HomeMy WebLinkAbout29-17 RESOLUTIONF 4nrEYl rr .�trk_r.:a5u S 113 West Mountain Street Fayetteville, AR 72701 (479)575-8323 Resolution: 29-17 File Number: 2016-0682 GARVER, LLC TASK ORDER NO. 7: A RESOLUTION TO APPROVE TASK ORDER NO. 7 WITH GARVER, LLC IN THE AMOUNT OF $49,800.00 FOR PREPARATION OF A PRELIMINARY ENGINEERING REPORT FOR THE TAXIWAY B WIDENING AND REHABILITATION PROJECT, TO EXPRESS THE CITY'S WILLINGNESS TO UTILIZE FEDERAL AVIATION ADMINISTRATION FUNDS FOR THE PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 7 with Garver, LLC in the amount of $49,800.00 for the preparation of a Preliminary Engineering Report for the Taxiway B Widening and Rehabilitation Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby expresses the City's willingness to utilize Federal Aviation Administration funds for all phases of the Taxiway B Widening and Rehabilitation Project. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. Page 1 Printed on 1/18/17 ISlliltdill PASSED and APPROVED on 1/17/2017 .•� of y .o . • ' f-AYETTEVII.I E .! Approve Attest: '. y .'• 110"- r 'fill fill 1%0\ LiAieId Jordan, h4i56r SondraE. Smith, CityClerkTreasurer Page 1 Printed on 1/18/17 City of Fayetteville, Arkansas 113 west Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2016-0682 Agenda Date: 1/17/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A. 3 GARVER, LLC TASK ORDER NO. 7: A RESOLUTION TO APPROVE TASK ORDER NO. 7 WITH GARVER, LLC IN THE AMOUNT OF $49,800.00 FOR PREPARATION OF A PRELIMINARY ENGINEERING REPORT FOR THE TAXIWAY B WIDENING AND REHABILITATION PROJECT, TO EXPRESS THE CITY'S WILLINGNESS TO UTILIZE FEDERAL AVIATION ADMINISTRATION FUNDS FOR THE PROJECT, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 7 with Garver, LLC in the amount of $49,800.00 for the preparation of a Preliminary Engineering Report for the Taxiway B Widening and Rehabilitation Project. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby expresses the City's willingness to utilize Federal Aviation Administration funds for all phases of the Taxiway B Widening and Rehabilitation Project. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 111812017 City of Fayetteville Staff Review Form 2016-0682 Legistar File ID 1/17/2017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Terry Gulley 12/29/2016 Aviation / Transportation Services Department Submitted By Submitted Date Division / Department Action Recommendation: Staff requests approval of a Resolution expressing the willingness to utilize Federal Aviation Administration (FAA) funds and allow the Aviation Division to execute a task order in the amount of $49,800.00 for Garver, LLC to prepare a preliminary engineering report (PER) for the Taxiway B Widening and Rehabilitation project that is included in the airport's FAA capital improvement plan (CIP). Staff is also requesting approval of a budget adjustment. Budget Impact: 5550.760.3960.5314.00 Airport Account Number Fund 15029 Airport Engineering Consultant Services Project Number Project Tifle Budgeted Item? No Current Budget Funds Obligated $ - Current Balance ��_� Does item have a cost? Yes Item Cost $ 49,800.00 Budget Adjustment Attached? Yes Budget Adjustment $ 49,800.00 Remaining Budget - V20140710 Previous Ordinance or Resolution# Original Contract Number: Approval Date: Comments: Total amount will be reimbursed upon receipt of grant funds. CITY OF a e eel ARKANSAS MEETING OF JANUARY 17, 2017 TO: Mayor Lioneld Jordan Fayetteville City Council THRU: Don Marr, Chief of Staff CITY COUNCIL AGENDA MEMO FROM: Terry Gulley, Transportation Services Director DATE: December 29, 2016 SUBJECT: Taxiway B Widening and Rehabilitation RECOMMENDATION: Staff requests approval of a Resolution expressing the willingness to utilize Federal Aviation Administration (FAA) funds and allow the Aviation Division to execute a task order in the amount of $49,800.00 for Garver, LLC to prepare a preliminary engineering report (PER) for the Taxiway B Widening and Rehabilitation project that is included in the airport's FAA capital improvement plan (CIP). I4TTSI3r130111r! I The airport currently has charter flights that operate at the