Loading...
HomeMy WebLinkAboutORDINANCE 5879113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Ordinance: 5879 File Number: 2016-0276 MARK ZWEIG, INC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, INC. FOR A WATER MAIN UPGRADE ALONG COLLEGE AVENUE BETWEEN EAST DAVIDSON STREET AND EAST MAPLE STREET WITH THE AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $73,100.40. WHEREAS, Mark Zweig, Inc. will be renovating the Twin Arches Motel located at 521 North College Avenue, a project which was approved by the City's Planning Commission on May 9, 2016; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made aware of an existing water volume fire flow issue with the existing water piping; and WHEREAS, increasing the size of this approximately 250-foot segment from a 2-inch main to an 8-inch main will alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it would facilitate future development and promote better fire flow in the vicinity and will save time and cost by utilizing the developer's contractor who will be on -site installing the larger line for the developer's project; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." Page 1 Printed on 618116 Ordinance: 5879 File Number: 2016-0276 NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mark Zweig, Inc. for a water main upgrade along College Avenue between East Davidson Street and East Maple Street with the amount to be paid by the City of Fayetteville not to exceed $73,100.00. PASSED and APPROVED on 6/7/2016 Attest: Sondra E. Smith, City Clerk Treasurer FAYETFEVILLL. = .W '. C iitN►t Page 2 Printed on 618116 City of Fayetteville, Arkansas 5 I # 1 w Text File File Number: 2016-0276 Agenda Date: 6/7/2016 Version: 1 In Control: City Council Meeting Agenda Number: D. 4 MARK ZWEIG, INC.: 113 West Mountain Street Fayetteville, AR 72701 (479) 575-8323 Status: Passed File Type: Ordinance AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, INC. FOR A WATER MAIN UPGRADE ALONG COLLEGE AVENUE BETWEEN EAST DAVIDSON STREET AND EAST MAPLE STREET WITH THE AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $73,100.40 WHEREAS, Mark Zweig, Inc. will be renovating the Twin Arches Motel located at 521 North College Avenue, a project which was approved by the City's Planning Commission on May 9, 2016; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made aware of an existing water volume fire flow issue with the existing water piping; and WHEREAS, increasing the size of this approximately 250-foot segment from a 2-inch main to ar 8-inch main will alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it would facilitate future development and promote better fire flow in the vicinity and will save time and cost by utilizing the developer's contractor who will be on -site installing the larger line for the developer's project; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mark Zweig, Inc. for a water main upgrade along College Avenue between East Davidson Street and East Maple Street with the amount to be paid by the City of Fayetteville not to exceed $73,100.00. City of Fayetteville, Arkansas Page 1 Printed on 61812016 Tim Nyander Submitted By City of Fayetteville Staff Review Form 2016-0276 Legistar File ID 6/7/2016 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item 5/23/2016 Utilities Director/ Utilities Department Submitted Date Division / Department Action Recommendation: City Administration recommends approval of a resolution for a cost -share and bid waiver in the amount of $73,100.40 with Mark Zweig Inc. for the upsizing of an existing 2-inch waterline to 8-inch in the vicinity of the proposed development. 