Loading...
HomeMy WebLinkAbout07-15 RESOLUTIONRESOLUTION NO. 07-15 A RESOLUTION TO APPROVE A PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH GARVER, LLC IN AN AMOUNT NOT TO EXCEED $149,900.00 FOR ENGINEERING DESIGN AND CONSTRUCTION OBSERVATION FOR THE PAINTING OF THE EXTERIOR AND INTERIOR OF THE 5 MILLION GALLON BAXTER WATER TANK AND THE MOUNT SEQUOYAH WATER TANK, AND FOR THE DEMOLITION AND SALE OF THE 1 MILLION GALLON BAXTER WATER TANK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an agreement for professional engineering services with Garver, LLC in an amount not to exceed $149,900.00 for engineering design and construction observation for the painting of the exterior and interior of the 5 million gallon Baxter Water Tank and the Mount Sequoyah Water Tank, and for the demolition and sale of the 1 million gallon Baxter Water Tank. PASSED and APPROVED this 201h day of January, 2015. APPR (1VPTl- :A ATTEST: SONDRA E. SMITH, City Clerk/Treasurer Ue ° FAYEZTEVILLF_ ems,_ " %J °.QkANSP sass`'IVO t 11► ``e City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, AR 72701 479-575-8323 1 ,,. Text File File Number: 2014-0583 Agenda Date: 1/20/2015 Version: 1 Status: Passed In Control: City Council File Type: Resolution Agenda Number: A. 3 GARVER, LLC PROFESSIONAL ENGINEERING SERVICES AGREEMENT: A RESOLUTION TO APPROVE A PROFESSIONAL ENGINEERING SERVICES AGREEMENT WITH GARVER, LLC IN AN AMOUNT NOT TO EXCEED $149,900.00 FOR ENGINEERING DESIGN AND CONSTRUCTION OBSERVATION FOR THE PAINTING OF THE EXTERIOR AND INTERIOR OF THE 5 MILLION GALLON BAXTER WATER TANK AND THE MOUNT SEQUOYAH WATER TANK, AND FOR THE DEMOLITION AND SALE OF THE 1 MILLION GALLON BAXTER WATER TANK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an agreement for professional engineering services with Garver, LLC in an amount not to exceed $149,900.00 for engineering design and construction observation for the painting of the exterior and interior of the 5 million gallon Baxter Water Tank and the Mount Sequoyah Water Tank, and for the demolition and sale of the 1 million gallon Baxter Water Tank. City of Fayetteville, Arkansas Page 1 Printed on 1/2112015 City of Fayetteville Staff Review Form 2014-0583 Legistar File ID 1/20/2015 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Jim Beavers 12/29/2014 Utilities Director / Utilities Department Submitted By Submitted Date Division / Department Action Recommendation: Resolution to approve a Professional Engineering Service Contract with Garver LLC for $149,900.00 for engineering and construction observation to paint the exterior and interior of the Baxter Water Tank and the Mount Sequoyah Water Tank. Budget Impact: 5400.5600.5314.00 Water/Sewer Account Number Fund 14010.1 and 14010.1501 Water Tank Improvements Project Number Project Title Budgeted Item? Yes Current Budget $ 850,000.00 Funds Obligated $ - Current Balance [ $ 850,000.001 Does item have a cost? Yes Item Cost $ 149,900.00 Budget Adjustment Attached? No Budget Adjustment Remaining Budget I $ 700,100.0 V20140710 Previous Ordinance or Resolution # Original Contract Number: Comments: Approval Date: )'Ad 5 CITY OF Tayeevle ARKANSAS MEETING OF JANUARY 20, 2015 TO: Mayor Jordan and City Council Members THRU: Water, Sewer and Solid Waste Committee Don Marr, Chief of Staff Tim Nyander, Interim Utility Director FROM: Jim Beavers, P.E. Utilities Engineer DATE: December 29, 2014 SUBJECT: Resolution to approve a Professional Engineering Service Contract with Garver LLC for $149,900.00 for engineering and construction observation to paint the exterior and interior of the Baxter Water Tank and Mount Sequoyah Water Tank. RECOMMENDATION: City Administration recommends approving a Professional Engineering Service Contract with Garver LLC for $149,900.00 for engineering and construction observation to paint the exterior and interior of the Baxter Water Tank and the Mount Sequoyah Water Tank. BACKGROUND: The proposed tank maintenance contract will provide for the engineering and construction observation to paint the exterior and interior of the 5 MG tank on Baxter, the beneficial demolition and sale of the 1 MG tank on Baxter, and to paint the exterior and interior of the Mount Sequoyah tank. The Baxter tanks and the Mount Sequoyah tank were inspected by Garver LLC engineers in 2014. The inspection reports recommend painting the interior and exterior of all tanks. Based upon the 2011 Water Study and the current water model it is proposed to demolish the 1 MG tank on Baxter and sell the tank or steel. The engineering contract for the two tanks are being combined into one contract to save City funding as certain designs specifications and details will apply to both tank location. DISCUSSION: Garver LLC, was selected for this project through the City's formal section procedure and purchasing requirements. The scope of work and the proposed fee have been reviewed and negotiated by Utilities Division. The proposed Professional Engineering Services Contract with Garver LLC is not to exceed $149,900.00. BUDGET/STAFF IMPACT: Budgeted funds are available in the Baxter Water Tank Painting project. This project was originally approved in the 2014 CIP for both Baxter tanks to be painted. It is proposed to demolish the 1 MG tank on Baxter. With this change to the project, the painting of the Mount Sequoyah tank has been added to this project to save City funding. ATTACHMENTS: 1. Staff Review Form 2. Purchase Order 3. Proposed Contract with Garver LLC 4. Location Map Mailing Address: 113 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701