Loading...
HomeMy WebLinkAboutORDINANCE 5947113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5947 File Number: 2017-0030 21 WEST, LLC COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH 21 WEST, LLC FOR THE INSTALLATION OF SEWER MAIN ALONG A PORTION OF MEADOW STREET BETWEEN WEST AVENUE AND GREGG AVENUE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $36,128.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $7,225.60 WHEREAS, 21 West, LLC, which will be developing property located at 21 West Avenue, has requested that the City share in the cost of constructing an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 feet; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will extend sewer service to an area in the core of the City that has never been served before and provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the Page 1 Printed on 218117 Ordinance: 5947File Number 2017-0030 requirements of formal competitive bidding and approves a cost share agreement with 21 West, LLC for the installation of an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue with the estimated amount to be paid by the City of Fayetteville not to exceed $36,128.00, and further approves a project contingency in the amount of $7,225.60. PASSED and APPROVED on 2/7/2017 �,����ti►rrrrllr�s ,1 �rroarrr"try �/ FAYETT FVI l -L: Attest: Sondra E. Smith, City Clerk Treasurer Page 2 Printed on 218117 sop sop 509 509 8 MOO 609 so@ 502 600 508 ON 509 EXHIBIT A Home 500 509 sop 500 509 509 900 "o. me 50 609 M 609 500 509 509 60 $09 $09 SOS BOOBOO 509 4w 000 Goo an 000 Soo 600 600 71 21 548 rY 'A lei t 188K. 15 la „rte .: wds,6 W-(18BIQ597 CENT R ST W-� A 00" EXHIBIT B CALAMON BUILDING CORPORATION calamon@sbcglobal. net December 22, 2016 Mr Tim Nyander, Utilities Director City of Fayetteville Fayetteville, AR On behalf of our client (21 West LLC, PO Box 291, Fayetteville 72702), we are hereby requesting consideration for City cost -share of the required new sewer line installation under Meadow Street between West Avenue and Gregg Avenue. I have attached a site plan showing our intent to add two duplex townhouses to the property in keeping with the City's stated goals of infill and densification. I have also attached the preliminary engineered drawings of that sewer line, as prepared by Jorgensen and Associates. Lastly, I have attached bids from utilities contractors. Please consider the following costs: 1. Calamon Building Corporation's cost to review plans, solicit and review bids, etc. 20 hours @ $52.00 $ 1,040 2. Jorgensen and Associates - cost for plans, construction staking, inspection, and as -built plans. $ 5,000 3. Matt Wood Plumbing, low bid for'installation of work per Jorgensen's plans and specifications $67,256 4. Portable toilet costs 170 Subtotal $73,466 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 ;. Text File File Number: 2017-0030 Agenda Date: 2/7/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 4 21 WEST, LLC COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH 21 WEST, LLC FOR THE INSTALLATION OF SEWER MAIN ALONG A PORTION OF MEADOW STREET BETWEEN WEST AVENUE AND GREGG AVENUE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $36,128.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $7,225.60 WHEREAS, 21 West, LLC, which will be developing property located at 21 West Avenue, has requested that the City share in the cost of constructing an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 feet; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will extend sewer service to an area in the core of the City that has never been served before and provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with 21 West, LLC for the installation of an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue with the estimated amount to be paid by the City of Fayetteville not to exceed $36,128.00, and further approves a project contingency in the amount of $7,225.60. City of Fayetteville, Arkansas Page 1 Printed on 218/2017 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2017-0030 Legistar File ID 2/7/2017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 1/19/2017 Utilities Director / Utilities Department Submitted Date Division / Department Action Recommendation: Staff recommends approval of a cost -share agreement between the City of Fayetteville and 21 West, LLC, to share the costs of installing a sewer main in Meadow Street between West Avenue and Gregg Avenue in the not -to - exceed amount of $36,128.00 with a contingency fund not -to -exceed $7,225.60 for a total of $43,353.60. 