Loading...
HomeMy WebLinkAbout241-13 RESOLUTIONRESOLUTION NO.241-13 A RESOLUTION APPROVING CHANGE ORDER NO. 1 TO THE CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $34,037.14 FOR THE COMPLETION OF CONSTRUCTION ON FEMA PROJECT, LOCATION 22 SANITARY SEWER NEAR THE ENTRANCE TO THE CLIFFS APARTMENTS RELATED TO SPRING 2011 FLOODING, AND APPROVING A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 1 to the contract with General Construction Solutions, Inc. in the amount of $34,037.14 for the completion of construction on FEMA project, Location 22 Sanitary Sewer near the entrance to the Cliffs Apartments related to Spring 2011 flooding. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution as Exhibit "A". PASSED and APPROVED this 3`d day of December, 2013. APPROVED: ATTEST: By: A&d' ' .� SONDRA E. SMITH, City Clerk/T®'�ur�� City of Fayetteville, Arkansas Budget Adjustment Form Budget Year Division: Utilities Director Request Date 2013 1 Department: Utilities Director 12/3/2013 BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION V13.1030 Legistar Adjustment Number A BA is needed in the FEMA Flood Damage project to cover the additional expenditures for the contract with General Construction Solutions for bores across the entrance to the Cliffs apartments to repair sewer line damage manholes across the Cliffs driveway. The existing pipe is an allow for future growth, and significantly improves the alignment. CITY\kspringer 11 /13/2013 11:09 AM Prepared By j Division Head ks rin er@fa ette Digitally signed by I' J Y kspringer@fayetteville-ar.gov Ville-ar.gov DN:cn=kspringer@fayetteville-ar.gov Date: 2013.11.13 11:11:00-06'00' Budget Director Legistar# / Date: 2013-0172 / Legistar Title FEMA_CLIFFS CHANGE ORDER 12/3/2013 Budget & Information Management Use Only Type: A B C D E P General Ledger Date Posted to General Ledger Checked / Verified Initial Date Initial Date TOTAL BUDGET ADJUSTMENT - - Increase / (Decrease) Project.Sub Account Name Account Number Expense Revenue Number Contract services 5400.5700.5315.00 } 34,037 - 11020 5400 Sewer improvements 5400.5700.5815.00 } (34,037) 02017 1 H:\Budget\Budget Adjustments\2013_Budget\LEGISTAR\BA_FORM_TEMPLATE_LEGISTAR_v3.xlsb 1 of 1 1�-1g-2,6t`3 David Jurgens Submitted By City of Fayetteville Item Review Form 2013-0139 Legistar File Number 12/3/ 13 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Action Required: Utilities Department Approval of Change Order 1 with with General Construction Solutions, Inc. for $34,037.14 for the completion of Construction of FEMA Project, Location 22 Sanitary Sewer, construction in the vicinity of the entrance to the Cliffs apartments to repair sewer line damage cause by flooding in the spring of 2011, Bid 13-38, and approval of a budget adjustment. Does this item have a cost? Yes $34,037.00 Cost of this request 5400.5700.5315.00 Account Number 11020.5400 Project Number $34,037.00 Category or Project Budget $0.00 Funds Used to Date $0.00 Remaining Balance FEMA 2011 Contracts Program or Project Name 2011 FEMA Program or Project Category Disaster/Replacement Fund Name Budgeted Item? Yes Budget Adjustment Attached? Yes V20130812 Previous Ordinance or Resolution # 167-13 Original Contract Number: 2295 Comment �-P(:)�__ Ao""' 6/7:ss P/,V,-j 413 4V-J EflTEaRE'D aYLI AR• V e KANSAS_ To: Fayetteville City Council Thru: Mayor Lioneld Jordan Don Marr, Chief of Staff From: David Jurgens, Utilities Direct Fayetteville Water and Sewer Date: November 5, 2013 Subject: Change Order 1 with General CITY COUNCIL AGENDA MEMO MEETING DATE OF DECEMBER 3, 2013 THE CITY OF FAYETTEVILLE, ARKANSAS xtions, Inc. for FEMA Related Sewer Repairs at The Cliffs RECOMMENDATION City Administration recommends approval