HomeMy WebLinkAbout254-13 RESOLUTIONRESOLUTION NO.254-13 A RESOLUTION APPROVING CHANGE ORDER NO. 3 TO THE CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $7,009.00, AND APPROVING AN ADDITIONAL PROJECT CONTINGENCY IN THE AMOUNT OF $700.00, FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 3 to the contract with General Construction Solutions, Inc. in the amount of $7,009.00, and approves an additional project contingency in the amount of $700.00, for construction of improvements to Mount Sequoyah Gardens. PASSED and APPROVED this 17'h day of December, 2013. APPROVED: ATTEST: By: z-, ,-dp� SONDRA E. SMITH, City Clerk/Treasurer Carole Jones Submitted By City of Fayetteville Item Review Form 2013--0199 Legistar File Number December 17, 2013 City Council Meeting Date • Agenda Item Only NIA for Nan -Agenda Item Action Required: Parks and Recreation Department Request for approval of change order #3 to Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. in the amount of $7,009 and an additional 10% project contingency of $700 for a total increase of $7,709 for the Construction of Mt. Sequoyah Gardens Improvements (see attached memo). Does this item have a cost? Yes $7,709.00 Cost of this request 2250.9255.5315.00 Account Number 02013.1202 Project Number $111,790.00 Category or Project Budget $97,598.78 Funds Used to Date $6,482.22 Remaining Balance Mt. Sequoyah Gardens Improvements Program or Project Name Mt. Sequoyah Gardens Improvements Program or Project Category Parks Development Fund Name Budgeted Item? Yes Budget Adjustment Attached? No V20130812 Previous ordinance or Resolution # 145-13 Original Contract Number: P 0 I'll /�� /j~z�•�3 IAI--l -, V-oA q , N,-� I �- 2-71 - ;zal -�, �-7 7, 61f aye ev,' le CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff Connie Edmonston, Parks and Recreation Director Alison Jumper, Park Planning Superintendent From: Carole Jones, Park Planner II Date: November 27, 2013 THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE Subject: CO #3 for Construction of Mt. Sequoyah Gardens Improvements Agenda Request for December 17, 2013 Meeting PROPOSAL: Mount Sequoyah Gardens, consisting of three acres, is classified as a neighborhood park and serves the adjacent neighborhoods. Approximately 900 homes are located in a '/Z-mile radius of the park ultimately serving an estimated 1,960 Fayetteville residents. The park is located in Fayetteville's southeast quadrant along Summit Avenue. Mount Sequoyah Gardens overlooks the city from the west slope of Mount Sequoyah and offers passive and active recreational activities in an open space with stunning views of the city. The elevation is 1,590 feet at the top of the park property. The site is the former location of an abandoned water treatment facility and water storage tank. In January 1998, several residents of the Mount Sequoyah area urged the Fayetteville Parks and Recreation Advisory Board to develop a park at the site. At that time, Walker Park, a community park located in south Fayetteville along Arkansas Highway 16, was the closest city park. On August 4, 1998, the City Council passed a resolution establishing and dedicating the site as a city park to preserve and enhance the panoramic views of the City of Fayetteville and the surrounding mountains. Citizens have requested a lookout in addition to accessible parking at Mount Sequoyah Gardens for many years. On July 2, 2013, the City Council passed Resolution Number 145-13 approving a contract with General Construction Solutions, Inc. for Bid 13-31, Construction of Mt. Sequoyah Gardens Improvements, in the amount of $71,980 with a 10% project contingency of $7,198 for a total amount of $79,178. The project includes the replacement of an existing asphalt roadway/access drive, installation of a pre-engineered arbor, and the construction of a concrete and native stone structure slab, an 18-inch native stone seat wall, a colored concrete apron, ADA accessible parking, connecting sidewalks, tree planting and associated site work. The original design included approximately 60 square yards of concrete sidewalk which