Resolution: 29-17
File Number: 2016-0682
GARVER, LLC TASK ORDER NO. 7:
A RESOLUTION TO APPROVE TASK ORDER NO. 7 WITH GARVER, LLC IN THE AMOUNT OF
$49,800.00 FOR PREPARATION OF A PRELIMINARY ENGINEERING REPORT FOR THE
TAXIWAY B WIDENING AND REHABILITATION PROJECT, TO EXPRESS THE CITY'S
WILLINGNESS TO UTILIZE FEDERAL AVIATION ADMINISTRATION FUNDS FOR THE
PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No.
7 with Garver, LLC in the amount of $49,800.00 for the preparation of a Preliminary Engineering Report
for the Taxiway B Widening and Rehabilitation Project.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby expresses the City's
willingness to utilize Federal Aviation Administration funds for all phases of the Taxiway B Widening
and Rehabilitation Project.
Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
Page 1 Printed on 1/18/17
ISlliltdill
PASSED and APPROVED on 1/17/2017
.•� of y .o . •
' f-AYETTEVII.I E .!
Approve
Attest: '. y .'•
110"-
r
'fill fill 1%0\
LiAieId Jordan, h4i56r
SondraE. Smith, CityClerkTreasurer
Page 1 Printed on 1/18/17
City of Fayetteville, Arkansas 113 west Mountain Street
Fayetteville, AR 72701
(479) 575-8323
Text File
File Number: 2016-0682
Agenda Date: 1/17/2017 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 3
GARVER, LLC TASK ORDER NO. 7:
A RESOLUTION TO APPROVE TASK ORDER NO. 7 WITH GARVER, LLC IN THE AMOUNT
OF $49,800.00 FOR PREPARATION OF A PRELIMINARY ENGINEERING REPORT FOR THE
TAXIWAY B WIDENING AND REHABILITATION PROJECT, TO EXPRESS THE CITY'S
WILLINGNESS TO UTILIZE FEDERAL AVIATION ADMINISTRATION FUNDS FOR THE
PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No.
7 with Garver, LLC in the amount of $49,800.00 for the preparation of a Preliminary Engineering
Report for the Taxiway B Widening and Rehabilitation Project.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby expresses the City's
willingness to utilize Federal Aviation Administration funds for all phases of the Taxiway B Widening
and Rehabilitation Project.
Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget
adjustment, a copy of which is attached to this Resolution.
City of Fayetteville, Arkansas Page 1 Printed on 111812017
City of Fayetteville Staff Review Form
2016-0682
Legistar File ID
1/17/2017
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Terry Gulley 12/29/2016 Aviation /
Transportation Services Department
Submitted By Submitted Date Division / Department
Action Recommendation:
Staff requests approval of a Resolution expressing the willingness to utilize Federal Aviation Administration (FAA)
funds and allow the Aviation Division to execute a task order in the amount of $49,800.00 for Garver, LLC to
prepare a preliminary engineering report (PER) for the Taxiway B Widening and Rehabilitation project that is
included in the airport's FAA capital improvement plan (CIP). Staff is also requesting approval of a budget
adjustment.
Budget Impact:
5550.760.3960.5314.00 Airport
Account Number
Fund
15029 Airport Engineering Consultant Services
Project Number Project Tifle
Budgeted Item? No
Current Budget
Funds Obligated
$ -
Current Balance
��_�
Does item have a cost? Yes
Item Cost
$ 49,800.00
Budget Adjustment Attached? Yes
Budget Adjustment
$ 49,800.00
Remaining Budget
-
V20140710
Previous Ordinance or Resolution#
Original Contract Number: Approval Date:
Comments: Total amount will be reimbursed upon receipt of grant funds.
CITY OF
a e eel
ARKANSAS
MEETING OF JANUARY 17, 2017
TO: Mayor Lioneld Jordan
Fayetteville City Council
THRU: Don Marr, Chief of Staff
CITY COUNCIL AGENDA MEMO
FROM: Terry Gulley, Transportation Services Director
DATE: December 29, 2016
SUBJECT: Taxiway B Widening and Rehabilitation
RECOMMENDATION:
Staff requests approval of a Resolution expressing the willingness to utilize Federal Aviation
Administration (FAA) funds and allow the Aviation Division to execute a task order in the amount
of $49,800.00 for Garver, LLC to prepare a preliminary engineering report (PER) for the Taxiway
B Widening and Rehabilitation project that is included in the airport's FAA capital improvement
plan (CIP).