airfield with a Boeing 737-800 and Boeing 757-200 aircraft. These aircraft cannot taxi from the terminal apron to the Runway 16 threshold without crossing the runway due to current width of Taxiway B north of Taxiway D. In addition, these aircraft cannot taxi to.the Runway 34 threshold without utilizing judgmental oversteering to maneuver the final turn on the south end of Taxiway B. In an effort to provide adequate taxiway width to promote safe taxiing operations for the large charter aircraft, the airport included a taxiway widening project in their FAA CIP. In addition to the widening of the taxiway, the rehabilitation of pavement adjacent to all taxiway widened as part of the project will also be included. The project was originally scheduled to be completed in 2019. However, the FAA has recently notified the airport that additional funding was secured and construction will be moved to 2018. The FAA has requested that a PER be completed as part of this project and due to the adjustment in project schedule, the PER submittal deadline is March 31, 2017. Mailing Address: 113 W. Mountain Street www.tayetteville-ar.gov Fayetteville, AR 72701 DISCUSSION: Following the FAA approval of the PER, Aviation Division will execute a task order to complete design and bidding services related to the Taxiway B Widening and Rehabilitation project. All costs associated with the PER, Design, and Bidding Services will be included in an FAA design - only grant application that will be submitted to the FAA in June 2017. Prior to submission and execution, the task order and grant application will be submitted for Council approval. BUDGET/STAFF IMPACT: The project will advertise for bids in spring 2018. A task order for construction phase services and FAA grant application will be submitted for Council approval in summer 2018 and construction will begin after the FAA grant has been executed. Below is a summary of the costs and funding breakdown for each upcoming grant. 2017 FAA Grant (Desian-Onl Preliminary Engineering Report: $49,800.00 FAA: $135,000.00 Design and Bidding Services (estimated):$100,200.00 ADA: $15,000.00 TOTAL: $150,000.00 City: $0.00 TOTAL: $150,000.00 2018 FAA Grant (Construction) Construction Phase Services (estimated): $100,000.00 FAA: $1,480,500.00 Construction (estimated): $1,500,000.00 ADA: $164,500.00 TOTAL: $1,650,000.00 City: $5,000,00 - TOTAL: $1,650,000.00 Attachments: Staff Review Form City Council Memo Garver Task Order 07 APPENDIX A-7 TASK ORDER 07 FAYETTEVILLE — DRAKE FIELD (FYV) TAXIWAY B WIDENING AND REHABILITATION This TASK ORDER is made as of om L ill VJ I 2017 by and between the CITY OF FAYETTEVILLE of Fayetteville, Arkansas hereina er referred to as "CITY OF FAYETTEVILLE," and GARVER, LLC, hereinafter referred to as "GARVER", in accordance with the provisions of the AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES executed on April 21, 2015. Under this Task Order, the CITY OF FAYETTEVILLE intends to make the following improvements for the FYV Taxiway B Widening and Rehabilitation project. Widen portions of Taxiway B to bring them into TDG 3 standards and rehabilitation of pavement on Taxiway B adjacent to the proposed widening. GARVER will provide professional services related to these improvements as described herein. SECTION 1- SCOPE OF SERVICES GARVER will provide services as detailed in Exhibit A-7. SECTION 2 PAYMENT For the work described under SECTION I - SCOPE OF SERVICES, the CITY OF FAYETTEVILLE- wi I I pay GARVER on a lump sum basis. The CITY OF FAYETTEVILLE represents that funding sources are in place with the available funds necessary to pay GARVER. The table below presents a summary of the fee amounts and fee types for this contract. WORK DESCRIPTION FEE AMOUNT FEE TYPE Geotechnical Investigation $10,000 Lump Sum Surveys $6,800 Lump Sum Preliminary Engineer's Report $33,000 Lump Sum TOTAL FEE $49,800 71 The lump sum amount to be paid under this agreement is $49,800. For informational purposes, a breakdown of GARVER's estimated costs is included in Exhibit B-7 with approximate current hourly rates for each employee classification. Task Order 07 1 of 