5400.5600.5808.00 Account Number 04039.1 Project Number Budgeted Item? Yes Budget Impact: Water & Sewer Fund Water/Sewer Impact Fee Cost Sharing Projects Current Budget Funds Obligated Current Balance Project Title Does item have a cost? Yes Item Cost $ Budget Adjustment Attached? NA Budget Adjustment 1,070,594.00 73,100.40 Kemaimng buaget V20140710 Previous Ordinance or Resolution # Original Contract Number: Comments: Approval Date: CITY OF T k le a y% ARKANSAS MEETING OF JUNE 7, 2016 TO: Fayetteville City Council THRU: Mayor Lioneld Jordan Don Marr, Chief of Staff FROM: Tim Nyander, Utilities Director 1� DATE: May 20, 2016 SUBJECT: Twin Arches Waterline Cost Share CITY COUNCIL AGENDA MEMO RECOMMENDATION: City Administration recommends approval of a resolution for a cost -share and bid waiver in the amount of $73,100.40 with Mark Zweig Inc. for the upsizing of an existing 2-inch waterline to 8-inch in the vicinity of the proposed development. BACKGROUND: Mark Zweig Inc. has proposed rehabilitation/reconstruction of the existing Twin Arches Hotel at 521 North College Avenue (Site Improvement Plan SIP 16-5381). A 2" public water main exists on the west side of College Avenue between East Davidson Street and East Maple Street. In order to meet the minimum fire flow demands of this proposed redevelopment, Mark Zweig Inc. must upgrade the 2" line to an 8" line from East Davidson Street south to a proposed fire hydrant to service this development. DISCUSSION: It is in the best interests of the city utility department to replace the remaining 2" water line from this project south to East Maple Street to facilitate future development, promote better fire flow in the vicinity, and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area. The City would benefit from the cost share by utilizing the developer's contractor who will already be onsite performing water line installation. A bid waiver is requested since this cost share is greater than $20,000. The total estimated waterline project cost of construction and associated engineering services (from Davidson to Maple) is $125,475.00. The waterline installation from the development south to Maple Street would comprise the city's obligation, which is 48.5% of total project costs. The city's estimated 48.5% cost share is $60,917.00. however a 20% contingency of $12,183.40 has been included such that this resolution would approve a not -to -exceed ceiling of $73,100.40. This contingency will be used as necessary if the actual bid prices exceed the estimates prepared by the developer's Engineer. The percentage of the construction cost will be the basis of calculation for the actual cost. Mailing Address: 113 W. Mountain Street www.fayetteviIle-ar.gov Fayetteville, AR 72701 BUDGET/STAFF IMPACT: Funds for the City portion of work are available in the Water and Sewer Impact Fee Cost Sharing Project. The final actual cost to the City will be based'upon actual bid price for this project. Attachments: Staff Review Form P4 Request Engineering Cost Estimate for Waterline Improvements Waterline Extension Plan Contractual Agreement ... . . a . - . . . ( - LL ' k 2cq k . ! RCL j f w Q Q » > � 2 .. \ /m§ � ) - k # \ 2 CP - - : / )� R\ ) { § \ a)£ _/ e 3 w i 3/& F ) d k \ s E 6 \p2 � t M , co ° \ k k \ \�ƒ _ / / \ 3 s O § a p ) ¥ \ C? C� <� q q q R 'i \ § i § : - - - - - - - - W. to � ) ) w ) CD ]� k ƒ =f IL « 0 6 / - ) E A ] 2 C \ \ \ ■ P u °°`` ! � ■ e� ; & $ �22= 2ker CO 2t�7 -•� A ■ R % \ � ) _ § CD §£. \ 2 m �e LL LL k� \_ - SIL k �. . ; 2 !� _ ] �cm \ \ CY)� Lto Lto § 0 M )@f ± v ck§\ �\\ / §§%ƒ - \ / C. M 2 c § E cli \ \ & )a (> ] f » 6 a JORGENSEN +ASSOCIATES April 27, 2016 City of Fayetteville Development Services 113 West Mountain Street Fayetteville, AR 72701 Re: Twin Arches Waterline Extension 124 W Sunbridge D Fayetteville, AR 72, Office: 479-442-912' Fax: 479.582 4807 In regards the waterline extension along the west side of College Avenue for the Twin Arches project, we have developed the following preliminary cost estimate: North Off -Site Estimated Costs Item Description Qty. Unit Unit Price Total 001 8' PVC, C-900 Class 200 DR-14 Water Main 247 LF $55.00 $13,585.00 002 8"x6" Tap and Valve 1 EA $3,000.00 $3,000.00 003 16" Steel Encasement 20 LF $150.00 $3,000.00 004 Relocate Ex WM, Reconnect to New Line 2 EA $3,500.00 $7,000.00 005 Remove and Replace Sidewalk 4 SY $75.00 $300.00 006 Remove and Replace Asphalt 75 SY $100.00 $7,500.00 007 Remove and Replace Curb and Gutter 10 LF $45.00 $450.00 008 Install 8" 45' Bend 2 EA $550.00 $1,100.00 009 SB-2 125 Tons $25.00 $3,125.00 010 Traffic Control 1 LS $4,000.00 $4,000.00 011 Clean +Test 1 LS $750.00 $750.00 012 Bond 1 LS $500.00 $500.00 $44,310.00 Twin Arches Estimated Costs Item Description Qty. Unit Unit Price Total 001 8" PVC, C-900 Class 200 DR-14 Water Main 19 LF $55.00 $1,045.00 002 Install FH Assembly 1 EA $3,750.00 $3,750.00 003 Install 8" G.V. 2 EA $1,800.00 $3,600.00 004 Install 8"x6" Tee 1 EA $800.00 $800.00 005 Install PIV 1 EA $3,250.00 $3,250.00 006 Clean +Test 1 LS $350.00 $350.00 007 Bond 1 LS $250.00 $250.00 $13,045.00 South Off -site Estimated Costs Item Description Qty. Unit Unit Price Total 001 8" PVC, C-900 Class 200 DR-14 Water Main 264 LF $55.00 $14,520.00 002 8"x12" Tap and Valve 1 EA $3,800.00 $3,800.00 003 16" Steel Encasement 15 LF $150.00 $2,250.00 004 Relocate Ex WM, Reconnect to New Line 2 EA $5,500.00 $11,000.00 005 Remove and Replace Sidewalk 7 SY $75.00 $525.00 006 Remove and Replace Asphalt 50 SY $100.00 $5,000.00 007 Remove and Replace Curb and Gutter 10 LF $45.00 $450.00 008 Remove and Replace Ex Steps and Wall 1 LS $7,500.00 $7,500.00 009 Relocate Ex Sign 1 LS $450.00 $450.00 010 Install 8" 45' Bend 2 EA $550.00 $1,100.00 011 SB-2 91 Tons $25.00 $2,275.00 012 Traffic Control 1 LS $4,000.00 $4,000.00 013 Clean +Test 1 LS $750.00 $750.00 014 Bond 1 LS $500.00 $500.00 $54,120.00 Total Estimate Cost: $111,475 South Off -site Cost represents — 48.55% North Off -site Cost represents—39.75% Engineering, Surveying, Inspection Cost: $14,000 Total Estimated Cost: $125,475 We are kindly asking that the City cost share the south portion of this waterline extension: South Side costs ($54,120 + 48.55% of engineering fee ($6,797)). Requested total City cost share amount: $60,917. Please review at your convenience and let us know how we can be of further assistance for this project. CONTRACTUAL AGREEMENT FOR COST SHARE OF WATER MAIN UPGRADE COSTS This Agreement, made and entered into on this 7th day of June, 2016, by and between the City of Fayetteville, Arkansas ("City") and Mark Zweig, Inc., witnesseth: WHEREAS, Mark Zweig, Inc. will be renovating the Twin Arches Motel located at 521 North College Avenue, a project which was approved by the City's Planning Commission on May 9, 2016; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made aware of an existing water volume fire flow issue with the existing water piping; and WHEREAS, increasing the size of this approximately 250 foot segment from a 2-inch main to an 8-inch main will alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the Fayetteville City Plan 2030, adopted in 2011 as the City's comprehensive land use plan, list infill development as one of its top two goals. Replacing and upgrading aged infrastructure in the core of the city provides improved service and fire protection for residents and businesses; and WHEREAS, the City of Fayetteville would benefit from the cost share as it would facilitate future development and promote better fire flow in the vicinity; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." NOW, THEREFORE, the City of Fayetteville, Arkansas and Mark Zweig, Inc. agree as follows: 1. The City of Fayetteville, Arkansas agrees to: A. Reimburse Mark Zweig, Inc. for 48.5% of the cost to upgrade approximately 250 linear feet of 2-inch water main in the area identified in Exhibit "A" to fl- inch main up to a maximum -not -to -exceed amount of $60,917.00 as was estimated by the builder's representative and shown on Exhibit `B", attached. B. Payments due to Mark Zweig, Inc. shall be remitted within sixty (60) days after receipt of valid invoices. 