I4TTSI3r130111r! I
The airport currently has charter flights that operate at the airfield with a Boeing 737-800 and
Boeing 757-200 aircraft. These aircraft cannot taxi from the terminal apron to the Runway 16
threshold without crossing the runway due to current width of Taxiway B north of Taxiway D. In
addition, these aircraft cannot taxi to.the Runway 34 threshold without utilizing judgmental
oversteering to maneuver the final turn on the south end of Taxiway B.
In an effort to provide adequate taxiway width to promote safe taxiing operations for the large
charter aircraft, the airport included a taxiway widening project in their FAA CIP. In addition to the
widening of the taxiway, the rehabilitation of pavement adjacent to all taxiway widened as part of
the project will also be included. The project was originally scheduled to be completed in 2019.
However, the FAA has recently notified the airport that additional funding was secured and
construction will be moved to 2018. The FAA has requested that a PER be completed as part of
this project and due to the adjustment in project schedule, the PER submittal deadline is March
31, 2017.
Mailing Address:
113 W. Mountain Street www.tayetteville-ar.gov
Fayetteville, AR 72701
DISCUSSION:
Following the FAA approval of the PER, Aviation Division will execute a task order to complete
design and bidding services related to the Taxiway B Widening and Rehabilitation project. All
costs associated with the PER, Design, and Bidding Services will be included in an FAA design -
only grant application that will be submitted to the FAA in June 2017. Prior to submission and
execution, the task order and grant application will be submitted for Council approval.
BUDGET/STAFF IMPACT:
The project will advertise for bids in spring 2018. A task order for construction phase services and
FAA grant application will be submitted for Council approval in summer 2018 and construction
will begin after the FAA grant has been executed. Below is a summary of the costs and funding
breakdown for each upcoming grant.
2017 FAA Grant (Desian-Onl
Preliminary Engineering Report: $49,800.00 FAA: $135,000.00
Design and Bidding Services (estimated):$100,200.00 ADA: $15,000.00
TOTAL: $150,000.00 City: $0.00
TOTAL: $150,000.00
2018 FAA Grant (Construction)
Construction Phase Services (estimated): $100,000.00 FAA: $1,480,500.00
Construction (estimated): $1,500,000.00 ADA: $164,500.00
TOTAL: $1,650,000.00 City: $5,000,00 -
TOTAL: $1,650,000.00
Attachments:
Staff Review Form
City Council Memo
Garver Task Order 07
APPENDIX A-7
TASK ORDER 07
FAYETTEVILLE — DRAKE FIELD (FYV)
TAXIWAY B WIDENING AND REHABILITATION
This TASK ORDER is made as of om L ill VJ I 2017 by and between the CITY
OF FAYETTEVILLE of Fayetteville, Arkansas hereina er referred to as "CITY OF FAYETTEVILLE," and
GARVER, LLC, hereinafter referred to as "GARVER", in accordance with the provisions of the
AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES executed on April 21, 2015.
Under this Task Order, the CITY OF FAYETTEVILLE intends to make the following improvements for the
FYV Taxiway B Widening and Rehabilitation project.
Widen portions of Taxiway B to bring them into TDG 3 standards and rehabilitation of
pavement on Taxiway B adjacent to the proposed widening.
GARVER will provide professional services related to these improvements as described herein.
SECTION 1- SCOPE OF SERVICES
GARVER will provide services as detailed in Exhibit A-7.
SECTION 2 PAYMENT
For the work described under SECTION I - SCOPE OF SERVICES, the CITY OF FAYETTEVILLE- wi I I
pay GARVER on a lump sum basis. The CITY OF FAYETTEVILLE represents that funding sources are in
place with the available funds necessary to pay GARVER.
The table below presents a summary of the fee amounts and fee types for this contract.
WORK DESCRIPTION
FEE AMOUNT
FEE TYPE
Geotechnical Investigation
$10,000
Lump Sum
Surveys
$6,800
Lump Sum
Preliminary Engineer's Report
$33,000
Lump Sum
TOTAL FEE
$49,800
71
The lump sum amount to be paid under this agreement is $49,800. For informational purposes, a breakdown
of GARVER's estimated costs is included in Exhibit B-7 with approximate current hourly rates for each
employee classification.
