Loading...
HomeMy WebLinkAboutORDINANCE 5942113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5942 File Number: 2016-0659 MARK ZWEIG, INC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, INC. FOR A WATER MAIN UPGRADE ALONG A PORTION OF NORTH CHURCH AVENUE BETWEEN WEST SPRING STREET AND WEST DICKSON STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $103,665.15, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $20,733.03. WHEREAS, Mark Zweig, Inc. will be developing property located at 218 North Church Avenue, a project which has been approved by the City's Planning Division; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made aware of an existing water volume fire flow issue with the current water piping; and WHEREAS, increasing -the size of this approximately-625--foot-segment from a 4=inch mainto an 8=inch main will alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will replace and upgrade aged infrastructure in the core of the city, providing improved service and fire protection for residents and business in the area, and will facilitate future development; and WHEREAS, § 5 1. 112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system"; and Page 1 Printed on 114117 Ordinance: 5942 File Number.' 2016-0659 WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mark Zweig, Inc. for a water main upgrade along North Church Avenue between West Spring Street and West Dickson Street with the estimated amount to be paid by the City of Fayetteville not to exceed $103,665.15, and further approves a project contingency in the amount of $20,733.03. PASSED and APPROVED on 1/3/2017 Attest: Sondra E. Smith, City Clerk Treasv;t� � • ` A FAYETTEVII l_L • -� 9�kANS'• I'C,,,�"�; Page 2 Printed on 114117 EXHIBIT B JORGENSEN +ASSOCIATES Civil Engineering Surveying Lanascape Arcr)ifecture 5ervsces November 1, 2016 City of Fayetteville Water & Sewer Department 113 West Mountain Street Fayetteville, AR 72701 RE: N. Church Ave. Waterline Extension — Between Spring & Dickson Streets 124 W Sunbridge Drive, Suite 5 Fayetteville, AR 72703 Office: 479.442.9127 Fax: 479-582 4807 www orgensenassoc corn In regards to the waterline extension along Church Ave. north of Spring St we have developed the following preliminary cost estimate: Water Main Estimated Costs Item Description Qty. Unit Unit Price Total 001 8" PVC, C-900 Class 200 DR -14 Water Main 620 LF $65.00 $40,300.00 002 8"x12" Tap and Valve 2 EA $4,000.00 $8,000.00 003 6" PVC, C-900 Class 200 DR -14 Water Main 15 LF $65.00 5975.00 004 8"x6" Tap and Valve 1 EA $3,800.00 $3,800.00 005 Vertical Bends (45's) 4 EA $625.00 $2,500.00 006 _ Install Fire Hydrant Assembly 1 EA $5,000.00 $5,000.00 007 16" Steel Encasement 40 LF $60.00 $2.,400.00 008 Relocate Ex WM, Reconnect to New Line 9 EA $250.00 $2,250.00 009 8" Gate 2 EA $1,500.00 $3,000.00 010 Remove Asphalt 279 SY $10.00 $2,790.00 011 Install "T" Patch 300 SY $110.00 $33,000.00 012 Additional SB2 for T -Patch 211 Tons $45.00 $9,495.00 013 Traffic Control 1 LS $2,000.00 $2,000.00 014 Clean + Test 1 LS $1,000.00 $1,500.00 015 Bond 1 LS $2,500.00 $3,500.00 Total $120,510.00 Below, is a list of 9 properties that would benefit from a new water main running along Church Ave. The Collier lots and the empty Three Ten lot in particular have had development requests recently but have fallen through due to downtown development costs, one of which was this Water Line Extension. Mark Zweig Inc.'s 150' of frontage along the extension should not bear the full burden of the costs, in turn, we propose MZ Inc. pay the proportional cost of 218 N. Church's (and the associated empty lot) property length. With the added emphasis from the City Council along with the infrastructure fund specifically set aside to cost share on downtown infill this makes a fair assessment of the responsibility. In addition, the lack of a fire hydrant along the block cause safety concerns. Most of these concerns relate to the compact timber frame apartments with no fire suppression system along the street. They would be alleviated with the installation of the fire hydrant associated with this upgrade. Below is a list of the nine aforementioned properties to benefit from the extension. 1. 765-01671-000 & 765-01672-000; Mark Zweig Inc. Property (150'): 2. 765-01688-000 & 765-22566-000 & 765-01690-000 (214') 3. 765-01699-000 (136') 4. 765-01670-000 (106') 5. 765-01673-000 (66') 6. 765-01674-000 (84') 7. 765-01702-000 (112') 8. 765-01696-000 (112') 9. 