HomeMy WebLinkAbout128-16 RESOLUTION113 West Mountain
Street Fayetteville,
AR 72701
(479) 575-8323
Resolution: 128-16
File Number: 2016-0303
MCCLELLAND CONSULTING ENGINEERS, INC.:
A RESOLUTION TO APPROVE A CONTRACT WITH MCCLELLAND CONSULTING ENGINEERS,
INC. IN THE AMOUNT OF $93,900.00 FOR SURVEYING SERVICES ASSOCIATED WITH THE
GARDEN PARK APARTMENTS WATER LINE PROJECT, THE POPLAR STREET/EASY STREET
SEWER LINE PROJECT, THE GREGG STREET/FULBRIGHT SEWER PROJECT, AND THE KITTY
CREEK SEWER LINE PROJECT.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with
McClelland Consulting Engineers, Inc. in the amount of $93,900.00 for surveying services associated with
the Garden Park Apartments Water Line Project, the Poplar/Easy Street Sewer Line Project, the Gregg
Street/Fulbright Sewer Project, and the Kitty Creek Sewer Line Project.
PASSED and APPROVED on 7/5/2016
kCrfi T 1r'',�i
f
AYErTEW1LLl %c=
i
Attest:xx
��' •�'. �,�
Sondra E. Smith, City Clerk
Treasurer
Page 1 Printed on 716116
" - - - City of Fayetteville Arkansas 113 West Mountain Street
1
Fayetteville, AR 72701
1 — (479) 575-8323
�1 -., a F�3 •f
Text File
File Number: 2016-0303
Agenda Date: 7/5/2016 Version: 1 Status: Passed
In Control: City Council Meeting File Type: Resolution
Agenda Number: A. 2
MCCLELLAND CONSULTING ENGINEERS, INC.:
A RESOLUTION TO APPROVE A CONTRACT WITH MCCLELLAND CONSULTING
ENGINEERS, INC. IN THE AMOUNT OF $93,900.00 FOR SURVEYING SERVICES
ASSOCIATED WITH THE GARDEN PARK APARTMENTS WATER LINE PROJECT, THE
POPLAR STREET/EASY STREET SEWER LINE PROJECT, THE GREGG STREET/FULBRIGHT
SEWER PROJECT, AND THE KITTY CREEK SEWER LINE PROJECT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE,
ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves a contract with
McClelland Consulting Engineers, Inc. in the amount of $93,900.00 for surveying services associated
with the Garden Park Apartments Water Line Project, the Poplar/Easy Street Sewer Line Project, the
Gregg Street/Fulbright Sewer Project, and the Kitty Creek Sewer Line Project.
City of Fayetteville, Arkansas Page 1 Printed on 7/6/2016
City of Fayetteville Staff Review Form
2016-0303
Legistar File ID
7/5/2016
City Council Meeting Date - Agenda Item Only
N/A for Non -Agenda Item
Tim Nyander 6/10/2016
Utilities Director /
Utilities Department
Submitted By Submitted Date Division / Department
Action Recommendation:
Approval of the agreement with McClelland Consulting Engineers, Inc. to in the amount of $93,900.00 to provide
Surveying services for the Garden Park Apartments Water Line Project, the Poplar Street/Easy Street Sewer Line
Project, the Gregg Street/Fu Ibright Sewer Project, the Kitty Creek Sewer Line Project and on-call surveying
associated with these design projects
Budget Impact:
5400.5600.5314.00/5400.5700.5314.00
Account Number
12009.1 and 02017.1
Project Number
Budgeted Item? Yes
Does item have a cost? Yes
Budget Adjustment Attached? No
Previous Ordinance or Resolution #
Original Contract Number:
Comments:
Water/Sewer
Fund
Water System Rehab/Replacement & Sanitary
Sewer Rehab
Project Title
Current Budget $ 9,111,335.00
Funds Obligated $ 1,219,243.34
Current Balance
Item Cost $ 93,900.00
Budget Adjustment S -
Remaining Budget
Approval Date:
V20140710
CITY OF
'�ttvtlle
ARKANSAS
MEETING OF JULY 5, 2016
TO: Mayor and City Council
THRU: Don Marr, Chief of Staff
FROM: Tim Nyander, Utilities Director
DATE: June 14, 2016
CITY COUNCIL AGENDA MEMO
SUBJECT: Survey Agreement with McClelland Consulting Engineers
RECOMMENDATION:
Staff recommends approval of the agreement with McClelland Consulting Engineers, Inc.(MCE)
to in the amount of $93,900.00 to provide Surveying services for the Garden Park Apartments
Water Line Project, the Poplar Street/Easy Street Sewer Line Project, the Gregg Street/Fulbright
Sewer Project, the Kitty Creek Sewer Line Project and on -call surveying associated with these
design projects.