Task Order 07 1 of 2
FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211
Additional Services (Extra Work). For work not described or included in Section 1 — Scope of Services but
requested by the CITY OF FAYETTEVILLE in writing, the CITY OF FAYETTEVILLE will pay
GARVER, for time spent on the project, at the rates shown in Exhibit B-7 for each classification of
GARVER's personnel, plus overhead, plus 15% profit, plus reimbursable expenses including but not
limited to printing, courier service, reproduction, and travel. The rates shown in Exhibit B-7 will be
increased annually with the first increase effective on or about July 1, 2017.
SECTION 3 —EXHIBITS
3.1 The following Exhibits are attached to and made a part of this Agreement:
3.1.1 Exhibit A-7 Scope of Services
3.1.2 Exhibit B-7 Rate Schedule & Fee Tables
3.1.3 Exhibit C-7 Project Exhibit
This Agreement may be executed in two (2) or more counterparts each of which shall be deemed an original,
but all of which together shall constitute one and the same instrument.
Approval and acceptance of this Task Order, including attachments listed in SECTION 3 —EXHIBITS,
shall incorporate this document as part of the Agreement. Garver is authorized to begin performance upon
receipt of a copy of this Task Order signed by the CITY OF FAYETTEVILLE. The effective date of this
Task Order shall be the last date written below.
CITY OF FA
By.
MaN
ARKANSAS
ATTEST:
` %
By:
City Clerk w�
•0
�A YE7—r• rm r
.z: EVI<<E;�:u
°
Task Order 07 2 of 2
FYV Taxiway B Widening and Rehabilitation
GARVER
Digitally signed by Michael
J. G,iffin
ivJ Data: 2076.12.27
By: 09:06:43-0600'
Title: Senior Vice President
Garver Project No. 17041211
EXHIBIT A-7 — SCOPE OF SERVICES
FAYETTEVILLE — DRAKE FIELD (FYV)
TAXIWAY B WIDENING AND REHABILITATION
1.1 General
Generally, the scope of services includes review of aircraft operations, pavement condition review,
drainage analysis, and field investigations to develop a Preliminary Engineering Report (PER) that
provides widening and rehabilitation recommendations for portions of Taxiway B at Fayetteville—
Drake Field.
1.2 Review of Operational Activity
GARVER will perform a review of aviation activity at the airport as detailed in the 2006 Airport
Master Plan. GARVER will coordinate with the airport staff and review ATADS data to determine the
current aircraft fleet and operational levels, by aircraft type and Runway Design Code (RDC). This
final fleet mix will be used to developing aircraft turning movements for fillet design and in the
rehabilitation analysis with the FAA pavement design software, FAARFIELD.
1.3 Pavement Condition Analysis
1.3.1 Records Research
Prior to obtaining field data, GARVER will perform a thorough review of Taxiway B's historic
construction data, design considerations, test results, as -built drawings, pavement design reports, airport
layout plan, and maintenance history.
1.3.2 Pavement Condition Survey
GARVER will utilize ASTM D5340 procedures to perform a PCI Survey of the portion of Taxiway B
planned for rehabilitation. A PCI will be developed for each separate portion of Taxiway B planned for
rehabilitation. The PCI and distresses found will be used to determine the best rehabilitation approach.
1.4 Field Investigations
1.4.1 Geotechnical Investigation
GARVER will use a subconsultant (Grubbs, Barton, Hoskyn, & Wyatt) to perform 8 subsurface
borings equally spaced along the portions of Taxiway B that will be widened and rehabilitated to a
depth sufficient to determine the material properties of the existing pavement section and natural
subgrade. Four borings shall be taken at locations where widening is expected, and four borings will be
taken at locations were rehabilitation is expected.
Prior to the geotechnical investigation, GARVER will assist the subconsultant in reviewing previous
utility plans and located existing utility lines and ducts.
