HomeMy WebLinkAbout170-16 RESOLUTION113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Resolution: 170-16 File Number: 2016-0420 BID NO. 16-49 GOODWIN & GOODWIN, INC.: A RESOLUTION TO AWARD BID NO. 16-49 AND AUTHORIZE A CONTRACT WITH GOODWIN & GOODWIN, INC. IN THE AMOUNT OF $3,286,735.00 FOR THE WATER AND SEWER RELOCATIONS ASSOCIATED WITH ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT PROJECT BB0414 - PORTER ROAD -HIGHWAY 112/71B WIDENING AND INTERCHANGE IMPROVEMENTS, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $328,673.50, AND TO APPROVE A BUDGET ADJUSTMENT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid No. 16-49 and authorizes a contract with Goodwin & Goodwin, Inc. in the amount of $3,286,735.00 for the water and sewer relocations associated with Arkansas Highway and Transportation Department Project BB0414 - Porter Road -Highway 112/71B Widening and Interchange Improvements, and further approves a project contingency in the amount of $328,673.50. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby apl,rpMFiri budget adjustment, a copy of which is attached to this Resolution. �.�` rr_ ? �f�?�'1"", PASSED and APPROVED on 9/20/2016 � A, G ="; FAYETTEVILLE ;_A d • %�M• T � • �6 Attest: �fih',`•••••`• .R' ry T,O*N C%%%% Sondra E. Smith, City Clerk freasui Page 1 Printed on 9/21116 :: -- City of Fayetteville, Arkansas 113 West Mountain Street �. Fayetteville, AR 72701 (479) 575-8323 Text File --- File Number: 2016-0420 Agenda Date: 9/20/2016 Version: 1 Status: Passed In Control: City Council Meeting File Type: Resolution Agenda Number: A. 9 BID NO. 16-49 GOODWIN & GOODWIN, INC.: A RESOLUTION TO AWARD BID NO. 16-49 AND AUTHORIZE A CONTRACT WITH GOODWIN & GOODWIN, INC. IN THE AMOUNT OF $3,286,735.00 FOR THE WATER AND SEWER RELOCATIONS ASSOCIATED WITH ARKANSAS HIGHWAY AND TRANSPORTATION DEPARTMENT PROJECT BB0414 - PORTER ROAD -HIGHWAY 112/71B WIDENING AND INTERCHANGE IMPROVEMENTS, TO APPROVE A PROJECT CONTINGENCY IN THE AMOUNT OF $328,673.50, AND TO APPROVE A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid No. 16-49 and authorizes a contract with Goodwin & Goodwin, Inc. in the amount of $3,286,735.00 for the water and sewer relocations associated with Arkansas Highway and Transportation Department Project BB0414 - Porter Road -Highway 112/71B Widening and Interchange Improvements, and further approves a project contingency in the amount of $328,673.50. Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution. City of Fayetteville, Arkansas Page 1 Printed on 9/2112016 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2016-0420 Legistar File ID 9/20/2016 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 9/7/2016 Utilities Director/ Utilities Department Submitted Date Division / Department Action Recommendation: Approval of a Resolution awarding Construction Contract, BID 16-49, Construction, Porter RD — HWY 112/718 Widening and Interchange Water and Sewer Relocations to Goodwin & Goodwin Inc., in the amount of $3,286,735.00; approval of a project contingency of 10% in the amount of $328,673.50 for a total of $3,615,408.50; and approval of a budget adjustment. 87.06% is reimbursable from the AHTD. AHTD cost is $3,147,574.64 and City cost is $467,833.86. V20140710 Previous Ordinance or Resolution # Original Contract Number: Comments: Approval Date: Budget Impact: 5400.720.5700-5815.00 Water/Sewer Account Number Fund 11011.1501 Water/Sewer Relocations -Bond Projects Project Number Project Title Budgeted Item? Yes Current Budget $ 1,532,344.00 Funds Obligated $ 615,459.84 Current Balance J�_:x,rx..�. Does item have a cost? Yes Item Cost $ 3,615,408.50 Budget Adjustment Attached? Yes Budget Adjustment $ 3,147,575.00 Remaining Budget V20140710 Previous Ordinance or Resolution # Original Contract Number: Comments: Approval Date: CITY OF Tay evi.. V ARKANSAS MEETING OF SEPTEMBER 20, 2016 CITY COUNCIL AGENDA MEMO TO: Mayor Jordan and City Council THRU: Don Marr, Chief of Staff Tim Nyander, Utilities Director Water & Sewer Committee FROM: Jim Beavers, P.E. DATE: September 6, 2016 SUBJECT: Approval of a Resolution awarding Construction Contract, BID 16-49, Construction, Porter RD — HWY 112/71 B Widening and Interchange Water and Sewer Relocations to Goodwin & Goodwin Inc., in the amount of $3,286,735.00; approval of a project contingency of 10% in the amount of $328,673.50 for a total cost of $3,615,408.50; and approval of a budget adjustment. 