2 FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211 Additional Services (Extra Work). For work not described or included in Section 1 — Scope of Services but requested by the CITY OF FAYETTEVILLE in writing, the CITY OF FAYETTEVILLE will pay GARVER, for time spent on the project, at the rates shown in Exhibit B-7 for each classification of GARVER's personnel, plus overhead, plus 15% profit, plus reimbursable expenses including but not limited to printing, courier service, reproduction, and travel. The rates shown in Exhibit B-7 will be increased annually with the first increase effective on or about July 1, 2017. SECTION 3 —EXHIBITS 3.1 The following Exhibits are attached to and made a part of this Agreement: 3.1.1 Exhibit A-7 Scope of Services 3.1.2 Exhibit B-7 Rate Schedule & Fee Tables 3.1.3 Exhibit C-7 Project Exhibit This Agreement may be executed in two (2) or more counterparts each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Approval and acceptance of this Task Order, including attachments listed in SECTION 3 —EXHIBITS, shall incorporate this document as part of the Agreement. Garver is authorized to begin performance upon receipt of a copy of this Task Order signed by the CITY OF FAYETTEVILLE. The effective date of this Task Order shall be the last date written below. CITY OF FA By. MaN ARKANSAS ATTEST: ` % By: City Clerk w� •0 �A YE7—r• rm r .z: EVI<<E;�:u ° Task Order 07 2 of 2 FYV Taxiway B Widening and Rehabilitation GARVER Digitally signed by Michael J. G,iffin ivJ Data: 2076.12.27 By: 09:06:43-0600' Title: Senior Vice President Garver Project No. 17041211 EXHIBIT A-7 — SCOPE OF SERVICES FAYETTEVILLE — DRAKE FIELD (FYV) TAXIWAY B WIDENING AND REHABILITATION 1.1 General Generally, the scope of services includes review of aircraft operations, pavement condition review, drainage analysis, and field investigations to develop a Preliminary Engineering Report (PER) that provides widening and rehabilitation recommendations for portions of Taxiway B at Fayetteville— Drake Field. 1.2 Review of Operational Activity GARVER will perform a review of aviation activity at the airport as detailed in the 2006 Airport Master Plan. GARVER will coordinate with the airport staff and review ATADS data to determine the current aircraft fleet and operational levels, by aircraft type and Runway Design Code (RDC). This final fleet mix will be used to developing aircraft turning movements for fillet design and in the rehabilitation analysis with the FAA pavement design software, FAARFIELD. 1.3 Pavement Condition Analysis 1.3.1 Records Research Prior to obtaining field data, GARVER will perform a thorough review of Taxiway B's historic construction data, design considerations, test results, as -built drawings, pavement design reports, airport layout plan, and maintenance history. 1.3.2 Pavement Condition Survey GARVER will utilize ASTM D5340 procedures to perform a PCI Survey of the portion of Taxiway B planned for rehabilitation. A PCI will be developed for each separate portion of Taxiway B planned for rehabilitation. The PCI and distresses found will be used to determine the best rehabilitation approach. 1.4 Field Investigations 1.4.1 Geotechnical Investigation GARVER will use a subconsultant (Grubbs, Barton, Hoskyn, & Wyatt) to perform 8 subsurface borings equally spaced along the portions of Taxiway B that will be widened and rehabilitated to a depth sufficient to determine the material properties of the existing pavement section and natural subgrade. Four borings shall be taken at locations where widening is expected, and four borings will be taken at locations were rehabilitation is expected. Prior to the geotechnical investigation, GARVER will assist the subconsultant in reviewing previous utility plans and located existing utility lines and ducts. Exhibit A-7 - Scope of Services I of 3 FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211 I A geotechnical investigation report will be completed from the on-site investigation and will include, at a minimum, the following: • Summary of laboratory tests and methods • Field CBR values from material obtained from the borings • Layout