Exhibit A-7 - Scope of Services I of 3
FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211
I
A geotechnical investigation report will be completed from the on-site investigation and will include, at
a minimum, the following:
• Summary of laboratory tests and methods
• Field CBR values from material obtained from the borings
• Layout of borings
• Log of all borings that includes pavement section thicknesses and water content, atterburg
limits, soil classifications, and the percentage of fines of the subgrade material
1.4.2 Survey
GARVER will provide field survey data from field work for designing the project, and this survey will
be tied to the CITY OF FAYETTEVILLE's control network. GARVER will conduct field surveys,
utilizing radial topography methods, at -intervals and for distances at and/or along the project site as
appropriate for modeling the existing ground, including locations of pertinent features or
improvements. Buildings and other structures, drainage features, visible utilities as well as those
underground utilities marked by their owners and/or representatives, and any other pertinent
topographic features that may be present at and/or along the project site, will be located. If necessary,
control points will be established for use during construction. GARVER will also survey the existing
runway centerline and west pavement edge for correlation with the taxiway centerline elevation.
1.5 Environmental Coordination
GARVER will work with the FAA in order- to obtain a categorical exclusion for the project.
Coordination will_ include completion of a documented CATEX questionnaire in accordance with
FAA. SOP No. 500 and submission to the FAA's environmental specialist for approval.
1.6 DBE Coordination
GARVER will coordinate with the FAA's Office and Civil Rights and complete a three year DBE
goal for the planned construction grant:If required by the FAA, GARVER will also update the
airport's overall DBE program and develop a Small Business Element to conform to the most recent
Part 39 revisions.
1.7 Preliminary Engineer's Report
Garver will develop a Preliminary Engineer's Report (PER) to document the proposed design
decisions for both the Taxiway B widening and rehabilitation. The PER will include all sections
listed below.
1.7.1 General Scope / Project Background
1.7.2 Project Photographs
1.7.3 List of Applicable AIP Standards
1.7.4 Construction Safety and Phasing
1.7.5 Geometric Design
1.7.6 Pavement Design
1.7.7 Drainage Design
1.7.8 Airfield Lighting and Signage
1.7.9 Environmental Considerations
1.7.10 Engineer's Estimate of Project Cost and Project Schedule
Exhibit A-7 - Scope of Services 2 of 3
FYV Taxiway B Widening and Rehabilitation
Garver Project No. 17041211
u
1.8 Design Services
To be added via Work Order Amendment or subsequent work order.
1.9 Bidding Services
To be added via Work Order Amendment or subsequent work order.
1.10 Construction Phase Services
To be added via Work Order Amendment or subsequent work order.
1.11 Materials Testing Services
To be added via Work Order Amendment or subsequent work order.
1.12 Closeout Services
To be added via Work Order Amendment or subsequent work order.
1.13 Project Deliverables
The following will be submitted to the CITY OF FAYETTEVILLE, or others as indicated, by
GARVER:
1. One copy of the Preliminary Engineer's Report to CITY OF FAYETTEVILLE and FAA.
2. Electronic files as requested.
1.14 Extra Work
The following items are not, included under this agreement but will be considered as extra work:
I . Redesign for the CITY OF FAYETTEVILLE's convenience or due to changed conditions after
previous alternate direction and/or approval.
2. Submittals or deliverables in addition to those listed herein.
3. Preparation of Plans and Specifications.
4. Preparation of a Storm Water Pollution Prevention Plan (SWPPP).
5. Construction Phase Services or Materials Testing.
5. Environmental Handling and Documentation, including wetlands identification or mitigation
plans or other work related to environmentally or historically (culturally) significant items.
7. Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR.
8. Services after construction, such as warranty follow-up.
Extra Work will be as directed by the CITY OF FAYETTEVILLE in writing for an additional fee as
agreed upon by the CITY OF FAYETTEVILLE and GARVER.
1.15 Schedule
GARVER shall begin work immediately upon receipt of the executed task order and shall complete the
work within a mutually agreeable schedule.
Exhibit A-7 - Scope of Services 3 of 3
FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211
Exhibit B-7
FYV Taxiway B Widening and Rehabilitation
Garver Hourly Rate Schedule
Classification
Rates
Engineers / Architects
E-1...............................................................
........... $
32.70
E-2 ............................................... . .......................
$
37.90
E-3...................................................................
__ ....... $
45.90
E-4..........................................................................
$
53.60
E-5........................................................................
$
65.40
E-6.............................................................................
