Loading...
HomeMy WebLinkAbout183-16 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 183-16 File Number: 2016-0403 BID NO. 16-53 BOULDER CONSTRUCTION, INC.: A RESOLUTION TO AWARD BID NO. 16-53 AND AUTHORIZE A CONTRACT WITH BOULDER CONSTRUCTION, INC. IN THE AMOUNT OF $3,753,369.40 FOR CONSTRUCTION OF PORTIONS OF THE CATO SPRINGS TRAIL FROM THE TOWN BRANCH TRAIL TO KESSLER MOUNTAIN REGIONAL PARK, TO APPROVE CHANGE ORDER NO. 1 TO REFLECT VALUE ENGINEERING ITEMS AND REDUCE THE CONTRACT AMOUNT BY $880,253.40, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $287,311.16. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid No. 16-53 and authorizes a contract with Boulder Construction, Inc. in the amount of $3,753,369.40 for construction of portions of the Cato Springs Trail from the Town Branch Trail to Kessler Mountain Regional Park, and further approves a project contingency in the amount of $287,311.16. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 1 to reflect value engineering items and reduce the contract amount by $880,253.40. PASSED and APPROVED on 10/4/2016 ��`y"'!• • Attest: :te r••. r 9 C. Pt' • �'. ANGTOS N Sondra E. Smith, City Clerk Treasurer Page 1 Printed on 1015116 - _ City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Text File File Number: 2016-0403 Agenda Date: 10/4/2016 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: C. 1 BID NO. 16-53 BOULDER CONSTRUCTION, INC.: A RESOLUTION TO AWARD BID NO. 16-53 AND AUTHORIZE A CONTRACT WITH BOULDER CONSTRUCTION, INC. IN THE AMOUNT OF $3,753,369.40 FOR CONSTRUCTION OF PORTIONS OF THE CATO SPRINGS TRAIL FROM THE TOWN BRANCH TRAIL TO KESSLER MOUNTAIN REGIONAL PARK, TO APPROVE CHANGE ORDER NO. 1 TO REFLECT VALUE ENGINEERING ITEMS AND REDUCE THE CONTRACT AMOUNT BY $880,253.40, AND TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $287,311.16 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid No. 16-53 and authorizes a contract with Boulder Construction, Inc. in the amount of $3,753,369.40 for construction of portions of the Cato Springs Trail from the Town Branch Trail to Kessler Mountain Regional Park, and further approves a project contingency in the amount of $287,311.16. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 1 to reflect value engineering items and reduce the contract amount by $880,253.40. City of Fayetteville, Arkansas Page 1 Printed on 10/5/2018 Matt Mihalevich Submitted By City of Fayetteville Staff Review Form 2016-0403 Legistar File ID October 4th, 2016 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 9/19/2016 Engineering / Development Services Department Submitted Date Division / Department Action Recommendation: Approval of a Resolution awarding Bid 16-53 and authorizing a contract with Boulder Construction, Inc. in the amount of $3,753,369.40 and approving change order no. 1 in the deductive amount of ($880,253.40) making the net contract amount of $2,873,116.00 for the construction of portions the Cato Springs Trail from the Town Branch Trail to the Kessler Mountain Regional Park and approving a 10% project contingency in the amount of $287,311.16. Budget Impact: 4470.900.9470-5814.05 Account Number 02016.1405 Project Number Sales Tax Cap Imp Fund Cato Springs Trail Project Title Budgeted Item? Yes Current Budget $ 3,333,361.00 Funds Obligated $ 298,294.13 Current Balance