of borings • Log of all borings that includes pavement section thicknesses and water content, atterburg limits, soil classifications, and the percentage of fines of the subgrade material 1.4.2 Survey GARVER will provide field survey data from field work for designing the project, and this survey will be tied to the CITY OF FAYETTEVILLE's control network. GARVER will conduct field surveys, utilizing radial topography methods, at -intervals and for distances at and/or along the project site as appropriate for modeling the existing ground, including locations of pertinent features or improvements. Buildings and other structures, drainage features, visible utilities as well as those underground utilities marked by their owners and/or representatives, and any other pertinent topographic features that may be present at and/or along the project site, will be located. If necessary, control points will be established for use during construction. GARVER will also survey the existing runway centerline and west pavement edge for correlation with the taxiway centerline elevation. 1.5 Environmental Coordination GARVER will work with the FAA in order- to obtain a categorical exclusion for the project. Coordination will_ include completion of a documented CATEX questionnaire in accordance with FAA. SOP No. 500 and submission to the FAA's environmental specialist for approval. 1.6 DBE Coordination GARVER will coordinate with the FAA's Office and Civil Rights and complete a three year DBE goal for the planned construction grant:If required by the FAA, GARVER will also update the airport's overall DBE program and develop a Small Business Element to conform to the most recent Part 39 revisions. 1.7 Preliminary Engineer's Report Garver will develop a Preliminary Engineer's Report (PER) to document the proposed design decisions for both the Taxiway B widening and rehabilitation. The PER will include all sections listed below. 1.7.1 General Scope / Project Background 1.7.2 Project Photographs 1.7.3 List of Applicable AIP Standards 1.7.4 Construction Safety and Phasing 1.7.5 Geometric Design 1.7.6 Pavement Design 1.7.7 Drainage Design 1.7.8 Airfield Lighting and Signage 1.7.9 Environmental Considerations 1.7.10 Engineer's Estimate of Project Cost and Project Schedule Exhibit A-7 - Scope of Services 2 of 3 FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211 u 1.8 Design Services To be added via Work Order Amendment or subsequent work order. 1.9 Bidding Services To be added via Work Order Amendment or subsequent work order. 1.10 Construction Phase Services To be added via Work Order Amendment or subsequent work order. 1.11 Materials Testing Services To be added via Work Order Amendment or subsequent work order. 1.12 Closeout Services To be added via Work Order Amendment or subsequent work order. 1.13 Project Deliverables The following will be submitted to the CITY OF FAYETTEVILLE, or others as indicated, by GARVER: 1. One copy of the Preliminary Engineer's Report to CITY OF FAYETTEVILLE and FAA. 2. Electronic files as requested. 1.14 Extra Work The following items are not, included under this agreement but will be considered as extra work: I . Redesign for the CITY OF FAYETTEVILLE's convenience or due to changed conditions after previous alternate direction and/or approval. 2. Submittals or deliverables in addition to those listed herein. 3. Preparation of Plans and Specifications. 4. Preparation of a Storm Water Pollution Prevention Plan (SWPPP). 5. Construction Phase Services or Materials Testing. 5. Environmental Handling and Documentation, including wetlands identification or mitigation plans or other work related to environmentally or historically (culturally) significant items. 7. Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR. 8. Services after construction, such as warranty follow-up. Extra Work will be as directed by the CITY OF FAYETTEVILLE in writing for an additional fee as agreed upon by the CITY OF FAYETTEVILLE and GARVER. 