765-01695-000 (112') Total Length of properties: 1,092' Total Estimate Cost: $120,510 76.5% of the Water Main Cost for City of Fayetteville represents = $92,190.15 23.5% of the Water Main Cost for 218 N. Church represents = $28,319.85 Engineering, Surveying, Inspection Cost: $15,000 Total Estimated Cost: $135,510.00 We are kindly asking that the City cost share 76.5% of the water main extension ($92,190.15 + 76.5% of engineering fee ($11,475)). Requested total City cost share amount: $103,665.15 (To be based on actual construction costs.) Please review at your convenience and let us know how we can be of further assistance for this project. Total Estimated Cost: $135,510.00 Total City Share: $103,665.15 (in addition a contingency of 20% ($20,773.03) will be included) Please review at your convenience and let us know how we can be of further assistance for this project. - City of Fayetteville, Arkansas 113 West Mountain Street r Fayetteville, AR 72701 ` (479) 575-5323 ' Text File '- - File Number: 2016-0659 Agenda Date: 1/3/2017 Version: 1 Status: Passed In Control: City Council Meeting File Type: Ordinance Agenda Number: C. 2 MARK ZWEIG, INC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, INC. FOR A WATER MAIN UPGRADE ALONG A PORTION OF NORTH CHURCH AVENUE BETWEEN WEST SPRING STREET AND WEST DICKSON STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $103,665.15, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $20,733.03 WHEREAS, Mark Zweig, Inc. will be developing property located at 218 North Church Avenue, a project which has been approved by the City's Planning Division; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made 'aware of an existing water volume fire flow issue with the current water piping; and WHEREAS, increasing the size of this approximately 625 -foot segment from a 4 -inch main to an 8 -inch main will—alleviate -the -current -water -volume- deficiency; allow- the - development to connect -and- also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will replace and upgrade aged infrastructure in the core of the city, providing improved service and fire protection for residents and business in the area, and will facilitate future development; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system"; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line for the developer's project. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives City of Fayetteville, Arkansas Page 1 Printed on 11412017 File Number 2016-0659 the requirements of formal competitive bidding and approves a cost share agreement with Mark Zweig, Inc. for a water main upgrade along North Church Avenue between West Spring Street and West Dickson Street with the estimated amount to be paid by the City of Fayetteville not to exceed $103,665.15, and further approves a project contingency in the amount of $20,733.03. City of Fayetteville, Arkansas Page 2 Printed on 914/4017 City of Fayetteville Staff Review Form 2016-0659 Legistar File ID 1/3/2017 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Tim Nyander 12/15/2016 Utilities Director/ Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: A RESOLUTION TO APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, INC. FOR UPGRADING A WATERLINE ALONG A PORTION OF NORTH CHURCH AVENUE BETWEEN WESTSPRING STREET AND WEST DICKSON STREET ATA COST OF $103,665.15 TO THE CITY, WHICH IS 76.5% OF THE TOTAL COST OF THE PROJECT, WITH A NOT -TO -EXCEED CONTINGENCY FUND OF $20,773.03 5400.720.5600-5808.00 Account Number - 04039.1 Project Number Budgeted Item? Yes Does item have a cost? Yes Budget Adjustment Attached? No Previous Ordinance or Resolution # Original Contract Number: Comments: Budget Impact: Water/Sewer Fund Water/Sewer Impact Fee Cost Sharing Projects Current Budget Funds Obligated Current Balance Item Cost Budget Adjustment Remaining Budget Project Title $ 1,070,594.00 $ 60, 917.00 $ 124,438.18 Approval Date: V20140710 CITY OF 7ay% Nile ARKANSAS MEETING OF JANUARY 3, 2016 TO: Fayetteville City Council THRU: Mayor Lioneld Jordan Don Marr, Chief of Staff Water and Sewer Committee FROM: Tim Nyander, Utilities Director DATE: December 15. 