5400.720.5700-5815.00 Account Number 04039.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Previous Ordinance or Resolution # Original Contract Number: Comments: Budget Impact: Water/Sewer Budget Adjustment Remaining Budget Approval Date: V20140710 Fund Water/Sewer Impact Fee Cost Sharing Project Project Title Current Budget $ 1,270,594.00 Funds Obligated $ 60,917.00 Current Balance Item Cost $ 43,353.60 Budget Adjustment Remaining Budget Approval Date: V20140710 CITY OF • ay V ARKANSAS TO: Mayor and City Council THRU: Don Marr, Chief of Staff Water & Sewer Committee FROM: Tim Nyander, Utilities Director DATE: January 19, 2017 CITY COUNCIL AGENDA MEMO SUBJECT: Cost Share Agreement with 21 West, LLC RECOMMENDATION: Staff recommends approval of a cost -share agreement between the City of Fayetteville and 21 West, LLC, to share the costs of installing a sewer main in Meadow Street between West Avenue and Gregg Avenue in the not -to -exceed amount of $36,128.00 with a contingency fund not -to -exceed $7,225.60 for a total of $43,353.60. The estimated total cost of the project is $72,256.00 The City's portion of the cost share is 50% of the estimated project cost, in the amount of $36,128.00, plus the contingency. BACKGROUND: 21 West, LLC has requested that the City share in the cost of installing an 8 -inch sewer line along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 feet, so that 21 West, LLC may develop the property located at the SW corner of Meadow Street and West Avenue. DISCUSSION: Constructing this segment of 8 -inch main will allow development of these properties and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main. BUDGET/STAFF IMPACT: Funds for the City portion of work are available in the Water/Sewer Impact Fee Cost Sharing Project. The final actual cost is based on the bids received by the developer of this project. ATTACHMENTS: Staff Review Form Cost Share Agreement Exhibit A - Map of Area Exhibit B — Cost Estimate Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL .AGREEMENT FOR COST SHARE OF SEWFR MAIN INSTALLATION COSTS This A.,,,rcement, made and entered into on this day of February, 2017, by and between the City of Fayetteville, Arkansas ("City") and ') 41'i t, LIA'("2 I West"), wittlesseth: WHEREAS, 21 West has requested that the City share in the cost ofconstructing an 8 - inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance o#` approximately 270 feet'. so that 21 West may dtvelop the property located at the southwest corner ol'Meadow Street and West Avenue; and WHEREAS, constructing this segment of 8 -inch sewer main �vill allow development of this property. will extend sewer service to an area in the core of the City that has never been served beforc. and will also provide fbr ample Iliture capacity which the City recognizes will be necessary liar the area that is served by this sewer main; and WHEREAS, § 51.1 l3 of the Fave(tevillc City Code provides that "the City shall pay the excess rnaterial cost of facilities ofa size harger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit ofthe sevverage systern." I NOW, THEREFORE, the City ol" Fayetteville, Arkansas and 21 West. II(II au"Ne as fi) [lows-. I - The City cif Fayette Arkansas aQrees tee: A. P,,eimburse 2i VVes,% I 1j)r 50% Ofthe cost to install approximately_271 0 linear J , ect of 8 -inch sewer main in [lie area identified in E`xhibit -A- Lip to a maximuni- not-to-exceed amount of IS36,128 avith a contim-,ency Fund not--to-exceed $7.2125.601 as