2. Mark Zweig, Inc. agrees to: A. Provide the necessary and normal project management, inspection, and testing as necessary for a complete and acceptable water main installation. B. Provide a copy of the invoices from the Contractor upon City approval of the water main upgrade. C. Pay for the water main installation (with reimbursement of 48.5% of the cost by the City of Fayetteville in a not -to -exceed amount of $60,917.00 with a contingency fund not -to -exceed $12,183.40). 3. It is further understood that the contract for construction of the water main upgrade is between Mark Zweig, Inc. and its Contractor and that the City has no contractual obligation with either the Contractor or the Engineer. The City's only obligation shall be to participate in this agreement with a not -to -exceed reimbursable amount of $60,917.00 for the water main upgrade, with a contingency fund not -to -exceed $12,183.40. IN AGREEMENT WITH ALL THE TERMS AND CONDITIONS ABOVE, WE SIGN BELOW: MARK ZWEIG, INC. - CITY OF FAYETTEVILLE, c ATTEST: By: SONDRA SMITH, City Clerk �Itt%111111frp11 Tp FAYFnEVILLE : W= rr�l� kA N S . w NORTHWESTAmANsAs Democrat azcfte _.. t60/. IFk. 72JTst n .J.1'C... FM;'. 4,96 -1I 3F AFFIDAVIT OF PUBLICATION I Cathy Wiles, do solemnly swear that I am the Legal Clerk of the Northwest Arkansas Democrat -Gazette, printed and published in Washington County and Benton County, Arkansas, and of bona fide circulation, that from my own personal knowledge and reference to the files of said publication, the advertisement of - CITY OF FAYETTEVILLE Ord. 5879 Was inserted in the Regular Edition on: June 16, 2016 Public tion Charges $ 144.30 Cathy Wiles Subscribed and sworn to before me This Z.Oday of JLvv -, 2016. A5 WAJ 2)CM S Notary Public My Commission Expires: 7lz- / Z5__ LASHLEY DAVIS Notary as - Washington County ublic - Comm#12694247 mission Eynire !l**NOTE**u Please do not pay from Affidavit. Invoice will be sent. Ordinance: 5879 File Number: 2016-0276 MARK ZWEIG, INC.: AN ORDINANCE TO WAIVE THE REQUIREMENTS OF FORMAL COMPETITIVE BIDDING AND APPROVE A COST SHARE AGREEMENT WITH MARK ZWEIG, INC. FOR A WATER MAIN UPGRADE ALONG COLLEGE AVENUE BETWEEN EAST DAVIDSON STREET AND EAST MAPLE STREET WITH THE AMOUNT TO BE PAID BY THE CITY OF FAYETTEVILLE NOT TO EXCEED $73,100.40. WHEREAS, Mark Zweig, Inc. will be renovating the Twin Arches Motel located at 521 North College Avenue, a project which was approved by the City's Planning Commission on May 9, 2016; and WHEREAS, during the course of design review by the City of Fayetteville, Mark Zweig, Inc. was made aware of an existing water volume fire flow issue with the existing water piping; and WHEREAS, increasing the size of this approximately 250-foot segment from a 2- inch main to an 8-inch main will alleviate the current water volume deficiency, allow the development to connect and also allow for a secondary water loop to help prevent the possibility of residents losing water service in the event of a water leak in the area; and WHEREAS, the City of Fayetteville would benefit from the cost share as it would facilitate future development and promote better fire flow in the vicinity and will save time and cost by utilizing the developer's contractor who will be on -site installing the larger line for the developer's project; and WHEREAS, § 51.112 of the Fayetteville City Code provides that "the City shall pay the excess material cost of facilities of a size that is larger than required to serve subdivisions when such excess size is specified and required by the water and wastewater director for the general benefit of the water system." NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines an exceptional situation exists in which competitive bidding is deemed not feasible or practical and therefore waives the requirements of formal competitive bidding and approves a cost share agreement with Mark Zweig, Inc. for a water main upgrade along College Avenue between East Davidson Street and East Maple Street with the amount to be paid by the City of Fayetteville not to exceed $73,100.00. PASSED and APPROVED on 6n12016 Approved: Lioneld Jordan, Mayor Attest: Sondra E. Smith, City Clerk Treasurer 73736580 June 16, 2016 JLIN 2 2 2016 Cl TYCLERKS p�cLE