2016 CITY COUNCIL AGENDA MEMO SUBJECT: Cost Share Agreement with Mark Zweig, Inc. for a Water Line Upgrade on N. Church Ave. RECOMMENDATION: Staff recommends approval of a cost -share agreement between the City of Fayetteville and Mark Zweig, Inc., to share the costs of upgrading a waterline on N. Church Ave. between W. Spring St. and W. Dickson St. The estimated total cost of the project is $135,510.00. The City's portion of the cost share is 76.5% of the estimated project cost, in the not -to -exceed amount of $103,665.15, with a not -to -exceed contingency fund of $20,773.03. BACKGROUND: Mark Zweig, Inc. has requested that the City share in the cost of upgrading a 4 -inch waterline to 8 -inch along a portion of N. Church Ave. between W. Spring St. and W. Dickson St., a distance of approximately 625 feet, so that Mark Zweig, Inc. may develop the property located at 218 N. Church Ave. DISCUSSION: Upgrading this waterline will allow development of this property and will also provide for ample future capacity which the City recognizes will be necessary for the area that is served by this waterline. There are 9 other properties mentioned in Exhibit "B" that will also benefit from the waterline upgrade. Exhibit "A" shows a map of the area and the waterline to be upgraded. BUDGET/STAFF IMPACT: Funds for the City portion of work are available in the Water Impact Fee Cost Sharing Project. The final actual cost to the City will be based upon actual bid price for this project. ATTACHMENTS: Staff Review Form Cost -Share Agreement Map of Area (Exhibit A) Cost Share Estimate (Exhibit B) Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 CONTRACTUAL AGREEMENT FOR COST SHARE OF WATER MAIN UPGRADE COSTS This Agreement, made and entered into on this 3 midday of January, 2017, by and between the City of Fayetteville, Arkansas ("City") and Mark Zweig, Inc., witnesseth: WHEREAS, Mark Zweig, Inc. received approval by the City's Planning Department on November 21, 2016, for a renovation project in the 200 block of Church Avenue; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made aware of an existing water volume fire flow issue with the existing water piping; and WHEREAS, increasing the size of this approximately 625 -foot segment from a 4 -inch main to an 8 -inch main will alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will replace and upgrade aged infrastructure in the core of the city, providing improved service and fire protection for residents and business in the area, and will facilitate future development; and WHEREAS, the Fayetteville City Plan 2030, adopted in 2011 as the City's comprehensive land use plan, lists infill development as one of its top two goals.; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." NOW, THEREFORE, the City of Fayetteville, Arkansas and Mark Zweig, Inc. agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Mark Zweig, Inc. for 76.5% of the cost to upgrade approximately 625 linear feet of 4 -inch water main in the area identified in Exhibit "A" to 8 - inch main up to a maximum -not -to -exceed amount of $103,665.15 as was estimated by the builder's representative and shown on Exhibit `B", attached. The 76.5% cost represents the excess materials and labor cost required to fully upgrade the water line, as well as sharing in the cost of Mark Zweig, Inc.'s portion of the project. B. Payments due to Mark Zweig, Inc. shall be remitted within sixty (60) days after receipt of valid invoices. 2. Mark Zweig, Inc. agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation, including submittal of plans and specifications to the City's Engineering Department, per their standard procedures. B. Provide a copy of the invoices from the Contractor upon City approval of the water main upgrade. C. Pay for the water main installation (with reimbursement of 76.5% of the cost by the City of Fayetteville in a not -to -exceed amount of $103,665.15 with a contingency fund not -to -exceed $20,773.03). 3. It is further understood that the contract for construction of the water main upgrade is between Mark Zweig, Inc. and its Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in this agreement with a not -to -exceed reimbursable amount of $103,665.15 for the water main upgrade, with a contingency fund not -to -exceed $20,733.03. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: MARK ZWEIG, INC. WN ATTEST: E REND&D.WALLNERSHrNGTON COUNTYRYPUBUC-ARKANSAS"on E�iree JuKAfY 2E, 2622,JWon No. 12386129 CITY OF FAYETTEVILLE, ARKANSMS ATTEST: e. cy, By:..., SONDRA SMITH, City C1 9; 'G\A Y 0". sG • EAYETTEVILLF;...