l Does item have a cost? Yes Item Cost $ 2,873,116.00 Budget Adjustment Attached? NA Budget Adjustment Remaining Budget 1 V20140710 Previous Ordinance or Resolution # 76-16, 142-14 Original Contract Number: Comments: Approval Date: CITY OF P1 Tjr l' ARKANSAS MEETING OF OCTOBER 4, 2015 TO: Mayor and City Council CITY COUNCIL AGENDA MEMO THRU: Don Marr, Chief of Staff Terry Gulley, Transportation Services Director Chris Brown, City Engineer FROM: Matt Mihalevich, Trails Coordinator DATE: September 19th, 2016 SUBJECT: 2016-0403 Cato Springs Trail Construction RECOMMENDATION: Approval of a Resolution awarding Bid 16-53 and authorizing a contract with Boulder Construction, Inc. in the amount of $3,753,369.40 and approving change order no. 1 in the deductive amount of ($880,253.40) making the net contract amount of $2,873,116.00 for the construction of portions the Cato Springs Trail from the Town Branch Trail to the Kessler Mountain Regional Park and approving a 10% project contingency in the amount of $287,311.16. BACKGROUND: In June of 2014, the City was awarded a matching grant from the Walton Family Foundation for the design and engineering of the Cato Springs Trail. In August of 2014, the City Council approved resolution 142-14 for contract #2330 with Garver, LLC for design services for the Cato Springs Trail. The Cato Springs Trail will extend approximately 2.9 miles south from the Town Branch Trail starting Greathouse Park and continuing southwest along the Cato Springs Branch to the Kessler Mountain Regional Park as shown on the attached map. The trail has been designed as a 12 -foot wide concrete shared -use paved trail with pedestrian lighting. This trail will also include a bridge across the Cato Springs Branch, a bridge over the Fulbright Expressway and a tunnel under Razorback Road. The completion of the Cato Springs Trail will extend the Razorback Regional Greenway to the Kessler Mountain Regional Park and provide an active transportation route for all the residents of Northwest Arkansas to visit and enjoy the cultural and recreation amenities and beautiful natural areas in Fayetteville. As soon as the property acquisition of Kessler Mountain took place, the community began requesting a safe alternative transportation route to the new park. The Walton Family Foundation also expressed interested in the trail connection. On March 7th 2016, the City was awarded the matching grant of $2,000,000 for the construction of the Cato Springs Trail from the Walton Family Foundation recognized through Resolution 73-16. Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 DISCUSSION: The design is now complete and the project has been divided into two sections for efficiency of construction. The City in-house trail construction crew has started construction on approximately 2.3 miles of the Cato Springs Trail. Bids opened on September 1St, 2016 on the remaining 0.6 -mile section of trail to be constructed by a private contractor. The contracted section includes the bridges and tunnel installation within the Arkansas State Highway and Transportation Department right of way. Four bidders responded to the request for formal bids and Boulder Construction, Inc. was the lowest responsive bidder. The bid from Boulder Construction is 14% above the engineer estimate. Based on a series of recent bids, we have