BACKGROUND:
The City conducted a formal professional service selection committee meeting (RFQ-1 0-01,
April 1, 2016) and selected McClelland Consulting Engineers to provide surveying services for
City of Fayetteville in-house design and construction projects as noted above.
DISCUSSION:
The Engineering Division has a two -person survey crew as part of the design team. The survey
crew provides surveying services to multiple City Divisions in addition to the surveys needed for
the in-house projects designed by the City engineers. As a result, the current workload for the
survey crew is quite large. In order to allow design for the above mentioned projects to begin in
2016, City staff requested that McClelland Consulting Engineers (MCE) provide a quote for the
survey work needed. The design for these projects is planned to be done in-house by the
Engineering design team.
BUDGET/STAFF IMPACT:
Budgeted CIP funds are available in the Sewer Rehabilitation Project and the Water
Rehabilitation Project. The surveying costs that will be coming out of the Sewer Rehabilitation
Project is $77,800.00 and $16,100 00 will be coming out of the Water Rehabilitation Project.
Attachments:
Staff Review Form
PO Request
MCE Agreement
Mailing Address:
113 W. Mountain Street www.fayetteville-ar.gov
Fayetteville, AR 72701
City of Fayetteville - Purchase Order Request (PO)
egliisllton o.
ate
(Not a Purchase Orderl
6/15/2016
P.C Number.
All PO Requests shall be scanned to the Purchasing e-mail: Purcftasin�}@(ayetteville-ar.gov.
Purchase shall not be made until an actual PO has been issued.
Vendor 74660 Vendor
Name. McClelland Consulting Engineers
Mail Legistar#:
or cl'o
-
20160303
Address 1810 N. N. College Ave.
FOB Point
Taxable
35 a
Expected Delivery Date:
Quotes Attached
City Fayetteville
AR
Zip Code
Ship to code-
7z7o2
is Iff
Requester Matt Casey
Requester's Employee 4:
Extension
2119
3429
Item
Description
Quantity
Unit at Issue
Unit Cost
Extended Cost
Account Number
Project.Sub#
Inventory #
Fixed Asset #
1
Surveying for In -House CIP Design
Projects
1
Each
77,800.00
$77,800.00
5400.5700.5314.00
02017.1
2
Surveying for In -House CIP Design
Projects
1
Each
16,100,00
$16,100.00
5400.5600.5314.00
12009.1
50.00
4
$0.00
5
$0.00
$0.00
$0.00
8
50.00
9
50.00
10
S0.00
ShippingiHandling
Lot
$0.00
Special Instructions.
Subtotal: 593,900.00
Tax: $0.00
Total: 593.900.00
Approvals
Mayor: Department Director Purchasing Manager
Chief Financial Officer Budget Director. IT Director.
Dispatch Manager. Utilities Manager: Other:
Revised 1/21,2015
MEMcCLELLAND
CONSULTING
ENGINEERS, INC.
May 27, 2016
Mr. Jim Beavers, P.E.
Utilities Engineer
City of Fayetteville
113 West Mountain
Fayetteville, Arkansas 72701
1810 N. College Avenue
P.O. Box 1229
Fayetteville, AR 73703/72702-1229
479-443-2377/Fax 479-443-9241
www. me clelan d-engrs. corn
Re: Proposal for providing surveying services for the design of water and sewer projects in
Fayetteville, AR.
Dear Mr. Beavers:
As requested, we are presenting herewith a proposed engineering services contract between
McClelland Consulting Engineers, Inc., hereinafter referred to as the ENGINEER, and
The City of Fayetteville, hereinafter referred to as the OWNER, which is associated with the provision of
professional services as defined in Article 1 and for the consideration defined in Article 2 hereinafter.
The OWNER would like for the ENGINEER to provide surveying services for 4 water and sewer design
projects in Fayetteville, Arkansas. The projects are:
(a)water line rehabilitations at Garden Park Apartments, Mount Comfort Road, Fayetteville.
(b) mapping for sewer line design at Poplar Street and Easy Street, Fayetteville.
(c) mapping for sewer line design at Gregg Street and the Fulbright Expressway, Fayetteville.
(d) mapping for sewer line analysis for Kitty Creek sewer line from Mud Creek Trail to Zion Road.
The ENGINEER will complete the tasks as outlined in Article 1.
ARTICLE I
Task 1 -Garden Park Apartments Water Line Mapping
• Conduct topographic survey of 30 foot wide corridor of existing waterline route at apartment
complex. Length of existing waterline is approximately 2350 feet. Research existing easement(s)
for existing waterline. Make property boundary survey ties for plotting existing water line
easement(s). Plot existing easements and right of way lines on topographic survey. Provide
electronic file of completed work to the City of Fayetteville. Exhibit "A" maps for additional
easements are not included under this task.