would connect the parking area to the arbor and an existing bench. During excavation for the sidewalk, an existing concrete and steel footing was uncovered (see attached photo). The extents and depth of the footing are unknown. To prevent the potentially costly removal of the footing, Park Planning staff re -designed the layout of the sidewalk to avoid the footing. Attached is a cost estimate for the proposed changes. THE CITY OF FAYETTEVILLE, ARKANSAS Even with the proposed increase, the total cost of the contract ($86,887) is less than the second low bid of $89,804 which would also have increased. Additionally, the pre -construction cost estimate of the project was $88,700, and $111,000 was approved for the project as part of the 2013 CIP. The contractor is also requesting 30 additional days for completion of the project. If approved, the construction of the project is anticipated to be completed in February 2014. RECOMMENDATION: Parks and Recreation staff recommends approval of change order 43 to Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. in the amount of $7,009 with an additional 10% project contingency of $700 resulting in an increase of $7,709. BUDGET IMPACT - This project is funded with Parks Development Funds. The additional cost of $7,709 is accounted for in project number 02013.1202 - Mt. Sequoyah Gardens Improvements. Attachments: Staff Review Form Resolution No. 145-13 General Construction Solutions, Inc. Change Order No. 3 Cost Estimate Change Order No. 3 THE CITY OF FAYETTEVILLE, ARKANSAS Existing Concrete Footing Encountered during Sidewalk Construction RESOLUTION NO. A RESOLUTION APPROVING CHANGE ORDER NO. 3 TO THE CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $7,009.00, AND APPROVING AN ADDITIONAL PROJECT CONTINGENCY IN THE AMOUNT OF $700.00, FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 3 to the contract with General Construction Solutions, Inc. in the amount of $7,009.00, and approves an additional project contingency in the amount of $700.00, for construction of improvements to Mount Sequoyah Gardens. PASSED and APPROVED this 171h day of December, 2013. APPROVED: ATTEST: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer RESOLUTION NO.145-13 A RESOLUTION AWARDING BID #13-31 AND AUTHORIZING A CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $71,980.00 FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS, AND APPROVING A PROJECT CONTINGENCY OF $7,198.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #13-31 and authorizes a contract with General Construction Solutions, Inc. in the amount of $71,980.00 for the construction of improvements to Mount Sequoyah Gardens, and additionally approves a project contingency of $7,198.00. PASSED and APPROVED this 2"d day of July, 2013. n DDDnXfT7n- ATTEST: —�. By: h �• SONDRA E. SMITH, City Clerk/Treasurer F'AYE7TEVILLE;-x 9 •;QkANSP`.••�'�•' G�ii� • • . • . • •Otj`�x Bid 13-31, Construction - Mt. Seauovah Gardens Improvements CO #3 Cast Estimate GeeeratGanatructlon;Sotudona, Ino. ITEM it OESCRIPTION UNIT EST. QTY. UNIT PRICE I T OTAL Reduction OF 5-foot c cmle aidewalk uan!- .Y. -} .67 i 41,095,73 Matmal. labor and equipmesll For Chong& of sklawalk layout intludirg grading, fill And cornpaction of subgraide due to presence of exmng underground concrete building facts g. Ravisions will also include adjusting exrWing bench area layout and location 2 inctudinp grai%nq,fill and our of subgrade. L.s. 1 S3 250.0 $3,25000 3 Addltional axcaraficn C.Y. 115 7 1966.75 4 Wale site mworaw irldludi 4-inch straw and water S.F. -1 225 $O.S5-51.165.00 DoWte vile restoratidn irraud ing 44nch depth topsdli, bufF D grass seed, straw and Water SX, .1,035_ 1.92 41990. Add site restoration including 4-inch depth topeok, annual vAeat grass aced, straw and 6 water S,F, 8,900 TOTAL 00 #3 COST ESTIMATE $7 009.02 Respectfully submitted, Firm Name: [general C®ansWigxion Solutions, Inc. Date: C'Mo,turmme and SetGngslwtayloALmal SettingslTampo ry Intemst FilesrAtvtwvtOutlook%V826%DABBid 13-31 Change Order C3st l2slimalas THE CITY OF FAYETTEVILLE, ARKANSAS A 7T� ��A11 -- PARRS AND RECREATION DEPARTMENT P 1 1 r .: 113Wele,Z27 Yain 7YMALI G V 1 j P (479) 444-3471Pay4tF (479) SZ1.7714 ARKANSAS CHANGE ORDER NO. 3 Cost PlusX Pre -Agreed Unit Price X Project Name and Number__ Construction of Mt. Seguoyah Gardens -Improvement Name of Contractor: General Construction Solutions, Inc. Address of Contractor. 