HomeMy WebLinkAbout225-13 RESOLUTIONRESOLUTION NO.225-13 A RESOLUTION APPROVING TASK ORDER NO. 5 WITH THE WATERSHED CONSERVATION RESOURCES CENTER (WCRC) FOR THE CITY TO PAY $195,707.00 TO RESTORE WHITE RIVER STREAM BANK NEAR THE NOLAND WASTEWATER TREATMENT FACILITY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 5 with the Watershed Conservation Resources Center (WCRC) for the City to pay $195,707.00 to restore White River stream bank near the Noland Wastewater Treatment Facility. PASSED and APPROVED this 19th day of November, 2013. APPROVED: Lo ATTEST: By: c � �- et 44-t-'k SONDRA E. SMITH, City Clerk/Treasurer 1�►�r►�tFrtrtftt� �~L • � L!` � V .r] � • � / ,ram wi j; •�7r David Jurgens Submitted By City of Fayetteville Item Review Form 2013-0136 Legistar File Number 11/19/13 City Council Meeting Date - Agenda Item Only N/A for Non -Agenda Item Action Required: Utilities Department A resolution approving Task Order No. 5 with the Watershed Conservation Resources Center (WCRC) to provide $195,705 to restore approximately 1,250' of White River streambank at the Noland Wastewater Treatment Facility (WWTF). WCRC has received a $329,016 grant from the Arkansas Natural Resources Commission (ANRC) and $45,000 in matching funds or in -kind efforts from several other sources for this project Does this item have a cost? Ygg $195, 705.00 Cost of this request 5400.5800.5315.00 Account Number 13018-1001 $1,382,850.00 Category or Project Budget $0.00 Funds Used to Date $1,187,145.00 WWT/Water Quality Improvements Program or Project Name Water/Sewer Program or Project Category Water/Sewer Project Number Remaining Balance Fund Name Budgeted Item? Yes Budget Adjustment Attached? ND Previous Ordinance or Resolution # Original Contract Number: Comments: 5341 //- vw,�_ 11--t-2b13 %/- LI-0 ENTit1EA n V20130812 (ZZ Zayetrlle To: Thru: From: Date: Subject: Fayetteville City Council Mayor Lioneld Jordan Don Marr, Chief of Staff David Jurgens, Utilities Director October 31, 2013 f CITY COUNCIL AGENDA MEMO MEETING DATE OF NOVEMBER 19, 2013 THE CITY OF FAYETTEVILLE, ARKANSAS White River Stream Restoration Projeja, Noland Wastewater Treatment Plant Site RECOMMENDATION Staff recommends approval approving Task Order No. 5 with the Watershed Conservation Resources Center (WCRC) to provide $195,705 to restore approximately 1,250' of White River streambank at the Noland Wastewater Treatment Facility (WWTF). WCRC has received a $329,016 grant from the Arkansas Natural Resources Commission (ANRC) and $45,000 in matching funds or in -kind efforts from several other sources for this project. BACKGROUND The White River is on the ADEQ Arkansas impaired streams list for excess total suspended solids, much of which comes from sediment from stream bank erosion. The erosion also places significant amounts of phosphorus to the White River and Beaver Lake. By restoring this section of the river bank, studies indicate that the phosphorus loading would be reduced by 1,600 pounds per year which equates to 121 days of average discharge from the Noland WWTF in current conditions. DISCUSSION This task order, executed under the City's Memorandum of Understanding with the WCRC (ordinance 5341), will be used for the restoration of stream banks along the White River (shown in the attached aerial photo) in order to reduce annual phosphorus and sediment loads entering the river. It also includes monitoring of several specific banks in the area to evaluate longer term impacts of such restoration. The Environmental Protection Agency is increasingly focused on non -point source pollution entering the watersheds in Northwest Arkansas. This project is another quality example of the City's ongoing commitment to watershed protection, and will count as matching funds to the Beaver Water District Nutrient Reduction Agreement. The work to be executed using these City funds, the grant, and the matching funds, is similar to the very successful stream restoration project at completed two years ago 3/4 mile downstream from this site. The work can be entirely completed on land owned by the City of Fayetteville as part of the Noland WWTF. All City funds will be expended on work on City property. The grant requires a $195,705 City match, which staff proposes to be paid for using Water/Sewer funds in a project set aside for water quality improvements. This grant includes cost shares from several organizations, shown below: Source Total ANRC Grant $ 329,016 City of Fayetteville $ 195,705 Beaver Water District $ 20,000 ADEQ $ 10,000 Beaver Watershed Alliance $ 10,000 WCRC Software Match $ 7,500 Volunteer Planting Da $ 5,000 Total Project $ 577,221 BUDGETIMPACT $195,705 is available in project 13018, Wastewater Treatment/Water Quality Improvements. White River Restor CC Memo 0ct13 RESOLUTION NO. A RESOLUTION APPROVING TASK ORDER NO. 5 WITH THE WATERSHED CONSERVATION RESOURCES CENTER (WCRC) FOR THE CITY TO PAY $195,707.00 TO RESTORE WHITE RIVER STREAM BANK NEAR THE NOLAND WASTEWATER TREATMENT FACILITY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves Task