Nvas o_sLinmwd b� the and shown oro l Falai sit "B-. atmeho& B. Pavinents due to 21 VVc,t_ H.Ct shall be remitted ,Nithin sixty (60) days aller reck:ipt of valid invoices, 2, 21 Wc,�t, L I ,(.' aQrees IJO: A. Provide !hc nm.,s,arL and normal project marm!eIrwilt. I C0111pleEe and acceplable sever main installation, Includill"I Albmittal of planS,,ujjl� C I % � 1, their slandard proccdoto . ;. jc�j[joj-ts Co . t[I C't, Dcparti-nem� B. Provide a copy ofthe iro,-Oic,:s fIrwri the Contrac:Ior upop City approval of the water main upgrade. f �2 a C. Payfor the sewer main installation (with reimbursement of 50% of the cost by the City of Fayetteville in a not -to -exceed amount of $316,128.00 with a contingency fund not -to -exceed $7.225.60). IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: 21 WEST, LLC AARON CRiAC71UAVt1- artner ATTEST: CITY OF FAYETTEVILLE, ARKANSAS 06NELiDJ DAN, flavor ATTEST: By: - �,, � 6, .�� SONDRA SMITH, Ciiv TRO, 0 % *;ixvGio 'OoN 1641161110 Pagac alt 2 4 5Vl) 509 509 509 - �� �, �, •� 5x2569 509 $' Sag 509 509 509Soo EXHIBIT A 509509 509 t 509 .� 509 5iO£ 50+9 UN 509 r X43° 509 50�i 's r€3 509 600 r 5n 509 569 5 Pjr e}o c� oso s 509 s09 sce 600 50+9 �� 5x5 � n 4000 900 60066 ' A saa 8 zea - 300 900 �= t X70 000 _ate—1►a��,._ = /40 4. Oft J s r a. co {� +� 419 �, ��� •4't ,� , }� ►,i. . n'° h,1e a 1 'a. v d ' ,'". 1851C)017 512 r Yi d 374!'91,, Of E �t3fi/c1Q15 �m EXHIBIT B CALAMON BUILDING CORPORATION calamonfizisbcglobal . net December 22, 2016 Mr Tim Nyander, Utilities Director City of Fayetteville Fayetteville, AR On behalf of our client (21 West LLC, PO Box 291, Fayetteville 72702), we are hereby requesting consideration for City cost -share of the required new sewer line installation under Meadow Street between West Avenue and Gregg Avenue. I have attached a site plan showing our intent to add two duplex townhouses to the property in keeping with the City's stated goals of infill and densification. I have also attached the preliminary engineered drawings of that sewer line, as prepared by Jorgensen and Associates. Lastly, I have attached bids from utilities contractors. Please consider the following costs: 1. Calamon Building Corporation's cost to review plans, solicit and review bids, etc. 20 hours @ $52.00 $ 1,040 2. Jorgensen and Associates - cost for plans, construction staking, inspection, and as -built plans. $ 5,000 3. Matt Wood Plumbing, low bid for installation of work per Jorgensen's plans and specifications $67,256 4. Portable toilet costs $ 170 Subtotal $73,466 RECEIVED FEB 2 3 2017 NORTHWESTARKANsAs CITY TY CLEFAYETTEVILLE Democrat*0azette ...,. 1?r �,:)r. ..y_: 3_ ri__t-., -..�, rr, c,. , 1C s WWW..NWA�. AFFIDAVIT OF PUBLICATION I Karen Caler, do solemnly swear that I am the Legal Clerk of the Northwest Arkansas Democrat -Gazette, printed and published in Washington County and Benton County, Arkansas, and of bona fide circulation, that from my own personal knowledge and reference to the files of said publication, the advertisement of: CITY OF FAYETTEVILLE Ord. 5947 Was inserted in the Regular Edition on: February 16, 2017 Publication Charges: $ 144.30 Karen Caler Subscribed and sworn to before me This today of , 2017. ac e I � Notary Public My Commission Expires: ZMv 1,9- __.........__'o-.::'1 V AJ IF! V `h i.l 5 I•..r yt :'illlf4 '4iiJi ,i., 2:301 i lS tr **NOTE** Corn n;ssion Expir,"s Feb 20, 2024 Please do not pay from Affidavit y Invoice will be sent. Ordinance: 5947 File Number: 2017-0030 21 WEST, LLC COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH 21 WEST, LLC FOR THE INSTALLATION OF SEWER MAIN ALONG A PORTION OF MEADOW STREET BETWEEN WEST AVENUE AND GREGG AVENUE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $36,128.