$
82.00
E-7 .................................................. ......................
$
108.00
Planners / Environmental Specialist
P-1..............................................................................
$
39.40
P-2..............................................................................
$
49.40
P-3..............................................................................
$
61.50
P-4..............................................................................
$
69.70
P-5................_......................................................_....
$
81.00
P-6..............................................................................
$
92.20
Designers
D-1.......................:.....................................................
$
30.60
D-2.............................................................................
$
35.80
D-3 ........................................ ...............................
$
42.50
D-4.............................................................................
$
49.40
Technicians
T -1.:c........ - ...............
......:. - .......................................
$
23.80
T-2 ...................................:.......................................
$
30.20
T-3 ........................................................................
$
36.80
Surveyors
S-1.............................................................................
$
14.60
S-2.............................................................................
$
19.30
S-3..............................................................................
$
26.00
S-4.............................................................................
$
37.30
S-5.............................................................................
$
49.40
S-6..............................................................................
$
56.20
2 -Man Crew (Survey).....................................•................
$
56.60
3 -Man Crew (Survey)......................................................
$
71.20
2 -Man Crew (GPS Survey) ...............................................
NA
3 -Man Crew (GPS Survey) ...............................................
NA
Construction Observation
C-1 ......... _ _................................................................
$
28.80
C-2 ........... ....................................................
.. .......... $
37.00
C-3 ..... _......................................................................
$
45.30
C-4.............................................................................
$
55.70
Management / Administration
M-1...................................................:.........................
$
108.00
X-1 .....................
$
18.70
X-2..............................................................................
$
25.40
X-3..............................................................................
$
35.40
X-4................................................_.............................
$
45.10
X-5..............................................................................
$
55.40
X-6..............................................................................
$
70.00
Agreement for Professional Services
FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211
11
Exhibit B-7
FAYETTEVILLE - DRAKE FIELD
TAXIWAY B WIDENING AND REHABILITATION
GEOTECHNICAL INVESTIGATION
WORK TASK DESCRIPTION
E-4 E-3
$53.60 $45.90
hr hr
E-2 E-1 D-2 T-2
$37.90 $32.70 $35.80 $30.20
hr hr hr hr
T-1
$23.80
hr
1. Civil Engineering
Subconsultant Coordination
1
2
Utility Coordination
1
2
5
Report Review
2
4
Subtotal - Civil Engineering
0 4
0 8 0 0
5
Hours 0 4 0 8 0 0 5
Salary Costs $0.00 $183.60 $0.00 $261.60 $0.00 $0.00 $119.00
SUBTOTAL - SALARIES: $564.20
LABOR AND GENERAL
ADMINISTRATIVE OVERHEAD $1,084.73
DIRECT NON -LABOR EXPENSES
Document Printing/Reproduction/Assembly $25.00
Postage/Freight/Courier _$21.72
Travel Costs $0.00
SUBTOTAL - DIRECT NON -LABOR EXPENSES: $46.72
SUBTOTAL: $1,695.65
SUBCONSULTANTS FEE (GRUBBS): $7,000.00
PROFESSIONAL FEE $1,304.35
TOTAL FEE: $10,000.00
Exhibit B-7
FAYETTEVILLE - DRAKE FIELD
TAXIWAY B WIDENING AND REHABILITATION
SURVEYS
WORK TASK DESCRIPTION
E-4
$53.60
hr
E-3
$45.90
hr
E-2
$37.90
hr
E-1
$32.70
hr
S-5
$49.40
hr
S-4
$37.30
hr
2 -Man Crew
(Survey)
$56.60
hr
T-1
$23.80
hr
1. Surveys - Topographic
ADMINISTRATIVE OVERHEAD
$3,849.62
DIRECT NON -LABOR EXPENSES
Survey Coordination
$11.12
1
Postage/Freight/Courier
$0.00
2
2
$50.00
Utility Coordination
1
SUBTOTAL:
4
1
1 2
5
Topographic Surveys
$886.96
TOTAL FEE:
$6,800.00
20
Data Processin /DTM Preparation
1
1
4
Subtotal - Surveying
0
1 2
1 0
5 1
4
8
1 20 1
5
Hours 0 2 0 5 4 8 20 5
Salary Costs
$0.00
$91.80 $0.00 $163.50 -$197.60 $298.40 $1,132.00 $119.00
SUBTOTAL - SALARIES:
$2,002.30
LABOR AND GENERAL
ADMINISTRATIVE OVERHEAD
$3,849.62
DIRECT NON -LABOR EXPENSES
Document Printing/Reproduction/Assembly
$11.12
Postage/Freight/Courier
$0.00
Travel Costs
$50.00
SUBTOTAL - DIRECT NON -LABOR EXPENSES:
$61.12
SUBTOTAL:
$5,913.04
SUBCONSULTANTS FEE:
$0.00
PROFESSIONAL FEE
$886.96
TOTAL FEE:
$6,800.00
1!