= a ��///' 111111110 o}''0�1,+h,,a C�i EXHIBIT B JORGENSEN +ASSOCIATES I r iil:,'li; November 1, 2016 City of Fayetteville Water & Sewer Department 113 West Mountain Street Fayetteville, AR 72701 RE: N. Church Ave. Waterline Extension — Between Spring & Dickson Streets 124 W Sunbridge Drive, Suite 5 Fayetteville, AR 72703 Office: 479.442.9127 Fax: 479.582.4807 In regards to the waterline extension along Church Ave. north of Spring St we have developed the following preliminary cost estimate: Water Main Estimated Costs Item Description Qty. Unit Unit Price Total 001 8" PVC, C-900 Class 200 DR -14 Water Main 620 LF $65.00 $40,300.00 002 8"x12" Tap and Valve 2 EA $4,000.00 $8,000.00 003 6" PVC, C-900 Class 200 DR -14 Water Main 15 LF $65.00 $975.00 004 8"x6" Tap and Valve 1 EA $3,800.00 $3,800.00 005 Vertical Bends (45's) 4 EA $625.00 $2,500.00 006 Install Fire Hydrant Assembly 1 EA $5,000.00 $5,000.00 007 16" Steel Encasement 40 LF $60.00 $2,400.00 008 Relocate Ex WM, Reconnect to New Line 9 EA $250.00 $2,250.00 009 8" Gate Valve 2 EA $1,500.00 $3,000.00 010 Remove Asphalt 279 SY $10.00 $2,790.00 011 Install "T" Patch 300 SY $110.00 $33,000.00 012 Additional SB2 for T -Patch 211 Tons $45.00 $9,495.00 013 Traffic Control 1 LS $2,000.00 $2,000.00 014 Clean+Test 1 LS $1,000.00 $1,500.00 015 Bond 1 LS $2,500.00 $3,500.00 Tota I $120,510.00 Below, is a list of 9 properties that would benefit from a new water main running along Church Ave. The Collier lots and the empty Three Ten lot in particular have had development requests recently but have fallen through due to downtown development costs, one of which was this Water Line Extension, Mark Zweig Inc.'s 150' of frontage along the extension should not bear the full burden of the costs, in turn, we propose MZ Inc. pay the proportional cost of 218 N. Church's (and the associated empty lot) property length. With the added emphasis from the City Council along with the infrastructure fund specifically set aside to cost share on downtown infill this makes a fair assessment of the responsibility. In addition, the lack of a fire hydrant along the block cause safety concerns. Most of these concerns relate to the compact timber frame apartments with no fire suppression system along the street. They would be alleviated with the installation of the fire hydrant associated with this upgrade. Below is a list of the nine aforementioned properties to benefit from the extension. 1. 765-01671-000 & 765-01672-000; Mark Zweig Inc. Property (150') 2. 765-01688-000 & 765-22566-000 & 765-01690-000 (214') 3. 765-01699-000 (136') 4. 765-01670-000 (106') 5. 765-01673-000 (66') 6. 765-01674-000 (84') 7. 765-01702-000 (112') 8. 765-01696-000 (112') 9. 765-01695-000 (112') Total Length of properties: 1,092' Total Estimate Cost: $120,510 76.5% of the Water Main Cost for City of Fayetteville represents = $92,190.15 23.5% of the Water Main Cost for 218 N. Church represents = $28,319.85 Engineering, Surveying, Inspection Cost: $15,000 Total Estimated Cost: $135,510.00 We are kindly asking that the City cost share 76.5% of the water main extension ($92,190.15 + 76.5% of engineering fee ($11,475)). Requested total City cost share amount: $103,665.15 (To be based on actual construction costs.) Please review at your convenience and let us know how we can be of further assistance for this project. Total Estimated Cost: $135,510.00 Total City Share: $103,665.15 (in addition a contingency of 20% ($20,773.03) will be included) Please review at your convenience and let us know how we can be of further assistance for this project. City of Fayetteville Staff Review Form 2016-0659 Legistar File ID 1/3/2017 City Council Meeting Date - Agenda Item only N/A for Non -Agenda Item \Timyander 12/15/2016 Utilit° s Director/ Util' ies Department Submit t d By Submitted Date Di cion / Department Action Recommendation: A RESOLUTION TO APPROV COST SHARE AGREEMENT WITH MARK ZFHE INC. FOR UPGRADING A WATERLINE ALONG A PORTION OF NORTH HURCH AVENUE BETWEEN WEST SPRINEETAND WEST DICKSON STREET ATA COST OF $103,665.15 TO THE CI -N, WHICH IS 76.5% OF THE TOTAL CO PROJECT 5400.720.5600-5808.00 Account Number 04039.1 Budget)Apact: Water/Sewer Fund Water/Sewer Impact l=ee Cost Sharing Projects Project Number Project Title Budgeted Item? Yes Cur nt Budget $ 1,070,594.00 Funds bligated $ 60,917.00 Current lance - Does item hav a cost? Yes Item ost $ 103,665.15 Budget Adjustme Attached? No Budget Adjustme t 5 Remaining Budget V20140770 PreviousOrdina a or Resolution # Original Co act Number: Approval ate: Commvh€s: CITY OF Fay% 1s_ ARKANSAS MEETING OF JANUARY 3, 2016 TO: Fayetteville City Council THRU: Mayor Lioneld Jordan Don Marr, Chief of Staff Water and Sewer Committee FROM: Tim Nyander, Utilities Director CITY COUNCIL AGENDA MEMO DATE: December 15, 2016 SUBJECT: Cost Sha%Agreement with Mark Zweig, Inc. f6r a Water Line Upgrade on N. Church Aver RECOMMENDATION: Staff recommends approval of a st-share agreeme between the City of Fayetteville and Mark Zweig, Inc., to share the costs