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $7,225.60 WHEREAS, 21 West, LLC, which will be developing property located at 21 West Avenue, has requested that the City share in the cost of constructing an 8 - inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 feet; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will extend sewer service to an area in the core of the City that has never been served before and provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, $ 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit ofthe sewerage system'; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements offormal competitive bidding and approves a cost share agreement with 21 West, LLC for the installation of an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue with the estimated amount to be paid by the City of Fayetteville not to exceed $36,128.00, and further approves a project contingency in the amount of $7,225.60. PASSED and APPROVED on 2/7/2017 Approved: Lioneld Jordan, Mayor Attest: Sondra E. Smith, City Clerk Treasurer 74025683 Feb. 16, 2017 S 21 WEST, LLC - Change .,.uzr No. 1- Ordinance 5947 City of Fayetteville Staff Review Form 2017-0465 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 8/21/2017 Utilities Director/ Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: APPROVAL OF CHANGE ORDER NO. 1 TO THE COST SHARE AGREEMENT WITH 21 WEST, LLC IN THE AMOUNT OF .$7,225.60 FOR PAYMENT OF THE PROJECT CONTINGENCY FOR A SEWER COST SHARE ON MEADOW STREET. Budget Impact: 5400.720.5700-5815.00 Water/Sewer Account Number Fund - 04039.1 Water/Sewer Impact Fee Cost Sharing Project Project Number Project Title Budgeted Item? Yes Current Budget $ _ 1,230,231.00 Funds Obligated $ 207,188.40 Current Balance $ 1,0123,Q42.60 Does item have a cost? Yes Item Cost $ 7,225.60 Budget Adjustment Attached? No Budget Adjustment $ - Remaining Budget $ 1,015,817.001 V20140710 Previous Ordinance or. Resolution # Ord. 5947 Original Contract Number: Approval Date: ��� I Comments: CITY OF LNI� FAYETTEVILLE ARKANSAS TO: Mayor Lioneld Jordan THRU: Don Marr, Chief of Staff FROM: Tim Nyander, Utilities Director DATE: July 28, 2017 STAFF MEMO SUBJECT: Approval of Change Order No. 1 to the Cost Share Agreement with 21 West, LLC RECOMMENDATION: Staff recommends the approval of Change Order No. 1 to the cost share agreement with 21 West, LLC in the amount of $7,225.60 for payment of the project contingency. BACKGROUND: The cost share agreement with 21 West, LLC was approved on February 7, 2017 by Ordinance 5947. The cost share project was for the installation of a sewer main along a portion of Meadow St. between West Ave. and Gregg Ave. The agreement was for a not -to -exceed amount of $36,128.00, with a project contingency of $7,225.60. DISCUSSION: During the installation of the sewer main, the contractor for 21 West, LLC encountered large amounts of rock that increased the cost of the project. Due to the increases in project costs, the utilization of the entire contingency is needed to pay 21 West, LLC in the amount of $7,225.60. BUDGET/STAFF IMPACT: Funds are available in the Water & Sewer Impact Fee Cost Sharing Project. Attachments: Invoice from 21 West, LLC Ordinance 5947 Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 21 West, LLC 08/21/2017 Shea Fankhouser Project Coordinator, Water & Sewer City of Fayetteville 113 W. Mountain Street Fayetteville, AR 72701 Dear Mr. Fankhouser: Below is the invoice for the sewer line cost -share agreement that was entered between 21 West, LLC and the City of Fayetteville. INVOICE Cost share for sewer installation as approved by the City Council on 02/17/2017 50% of expected cost ($72,256.00) $36,128.00 Contingency of 20% 7,225.60 Total D'ue $43,353.60 *Note that the actual cost was $38,924 more than expected (due to 148 cy of rock removal); however, the contingency was limited to 20%. A 07/26/2017 email from Tim Nyander includes 'The city of Fayetteville will assist by contributing the additional contingency of $7,225.60 toward the project". Please remit payment to: 21 West, LLC — P.O. Box 2991, Fayetteville, AR 72702 Sincerely, Aaron Crawley P.O. BOX 2991, FAYE_: ETEVILLE,', AR 72702 T(479) 502-0487 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5947 File Number: 2017-0030 21 WEST, LLC COST SHARE: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH 21 WEST, LLC FOR THE INSTALLATION OF SEWER MAIN ALONG A PORTION OF MEADOW STREET BETWEEN WEST AVENUE AND GREGG AVENUE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $36,128.00, AND TO APPROVE A PROJECT CONTINGENCY - 1N THE AMOUNT OF $7,225.60 WHEREAS, 21 West, LLC, which will be developing property located at 21 West Avenue, has requested that the City share in the cost of constructing an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 feet; and WHEREAS, the City of Fayetteville would benefit from the* cost share as it will extend sewer service to' an area in the core of the City that has never been served before and provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main, and WHEREAS,' § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the Page 1 Printed on 218117 Ordinance: 5947File Number. 2017-0030 requirements of formal competitive bidding and approves a cost share agreement with 21 West, LLC for the installation of an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue with the estimated amount to be paid by the City of Fayetteville not to exceed $36,128.00, and further approves a project contingency in the amount of $7,225.60. PASSED and APPROVED on 2/7/2017 `0 JIM111111i a -Y p Attest:'`'� c> G TO Sondra E. Smith, City Clerk Treasurer 0 Page 2 Printed•on 218117 J � " ' � J � ;�i�`�soo"4'""soc 4op �' a� "� - - � �� � ��""k 5,X^�,v.• ,,� �j . eoe60pSoaaesaa aoo,So_o EXHIBIT A i iy . { 1509 t1r i. i 9 600' 309 309 600: 500 600 6DQ: r '�£ 600 609.' v t f ', �- � •� 609 , f / ' �'f + • 600 ol t SA Oc- 8800. "raU6 •30Qt'.. �:,� ��-ii•• '' "a}'�, 4�, �£ s 1#3, ��, fes• � # s � _ ,t , } EXHIBIT B CALAM®N BUILDING CORPORATION calamon(a sbcg-lobal.net December 22, 2016 Mr Tim Nyander, Utilities Director City of Fayetteville Fayetteville, AR On behalf of our client (21 West LLC, PO Box 291, Fayetteville 72702), we are hereby requesting consideration for City cost -share of the required new sewer line installation under Meadow Street between West Avenue and Gregg Avenue. I have attached a site plan showing our intent to add two duplex townhouses to the property in keeping with the City's stated goals of infill and densification. I have also attached the preliminary engineered drawings of that sewer line, as prepared by Jorgensen and _ Associates. Lastly, I have attached bids from utilities contractors. ; Please consider the -following costs: 1. Calamon Building Corporation's cost to review plans, solicit and review bids, etc. 20 hours @ $52.00 $ 1)040 2. Jorgensen and Associates - cost for plans, construction staking, inspection, and as -built plans. $ 5,000 3. Matt Wood Plumbing, low bid for'installation of work per Jorgensen's plans and specifications $67,256 4. Portable toilet costs 170 Subtotal $73,466 City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575.8323 -.�:. Text File File Number: 2017-0030 Agenda Date: 2/7/2017 Version: 1 Status: Passed In Control: City Council Meeting Agenda Number: C. 4 21 WEST, LLC COST SHARE: File Type: Ordinance AN ORDINANCE TO WAIVE THE 'REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH - 21 WEST, LLC FOR THE INSTALLATION OF SEWER MAIN ALONG A PORTION OF MEADOW STREET BETWEEN WEST AVENUE AND GREGG AVENUE, WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $36,128.00, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $7,225.60 WHEREAS, 21 West, LLC, which will be developing property located at 21 West Avenue, has requested that the City share in the cost of constructing an .8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 feet; and WHEREAS, the City of Fayetteville would benefit. from the cost share as it will extend sewer service to an area in the core of the City that has never been served before and provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main; and WHEREAS, § 51.113 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size larger than required to service subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the sewerage system"; and - WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with 