1951 Electric Avenue. Snrinsdale. AR 72764 Date of Contract: July 2 2013 Original Contract Sum: S _ 71,980.00 Total Amount of All Previous Approved Change Orders: $ 7.110.85 Contract Sum prior to this Change Order: $ 79,090.85 Contract Sum increase this Change Order: $ 7,009.22 New Contract Sum including this Change Order: S 86,099.87 Subject and Reason for this Change Order: Staff is requesting approval for the following changes: 1) Reduction in the quantity of 5-foot concrete sidewalk of approximately I9 square yards; 2) Material, labor and equipment for change of sidewalk and bench layout including grading, fill and compaction of subgrade; 3) Additional unclassified excavation; and 4) Additional site restoration. The changes are required due to presence of existing underground concrete building footing. The contractor is also requesting 30 additional days for completion of the project. Additional Time Requested: 30 Calendar Days Dated this 27 day of November, 2013 CITY OF FAYETTEVILLE Parks & Rccrea n Department 13y: Car "ones, Park Planner It ttttttttl�Ni ,RK � rRF cyY per' FAYETTEVILLE'* 9 all, y �kA tvsp,�.•=���• General Construction Solutions, Inc - Contractor By: Title: T. Telecommunications o;v1c4'ir,`4 t6e Deaf Tot) (479) 521-1316 113 West Mountain -Fayetteville, AR 72701 Carole Jones Submitted By City of Fayetteville Item Review Form T 2014-0207 f Legistar File Number NIA City Council Meeting Date - Agenda Item Only NIA for Non -Agenda Item Action Required: Parks and Recreation Department Request for approval of change order #4 to Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. in the amount of $407 for the Construction of Mt. Sequoyah Gardens Improvements (see attached memo). Does this item have a cost? YeS $407.00 Cost of this request 2250.9255.5315.00 $49,511.00 Category or Project Budget $42,966.85 Account Number Funds Used to Date 02013.1202 $6,137.15 Mt. Sequoyah Gardens Improvements Program or Project Name Mt. Sequoyah Gardens Improvements Program or Project Category Parks Development Project Number Remaining Balance Fund Name Budgeted Item? Yes Budget Adjustment Attached? No V20130812 Previous Ordinance or Resolution # 145-13; 254-13 Original Contract Number: 2288 Comments: This is the Final Change Order for this project. CITY OF I y Iq ARKANSAS To: Mayor Lioneld Jordan Thru: Don Marr, Chief of Staff Connie Edmonston, Parks and Recreation Director Alison Jumper, Park Planning Superintendent From: Carole Jones, Park Planner II Date: April 29, 2014 Subject: Request for approval of change order #4 to Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. in the amount of $407 for the Construction of Mt. Sequoyah Gardens Improvements PROPOSAL: Mount Sequoyah Gardens, consisting of three acres, is classified as a neighborhood park and serves the adjacent neighborhoods. Approximately 900 homes are located in a'/Z-mile radius of the park ultimately serving an estimated 1,960 Fayetteville residents. The park is located in Fayetteville's southeast quadrant along Summit Avenue. Mount Sequoyah Gardens overlooks the city from the west slope of Mount Sequoyah and offers passive and active recreational activities in an open space with stunning views of the city. The elevation is 1,590 feet at the top of the park property. On July 2, 2013, the City Council passed Resolution Number 145-13 approving a contract with General Construction Solutions, Inc. for Bid 13-31, Construction of Mt. Sequoyah Gardens Improvements, in the amount of $71,980 with a 10% project contingency of $7,198 for a total amount of $79,178. The project included the replacement of an existing asphalt roadway/access drive, installation of a pre-engineered arbor, and the construction of a concrete and native stone structure slab, an 18-inch native stone seat wall, a