1.15 Schedule GARVER shall begin work immediately upon receipt of the executed task order and shall complete the work within a mutually agreeable schedule. Exhibit A-7 - Scope of Services 3 of 3 FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211 Exhibit B-7 FYV Taxiway B Widening and Rehabilitation Garver Hourly Rate Schedule Classification Rates Engineers / Architects E-1............................................................... ........... $ 32.70 E-2 ............................................... . ....................... $ 37.90 E-3................................................................... __ ....... $ 45.90 E-4.......................................................................... $ 53.60 E-5........................................................................ $ 65.40 E-6............................................................................. $ 82.00 E-7 .................................................. ...................... $ 108.00 Planners / Environmental Specialist P-1.............................................................................. $ 39.40 P-2.............................................................................. $ 49.40 P-3.............................................................................. $ 61.50 P-4.............................................................................. $ 69.70 P-5................_......................................................_.... $ 81.00 P-6.............................................................................. $ 92.20 Designers D-1.......................:..................................................... $ 30.60 D-2............................................................................. $ 35.80 D-3 ........................................ ............................... $ 42.50 D-4............................................................................. $ 49.40 Technicians T -1.:c........ - ............... ......:. - ....................................... $ 23.80 T-2 ...................................:....................................... $ 30.20 T-3 ........................................................................ $ 36.80 Surveyors S-1............................................................................. $ 14.60 S-2............................................................................. $ 19.30 S-3.............................................................................. $ 26.00 S-4............................................................................. $ 37.30 S-5............................................................................. $ 49.40 S-6.............................................................................. $ 56.20 2 -Man Crew (Survey).....................................•................ $ 56.60 3 -Man Crew (Survey)...................................................... $ 71.20 2 -Man Crew (GPS Survey) ............................................... NA 3 -Man Crew (GPS Survey) ............................................... NA Construction Observation C-1 ......... _ _................................................................ $ 28.80 C-2 ........... .................................................... .. .......... $ 37.00 C-3 ..... _...................................................................... $ 45.30 C-4............................................................................. $ 55.70 Management / Administration M-1...................................................:......................... $ 108.00 X-1 ..................... $ 18.70 X-2.............................................................................. $ 25.40 X-3.............................................................................. $ 35.40 X-4................................................_............................. $ 45.10 X-5.............................................................................. $ 55.40 X-6.............................................................................. $ 70.00 Agreement for Professional Services FYV Taxiway B Widening and Rehabilitation Garver Project No. 17041211 11 Exhibit B-7 FAYETTEVILLE - DRAKE FIELD TAXIWAY B WIDENING AND REHABILITATION GEOTECHNICAL INVESTIGATION WORK TASK DESCRIPTION E-4 E-3 $53.60 $45.90 hr hr E-2 E-1 D-2 T-2 $37.90 $32.70 $35.80 $30.20 hr hr hr hr T-1 $23.80 hr 1. Civil Engineering Subconsultant Coordination 1 2 Utility Coordination 1 2 5 Report Review 2 4 Subtotal - Civil Engineering 0 4 0 8 0 0 5 Hours 0 4 0 8 0 0 5 Salary Costs $0.00 $183.60 $0.00 $261.60 $0.00 $0.00 $119.00 SUBTOTAL - SALARIES: $564.20 LABOR AND GENERAL ADMINISTRATIVE OVERHEAD $1,084.73 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $25.00 Postage/Freight/Courier _$21.72 Travel Costs $0.