found that the Northwest Arkansas construction market is currently saturated with work resulting in the higher than expected prices. Staff has negotiated Boulder Construction, Inc. to reduce the contract amount by removing many of the pay items as shown in change order 1. These items will be constructed by the in- house trail construction crew instead of the contractor to reduce the overall cost. BUDGET/STAFF IMPACT: Funds are available for this contract in the Cato Springs Trail Project. Staff accepted deductive alternate no. 1 removing the trail lighting in the amount of $536,666.95 and negotiated with the contractor to remove two bridges for a total deductive change order no. 1 amount of $343,586.45 to get the project within the budget. Attachments: Cato Springs Trail Map Bid 16-53 Bid Tabulation Change Order #1 — Signed Boulder Construction, Inc. Signed Agreement - 4y, tiyl+`a SI t (ra,', Ts Tsa-La•Gi Trail N a v e - iA .::tt•. Sf a ) - r - - - - - - - - • - -R .- - - - - - - - - - - '- - - -A - - - - - - - - - - ` - - -+ « ` 1 A F Future U ofA 1 «� Interm urals 1 . � P y ! 1 airy slew UUIIt)uucicu Section - 2.3 Miles Total 1 :•0 F I A i)------- - - - - .. F y♦ r♦ W♦ ------- -.. .,,. ° ♦I lWy� `tttti WW CITY OF ♦ 1i4 y a e le'y,eSs\paf ARKANSAS__ +rt rAl yy xwz!�`a�r L O _ N I.L ~ Greathouse Park ♦' ♦ll(! r -%@mo/ ;.+ Cato S rin s St d& ath "'� LEDGEND Walker L Park Q City Crew Constructed Sections - 2.3 Miles Contractor Constructed Sections - 0.6 Miles -- _- _ - - -- - - - -- Existing Shared -Use Paved Trails Future Shared -Use Paved Trail 0 500 1,000 2,000 3,000 4,000 5,000 Cato Springs Trail - 2.9 Miles September 2016 Feet CI Y OF {�xV 1 2 3 15 19 20 21 22 23 31 M SPEC, NO - 111 112 201 202 202 202 202 202 203 204 205 301 301 301 301 301 301 301 301 301 302 302 302 302 302 302 302 302 302 305 305 401 401 40E DESCRIPTION Roadway Construction Control Trench and Excavation Safety Systems Clearing, Grubbing, and Demolition Undercut and Backfill Rock Excavation Unclassified Excavation (Plan Quantity) Select Embankment (Plan Quantity) Embankment (Plan Quantity) Subgrade Preparation (Plan Quantity) 4" Topsoil Placement (Yard Areas) Undercut and Stone Backfill 18" Class III R C. Pipe 30" Class III R.C. Pipe 36" Class III R.C, Pipe 45"X29" Class III R,C, Pipe 36" C.M. Pipe 18" R.0 Flared End Section 36" R.C. Flared End Section 45"X29" R.C. Flared End Section 36" C.M. Flared End Section 4' Drop Inlet (AHTD Type MO) 5' Drop Inlet (AHTD Type MO) 3'X4' Drop Inlet (AHTD Type RM) 4' Junction Box (AHTD Type ST) 6' Junction Bax (AHTD Type ST) 3'X5' Junction Box (AHTD Type ST) 3'X2' Junction Box (AHTD Type E) 4' Drop Inlet Extension 8' Drop Inlet Extension Channel Excavation (Plan Quantity) Erosion Control Fabric 5" Aggregate Base Course 4" Aggregate Base Course Asphalt Concrete Hot Mix Patching of Existing Roadway UNIT L5 LS CY CY CY CY CY 5Y SY Ton LF LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA CY SY SY SY To ; ESTIMATED 1 1 300 50 2,860 2,406 5;400 4,215 10,520 7;465 1,080 199 73 169 30 4 1 2 1 6 3 1 3 2 2 1 5 5 1,610 795 600 3,615 4S AYETTEVILLE, ARKAN CITY OF F Bid 16-53, Coi IAL BID TABULATION OFFIC 4:00 BID OPEP ENGINEER'S ESTIMATE UNIT PRICE PRICE AMOUNT $ 13,000 00 $ 13,000.00 $ 15,00000 $ 15,000 00 40,000.00 $ 40,000,00 $ 22.75 $ 6,825.00 $ 45.00 $ 2,250-00 $ 7.50 $ 21,450.00 $ 10.50 $ 25,200,00 $ 6,00 $ 32,400.00 $ 1.50 $ 6,322.50 $ 2.25 $ 23,670.00 $ 21.50 $ 160,497.50 $ 45.00 $ 48,600.00 $ 59.00 $ 11,741.00 $ 82,50 $ 6,022.50 $ 12500 $ 21,125.00 $ 101,00 $ 3,030.00 $ 1,145.00 $ 4,580.00 $ 1,675.00 $ 1,675.OD $ 2,050,00 $ 4,100.00 $ 1,05000 $ 1,050,00 $ 2,650,00 $ 15,900.00 $ 3,115.00 $ 9,345-00 $ 2,400-00 $ 2,400.00 $ 3,700.00 $ 11,100.00 $ 4,500.00 $ 9,000.00 $ 3,500.00 $ 7,000,00 $ 2,400,00 $ 2,400.00 $ 615.00 $ 3,075.00 $ 11850.00 $ 9,250..00 $ 11.50 $ 18,515X0 $ 3750 $ 29,812 50 $ 5:00 $ 3,000.00 $ 4.75 $ 17,171.25 5 85-00 5 3.825.00 AYETTEVILLE, ARKAN istruction - Cato Spri( IAL BID TABULATION LING: 9/1/2016; 4:00 Boulder Construction Inc UNIT $ 5,000.00 PRICE AMOUNT $ 10,00000 $ 10,000.00 $ 6,500 00 $ 6,50000 $ 68,500.00 $ 68,500.00 $ 26.00 $ 7,80000 $ 14300 $ 7,150.00 $ 14.25 $ 40,755,00 13.25 $ 31.,80000 $ 10.50 $ 56,700.00 $ 4.50 $ 18,967.50 $ 4,25 $ 44,710.00 $ 31.50 $ 235,147.50 $ 58.85 $ 63,558.00 $ 117.00 $ 23,283 00 $ 22100 $ 16,133,00 $ 198,00 $ 33,462.00 $ 140.00 $ 4,200.00 $ 1,120.00 $ 4,480.00 $ 2,890.00 $ 2,890 -OD $ 2,645.00 $ 5,290.00 $ 2,020.00 $ 2,020.00 $ 3,205.00 $ 19,230.00 $ 4,700.00 $ 14,100.00 $ 5,710.00 $ 5,710.00 $ 3,495.00 $ 10,485.00 $ 5,325.00 $ 10,650.00 $ 3,675.00 $ 7,350.00 $ 3,675.00 $ 3,675.00 $ 2,580.00 $ 12,900 00 $ 2,950X0 $ 14,750 00 $ 16.00 $ 25,760.00 $ 1610 $ 12,799.50 $ 14,25 $ 8,550.00 $ 8.75 $ 31,631.25 $ 345.00 $ 15,525,00 SAS tlgs Trail PM Crossland Heavy UNIT PRICE $ 29,000 00 S 5 500:00 $ $ 32,000.00 $ $ 23.00 $ $ 160.00 $ $ 1200 $ $ 12.00 $ $ 15,50 $ $ 1,00 $ $ 3.00 $ $ 30.00 $ $ 46.00 $ $ 107.00 $ $ 150.00 $ $ 145.00 $ $ 115.00 $ S 950.00 $ $ 1,700.00 $ $ 2,300.00 $ $ 1,500.00 $ $ 3,500.00 $ $ 5,100,00 $ $ 6,300,00 $ $ 31800,00 $ $ 5,800.00 $ $ 4,00000 $ $ 4,000-00 $ $ 1,300.00 $ $ 1,700.00 $ $ 12.00 $ $ 11.00 $ 5 10,00 $ $ 9.00 $ $ 326,00 $ AMOUNT 29,000 00 500-00 32,000.00 6,900-00 8;000.00 34,320-00 28,800.00 83,70000 4,215.00 31,560.00 223,950.00 49,680.00 21,29300 10,950.00 24,505.00 3,450.00 3,800.00 1,700.00 4,600.00 1,500.00 21,000.00 15,300.00 6,300,00 11,400-00 11,600.00 8,000.00 4,000.00 6,500.00 8,500,00 19,320.00 8,745.00 6,000.00 32,535.00 14,670,00 Certification of Funds: $2,800,000 Max Bid Award Limit: $3,500,000 Sweetser Construction Inc UNIT PRICE AMOUNT 4 20,000.00 $ 20,000100 5 5100000 $ 5,000.00 10,000.00 $ 10,000.00 $ 24.00 $ 7,200.00 $ 250,00 $ 12,500 00 $ 18,00 $ 51,480.00 $ 18.00 $ 43,200.00 1800 5 97,200,00 $ 3.00 $ 12,645.00 $ 2X0 $ 21,040.00 $ 28,00 $ 209,020,00 $ 49,50 $ 53,460-00 $ 105,00 5 20,895.00 $ 158.25 $ 11,552,25 $ 223.50 $ 37,771.50 $ 132,00 5 3,960,OC $ 600,00 5 2,400,010 $ 1,700,00 $ 1,700.012 $ 2,295,00 $ 4,590,OC $ 950.00 $ 950.00 $ 3,50000 $ 21,000,OC $ 3,700.00 $ 11,100.0c $ 2,200 00 $ 2,200.Oc $ 4,600.00 $ 13,800,OC $ 4,800.00 $ 9,600.00 $ 4,600.00 $ 9,200.00 $ 2,60000 $ 2,600.0C $ 700.00 $ 3,500.0( $ 1,400.00 $ 7,0000( $ 18.00 $ 28,980.0C $ 15.00 $ 11,925.0( $ 7.50 $ 4,SOO.00 $ 6.00 $ 21,690.0( $ 330,00 $ 14,850.0( Tri Star Contractors LLC UNIT PRICE AMOUNT $ 60,000 00 5 60,000 00 S 10,000 00 $ 10,000.00 5 40,00000 $ 40,000 00 $ 36.00 $ 10,800,00 $ 125.00 $ 6,25000 $ 18,00 $ 51,480.00 $ 2200 $ 52,800,00 $ 22.00 $ 118,800,00 $ 2.50 $ 10,537.50 $ 5.00 $ 52,600.00 5 48,00 $ 358,320,011 $ 50.00 $ 54,000,00 $ 80.00 $ 15,920.00 $ 95,00 $ 6,93500 $ 120.00 $ 20,280,00 $ 90.00 $ 2,700.00 $ 700.00 $ 2,800.00 $ 11520.00 $ 1,520.00 $ 1,890.00 $ 3,780.00 $ 1,200.00 $ 1,200.00 $ 3,500.00 $ 21,000.00 $ 5,500.00 $ 16,500.00 $ 4,500,00 $ 4,500,00 $ 3,450.00 $ 10,350.00 $ 5,800.00 $ 11,6DO.00 $ 5,400,00 $ 10,800.00 $ 4,300,00 $ 4,300-00 $ 1,200.00 $ 6,000.00 $ 2,400,00 $ 12,000.00 $ 36.00 $ 57,960.00 $ 18.00 $ 14,310.00 $ 9.00 $ 5,400.00 $ 7 75 $ 28,016.25 $ 250,DO $ 11,250.00 Garver Project 11047140 7 1 69 70 71 72 73 SPEC. UNIT $ 32.50 NO, DESCRIPTION UNIT 501 Concrete Curb and Gutter LF 502 4" Thick Concrete Sidewalk SY 503 Asphalt Driveway SY $ 4.00 Cast In -Place Concrete Retaining CY 504 Wall $ 2,101,00 505 Seeding and Mulching Acre SOS Solid Sod SY 505 Additional Watering MG 507 4" Pavement Marking LF $ 315.00 (Thermoplastic) S 1,634,00 $ 205.00 24 Pavement Marking $ 30.00 507 (Thermoplastic) LF 507 Pavement Symbols (Thermoplastic) EA $ 1,924.00 4" Pavement Marking (Reflectorized LF 507 Paint) 508 Street Sign Installation EA 509 Erosion Control LS 510 Traffic Control and Maintenance L5 511 Mobilization LS (not to exceed 5% of contract price) 513 Cast -in -Place Detectable Warning SF Panel 517 Tree Protection Fencing LF SP -8 4" Thick Concrete Trail SY SP -8 6" Thick Concrete Trail SY SP -7 Concrete Island SY Permanent Pavement Repair (AHTD SY SP -10 Section) SP -12 Guard Rail LF SP -3 Bridge No. 1 Construction LS SP -4 Bridge No.2 Construction LS SP -5 Bridge No, 3 Construction LS SP -4 Tunnel Construction LS SP -40 Steel Piling LF SP -36 Coring Drilled Shaft CY SP -37 Drilled Shaft (60" Diameter) LF SP -6 Modular Block Gravity Retaining Wall SF SP -17 Railroad Protective Shelter LS SP -11 Decorative Fence LF SP -11 Wire Fence (AHTD Type A) LF SP -19 4" Thick Colored Concrete SY SP -14 Trail Sign Installation EA Thermoplastic Pavement Marking SY SP -9 Pattern SP -18 Native Stone Riprap CY SP -18 Concrete Riprap CY SP -18 Riprap CY ESTIMATED 2,035 50 152 107 1.8 1,960 118 1,910 74 2 1,798 21 1 1 1 96 1,000 2,946 270 101 660 426 d 1 1 d 316 19 74 4,975 1 727 35 43 18 5D 65 98 52 ENGINEE'R'S EST)MA7E UNIT $ 32.50 PRICE AMOUNT $ 9.50 $ 19,332-50 $ 32.50 $ 1,625.00 $ 27.50 $ 4,180.00 $ 525,00 $ 56,175,00 $ 1,750.00 $ 3,15000 $ 4.00 .8 7,840.00 $ 8.00 $ 944.00 $ 1.10 $ 2,101,00 $ 12.00 $ 888,00 $ 170.00 $ 340.00 $ 0.45 $ 804,60 $ 245.00 $ 5,145.00 $ 20,000.00 $ 20,000.00 $ 75,000.00 S 75,D00.00 5 45,048.40 $ 45,048.40 $ 32.00 $ 3,072.00 $ 7,00 $ 7,000.00 $ 32.50 $ 95,745.00 $ 38.00 $ 10,260.00 $ 52.50 $ 5,302,50 $ 95.00 $ 62,700.00 $ 27.50 $ 11,715 00 $ 60,953.00 $ 60,953,00 $ 602,685.00 $ 602,885.00 5, 283,92040 5 283,920.00 S 214,979.00 $ 214,979.00 5 65.00 $ 20,540.00 $ 170.00 $ 3,230.00 $ 1,125,00 $ 83,250.00 $ 51.45 $ 255,963,75 $ 27,500,00 5 27,500.00 $ 5100 $ 38,531.00 $ 9.00 $ 315.00 $ 38.00 S 1,634,00 $ 205.00 $ 3,690.00 $ 30.00 $ 1,500.00 $ 75.00 $ 4,875.00 $ 37500 $ 36,750.00 $ 37.00 $ 1,924.00 Bautder Construction Inc UNIT $ 50.25 PRICE AMOUNT $ 26.00 $ 52,910.00 $ 72.00 $ 3,600.00 c 46.50 $ 7,068,00 $ 740,00 $ 79,180.00 $ 2,425.00 $ 4,365,00 $ 4.10 $ 8,036.00 5 9.00 $ 1,06200 $ 4-40 $ 8,404.00 $ 27.50 $ 2,035.00 $ 1,100,00 $ 2,200.00 $ 3.30 $ 5,90040 $ 330.00 $ 6,930,00 $ 13,500,00 $ 13,50000 $ 39,000.00 $ 39,000.00 $ 183,650.00 $ 183,650.00 $ 35,00 $ 3,360.00 5 3.50 $ 3,500,00 $ 50.25 $ 148,036.50 S 56.30 $ 15,201.00 $ 85.00 $ 8,585.00 $ 44.00 $ 29,040.00 $ 