colored concrete apron, ADA accessible parking, connecting sidewalks, tree planting and associated site work. On December 17, 2013, the City Council passed Resolution Number 254-13 approving Change Order #3 in the amount of $7,009 with an additional 10% project contingency of $700 resulting in an increase of $7,709 for a total project amount of $86,887. Staff is requesting approval for the following changes: 1) Delete tree installation; 2) Labor and equipment required for relocating existing boulders to delineate parking area along the west side of the new driveway; and 3) Topsoil and turf type fescue sod for site restoration of approximately 1,050 SF near driveway approach. The tree installation bid item is being eliminated from the original contract because the required size and species of tree is unavailable at this time of the year. Items 2 and 3 are required to complete the site restoration and delineate additional parking areas. The contractor is requesting ten additional days for completion of the project. Mailing Address: 113 W. Mountain Street Fayetteville, AR 72701 www.fayetteville-ar.gov RECOMMENDATION: Parks and Recreation staff recommends approval of change order #4 to Resolution Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. resulting in an increase of $407. This leaves a balance of $407 in project contingency. This is the final change order for the project. BUDGET IMPACT: This project is funded with Parks Development Funds. The cost is accounted for in project number 02013.1202 - Mt. Sequoyah Gardens Improvements. Attachments: Staff Review Form Resolution No. 145-13 Resolution No. 254-13 General Construction Solutions, Inc. Change Order No. 4 Cost Estimate Change Order No. 4 RESOLUTION NO. 145-13 A RESOLUTION AWARDING BID #13-31 AND AUTHORIZING A CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $71,980.00 FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS, AND APPROVING A PROJECT CONTINGENCY OF $7,198.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #13-31 and authorizes a contract with General Construction Solutions, Inc. in the amount of $71,980.00 for the construction of improvements to Mount Sequoyah Gardens, and additionally approves a project contingency of $7,198.00. PASSED and APPROVED this 2"d day of July, 2013. A nnu nUPn- ATTEST: -� By: _4tia. e SONDRA E. SMITH, City Clerk/Treasurer - `,`�titis�rrrrrrrri p A,-�: • GAT Y � ••''. ' 'G•� FAYETTEVILLE Wiz• "� :�: y rrr,rrn, 11 RESOLUTION NO.254-13 A RESOLUTION APPROVING CHANGE ORDER NO. 3 TO THE CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $7,009.00, AND APPROVING AN ADDITIONAL PROJECT CONTINGENCY IN THE AMOUNT OF $700.00, FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 3 to the contract with General Construction Solutions, Inc. in the amount of $7,009.00, and approves an additional project contingency in the amount of $700.00, for construction of improvements to Mount Sequoyah Gardens. PASSED and APPROVED this 17`h day of December, 2013. APPROVED: EN014 6 By: SONDRA E. SMITH, City Clerk/Treasurer 00RK IrT+I FAYIET7 ' ev��iE: i�fr,G ,ON"p i��� $ \ n ito \ to M3 2 - LO k k ( 2 / 9 E � ■ » 2 � c 2 m ■ c / % E _\ k o 0 k :3 w } Ul 20 Lo ■ § 9 c0 § j a 0 § § @ ■ 4x . § )&� a 7 2 � £ � )k { / E0 / 2 crf2 \ n E �.5 'al �k u ` E§ { k 2 / \ \ \ 91 - / � ] A Ii . c o t � E 2 i � w ƒ / 2 £ � J k @ _ • 0 CITY OF 1 • e evlIayARKANSS CHANGE ORDER NO. 4 Cost Plus X Pre -Agreed Unit Price X Project Name and Number: Construction of Mt. Se uo ah Gardens Improvements Name of Contractor: General Construction Solutions, Inc. Address of Contractor: 1951 Electric Avenue. SDrinadale. AR 72764 Contract Number: 2288 Date of Contract: July 2. 