Order No. 5 with the Watershed Conservation Resources Center (WCRC) for the City to pay $195,707.00 to restore White River stream bank near the Noland Wastewater Treatment Facility. PASSED and APPROVED this 19th day of November, 2013. APPROVED: IIn ATTEST: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer o �'r 1 } Area'! i r 5• L 5 `i Area 2 pi 'I} ; =.. ir 'I Noland • - �.: � � fir. �� .. T :� - F Area 3 THE CITY OF FAYETTEVILLE, ARKANSAS Fayvette UTILITIESDEPARTMENT y f 11 tt West Mountain `TVJ 1 Fayetteville, AR 72701 P (479) 575-8330 F (479) 575-8257 ARKANSAS TASK ORDER NO.5 NOLAND PLANT WHITE RIVER RESTORATION PROJECT STATE OF ARKANSAS COUNTY OF WASHINGTON This Task Order is written pursuant to the Memorandum of Understanding (MOU) as described in Ordinance No. 5341 executed on August 3, 2010. The referenced MOU pertains to potential stream restoration projects and associated services with the Watershed Conservation Resource Center. This Task Order entered into and executed on the date indicated below the signature block, by and between the City of Fayetteville and Watershed Conservation Resource Center (WCRC) sets forth the project description, project schedule and associated fees for these services related to the White River Restoration Project located at the City's Noland Wastewater Treatment Plant. Section I — Project Description This project consists of streambank restoration activities including grant administration, pre- and post - monitoring of the affected river section, design, construction, and community outreach. Section II — Project Timeframe The Arkansas Natural Resources Commission has issued the following grant schedule to WCRC for the completion of the project and expenditure of funds. Task Timeframe A. ANRC Grant Period October 2013 — December 2016 Section III — Scope of Services • Grant administration includes financial tracking and reporting, procurement of materials, quarter reporting, developing final report, matching funds tracking and reporting, and coordination among project partners and contractors. • Pre- and post -monitoring of the streambank includes sampling and analysis of bank materials, installing toe pins and measuring erosion rates, and evaluating the streambank for bank erosion hazard index and near bank shear stress. • Develop streambank restoration design which includes collecting reference fluvial geomorphology data on a stable riffle, surveying geomorphic features of the existing site, developing a stabilization design based on data collected, and developing construction drawings. • Streambank restoration construction includes obtaining 404 permit and ADEQ authorization, coordinate construction material deliveries, developing heavy equipment construction bid packet, selecting contractor, overseeing heavy equipment construction, performing minor construction, and re -vegetate site. • Conduct outreach which will include working with the City to host a planting day, conducting site tours, and developing project fact sheet. Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain -Fayetteville, AR 72701 Task Order 5 to WCRC Stream Bank Restoration Octt3 THE CITY OF FAYETTEVILLE, ARKANSAS Section IV — Fees and Payments WCRC will utilize $195,705 as matching funds from the City of Fayetteville, $329,016 in grant funds from the Arkansas Natural Resources Commission, and other funds as shown below. See Attachments 1-6 of the enclosed project submittal for more detail of the estimated project budget. Source Total ANRC Grant $ 329,016 City of Fayetteville $ 195,705 Beaver Water District $ 20,000 ADEQ $ 10,000 Beaver Watershed Alliance $ 10,000 WCRC Software Match $ 7,500 Volunteer Planting Da $ 5,000 Total Pro'ect $ 577,221 Section V — Memorandum of Understandine in Effect: Except as amended specifically herein, the Memorandum of Understanding as executed with the City of Fayetteville shall remain in full force as originally approved. IN WITNESS WHEREOF, the parties hereto have caused this TASK ORDER to be duly executed as of the date and year first herein written. FOR THE CITY OF FAYETTEVILLE LIM Dai Attest: e Alu.&- FOR WATERSHED CONSERVATION RESOURCE CENTER By: atL Date: b Z� Attest: TRt, Project Title: White River Bank Restoration and Monitoring Project 11/1/2013 Version #: 1 Page 1 of 25 . Nonpoint Source Summary Page Project 13-### FY 13 CWA Section 319(h) 1. Title of Project: White River Bank Restoration and Monitoring Project 2. Project Goals/Objectives: The goal of the project is to reduce erosion along a minimum of 1,250 feet of riverbank including approximately 750 feet of bank reconstruction using toe -wood techniques on the White River near the City of Fayetteville waste water treatment plant. The project will reduce sediment and phosphorus loads from eroding riverbanks, improve water quality, and enhance aquatic and terrestrial habitat. Project objectives include 1) Reduce sediment and phosphorus loadings by restoring and enhancing 1,250 feet riverbank on the White River 2) Develop a site specific, riverbank restoration plan which addresses stream instability; landowner and local objectives; maximizes sediment & phosphorus reduction; maximizes habitat restoration. 