 72.00 19,800.00 4' diameter sanitary sewer manhole per city detail S4 Service lateral per city detail S15 2 — 2 3,000.00 .1,000.60 6,000.00 2,000.00 Testing 1 3,600.00 3,600.00 . NOTE: Baumnn & Crosno will be responsible for all staking and layout. Total $63.600.00 Signature Phone # 479-631-7400 City of Fayetteville, Arkansas 113 West Mountain Street f Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2017-0109 Agenda Date: 3/7/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 2 JMSH, LLC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND TO APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC. FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00 WHEREAS, City staff recommends that we utilize the JMSH, LLC's engineer and construction team to enlarge a water main for about 160 feet of a water main and for about 275 feet of a sewer main that JMSH, LLC needs to build in a smaller dimension for its proposed development; and WHEREAS, anticipated growth in this area will need the larger dimensional water and sewer mains which will be an improvement to our water and sewer system's capacities; and WHEREAS, § 51.112 of the Fayetteville— City 'Code provides that -""the City. shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by :the water and wastewater director for the general benefit of the water system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY .COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby detennines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with JMSH, LLC. for the installation of water and sewer mains along a portion of North Assembly Drive north of East Maple Street with the estimated amount to be paid by the City of Fayetteville not to exceed $31,800.00, and further approves a project contingency in the amount of $6,360.00 for a total of $38,160.00. City of Fayetteville, Arkansas Page 1 Printed on 3/8/2017 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2017-0109 Legistar File ID 3/7/2.017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 2/16/2017 Utilities Director / Utilities Department Submitted Date Division / Department Action Recommendation: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH JMSH, LLC FOR THE INSTALLATION OF WATER AND SEWER MAINS ALONG A PORTION OF NORTH ASSEMBLY DRIVE NORTH OF EAST MAPLE STREET, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $31,800.00, AND TO APPROVE A PROJECT CONTINGENCY IN -THE AMOUNT OF $6,360.00 FOR A TOTAL OF $38,160.00. Budget Impact: 5400.720.5600-5808.00 Water/Sewer - Account Number Fund 04039.1 Water/Sewer Impact Fee Cost Sharing Projects - Project Number Project Title Budgeted Item? Yes Current Budget.. $ 1,230,231.00 Funds Obligated $ 103,665.15 Current Balance Does item have a cost? Yes Item Cost $ 38,160.00 Budget Adjustment Attached? No Budget Adjustment Remaining Budget V20140710 Previous Ordinance or Resolution a Original Contract Number: Approval Date: Comments: CITY OF r aeevre ARKANSAS MEETING OF MARCH 7, 2017 TO: Mayor and City Council THRU: Don Marr, Chief of Staff Water & Sewer Committee FROM: Tim Nyander, Utilities Director DATE: February 17, 2017 CITY COUNCIL AGENDA MEMO SUBJECT: Cost Share Agreement with JMSH, LLC RECOMMENDATION: Staff recommends approval of a cost share agreement between the City of Fayetteville and JMSH, LLC to share the costs of installing a water and sewer main in North Assembly Drive north of East Maple Street. The estimated total cost of the project is $63,600.00 The City's portion of the cost share is 50% of the estimated project cost, in the amount of $31,800.00. A 20% contingency fund ($6,360.00) will be added to account for unexpected costs, to make the total value of the cost share $38,160.00. - BACKGROUND: ' JMSH, LLC has requested that the City share in the cost of installing an 8 -inch water line -and an 8 -inch sewer line along a portion of Assembly Drive. North of Maple Street, a distance of approximately 160 feet of water -line, and 275 feet of sewer line, so that JMHS, LLC may develop the property located near the intersection of Assembly Drive and Vinson Avenue. DISCUSSION: Constructing these segments of 8 -inch water and sewer main will allow development of these properties and will also provide for .ample future capacity which the City recognizes will be necessary for the area that is served by this