2013 Original Contract Sum: $ 71,980.00 Total Amount of All Previous Approved Change Orders: $ 14,119.87 Contract Sum prior to this Change Order: S--_ 86,099.87 Contract Sum decrease this Change Order: $ 407.00 New Contract Sum including this Change Order: $ 86,506.87 Subject and Reason for this Change Order: Staff is requesting approval for the following change: 1) Delete tree installation; 2) Labor and equipment required for relocating existing boulders to delineate parking area along the west side of the new driveway; and 3) Topsoil and turf type fescue sod for site restoration of approximately 1,050 SF near driveway approach. The tree installation bid item is being eliminated from the original contract because the required size and species of tree is unavailable at this time of the year. Items 2 and 3 are required to complete the site restoration and delineate additional parking areas. The contractor is requesting ten additional days for completion of the project. Additional Time Requested: 10 Calendar Days Dated this 28th day of April, 2014 CITY OF FAYETTEVILLE Parks & ecreatio De artment By: ,O'-oCc Carole Jones ark Planner II CITYYFF,,JETTEV LEBy:— Mayor Lion ordan ATTES� Mailing Address: 113 W. Mountain Street Fayetteville, AR 72701 General Construction Solutions, Inc. Contractor Title: Pre:s ATT l � .,; .01 Y x" G FAYETTEVILLE •�'— ��` y C� a. TO www.rayetteville-ar.gov Carole Jones Submitted By �IfqTa! hsW60A 4, City of Fayetteville Item Review Form &whms N4Z S 2014-0227 Legistar File Number NIA City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Action Required: Parks and Recreation Department Request for approval of change order #5 to Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. in the amount of $407 for the Construction of Mt. Sequoyah Gardens Improvements (see attached memo). Does this item have a cost? YeS Cost of this request 2250.9255.5315.00 Account Number 02013.1202 $49,511.00 Category or Project Budget $43,373.85 Funds Used to Date $5,730.15 Mt. Sequoyah Gardens Improvements Program or Project Name Mt. Sequoyah Gardens Improvements Program or Project Category Parks Development Project Number Remaining Balance Fund Name Budgeted Item? YeS Budget Adjustment Attached? NO V20130812 Previous Ordinance or Resolution # Original Contract Number: Comments: This is the Final Change Order. 145-13;254-13 2288 CITY OF • Tay e eV,Vifle ARKANSAS To: Mayor Lioneld Jordan Thru: Don Marr, Chief of Staff Connie Edmonston, Parks and Recreation Director Alison Jumper, Park Planning Superintendent From: Carole Jones, Park Planner II Date: May 15, 2014 Subject: Request for approval of change order #5 to Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. in the amount of $407 for the Construction of Mt. Sequoyah Gardens Improvements PROPOSAL: Mount Sequoyah Gardens, consisting of three acres, is classified as a neighborhood park and serves the adjacent neighborhoods. Approximately 900 homes are located in a Y2-mile radius of the park ultimately serving an estimated 1,960 Fayetteville residents. The park is located in Fayetteville's southeast quadrant along Summit Avenue. Mount Sequoyah Gardens overlooks the city from the west slope of Mount Sequoyah and offers passive and active recreational activities in an open space with stunning views of the city. The elevation is 1,590 feet at the top of the park property. On July 2, 2013, the City Council passed Resolution Number 145-13 approving a contract with General Construction Solutions, Inc. for Bid 13-31, Construction of Mt. Sequoyah Gardens Improvements, in the amount of $71,980 with a 10% project contingency of $7,198 for a total amount of $79,178. The project included the replacement of an existing asphalt roadway/access drive, installation of a pre-engineered arbor, and the construction of a concrete and native stone structure slab, an 18-inch native stone seat wall, a colored concrete apron, ADA accessible parking, connecting sidewalks, tree planting and associated site work. On December 17, 2013, the City Council passed Resolution Number 254-13 approving Change Order #3 in the amount of $7,009 with an additional 10% project contingency of $700 resulting in an increase of $7,709 for a total project amount of $86,887. Staff is requesting approval for the following changes: 1) Reduction in the quantities of concrete flush curb, concrete apron, standard concrete curb and gutter and Class 7 base; 2) Additional quantities of concrete driveway approach and concrete sidewalk; and 3) Repair of site due to vandalism. The