Task 2 -Poplar Street and Easy Street Sewer Line Mapping
• Conduct topographic survey of a 50 foot wide corridor for design of new sewer line. Length of
proposed mapping route is 950 feet. Proposed sewer line route may be within the existing
platted, but undeveloped Elm Street. Make property boundary survey ties for easement
preparation. Research existing easement along proposed route. Plot existing easements and
right of way lines on topographic survey. Provide electronic file of completed work to the City of
Fayetteville. Exhibit "A" maps for additional easements are not included under this task.
Task 3 -Gregg Street and Fulbright Expressway Sewer Line Mapping
• Conduct topographic survey along existing 25 foot sewer easement route for sewer line analysis.
Length of proposed mapping route is approximately 1300 feet. Map approximately
twenty three (23) sanitary sewer manholes for sewer design analysis. Review and plot existing
easements in area of sewer line route (approximately 13). Make property boundary survey ties
for plotting existing easement(s) and to establish right of way lines of the Fulbright Expressway.
Plot existing easements and right of way lines on topographic survey. Provide electronic file of
completed work to the City of Fayetteville Exhibit "A" maps for additional easements are not
included under this task.
Task 4 -Kitty Creek Sewer Line from Zion Road to Mud Creek Trail Mapping
• Conduct topographic survey of 50 foot wide corridor, along the existing sewer line easement
route for sewer line analysis. Length of proposed mapping route is approximately 5400 feet.
Route contains approximately 29 sanitary sewer manholes. Review and plot existing easements
in area of sewer line route (approximately 13). Make property boundary survey ties for plotting
existing easement(s). Plot existing easements and right of way lines on topographic survey.
Provide electronic file of completed work to the City of Fayetteville. Exhibit "A" maps for
additional easements are not included under this task.
Task 5 -On Call Professional Services
• Provide additional topographic/boundary survey services as the owner develops the design of
the above utility projects.
• Provide construction staking as requested by the owner.
• Provide other assistance as requested by the owner.
• Prepare Exhibit "A" maps as needed for any additional easements.
• Any and all requests under this task must be requested in writing._
ARTICLE 2
Task 1 —Garden Park Apartments Water Line Mapping
• Payment for surveying services shall be based upon an hourly rate, plus expenses, to not
exceed $6,100 payable to the ENGINEER on a monthly basis as the work progresses.
Task 2 —Poplar Street and Easy Street Sewer Line Mapping
• Payment for the surveying services shall be based upon an hourly rate, plus expenses, to not
exceed $6,550 payable to the ENGINEER on a monthly basis as the work progresses.
Task 3 —Gregg Street and the Fulbri ht Expressway Sewer Line Mapping
• Payment for the surveying services shall be based upon an hourly rate, plus expenses, to not
exceed $15,750 payable to the ENGINEER on a monthly basis as the work progresses.
Task 4 —Kitty Creek Sewer Line from Mud Creek Trail to Zion Road
• Payment for the surveying services shall be based upon an hourly rate, plus expenses, to not
exceed $41,000 payable to the ENGINEER on a monthly basis as the work progresses.
Tasks -On Call Professional Services
• Payment for on call professional services shall be an hourly rate basis, plus expenses, not to
exceed $20,000, payable to the ENGINEER on a monthly basis as the services are provided.
Hourly rates will be based upon the latest hourly rate schedule.
Reimbursable expenses:
• Easement search by WACO Title: Estimated fee: $2500
• Utility locate by utility locate service: Estimated fee: $2000
ARTICLE 3
It is understood that time is of essence and that the ENGINEER shall endeavor to plan and provide his
services in a timely manner.
It is further mutually agreed by the parties hereto:
1. That the OWNER shall make available to the ENGINEER all technical data in the OWNER's
possession including maps and other information required by the ENGINEER and relating to his
work.
That, the ENGINEER shall maintain a level of competency presently maintained by other
practicing professional surveyors in the same type of work for the professional and technical
soundness and accuracy of all drawings, and other work and materials furnished under this
Agreement.
3. All documents including drawings, specifications, estimates, field notes and other data
pertaining to the work or to the project shall become the property of the OWNER.
We appreciate the opportunity to present this proposal to you. If you are in agreement, please sign and
date in the spaces provided below and return a copy to our office.
Sincerely,
McClelland Consulting Engineers, Inc.
Paul Walla, P.L.S.
Survey Department Supervisor
McClelland Consulting Engineers, Inc is hereby authorized to proceed in accordance with the foregoing
C.
v5 1LP
Title
Date