3) Restore riparian and protect existing riparian along with enhancement of terrestrial habitat and increase aquatic habitat in the stream watershed 4) Evaluate the effectiveness of riverbank restoration as a means to not only reduce sediment and nutrient loads but to improve aquatic habitat and fish communities 5) Increase awareness and promote the use of natural channel design among landowners and the public 3. Project Tasks: 1) Financial Audit; 2) Develop QAPP; 3) Collection of Pre and Post Implementation Erosion Data; 4) Develop Riverbank Restoration and Implementation Plan; 5) Conduct Outreach; 6) Reporting 4. Measures of Success: This project will be considered successful if there is an 80% reduction of sediment from the selected restoration site and an increase in near -bank aquatic habitat quality. 5. Project Type: Statewide ( ) Watershed (X) Demonstration (X) 6. Waterbody Type: River (X) Groundwater ( ) Other ( ) 7. Project Location: White River (11010001) 8. NPS Management Program Reference: The proposed project would help to meet key elements that the state non -point source program must address. Specific elements that are addressed include: Element #3 (Strong working partnerships with appropriate state, Tribal, regional, and local entities, private sector groups, citizens groups, and Federal agencies.) and Element #4The state program (a) abates water quality impairments from existing sources and (b) prevents significant threats to water quality from present and future activities. 9. NPS Assessment Report Status: Impaired (X) Impacted ( ) Threatened ( ) 10. Key Project Activities: Hire Staff ( ) Monitoring ( ) Technical Assistance ( ) Education ( ) BMP Implementation (X) Demonstration Project (X) Other ( ) Planning ( ) 11. NPS Management Program Elements: Section 7 — Sediment; Objectives 7.6, 7.10, & 7.13 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 2 of 25 . 12. Project Costs: Federal ($329,016) State/Local ($248,205) Total ($577,221) 13. Project Management: Watershed Conservation Resource Center will be responsible for grant administration and coordinating all activities related to the project. 14. Project Period: September 2013 — December 2016 2 Project Title: White River Bank Restoration and Monitoring Project 11/1/2013 Version #: 1 Page 3 of 25 . Project 13-### White River Bank Restoration and Monitoring Project FY 2013, CWA Section 319(h) Background The White River, located in Northwest Arkansas, drains into Beaver Lake, which is the primary drinking water source for over 350,000 people in Northwest Arkansas (Figure 1). The White River is located in the Beaver Reservoir Hydrologic Unit Area (HUA) — 11010001 and is part of Arkansas Department of Environmental Quality's (ADEQ) planning Segment 4K — Upper White River and Kings River. As described by Regulation Number 2, the White River is designated for propagation of fish and wildlife; primary and secondary contact recreation; and domestic, agricultural and industrial water supplies. Sections of the White River are on the State's 303 (d) list of impaired streams (ADEQ, 2008). The White River is a "priority watershed" and is located in a "nutrient surplus area" as described in the Arkansas 2011-2016 NPS Pollution Management Plan. _ Mw,rf _ The White River begins in NW Arkansas and 0 winds through SW Missouri, and then back to Arkansas where it eventually converges with DOOM the Mississippi River. A dam in the upper section of the White River in Northwest Arkansas was initiated in 1959 and completed !LoJ t in 1966, creating Beaver Lake, which serves "'"'R'"' as the public water supply to the fastest ..; r growing region of the state. Water quality of Beaver Lake directly impacts treatment costs ink �•}• �%; and future plant upgrade requirements. LY•Msars►7 There are many potential water quality concerns affecting Beaver Lake including a A, elevated bacteria counts, high concentrations a� r of phosphorus and sediment, and elevated Figure.) The White River begins in Madison County turbidity levels (Beaver Water District, 2008). and flows north into Beaver Lake Streambank erosion is the major contributor of sediment in the West Fork White River, a tributary to the White River/Beaver Lake. Restoration of streambanks in the West Fork White River has proven to reduce both sediment and nutrient loadings to the river, thus reducing loads generated in the Beaver Lake Watershed (Formica and Van Eps, 2010). Beaver Lake watershed has an area of approximately 1,190 square miles and is located within two ecoregions, the Boston Mountains and Ozark Highlands. The land uses in the watershed are 71% forest, 22% agriculture, 3% urban and 4% water. The mean annual precipitation in the basin is approximately 46 in/yr (Beaver Water District, 2008). General Project Description The Watershed Conservation Resource Center (WCRC) in partnership with the City of Fayetteville propose to implement a project to