sewer. main. BUDGET/STAFF IMPACT: Funds for the City portion of work are available in the Water and Sewer Impact Fee Cost Sharing Project. The final actual cost is based on the bids received by the developer of this project. Attachments: Staff Review Form Cost -Share Agreement Exhibit A - Map of Area Exhibit B - Project Quote Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL AGREEMENT FOR COST SHARE OF WATER AND SEWER MAIN INSTALLATION COSTS This Agreement, made and entered into on this r_[4 -Nay of March, 2017, by and between the City of Fayetteville, Arkansas ("City") and JMSH, LLC, witnesseth: WHEREAS, JMSH, LLC has requested that the City share in the cost of constructing approximately 160 feet of 8 -inch water main and approximately 275 feet of 8 -inch sewer main along a portion of North Assembly Drive north of East Maple Street so that JMSH, LLC may devel6p the property located near the intersection of North Assembly Drive and North Vinson Avenue; and WHEREAS, constructing this segment of 8 -inch water main and 8 -inch sewer main will allow development of this property, will extend water and sewer service to an area of the City that has never been served before, and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by the water and sewer mains; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the. excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system." NOW, THEREFORE, the City of Fayetteville, Arkansas and JMSH, LLC agree as follows: 1. The City of Fayetteville, Arkansas agrees to A.. Reimburse JMSH, LLC for 50% of the cost to install approximately 160 linear feet of 8 -inch water main, and approximately 275 linear feet of 8 -inch sewer main in the area identified in Exhibit "A" up to a maximum -not -to -exceed amount of $31,800.00 with a contingency fund not -to -exceed $6,360.00, as was estimated by the builder's representative and shown on Exhibit `B", attached. B. Payments due to JMSH, LLC, shall be remitted within sixty (60) days after receipt of valid invoices upon completion of the project. Page 1 of 2 2. JMSH, LLC agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water and sewer main installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Submit all required plans and specifications to the City and receive approval from the City's Engineering and Utilities Departments prior to commencing work on the project. C. Provide a copy of the invoices from the Contractor upon City approval of the water and sewer main upgrades. D. Pay for the water and sewer main installation (with reimbursement of 50% of the cost by the City of Fayetteville in a not -to -exceed amount of $31,800.00 with a contingency fund not -to -exceed $6,360.00). IN AGREEMENT WITH ALL THE TERIMS AND CONDITIONS ABOVE, WE SIGN BELOW: JMSH, LLC = CITY OF FAYETTEVILLE, - ARKANSA B y: B 11 y: �.-- ,ST.ER NC'HAMILTON, LI NELy J� AN, Mayor .Managing Member ATTEST41TNESS: MICHAEL LOUDEN Notary Pubiic•Arkoneos W08hington County My Commission Expires 09-01-2026 Commisslon S 12698672 ATTEST.: By: Page 2 of 2 o MYL I I tVILLL : N�C��``� r I EXHIBIT A WATER AND SEWER IMPROVEMENT CONCEPT PLAN 412 NORTH ASSEMBLY DRIVE - FAYETTEVILLE, ARKANSAS ALL IMPROVEMENTS TO BE IN ACCORDANCE WITH CITY OF FAYETTEVILLE STANDARD SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF WATER LINES AND SEWER LINES. SCALE 1" = 60' s/gid; 17 EXHIBIT B S&K Dirtworks, LLC Rogers, Arkansas 72758 I Name/Address I Baumann & Crosno Project Quote Date Quote# 2/8/2017 016-113 Signature Phone # 479-631-7400 Project 412 N. Assembly Wa... .Description Qty Cost Total -rap 8" PVC water main per city detail W 14 .with pavement repair 1 5,600.00 5,600.00 8" C-900 DR 14 PVC per city detail W2 160 100.00 16,000,00 8" Gate valve per city detail .W5 2 2,000.00 4,000.00 8" Cap and plug per city detail W 19 2 800.00 1,600.00 New service and double meter box per city detail W I 1 1 1,050.00 1,050.00 New service and single meter box per city detail W I I 1 950.00 - 950.00 Testing 1 3,0.00.00 3,000.00 8" SDR -26 PVC per city detail S2 (4'-6' depth) - _ 275 72.00 '19,800.00 4' diameter sanitary sewermanhole per city detail S4 2 3,000.00 61000.00 Service lateral per city detail S15 — 2 1,000.00 2,000.00 Testing 1 3,600.00 3;600.00 NOTE: Baumnn & Crosno will -be responsible for al1-staking•and — layout. Total $63,600.00 Signature Phone # 479-631-7400