21 West, LLC for the installation of an 8 -inch sewer main along a portion of Meadow Street between West Avenue and Gregg Avenue with the estimated amount to be paid by the City of Fayetteville not to exceed $36,128.00, and further approves a project contingency in the amount of $7,225.60. City of Fayetteville, Arkansas Page 1 Printed on 2/812017 I City of Fayetteville Staff Review Form 2017•-0030 Legistar File ID 2/7/2017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 1/19/2017 Utilities Director / Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: Staff recommends approval of a cost -share agreement between the City of Fayetteville and 21 West, LLC, to share the costs of installing a sewer main in Meadow Street between West Avenue and Gregg Avenue in the not -to - exceed amount of $36,128.00 with a contingency fund not -to -exceed $7,225.60 for a total of $43,353.60. Comments: Budget Impact: 5400.720.5700-5815.00 Water/Sewer - 'Account Number Fund 04039.1 _ Water/Sewer Impact Fee Cost Sharing Project Project Number Project Title Budgeted Item? Yes Current Budget $ 1,270,594.00 Funds Obligated $ 60,917.00 Current Balance Does item have a cost? Yes Item Cost $ 43,353.60 Budget Adjustment Attached? No Budget Adjustment Remaining Budget V20140710 Previous Ordinance or Resolution # Original Contract Number: Approval Date: Comments: CITY OF '* Fa AS TO: Mayor and City Council THRU: Don Marr, Chief of Staff Water & Sewer Committee FROM: Tim Nyander, Utilities Director DATE: January 19, 2017 CITY COUNCIL AGENDA MEMO SUBJECT: Cost Share Agreement with 21 West, LLC RECOMMENDATION: Staff recommends approval of a cost -share agreement between the City of Fayetteville and 21 West, LLC, to share the costs of installing a sewer main in Meadow Street between West Avenue and Gregg Avenue in the not -to -exceed amount of $36,128.00 with a contingency fund not -to -exceed $7,225.60 for a total of $43,353.60. The estimated total cost of the project is $72,256.00 The City's portion of the cost share is 50% of the estimated project cost, in the amount of $36,128.00, plus the contingency. BACKGROUND: 21 West, LLC has requested that the City share in the cost of installing an 8 -inch sewer line along a portion of Meadow Street between West Avenue and Gregg Avenue, a distance of approximately 270 -feet, so that 21 West, LLC may develop the property located at the SW corner of Meadow Street and West Avenue. DISCUSSION: Constructing this segment of 8 -inch main will allow development of these properties and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this sewer main. BUDGET/STAFF IMPACT: Funds for the City portion of work are available in the Water/Sewer Impact Fee Cost Sharing Project. The final actual cost is based on the bids received by the developer of this project. ATTACHMENTS: Staff Review Form Cost Share Agreement Exhibit A - Map of Area Exhibit B — Cost Estimate Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701. I CON'rRACTUAL Aj.;REEMENTFOR COST -SHARE Q SEVVER 14AIN INSTALLATION COSTS This Agrcernent, made and entered int() )n this —, - ... day of Fehuao% 2011 by and between the CRY of Fayetteville, Arkansas ("my") and 21 West, LLC (-,21 WCSL")wiinessc(I-.: IVHEREAN 21 West has rC(lUeS(Cd that Me City Aare in he WS1 CqC0nMr`UCLMg an 8- k, inch Sewer main along a portion of' Meadow Street bci\ e e n We, Avenue and Gireggo Avenue, a distance of approxhnuely 270 fea, so that 2i Wes! may develop tht: property located at the southwest corner of Meadow Street and WcA Avenue; and 'WHEREAS, constructing this ,,q,,nwnt of 8 -inch sewer n-tain 1110%V JCYCIOPMent. Of' this property, k0l extend sewer service m an area in the core of the Ciry that has never been saved behm and will also providc for ample future Capacity which the CRY mmgnius W bc necessary Pr the area that is served h»•• this sorer main; and WHAEAS, § SLI n ol'be FaYetlev% My Code provides that -the (1ityshay pay the excess material cost of Mcilities of a -size larger than required to Service