87.06% is reimbursable from the AHTD. AHTD cost is $3,147,574.64 and City cost is $467,833.86. RECOMMENDATION: Staff recommends approval of a Resolution awarding Construction Contract, BID 16-49, Construction, Porter RD — HWY 112/71 B Widening and Interchange Water and Sewer Relocations to Goodwin & Goodwin Inc., in the amount of $3,286,735.00; approval of a project contingency of 10% in the amount of $328,673.50; and approval of a budget adjustment. BACKGROUND: The water and sanitary sewer relocations are required for the construction of the new highway interchange by the Arkansas Highway and Transportation Department, Project AHTD Job BB0414 (PORTER RD. — HWY. 112/71 B WIDENING & INTCHNG. IMPVTS. (S). Please refer to the attached drawing, drawing, BB0414_2014.09.25. DISCUSSION: The City of Fayetteville, Arkansas publicly opened bids received on August 10, 2016 for BID 16-49, Construction, Porter RD — HWY 112/71B Widening and Interchange Water and Sewer Relocations, AHTD Job BB0414, Garver Project No. 14048160 (aka WS Improvements Hwy 112 Interchange). Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 Goodwin & Goodwin Inc. was the only bidder with the bid of $3,286,735.00. Goodwin & Goodwin Inc.'s bid was sent to AHTD for review. AHTD and the Engineering of Record (Garver) have concurred/recommended award of Bid 16-49 to Goodwin & Goodwin Inc. BUDGET/STAFF IMPACT: The water and sewer relocation project is 87.06% reimbursable from AHTD. Budgeted funds for the City's portion are available in 11011 W/S Relocations for Street Bond Projects. Attachments: Staff Review Form Budget Adjustment Drawing, BB0414_2014.09.25. Bid Tab Proposed Agreement with Goodwin & Goodwin Inc. Letter of Recommendation from Garver City of Fayetteville Staff Review Form 20 16-0468 N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Utilities Director / Tim Nyander 10/7/2016 Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: Approval of Change Order No. 1 to Goodwin & Goodwin, Inc. in the amount of $76,625.00 (which increase is 100% reimbursable by AHTD to the City of Fayetteville). Comments: Budget Impact: 5400.720.5700-5815.00 Water/Sewer Account Number Fund 11011.1501 Water/Sewer Relocations -Bond Projects Project Number Project Title Budgeted Item? Yes Current Budget $ 4,679,919.00 Funds Obligated $ 4,278,889.34 Current Balance �$ 401,029°66 Does item have a cost? Yes Item Cost $ 76,625.00 Budget Adjustment Attached? No Budget Adjustment $ - Remaining Budget $ 324,404.66 V20140710 Previous Ordinance or Resolution # 170-16 t /� —' LQ Original Contract Number: 2016-4 Approval Date: V V Comments: Jim Beavers Submitted By 4 C-'.'00&k)'kn 43.d ►�� . �c, -�R City of Fayetteville Staff Review Form Q., d� 2016-0627 Legistar File ID N/A City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 12/2/2016 Utilities Director/ _ Utilities Department Submitted Date Division / Department Action Recommendation: APPROVAL OF CHANGE ORDER NO. 2 TO THE CONTRACT WITH GOODWIN & GOODWIN, INC. IN THE AMOUNT OF $9,800.00 FOR CONSTRUCTION BID 16-49, PORTER RD. HWY 112/71B WIDENING AND INTERCHANGE WATER AND SEWER RELOCATIONS Budget Impact: 5400.720.5700-5815.00 Water/Sewer Account Number 11011.1501 Project Number Budgeted -Item? Yes Fund Water/Sewer Relocations -Bond Projects Current Budget Funds Obligated Current Balance Does item have a cost? Yes Item Cost Budget Adjustment Attached? No Budget Adjustment Project Title $ 4,851,253.00 $ 4,175,307.08 $ 675,945.9 $ 9,800.00 Remaining Budget I $ 666,145.92 V20140710 Previous Ordinance or Resolution # 170-16 Original Contract Number: 2016-4 Comments: Approval Date: � a - Ill — Ito CITY OF 7ayvevl e ARKANSAS TO: Mayor Jordan THRU: Don Marr, Chief of Staff Tim Nyander, Utilities Director FROM: Jim Beavers, Utilities Engineer STAFF MEMO DATE: December 1, 2016 SUBJECT:. Approval of Change Order No. 2 to Goodwin & Goodwin, Inc. in the amount of $9,800.00.' for Construction Bid 16-49, Porter Rd- Hwy 112/718 Widening and Interchange Water and Sewer Relocations, AHTD BB0414 RECOMMENDATION: Approval of Change Order No. 2 to Goodwin & Goodwin, Inc. in the amount of $9,800.00 for Construction Bid 16-49, Porter