Exhibit B-7
FAYETTEVILLE - DRAKE FIELD
TAXIWAY B WIDENING AND REHABILITATION
PRELIMINARY ENGINEER'S REPORT
WORK TASK DESCRIPTION
E-4
$53.60
hr
E-3
$45.90
hr
E-2
$37.90
hr
E-1
$32.70
hr
D-2
$35.80
hr
T-2
$30.20
hr
T-1
$23.80
hr
1. Civil Engineering
Review of Operational Activity
2
8
Pavement Condition Analysis
Records Research
2
4
PCI Survey
2
8
8
Rehabilitation Analysis
2
8
Fleet Mix Review
4
8
Geometric Design
4
8
g
Aircraft Turning Analysis
2
8
8
FAARField and COMFAA Review
4
12
Rehabilitation Methods
4
4
Drainage Review
2
4
Preliminary Engineer's Report PER
Narrative
8
16
Aerotum Exhibits
2
4
8
Plan & Profile Sheets
2
4
16
Typical Sections
2
4
10
Drainage Layout
1
2
4
CATEX Coordination
1
2
4
DBE Coordination
1
8
Floodplain Coordination
2
4
8 -
Engineers Opinion of Probable Cost
2
4
Subtotal - Civil Engineering
0
49
0
120
12
0
62
2. Electrical Engineering
Site Visit
5
5
Lighting Layout
2
8
8
Preliminary Engineer's Report (PER)
2
8
Engineer's Opinion of Probable Cost
2
4
Subtotal - Electrical Engineering
11
0
0
25
0
0
8
Hours 11 49 0 145 12 0 70
Salary Costs $589.60 $2,249.10 $0.00 $4,741.50 $429.60 $0.00 $1,666.00
SUBTOTAL - SALARIES: $9,675.80
LABOR AND GENERAL
ADMINISTRATIVE OVERHEAD $18,602.69
DIRECT NON -LABOR EXPENSES
Document Printing/Reproduction/Assembly $222.16
Postage/Freight/Courier $75.00
Travel Costs $120.00
SUBTOTAL - DIRECT NON -LABOR EXPENSES: $417.16
SUBTOTAL: $28,695.65
SUBCONSULTANTS FEE: $0.00
PROFESSIONAL FEE $4,304.35
TOTAL FEE: $33,000.00
V
City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar)
Budget Year Division
/0rg2 AIRPORT SERVICES (760)
2017
Requestor: Dee McCoy
Adjustment Number
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION:
Increase Engineering Services Budget for the preparation of a preliminary engineering report (PER) for the Taxiway B
widening and Rehab project. Funds will be returned to fund balance upon receiving grant funding.
COUNCIL DATE: 111712017
LEGISTAR FILE ID#: 2016-0682
CBGiX t'Gti Fau,
1j512017 8:49 AM
Budget Director Date
TYPE:
DESCRIPTION:
C:\Users\Ismith\AppData\Roaming\L5\Temp\2d83e58a-470a-4b74-ae29-d2731a6ebl27 1 of 1
GLDATE:
RESOLUTION/ORDINANCE
I
POSTED:
TOTAL
49,800 49,800
v.20161220
Increase / (Decrease).
Project.Sub#
Account Number
Expense Revenue
Project Sub AT
Account Name
5550.760.3960-5314.00
49,800 -
15029 1 EX
Professional Services - -
5550.760.3940-4999.99
- 49,800
RE
Use Fund Balance - Current
C:\Users\Ismith\AppData\Roaming\L5\Temp\2d83e58a-470a-4b74-ae29-d2731a6ebl27 1 of 1