contractor has field measured and confirmed the final quantities for the project. Repair of the site was required due to damage by unauthorized vehicles. The contractor is not requesting any additional days for completion of the project. RECOMMENDATION: Parks and Recreation staff recommends approval of change order #5 to Resolution Resolution 145-13 for Bid # 13-31 with General Construction Solutions, Inc. resulting in an increase of $407. This leaves a balance of $0 in project contingency. This is the final change order for the project. Mailing Address: 1.13 W. Mountain Street www.fayetteville-ar.gov Fayetteville, AR 72701 BUDGET IMPACT: This project is funded with Parks Development Funds. The cost is accounted for in project number 02013.1202 - Mt. Sequoyah Gardens Improvements. Attachments: Staff Review Form Resolution No. 145-13 Resolution No. 254-13 General Construction Solutions, Inc. Change Order No. 5 Cost Estimate Change Order No. 5 RESOLUTION NO. 145-13 A RESOLUTION AWARDING BID 413-31 AND AUTHORIZING A CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $71,980.00 FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS, AND APPROVING A PROJECT CONTINGENCY OF $7,198.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #13-31 and authorizes a contract with General Construction Solutions, Inc. in the amount of $71,980.00 for the construction of improvements to Mount Sequoyah Gardens, and additionally approves a project contingency of $7,198.00. PASSED and APPROVED this 2°a day of July, 2013. ATTEST: --- By: N` e 'AMA SONDRA E. SMITH, City Clerk/Treasurer I►1l►l FAYEITEVILLE;-;U' 9 r.� �����iiTON ��ti+ ���,� RESOLUTION NO.254-13 A RESOLUTION APPROVING CHANGE ORDER NO. 3 TO THE CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $7,009.00, AND APPROVING AN ADDITIONAL PROJECT CONTINGENCY IN THE AMOUNT OF $700.00, FOR THE CONSTRUCTION OF IMPROVEMENTS TO MOUNT SEQUOYAH GARDENS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 3 to the contract with General Construction Solutions, Inc. in the amount of $7,009.00, and approves an additional project contingency in the amount of $700.00, for construction of improvements to Mount Sequoyah Gardens. PASSED and APPROVED this 17�' day of December, 2013. APPROVED: ATTEST: SONDRA E. SMITH, City Clerk/Treasurer ��tr�rrrl�� ���..• G1TY p,�'9�G•. FAYETTEVILLE: •ems . kANS�' -a�+� / q 9 J G\ W) f � 2 � e k B g 2 � R $ * 5 0 � 2 e � \ d2 � 2� \ q f :. � 2 2 2S� § O m k � 2 a § to ! ) ) - to _ � k � CITY OF • T e ev e ARKANSAS CHANGE ORDER NO. 5 Cost Plus X Pre -Agreed Unit Price X Project Name and Number: Construction of Mt: Sequoyah Gardens Improvements Name of Contractor: General Construction Solutions, Inc. Address of Contractor: 1951 Electric Avenue, Springdale, AR 72764 Contract Number: 2288 Date of Contract: July 2. 2013 Original Contract Sum: $ 71,980.00 . Total Amount of All Previous Approved Change Orders: $ 14,526.87 Contract Sum prior to this Change Order: $ 86,506.87 Contract Sum decrease this Change Order: $ 407.00 New Contract Sum including this Change Order: $ 86,913.87 Subject and Reason for this Change Order: Staff is requesting approval for the following change: 1) Reduction in the quantities of concrete flush curb, concrete apron, standard concrete curb and gutter and Class 7 base; 2) Additional quantities of concrete driveway approach and concrete sidewalk; and 3) Repair of site due to vandalism. The contractor has field measured and confirmed the final quantities for the project. Repair of the site was required due to damage by unauthorized vehicles. The contractor is not requesting any additional days for completion of the project. This is the final Change Order. ' Additional Time Requested: 0 Calendar Days Dated this 15th day of May, 2014 CITY OF FAYETTEVILLE Parks & Recreation Department By: Carole Jo . , Park Planner 11 General Construction Solutions, Inc. Contractor By:_ �✓f�l Title: ATT CITY O AY TTE� ILLE B N--r� �. M or L' neld Jordan ATTEST: 4.-••••••.� �i ,�,. 0 . FAYEI I Mailing Address: 113 W. Mountain Street Fayetteville, AR 72701 TpN c i B 1111% www.fayetteville-ar.gov