Rd- Hwy 112/71 B Widening and Interchange Water and Sewer Relocations. BACKGROUND: Original contract: Resolution 170-16 approved 9/20/2016 in the amount of $3,286,735.00 plus a project contingency of $328,673.50. The City's original contract for Bid 16-49 is 87.06% reimbursable by AHTD to the City of Fayetteville. Previous Change Order No. 1 was approved in the amount of $76,625.00 on October 12, 2016. DISCUSSION: AHTD's roadway design requires removing a fire hydrant and short section of City water line southwest quadrant of Garland (Hwy 112) and 1-49. At the time of design a development was planned that would have relocated this section of line. The development did not occur and the City's relocation contact will be used. The Fire Department has concurred with the hydrant removal. The water line to be removed is a branch from a relatively long dead end water line. In order to keep adjacent residents with potable water and fire protection, a water main valve must be installed while the line is operational under pressure. BUDGET/STAFF IMPACT: Change Order No. 2 utilizes $9,800.00 of the available project contingency $252,048.50 ($328,673.50 original — 76,625.00 previous CO No. 1). Change Order No. 2 may be 87.06% reimbursable by AHTD to the City. Discussions are proceeding with AHTD but the work needs tomove forward during these discussions. .. . ATTACHMENTS: Staff Review Form Copy of signed proposed Change Order No. 2 (1 page). Relocation sketch Vicinity map Mailing Address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov H Construction Contract Change Order Project: Change Order No. 2 Porter Rd - HWY 112/71B Widening and Interchange Water and Sewer Relocations, Bid 16-49 Date Prepared: 12/1/2016 Fayetteville; Arkansas Garver Job No. 14048160 JPrepared by: Chris Buntin Owner: Contractor: City of Fayetteville Goodwin & Goodwin, Inc. 113 W. Mountain Street 3505 Free Ferry Road Fayetteville, AR 72701 Fort Smith, AR 72903 Description of Work Included in Contract The Contract includes, but is not limited to, approximately 3,000 linear feet water line (up to 12 inch) and facilities including bored steel encasement and approximately 5,000 linear feet of gravity sewer (mostly 18 inch) and facilities including bored steel encasement. Changes and Reasons Ordered (List Individual Changes as: A, B, C, D, etc.) A. The large scale development for the Nelms Climbing Gym at Drake Street and McConnell Avenue has not proceeded with construction, abandoning the existing 8 inch water line along the east side of McConnell Avenue and Fire Hydrant within the new AHTD right of way. The existing water line along Drake Street is the only water supply for a significany amount of customers to the south, west of McConnell Avenue and north of Knapp Drive. A new valve is needed near the intersection of Drake Street and McConnell, north side of the existing tee, to maintain existing water service and fire protection. The contractor will subcontract with Interstate Tapping Service, or other approved equal, to install an 8 inch Inserta Valve (epoxy coated inside and out with 250 psi maximum working pressure). The contractor will verity pipe od and assist the subcontractor with all excavation, trench safety, dewatering, site restoration, and anything else as required to complete the work. Attachments: None Bid Bid Unit Original Contract Revised Revised Original Revised Contract Item Item of Contract , Unit Contract Unit Contract Contract Changes No. Description Measure Quantity Price Quantity Price Cost Cost A 44 (CO#2) 8" Inserta Valve EA 0 $0.00 1 $9,800.00 $0.00 $9,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ' $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Summation of Costl $0.00 $9,800.00 Net Cost for this Change Orderl $9,800.00 Estimated Project Cost Estimated Project Cost Original Contract Amount $3,286.735.00 Previously Approved Changes $76,625.00 This Change Order $9,800.00 New Contract Amount 53,373,160.00 IS EEM SUBJECT TO ALL ORIGINAL CONTRACT PROVISIONS AND PREVIOUS CHANGE ORDERS ISSUED FOR REASONS INDICATED ABOVE Engineer: Garver ' Project Manager 'Z1� 20 Engineer's Signature Title Date ACCEPTED BY CONTRACTOR _ �T ..... Contr is Si ture TitLd Date APPROVED BY i OWNER ' n Mayor �.. LLX ner's SiclnaturTitle Date M CD 0 Io 0 0 C) 0 0 cD m