66.00 $ 28,116.00 $ 92,580.00 $ 92,580.00 $ 351,455.00 $ 351,455.00 $ 229,430,00 $ 229,430.00 $ 263,708 00 $ 263,708.00 $ 137.00 $ 43,292.00 $ 110.00 $ 2,090.00 $ 1,206.75 $ 89,299.50 $ 63.50 $ 315,912.50 $ 44,290.00 $ 44,290,00 $ 82.50 $ 59,977,50 $ 49.50 $ 1,732.50 $ 57 50 $ 2,472.50 $ 550,00 $ 9,900.00 $ 154.00 $ 7,700.00 $ 38.50 $ 2,502-50 $ 450.00 $ 44,100.00 $ 38.50 $ 2,002.00 Crossland Heavy UNIT PRICE i 1800 $ 54.00 $ > 52.00 $ i 970.00 $ j 3,800.00 $ > 3.00 $ > 8,00 $ > 2 50 $ 23.00 $ j 880.00 $ j 1.00 $ i 185.00 $ 24,000.00 $ 14,000.00 $ > 200,000 00 $ $ 2900 $ $ 3.00 $ $ 42.00 $ $ 64.00 $ $ 54.00 $ $ 86.00 $ $ 70-00 $ $ SS1,ODO.00 $ $ 609,000,00 $ $ 301,000.00 $ $ 244,000.00 $ $ 91.00 $ $ 543.00 $ $ 1,35000 $ $ 51.00 $ $ 215,000.00 $ $ 59.00 $ $ 85.00 $ $ 64.00 $ $ 185.00 $ $ 160,00 $ $ 102.00 $ $ 625.00 $ $ 79.00 $ 36,630.00 2,70000 7,904.00 103,790.00 6,840,00 5,880.00 944.00 4,775.00 1,702.00 1,760.00 1,788.00 3,885.00 24,000 00 14,000.00 200,000.00 2,78400 3,000.00 123,732.00 17,280.00 5,454.00 56,760.00 29,820.00 151,000.00 609,000.00 301,000.00 244,000 00 28,756.00 10,317.00 99,900.00 253,725.00 215,000 OD 42,893.00 2,9754D 2,752.00 3,330.00 8,000,00 6,630.00 61,250.00 4,108.00 Sweelaer construction Inc UNIT PRICE AM, OUNT $ 18.00 $ 36,630.00 $ 75.00 $ 3,750.00 $ 49.50 $ 7,524.00 $ 930.00 $ 99,510.00 $ 3,200.00 $ 5,760,00 $ 4.50 $ 8,820..00 5 15.00 $ 1,770.00 4,40 $ 8,404.00 $ 27.50 $ 2,035 00 $ 1,100.00 5 2,200,00 $ 3,30 $ 5,900,40 $ 33D,00 $ 6,930.00 $ 42,000.00 $ 42,000.00 $ 36,000.00 $ 36,000.00 $ 180,00000 $ 180,000.00 $ 20.00 $ $ 5.00 $ $ 4200 $ $ 54.00 $ $ 75.00 $ $ 140.00 $ $ 75.00 $ $ 151,730.00 $ $ 905,800.00 $ $ 402,500.00 $ $ 272,000.00 $ $ 210.00 $ $ 200.00 $ $ 94500 $ $ 82.50 $ $ 132,000.00 $ $ 75.00 $ $ 80.00 $ $ 64,00 S $ 55000 S $ 150.50 $ $ 120.00 $ $ 75.00 $ $ 75.00 $ 1,920.00 5,000.00 123,732.00 14,580.00 7,575.00 92,400.00 31,950.00 151,730.00 905,800,00 402, 50000 272,000.01) 66,360.00 3,800.00 69,930.00 410,437.50 132,000,00 54,525.00 2,800.00 2,752.00 9,90000 7,525.00 7,80000 7,350.00 3.900.00 Tri StartnntractorS LLC UNIT PRICE AMOUNT $ 14,00 $ 28,490.00 $ 36.00 $ 1,800.00 $ 10000 $ 15,200-00 $ 500.00 $ 53,500.00 $ 1,735.00 $ 3,123,00 $ 3,75 $ 7,350.00 $ 59.00 $ 6,962.00 $ 4.40 $ 8,404,00 $ 27.50 $ 2,035.00 $ 1,100.00 $ 2,200.00 $ 3.30 $ 5,900.40 $ 330.00 $ 6,93000 $ 35,000.00 $ 35,000.00 $ 55,000.00 $ 55,000,00 5 59,000,00 $ 59,000.00 $ 62.50 $ $ 700 $ $ 36,00 $ $ 54.00 $ $ 14.00 $ $ 150.00 $ $ 66.00 $ $ 138,240,00 $ $ 952,340.00 $ $ 258,126.00 $ $ 217,600,00 $ $ 75 DO S $ 1,000.00 5 $ 11200.00 S $ 84.10 $ $ 96,950.00 $ $ 82.00 $ $ 50.OD 5 $ 72.00 $ $ 55000 $ $ 55.00 $ $ 100,00 $ $ 300.00 $ $ 98.00 $ 6,000.00 7,000.00 106,056.00 14,580.00 1,414.00 99,000.00 28,116,00 138,240 00 952,340.00 258,126,00 217,600.00 23,700,00 19,000.00 88,800.00 418,397,50 96,950.00 59,614,00 1,750,00 3,096.00 9,900.00 2,750,00 6,500.00 29,400.00 5,096,00 2 01 Z Garver Project 11047140 Garver Project 11047140 ENGINEER'S ESTIMATE Boulder Construction Inc Crossland Heavy Contractors Inc Sweetser Construction Inc TO Star Contractors LLC ITEM SPEC, ESTIMATED UNIT UNIT UNIT UNIT UNIT NO.. NO, DESCRIPTION UNIT QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 74 SP -16 Concrete Ditch Paving $Y 35; $ 30.00 $ 10,590 00 < 103.00 $ 36,359.00 $ 57.00 $ 20,121-00 5 75.00 5 26,475.00 