of Change Order 1 with General Construction Solutions, Inc. for $34,037.14 for the completion of Construction of FEMA Project, Location 22 Sanitary Sewer, construction in the vicinity of the entrance to the Cliffs apartments to repair sewer line damage cause by flooding in the spring of 2011, Bid 13-38, and approval of a budget adjustment. BACKGROUND In spring 2011, the City experienced a period of extensive rainfall and suffered severe flooding. The incident was declared a national disaster by the President. The City's water and sewer systems experienced a variety of damage, including some locations where the water or sewer lines completely washed out. The City has worked with FEMA to obtain partial reimbursement of the costs incurred. For this particular site, where we are replacing the original line with a larger line on a new routing, installing a line that will meet 100 year capacity requirements, so most of the cost is the City's responsibility for upgrades. FEMA's reimbursement is based on a $5,027.75 repair, so FEMA is reimbursing $3,770.81, the State of Arkansas portion is $628.47, and the City's portion is $138,619.86. DISCUSSION This job installed 253' of 12" and 18" sewer pipe and three manholes across the Cliffs driveway. The existing pipe was an old 10" clay line with a very poor alignment. There were significant unforeseeable utility and storm drainage conflicts in this area that could not be identified before work began, the sewer line was encased in concrete (which was not shown on the as-builts), and the excavation was as much as 17' deep. These greatly increased the difficulty. Major increases are listed below. Even with this increase, the total cost of this contract (143,019.14) is well below the second low bid of $189,473, which would also have increased due to these issues. • Remove concrete encasement from the existing sewer line in the vicinity of MH 540. The concrete encasement was not identified on the as-builts, and thus was not reflected on the drawings. An increase of $4,950.00. • Install concrete anchors on the steel encasement crossing the creek at the direction of the City of Fayetteville. This was not identified on the drawings. An increase of $1,252.00. Reroute line and add manhole to avoid storm drainage and increased pavement repair, $15,170.14. Hand dig to locate a fiber optic telephone line that was not shown on the drawings. The final depth of the fiber optic line was 15 feet. The crew was shut down for two days. An increase of $7,790.00. • The Contractor had to cut and plug abandoned 8" and 10" high pressure gas mains at The Cliffs driveway. The gas mains were not shown on the drawings in this area. The Contractor did have to work around abandoned high pressure gas mains on the south side of the creek that were identified on the drawings. An increase of $4,875.00. • Concrete Pavement / Sidewalk — The bid quantity was estimated to be 12 square yards. The actual quantity was 215.22 square yards. An increase of $21,293.39. Original Contract General Construction Solutions $ 108,982.00 Change Order $ 34,037.14 Total Contract General Construction Solutions $ 143,019.14 Goodwin & Goodwin, Inc. (Second Low Bidder) $ 189,473.00 BUDGETIMPACT These additional costs are covered by project 02017, Sanitary Sewer Rehabilitation. Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701 Cliffs Swr Contract CC Memo Oct13 RESOLUTION NO. A RESOLUTION APPROVING CHANGE ORDER NO. I TO THE CONTRACT WITH GENERAL CONSTRUCTION SOLUTIONS, INC. IN THE AMOUNT OF $34,037.14 FOR THE COMPLETION OF CONSTRUCTION ON FEMA PROJECT, LOCATION 22 SANITARY SEWER NEAR THE ENTRANCE TO THE CLIFFS APARTMENTS RELATED TO SPRING 2011 FLOODING, AND APPROVING A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves Change Order No. 1 to the contract with General Construction Solutions, Inc. in the amount of $34,037.14 for the completion of construction on FEMA project, Location 22 Sanitary Sewer near the entrance to the Cliffs Apartments related to Spring 2011 flooding. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached to this Resolution as Exhibit "A". PASSED and APPROVED this 3rd day of December, 2013. APPROVED: LIONELD JORDAN, Mayor ATTEST: CIA SONDRA E. SMITH, City Clerk/Treasurer aye1 le V ARKANSAS Change Order No. 1 Page 1 of 2 CONTRACT CHANGE ORDER City Contract # 2295 Schedule City Resolution # 167-13 Date 1012112013 City Project No.: 11020 Project Name: FEMA Project, Location 22 Sanitary Sewer Location: Fayetteville, Arkansas Owner: City of Fayetteville Contractor: General Construction Solutions, Inc. Address: 113 West Mountain Address: 1951 Electric Avenue Fayetteville, AR 72701 Springdale, AR 72764 THE FOLLOWING CHANGES ARE HEREBY AMENDED INTO THE CONTRACT PLANS AND SPECIFICATIONS: ITEM # DESCRIPTION DECREASE INCREASE 1 Change order for unforseen conditions and reconcile contract $34,037.14 quantities. See attached breakdown. TOTAL DECREASE AMOUNT $0.00 TOTAL INCREASE AMOUNT $34,037.14 NET CHANGE ORDER $34,037.14 ENGINEERS FINAL CHANGE TO CONTRACT AMOUNT: TOTAL AMOUNT $108,982.00 ELIGIBLE AMOUNT $108,982.00 Original Contract Amount Total Previous Change Order(s) $0.00 $0.00 Net Amount This Change Order $34,037.14 $34,037.14 TOTAL CONTRACT AMOUNT TO DATE $143,019.14 $143,019.14 CHANGE TO CONTRACT COMPLETION DATE: Original Completion Date October 26, 2013 Previous Adjusted Completion Date (Increase)(Deer,ease) This Change Order 21 Calendar Days NEW CONTRACT COMPLETION DATE: November 16, 2013 RECOMMENDED: Cl FY OF FAYETTEVILLE Owner j_ n BY: uaj,/- Si nature Title Date ACCEPTED: GENERA CONSTRUCTION SOLUTIONS, INC. Contractor BY: 4ignqke Title ate APPROVED: CITY OFF Y TTEVILLE � wn r BY: i�� i ture Title Date M Cost Breakdown for Change Order Item Description Contract Contract Adjusted Unit Estimated Actual Adjust Contract Unit Cost Quantity Quantity +/- Amount 1 Mobilization LS $ 5,200.00 1 1 0.00 $ - 2 Trench & Safety Systems LS $19,500.00 1 1 0.00 $ - 3 Erosion Control LS $ 1,475.34 1 1 0.00 $ - 4 12" SDR-26 PVC Sewer Pipe LF $ 96.98 61 116 55.00 $ 5,333.90 5 18" DIP Sewer Pipe, Protecto 401 Lined LF $ 207.06 206 136.5 -69.50 $ (14,390.67) 6 30" Diameter Steel Encasement, Direct Bury LF $ 266.54 42 42 0.00 $ - 7 48" Diameter Manhole EA $ 2,687.66 2 3 1.00 $ 2,687.66 8 48" Diameter Manhole, Extra Depth VF $ 153.40 14 16.34 2.34 $ 358.96 Connect to Existing Manhole and Plug Existing 9 Line EA $ 1,534.60 2 2 0.00 $ - 10 Concrete Pavement / Sidewalk SY $ 104.78 12 215.22 203.22 $ 21,293.39 11 Fence Repair / Replacement LF $ 136.50 25 25 0.00 $ - 12 Abandon Existing Manhole EA $ 1,301.63 2 2 0.00 $ - Plug and Remove Existing Sewer Line Stream 13 Crossing LS $ 1,612.00 1 1 0.00 $ - 14 Topsoil / Sod / Landscape Replacement LS $ 1,482.00 1 1 0.00 $ - 15 Acceptance Inspection by CCTV LF $ 7.80 267 252.5 -14.50 $ 113.10 Reconcile bid quantities $15,170.14 16 Remove concrete encasement from existing sewer line in vicinity of MH 540. Crew was shut down one day. LS $ 4,950.00 0 1 1.00 $ 4,950.00 17 Install concrete anchors for encasement crossing creek LS $ 1,252.00 0 1 1.00 $ 1,252.00 18 Hand dig to locate fiber optic telephone line not shown on construction drawings. Final depth was 15 feet. Crew was shut down for two days. LS $ 7,790.00 0 1 1.00 $ 7,790.00 19 Cut and plug abandoned 8" and 10" high pressure gas mains not shown on construction drawings. Crew was shut down one day. LS $ 4,875.00 0 1 1.00 $ 45875.00 Total Change Order $34,037.14