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $46.72 SUBTOTAL: $1,695.65 SUBCONSULTANTS FEE (GRUBBS): $7,000.00 PROFESSIONAL FEE $1,304.35 TOTAL FEE: $10,000.00 Exhibit B-7 FAYETTEVILLE - DRAKE FIELD TAXIWAY B WIDENING AND REHABILITATION SURVEYS WORK TASK DESCRIPTION E-4 $53.60 hr E-3 $45.90 hr E-2 $37.90 hr E-1 $32.70 hr S-5 $49.40 hr S-4 $37.30 hr 2 -Man Crew (Survey) $56.60 hr T-1 $23.80 hr 1. Surveys - Topographic ADMINISTRATIVE OVERHEAD $3,849.62 DIRECT NON -LABOR EXPENSES Survey Coordination $11.12 1 Postage/Freight/Courier $0.00 2 2 $50.00 Utility Coordination 1 SUBTOTAL: 4 1 1 2 5 Topographic Surveys $886.96 TOTAL FEE: $6,800.00 20 Data Processin /DTM Preparation 1 1 4 Subtotal - Surveying 0 1 2 1 0 5 1 4 8 1 20 1 5 Hours 0 2 0 5 4 8 20 5 Salary Costs $0.00 $91.80 $0.00 $163.50 -$197.60 $298.40 $1,132.00 $119.00 SUBTOTAL - SALARIES: $2,002.30 LABOR AND GENERAL ADMINISTRATIVE OVERHEAD $3,849.62 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $11.12 Postage/Freight/Courier $0.00 Travel Costs $50.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $61.12 SUBTOTAL: $5,913.04 SUBCONSULTANTS FEE: $0.00 PROFESSIONAL FEE $886.96 TOTAL FEE: $6,800.00 1! Exhibit B-7 FAYETTEVILLE - DRAKE FIELD TAXIWAY B WIDENING AND REHABILITATION PRELIMINARY ENGINEER'S REPORT WORK TASK DESCRIPTION E-4 $53.60 hr E-3 $45.90 hr E-2 $37.90 hr E-1 $32.70 hr D-2 $35.80 hr T-2 $30.20 hr T-1 $23.80 hr 1. Civil Engineering Review of Operational Activity 2 8 Pavement Condition Analysis Records Research 2 4 PCI Survey 2 8 8 Rehabilitation Analysis 2 8 Fleet Mix Review 4 8 Geometric Design 4 8 g Aircraft Turning Analysis 2 8 8 FAARField and COMFAA Review 4 12 Rehabilitation Methods 4 4 Drainage Review 2 4 Preliminary Engineer's Report PER Narrative 8 16 Aerotum Exhibits 2 4 8 Plan & Profile Sheets 2 4 16 Typical Sections 2 4 10 Drainage Layout 1 2 4 CATEX Coordination 1 2 4 DBE Coordination 1 8 Floodplain Coordination 2 4 8 - Engineers Opinion of Probable Cost 2 4 Subtotal - Civil Engineering 0 49 0 120 12 0 62 2. Electrical Engineering Site Visit 5 5 Lighting Layout 2 8 8 Preliminary Engineer's Report (PER) 2 8 Engineer's Opinion of Probable Cost 2 4 Subtotal - Electrical Engineering 11 0 0 25 0 0 8 Hours 11 49 0 145 12 0 70 Salary Costs $589.60 $2,249.10 $0.00 $4,741.50 $429.60 $0.00 $1,666.00 SUBTOTAL - SALARIES: $9,675.80 LABOR AND GENERAL ADMINISTRATIVE OVERHEAD $18,602.69 DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly $222.16 Postage/Freight/Courier $75.00 Travel Costs $120.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $417.16 SUBTOTAL: $28,695.65 SUBCONSULTANTS FEE: $0.00 PROFESSIONAL FEE $4,304.35 TOTAL FEE: $33,000.00 V City of Fayetteville, Arkansas - Budget Adjustment Form (Legistar) Budget Year Division /0rg2 AIRPORT SERVICES (760) 2017 Requestor: Dee McCoy Adjustment Number BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION: Increase Engineering Services Budget for the preparation of a preliminary engineering report (PER) for the Taxiway B widening and Rehab project. Funds will be returned to fund balance upon receiving grant funding. COUNCIL DATE: 111712017 LEGISTAR FILE ID#: 2016-0682 CBGiX t'Gti Fau, 1j512017 8:49 AM Budget Director Date TYPE: DESCRIPTION: C:\Users\Ismith\AppData\Roaming\L5\Temp\2d83e58a-470a-4b74-ae29-d2731a6ebl27 1 of 1 GLDATE: RESOLUTION/ORDINANCE I POSTED: TOTAL 49,800 49,800 v.20161220 Increase / (Decrease). Project.Sub# Account Number Expense Revenue Project Sub AT Account Name 5550.760.3960-5314.00 49,800 - 15029 1 EX Professional Services - - 5550.760.3940-4999.99 - 49,800 RE Use Fund Balance - Current C:\Users\Ismith\AppData\Roaming\L5\Temp\2d83e58a-470a-4b74-ae29-d2731a6ebl27 1 of 1