reduce riverbank erosion along 1,250 linear feet of riverbanks along the White River using an approach that relies heavily on natural channel Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 4 of 25 . design principles and the use of materials and techniques that will improve aquatic habitat. Restoration of eroding riverbanks will include restoring approximately 750 feet of bank using toe -wood stabilization techniques. The bank restoration and enhancement will help to meet multiple local and regional objectives relating to stream channel instability, water quality, and habitat. The objectives of the project include: 1) Reduce sediment and phosphorus loadings by restoring and/or enhancing 1,250 feet riverbank on the White River 2) Develop a site specific, riverbank restoration plan which addresses stream instability; landowner and local objectives; maximizes sediment & phosphorus reduction; maximizes habitat restoration. 3) Restore riparian and protect existing riparian along with enhancement of terrestrial habitat and increase aquatic habitat in the stream watershed 4) Evaluate the effectiveness of riverbank restoration as a means to not only reduce sediment and nutrient loads but to improve aquatic habitat and fish communities 5) Increase awareness and promote the use of natural channel design among landowners and the public A restoration plan will be developed that stabilizes 1250 feet of eroding bank using natural channel design techniques, which will include rebuilding land mass along 750 feet of the eroding bank using toe wood and developing an inter -berm and bankfull benches. If necessary, structures such as stacked rock vanes may be incorporated into the design to divert flow away from the eroding area. The utilization of both the toe wood and structures will enhance the aquatic habitat at the site. The riparian area will be re -vegetated to enhance wildlife habitat and provide additional erosion control. The channel cross section in the area of the bank restoration will be adjusted though excavation to create sufficient area to transport bankfull discharge through the restoration area. Suitable channel dimensions will be determined based upon reference reach conditions for a river located in the same physiographic region. Reference reach data will be collected to provide basic information needed for the site design. Construction level design plans will be developed and a construction bid package will be prepared for soliciting bids from qualified contractors. In' addition to the myriad of environmental benefits, the restoration plan will help to protect vital city infrastructure located at the Noland waste water treatment plant by preventing encroachment of the river resulting from lateral bank erosion (Figure 2). The City of Fayetteville is the owner of all of the potential restoration sites considered for restoration as part of this project. Final site selection will be based on suitability and feasibility of restoration of the Figure 2 Eroding river bank near Noland Waste Water Treatment Plant 4 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 5 of 25 . selected riverbank and availability of sufficient funding to implement the design according to proposed specifications. In coordination with the bank restoration efforts, several sites will be evaluated and monitored in order to qualify and quantify benefits to water quality, habitat, and the community of fish. Two sites having similar bank instability conditions will be monitored before and after restoration to document improvements associated with the restoration efforts. Two additional sites that will serve as reference conditions will also be monitored to assist in the evaluation of the improvements associated with the project. Monitoring at each of the sites will be conducted before and after implementation of the bank restoration activities. Parameters to be evaluated include the bank erosion potential, river bank profiles, river bank habitat, and electro-sampling along the monitored river banks. The fish community will be sampled during critical flow periods during late summer. Success of the constructed restoration will be evaluated based on sediment and nutrient reduction and long-term stability of the restored site. The restoration will be designed and constructed to function through a wide variety of stream discharges. However no natural channel design restoration can be guaranteed to withstand flood events that are catastrophic or unforeseen changes in the watershed upstream or downstream of the restored site. Also, maintenance following flood events may be required to ensure functionality of the restoration into the future. The general project site is located near the City of Fayetteville Noland Waste Water Treatment Plant just east of Fayetteville (see Figure 2). Preliminary estimates of contaminant loadings resulting from erosion of the riverbank with the greatest apparent instability for an average flow year are 1,600 tons of sediment and 1,600 Ibs of phosphorus are generated from this site annually. The