5 100.00 $ 35,300.00 75 SP -35 Impact Attenuation Barrier (Type A) SY 40 $ 9800 $ 3,920.00 $ 390.00 $ 15,600.00 $ 29500 $ 11,800.00 $ 330.00 5 13,200.00 $ 550.00 $ 22,000.00 76 SP 33 Light Fixture, Type A, Installed on EA 129 $ 3,000 00 $ 384.000,00 S 3,352 41) $ 429,107.20 $ 3,650-00 $ 467,200.00 S 3,450.00 $ 441,600.00 5 3,118.53 $ 399,171.84 Pole 77 Light Fixture, Type A, installed on SP -33. Bridge, without Foundation and EA a 4 2,725.00 $ 10,900.00 c 3,337.80 $ 13,351.20 $ 3,630.00 $ 14,520.00 $ 3,400.00 $ 13,600.00 S 3,105,00 $ 12,420.00 Handho!e 78 Light Fixture, Type A, Installed on SP -33 Modified Pole EA 3 $ 3,000.00 $ 9,000.00 $ 2,276.85 $ 6,830.55 $ 3,650.00 $ 10,950 00 $ 3,450.00 5 10,350 00 $ 3,118.00 $ 9,354.00 79 SP -33 Light Fixture, Type B, Installed EA 7 $ 1,300.00 $ 9,100.00 $ 964.25 $ 6,749.75 $ 1,050.00 $ 7,350.00 $ 990.00 5 6,930-00 $ 897-00 $ 6,279-00 SO SP -26 Electrical Handhole, 11" x 9" EA 26 $ 250.00 $ 7,000.00 $ 242.80 $ 6,79840 $ 270.00 $ 7,560.00 $ 250.00 S 7,000.00 $ 340.00 $ 9,520.00 81 Non -Encased Schedule 40 PVC, 2" SP 26 ix 1,800 S B.00 $ 14,400.00 $ 4.99 $ 5,982.00 $ 5.50 $ 9,900.00 $ 5.25 $ 9,45000 S 7.25 S 13.050.00 Diameter, Installed in Trench 82 Galvanized Rigid Steel Conduit, 2" SP -26 LF700 $ 20.00 $ 14,000.00 $ 23,30 $ 16,310.,00 $ 26.00 $ 18,200.00 $ 2500 $ 17,500.00 S 41.25 $ 28,875.00 Diameter, Exposed 83 PVC Coated Glavanized Rigid. Steel SP 26 LF 50 $ 23.00 $ 1,150.00 $ 51.15 $ 2,557.50 $ 56.90 $ 2,845.00 $ 53.00 $ 2,650.00 $ 51.00 $ 2,550,00 Conduit, 2" Diameter 84 SP -34 Directional Bore 1-Way2"C LF 130 $ 40.00 $ 5,200-00 $ 20.65 $ 2,684.50 $ 22.50 S 2,925.00 $ 21.50 $ 2,795.00 $ 25.00 $ 3,250,00 85 SP -23 No. 2 AWG Copper Conductor LF 20,000 $ 2.50 S 50,000 00 $ 1,40 $ 28,000.00 $ 1.50 5 30,000.00 $ 1.50 $ 30,000.00 $ 1.29 $ 25,800.00 86 SP -23 No -3 AWG Copper Conductor LF 150 $ 2.20 S 330,00 $ 125 $ 187.50 $ 1.40 $ 210.00 $ 140 $ 210.00 $ 1.18 $ 177.00 87 SP -23 No -4 AWG Copper Conductor LF 39,000 $ 2.00 5 78,000.00 $ 1.05 $ 40,950.00 $ 1,15 S 44,850.00 $ 1,.25 $ 48,750.00 $ 099 $ 38,610,00 88 SP -23 No. 10 AWG Copper Conductor LF 1,800 $ 1.00 S 1,800.00 $ 0.54 $ 972.00 $ 0.60 S 1,080.00 $ 0.75 $ 1,350.00 $ 0.80 $ 1,44000 89 SP -30 Electrical Service Pedestals EA 1 $ 6,000.00 S 6,000.00 $ 3,506.25 $ 3,506.25 $ 3,800,00 $ 3,800.00 $ 3,600.00 $ 3,600.00 $ 3,948.56 $ 3,94&56 90 Electrical Service Pedestals, with SP 30 EA Transformer 2 $ 10,000.00 $ 20,000.00 $ 3,506.25 $ 7,012.50 $ 3,800.00 5 7,600.00 $ 3,60000 $ 7,200.00 $ 3,948.55 $ 7,897.10 91 - Insurance and Bonding LS 1 $ - S - $ 34,826 40 $ 34,826.40 $ 79,000 00 S 79,000.00 $ 58,500.00 $ 58,500.00 $ 79,000,00 $ 79,000,00 TOTAL BASE 010 $ 3,296,530 00 $ 3,753,369.40 $ 4,218,268.00 $ 4,725,168.65 5 4,677,671.15 *DEDUCTIVE ALTERNATE#1 OF 1 $ 569,130 00 $ 536,666.95 $ 587,560.00 $ 563,590 00 $ 505,097.50 'Sum of items 76, 77, 78, 79, 85, 86 87, 88, 89, and 90 listed above TOTAL BASE BID LESS DEDUCTIVE ALTERNATE#1 $ 2,727,400.00 $ 3,216,702.45 $ 3,630,708.00 S 4,161,578.65 $ 4,172,573.65 "Highlighting Notes Corrected Calculation Error CERTIFIED: I Atullea`Rottnip, CPPD, CPPO, Purchasing Manager Witness Date Garver Project 11047140 CITY OF Ta'ovlyoIl ARKANSAS Change Order No. To Contractor: Boulder Construction, Inc CHANGE ORDER Contract Number Contract Title Cato Springs Trail [aid 16-53 