f upgrading a terline on N. Church Ave. between W. Spring St. and W. Dickson St. The es " ated total st of the project is $135,510.00. The City's portion of the cost share is 76.5% of the stimate project cost, in the not -to -exceed amount of $103,665.15. BACKGROUND: Mark Zweig, Inc. has requested that the 8 -inch along a portion of N. Church Ave of approximately 625 feet, so that Mark/ Church Ave. a1T in the cost of upgrading a 4 -inch waterline to 3n . Spring St. and W. Dickson St., a distance Inc y develop the property located at 218 N. DISCUSSION: Upgrading this waterline will a/regnizes velopment of this pro erty and will also provide for ample future capacity which the City will be necessary for the area that is served by this waterline. There are 9 other pes mentioned in Exhibit °B" that will also benefit from the waterline upgrade. Exhibit "A" a map of the area and t e waterline to be upgraded. BUDGET/STAFF IMPACT:/ `` Funds for the City portion pf work are available in the Water ImpG,ct Fee Cost Sharing Project. The final actual cost to the City will be based upon actual bid price, for this project. ATTACHMENTS: Staff Review Form Cost -Share Agreement Map of Area (Exhibit A) Cost Share Estimate (Exhibit B) Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Ordinance: 5942 File Number: 2016-.0659 MARK ZWEIG, INC.: NoRTHWESTARKANsm ORDINANCE TO WAIVE THE RE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND Im ���� ��� APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, ' INC. FOR A WATER MAIN UPGRADE ALONG A PORTION OF NORTH CHURCH AVENUE AV ar BETWEEN WEST SPRING STREET AND WEST DICKSON STREET WITH THE ESTIMATED AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED AFFIDAVIT OF PUBLICATION $103,6PROJECT CCT C ANDONTING APPROVE A PROJGENCY IN THE AMOUNT OF $20,733.03. WHEREAS, Mark Zweig, Inc. will be I Karen Caler, do solemnly swear that I am the Le al Clerk of the developing property located at 218 North g Church Avenue, a project which has been Northwest Arkansas Democrat -Gazette, printed and published in approved by the City's Planning Division; and Washington County and Benton County, Arkansas, and of bona fide WHEREAS, during the course of design circulation, that from my own personal knowled e and reference review by the City Fayetteville, Mark g Zweig, Inc. was made aware of an to the files of said publication, the advertisement of: existing water volume fire flow issue with the current water piping; and WHEREAS, increasing the size of this CITY OF FAYETTEVILLE approximately 625 -foot segment from a 4 -inch main to an 8 -inch main will Ord. 5942 alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility Was inserted In the Regular Edition On: of residents losing water service in the January 13, 2017 event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it will replace and upgrade aged Publication Charges: $ 161.20 infrastructure in the core ofthe city, providing improved service and fire protection for residents and business in %y l/ the area, and will facilitate future —� development; and Karen Caler WHEREAS, § 51.112 ofthe Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size Subscribed and sworn to before me is specified and required by the water and wastewater director for the general This J& day of�ja _, 2017. benefit of the water system'; and WHEREAS, waiving formal competitive bidding will save time and cost by utilizing the developer's contractor who will be on-site installing the larger line (� for the developer's project. p Q. wit, n NOW, THEREFORE, BE IT V v���//1M��C//J111 ORDAINED BY THE CITY COUNCIL Notary Public OF THE CITY OF FAYETTEVILLE, 1 ' ARKANSAS: My Commission Expires:q4u �T/li y Section I: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists v Eg in which competitive bidding is deemed i! �� h� iP+ILES not feasible or practical and therefore Ark, !1 5 - rl Ii00 county waives the requirements of formal 11 Oiw; )i , , 1% competitive bidding and approves a cost uC i 2 n � p 7 q ' 8 share agreement with Mark Zweig, Inc. r_fb 20 2024 for a water main upgrade along North tit Church Avenue between West Spring **NOTE** 4 Street and West Dickson Street with the estimated amount to be paid by the City Please do not pay from Affidavit.RE�E'� Ed of Fayetteville not to exceed Invoice will be Sent. $103,665.15, and further approves a project contingency in the amount of 201.y $20,733.03. JAN 18 ( PASSED and APPROVED on 1/3/2017 Approved: CIT VILLE Lioneld Jordan, Mayor F;=ICE Attest: Sondra E. Smith, City Clerk Treasurer 73987786 Jan 13, 2017