proposed project will help to meet key elements of the Upper White River Watershed Management Strategy. Specific elements that are addressed are: 1) "Identification of Causes and Sources of NPS Pollution" — streambank erosion; 2) "Milestones and Criteria for Loading Reduction Effectiveness" — turbidity; and 3) "Schedule of Implementation" (Action Items addressed) — urban runoff, action item "Conduct Technology Transfer Workshops for City Planners, County Officials, Developers, Students, and Property Owners on Proper Installation and Maintenance of Erosion and Sediment Control". Success of the project will be documented by evaluating the site condition prior to and following the implementation of restoration activities. This project will be considered successful if an 80% reduction in sediment loads resulting from riverbank erosion are estimated. 5 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 6 of 25 . Figure 3 Proposed River Bank Restoration Sites on the White River near Fayetteville, Arkansas Project Title: White River Bank Restoration and Monitoring Project 11/1/2013 Version #: 1 Page 7 of 25 . Schedule This project will be initiated September 1, 2013 and will conclude December 30, 2016. A general project schedule with milestones follows: October, 2013 — March 2014.• QAPP developed & approved March 2014 — July 2014. Collect field data and evaluate bank erosion potential August 2014 — September 2014 Conduct pre -restoration fish sampling effort October 2014 — May 2015.• Bank Restoration plan developed June 2015 — September 2015.• Implement restoration plan October 2015 — February 2015.• Collect post -construction survey data August 2016 — Collect fish samples after one year following implementation October 2016 — Resurvey site and evaluate effectiveness December 2016 — Complete final report Specific project tasks and description are as follows: Task 1: Financial Audit: A financial review of all financial records following agreed upon procedures. Task 2: Develop QAPP: A QAPP document will be developed to insure that all data collection activities are performed in accordance with documented and approved techniques. Data collection consists of geomorphic data associated with the river area to be restored, reference reach conditions, and gage stations. Riverbank erosion data and samples of riverbank materials will be collected to document sediment and phosphorus loading reductions. Task 3: Pre and Post Implementation Monitoring: In order to document the success of the bank restoration efforts in reducing non -point source pollution, the condition of eroding river bank in the proposed restoration area, in addition to control and reference sites will be documented. A Bank Erosion Hazard Index (BEHI) and an evaluation of Near Bank Shear Stress (NBSS) will be used to determine the erosion potential of the riverbank in the restoration area. Using the BEHI values and NBSS observed, the amount of sediment generated by erosion of the riverbank will be estimated. Detailed cross sections will be surveyed using a total station to detect lateral erosion of the riverbanks over a one-year period. The lateral erosion rates measured during the observation period will allow determination of the volume of sediment eroded from the riverbanks. Samples of the riverbank material will be collected and analyzed for fine particle fractions and nutrient concentrations. Results of the riverbank material sampling effort will assist in determining the amount of sediment and nutrient load reductions that will achieved through Restoration of the eroding riverbank ultimately selected for treatment. Immediately following implementation, monitoring activities that are needed to document the pollutant load reduction improvements associated with the implementation of the bank restoration plan will be initiated. Post -implementation erosion monitoring, consisting of detailed cross-section surveys, will be conducted at the restoration site. Cross-section measurements will also be collected at the control and reference sites to document the erosion at these sites. Results from the monitoring will be compared to erosion rates prior to restoration to determine sediment and nutrient load reductions for the selected site. An evaluation of biological and habitat improvements associated with implementation of riverbank Restoration efforts will be conducted. This effort will include collection of fish Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 8 of 25 . samples and associated habitat index information from the restoration site, control site, and two reference sites prior to implementation of the restoration plan. The samples will be collected during the critical flow period that occurs in late summer. One year following implementation, samples from all four sites will be collected. The results of the data will be analyzed and then compared to the pre -restoration condition to identify improvements. Task 4: Develop and Implement Streambank Restoration Design: A restoration design for the site will be developed and