Date of Issuance September l9, 2016 ORDINANCE/RESOLUTION: The Contract is changed as follows: Items A-V are included in this change order as deducts to reduce the overall price. These items will be constructed by the In-house trail construction crew. Item T covers the additional cost for General Condition cost incured by the contractor with the removal or reduction of Items A-V. Item X is added to provide a deduct price for each retaining wall block not installed. Contract Changes Item No. Bid Item Description Previous Fstirrated uantily Unit of Meifsurn Contract Unit Price Revised Estimated Quantity Revised Unit Price Original Estimated Cost Revised Estimated Cost A, 30 Channel Excavation 1,610.00 CY $16.00 0,00 50.00 525,760.00 $0.00 B. 31 Erosion Control Fabric 795.00 SY $16.10 0.00 50.00 $12,799.50 $0,00 C. 42 4" Pavement Marking Thermo lastie 1,910.00 LF $4.40 0.00 5000 $8,40400 $0.00 D 43 24" Pavement Marking Thermo tic 74.00 LF $27,50 1 0.00 50.00 $2,035.00 $0.00 E 44 Pavement Symbols Thermo lip 200 EA $1,100.00 0.00 $0.00 $2,20000 $0.00 F. _ 45 4" Pavement Marking (Reflectorized Paint) 1,788.00 LF $330 000 $0.00 $5,900.40 $0.00 G 46 Street Sign Installation 21.00 EA $33000 0.00 50.00 $6,930.00 $0.00 H. 57 Bridge No. 1 Construction 1.00 LS $92,580.00 0.00 50.00 $92,580.00 $000 1. 59 Bridge No_ 3 Construction 1.00 LS $229,430.00 0.00 $0.00 5229,430.00 $0.00 i. .69 Trail Sisnu Installation 18.00 EA $550,00 0.00 S000 $9,900.00 $0.00 K 70 T1 ennoplastic Pavement Marking Patten 50.00 SY $154,00 0.00 50.00 $7,700.00 $0.00 L. 76 Light Fixture, Type A, Installed on Pole 128.00 SY $3,352,40 0.00 $0.00 S429,10720 $0.00 M. 77 Light Fixture, Type A, Installed on Bridge, without Foundation and Handhole 4.00 SY $3337.80 0.00 $0.00 $13,351.20 $0.00 N. 78 Light Fixture, Type A, las;Wled on Modified Pole 3.00 SY S2,276.85 0.00 50.00 $6.830.55 $0.00 O. 79 Light Fixture, Type B, Installed 7.00 CCY $964.25 0.00 50,00 56,749.75 $0.00 P. 85 Ne_ 2 AWG Copper Conductor 20,000.00 LF 51.40 000 S000 $28,000.00 $000 Q. 86 No. 3 AWG Copper Conductor 150.00 LF 51.25 000 S000 $187 50 $000 R 87 No. 4 .AWG Copper Conductor 39,000.00 LF $1.05 0.00 50.00 540.950.00 $0,00 S. 88 No. 10 AWG Copper Conductor 1,800.00 LF $0.54 0.00 $0.00 $972.00 5000 _ T. 89 Electrical Service Pedestals 1,00 EA I 53:506.25 000 50.00 $3.506.25 $0.00 LI. 90 Electrical Service Pedestals, with Transformer 2.00 EA 53,50625 0.00 SO.00 $7.012.50 $0.00 V. CO1.01 General Conditions LS $0.00 1 00 $60.052.45 $0.00 560,052.45 W_ CO1.02 Deduct Modular Block Retaining Wall (Not Installed) SF $0.00 S38.00 50.00 $0.00 Summation of Cost $940,305.85 $60,052.45 Net Cost for this Change Order (Original Minus Revised Cost) (5880,253.40) Not valid until signed by the Owner The original Contract Price was S 3,753,369.40 Net change by previously authorized change orders 5 - Tbe Contract Price prior to this Change Order was S 3,753,369.40 The Contract Price will be decreased by •w _ ry �m �W 5 (880 253.40) The new Contract Price including this Change Order will be ww„......................... .,..._ S 2,873,116.00 NOTE: This euni ry does not reflect changes in the Contract Price or Time(s) which have been authorized by Wotk Change Directives not inem porated in this or pqt Ions Change Orders. s BY V [ }r / DA I E Boulder C'onst+vctio]lrir11_ ?• 1? ./Ip BY DATE BY DATE