Subdivisions Nvilet) such excess size is Specified anti required by the water and mmmewater director for the zyeijeral benefit ofthe sewerage system." NOMq THEREFORE, We CO3` Of AtIamas and 21 West, III: agree as fbflmvs: I 'I'lle Ciq'of lNeWiN Arkansas agrees t): A. Int; n%me 21 VIC 14 50% 0111w coa tik"tall vppr()Nimakeh 270 linear :1zef M'S. -inch scN\cr mmin in the awealdentified in LUMA -A- up to a max3a31un- 110140-CNITed amount of $36J28 wirb a contoWency Ind nviAwexcced as mns emium, L, the hP1Q&vmPmwmnQc and Amwn on. a(lached. to 21 A!, shmil RT) dqS after 1 21 wm 1. Ik ag"s to: A. Provide thc ar.t arld ;-!(,Inial project inspuctif)(I., afl(l Icsting for a zul".1 uc.Cplabk, mN Ci- 'Win ins!.allalion. includim-Y ,,t1binktal cifpt: ray md 1%,cificaLialls i l (11c, Cit\'s the& mandard procudim. S! CU10 Ufdw hw�"' hOM to L"nunhw upm Cly qVRwj 6f die Mer main upylodc. 141. i ar,... n C. Pay for the sewer main installation (with reimbursement of 50% of the cost by the City of Fayctteville in a not -to -exceed amount of $16,128.00 with a contingency Rind not -to -exceed $7,225.60). IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE .SIGN BELOW: 21 WEST, LLC CITY OF FAYETTEVILL,F., JIKAN:S AS By: _ AA.IZUN, CRAAA'.I: V � ;irtner QNF;LI) Im ~ Ur1iti', May. A TI:;ST: .ATTEST: 3.. ..:........._.. _ _. _...... _... .._..__...... By SONDRA .. AMITH. City C'`�`t 4.UD •• 80 tiCp AR``r'P� P -arse 2 ol'2 F 509 SA8509 iw 509 50E .509 x : !4R SOE. 509 009, Ws 568 SOfl EXHIBIT A Ov/, r q t�t��l^ 506569 SCN i09 t n� ,SR 509 j t� �� h' � • 566 nir0 • a �• � i.�.i 508 r' ' ��r;;•�A t 50? Zy`r,}`C , ft�v;;%,y•., i a, r€ii f fi + 4:-a4 t 7•i0 ado 508. 046 ' r ' 566 IV 5 508 r 6jjQt' f 569= 08 505 YOap OOOa00600; ilf0 :di_r � Olt rr t 600:006 J. 00 a'� r 000 r800 M 111. KIM It pY 17+'r�i:� ' S�„} �. f '`^ jjjt°�.lr/.� .*««t,`,��`•,'�' 1 , r F tk��' e i,Y�,.' 419v � t \��-� t .s a X'f `` •-�2 �L� �,{`(-�Lf 1 ' !' i. �-�� '�r1"t j:7:` -i• Y It zEt ' y (188/C)018 7 .. ^++r+ --k+• �• -- .... + ` _'tl+ti ,� ' t=f "w i r. .. � ..«;«i: fia7Fi�'tir,: "'-+'� .•f ��0. "}' § ` =t: 'Y -` .... . c(�,8 0 "'f` 8".,, 7St:�r M11EA t t t � � r .yr i fr =�.{ (x' ��i� v •i + �!�>Z '���t ,f4 F:itt }"'r�'G��������.�v��"` yi�ir ..�w ,•_"L.l�;{"t.i-1#r:,«eta.^#'jr.j( "V� 5'•11 yF•~`< 7.3 • t• v j' f T �4 POM:. q� �• n..,i Vl:i'-� . ,T.•� �.0��t , [} „�.` °•+'' �� t+.. t •a':. r .:�.tss 11�Ty 2 +_ 15Z�- * � h' ,i it t t •_* i �*3,Xr;. i' ♦ ' a if,� i f��I Z, rl 1, '� S _< +• %i' i , 'i d:t }.�. 4 y z1�i . � '=" S�y !�r � . �=`a t 1 i ' 1 , I :etc ¢. `.»IM'S� •f rr. •;. Sr .t 7 � •.'}� r�` j�� 1A ft?1J .r.. a f rj'•Ybr— .rie 2,f r-- f 1 2. tg -y } r'�h r r - M �„ - J -iyi. t ) iY,l., 1 `"i'f r t�; ra i .1.i� 'S t. � !;. ��"�P`rt co 'ctF:•`� t'0'e�+w� A-M.t x a J �ig W -(168/C)684 k 642.21t�, air ,. 1 „� •i ! ;1 F rt T -M 9,1 �� 'e. GYi4� .L:7==� 74 r , .� td�c_t _4V-'i8fi/Cf597 ' j5t (ENTER ST 36666 2 /C)565 ;1: ^ T° �'� Y �rt' tt�y1~>t�(1 i� irt7p h.�.� t i "yam u EXHIBIT B December 22, 2016 Mr Tim Nyander, Utilities Director City of Fayetteville Fayetteville, AR On behalf of our client (21 West LLC, PO Box 291, Fayetteville 72702), we are hereby requesting consideration for City cost -share of the required new sewer line installation under Meadow Street between West Avenue and Gregg Avenue. I have attached a site plan showing our intent to add two duplex townhouses to the property in keeping with the City's stated goals of infill and densification. I have also attached the preliminary engineered drawings of that sewer line, as prepared by Jorgensen and Associates. Lastly, I have attached bids. from utilities contractors. Please consider the following costs: 1. Calamon Building Corporation's cost to review plans, solicit and review bids, etc. 20 hours @ $52.00 $ 1,040 2. Jorgensen and Associates - cost for plans, construction staking, inspection, and as -built plans. $ 5,000 3. Matt Wood Plumbing, low bid for installation of work per Jorgensen's plans and specifications $67,256 4. Portable toilet costs 170 Subtotal $73,466