implemented that will stabilize the selected eroding riverbank and greatly reduce the amount of erosion occurring at the site. A reference pool located on the White River upstream of Beaver Lake will be identified and surveyed. This data will be used to assist in the development of the restoration design. Bankfull discharge and other information for the selected site will be determined from regional relationships between bankfull discharge or channel geometry verses watershed area for the local physiographic region. A complete survey of the site's geomorphic features will be conducted including bankfull channel area, flood prone area, water surface/bankfull slope, channel geometry, and sediment size distribution. Using this data, along with reference reach and regional curve data, a bank restoration plan will be developed. Construction drawings will be generated for the design and an implementation schedule will be determined based upon site conditions and other constraints. Permits from the US Army Corps of Engineers, ADEQ, and Washington County will be obtained. Bid specifications will be developed and requests for qualified bids will be solicited. Task 5: Implement Restoration Design: The restoration design will be implemented by the selected contractor with direct oversight from the WCRC staff. Materials and equipment for the implementation phase will be procured. WCRC will coordinate with ADEQ inspectors. The site will be re -vegetated using in-house and volunteer labor. After implementation, the site will be inspected following flood events and prescriptions for maintenance will be made, if needed. Task 6: Conduct Outreach: Public awareness activities including two site tours, one fact sheet, and a volunteer planting day will be conducted to promote awareness of the project. Following the implementation of the riverbank Restoration activities, the site will be used as a tool for transferring the technology and concepts of river Restoration to a wide audience in order to encourage the use of sustainable technologies when addressing riverbank erosion on large rivers. The outreach component will serve to demonstrate the effectiveness of using natural design concepts when addressing bank instability on large rivers. Task 7: Reporting: All reports will be prepared and submitted (hard copies and electronically) according to the grant requirements. 1. Quarterly reports will be submitted utilizing the format/forms provided electronically by ANRC and will briefly state accomplishments made for each subtask. Quarterly reports will also include implementation documentation (forms provided electronically by ANRC) that contains the following information: Name and USDA-NRCS practice number, farm number in which BMP was implemented, GPS or latitude/longitude of the BMP, number or acres affected and the date BMP implementation was completed. 2. Annual reports will be submitted to ANRC by October 1 of each year in which the project is/was active. The Annual Report will contain a summary of the BMP implementation documentation utilizing a form provided (electronically) by ANRC. This requirement will be in addition to a narrative summary of the project activities that occurred in the previous Federal Fiscal year (October 1 — September 30). N Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 9 of 25 . 3. Attendance at annual project review meetings is required. The project manager is responsible for presenting an overview of the project, status, activities to date and any data collected. A copy of the presentation and/or documentation of project activities will be provided to ANRC at the meetings. 4. A Final Report will be submitted to ANRC at the completion or the end date for the project based on final report guidance provided by ANRC. The guidance will be in outline form. The Final Report should be a narrative description and will encompass all activities, from start to finish, related to the project. An executive summary as well as a final outcome and/or conclusion section shall be contained in the Final Report. Tasks, Objectives, Subtasks, Schedules, Deliverables, and Estimated Costs Task 1, Financial Review Costs Federal Non -Federal Match Total $1,000 $0 $1, 000 Objectives: A financial review of all financial records following agreed upon procedures. Subtask 1.1 Financial review for project period Deliverables: 1. Report of Financial review Task 2: Develop QAPP Costs Federal Non -Federal Match Total $10,000 $0 $10,000 Objectives: Develop a QAPP document to insure that all data collection activities are performed in accordance with documented and approved techniques. Subtask 2.1 Develop QAPP for submittal to ANRC Subtask 2.2 Edit QAPP per ANRC comments Subtask 2.3 Submit final QAPP for approval Deliverables: 1. Draft QAPP 2. QAPP approved by ANRC and EPA Task 3: Pre and Post Implementation Monitoring Costs Federal Non -Federal Match Total $40,000 $20,000 $60,000 Objective: To estimate the pre -restoration sediment and phosphorus load from the site and to quantify the improvements resulting from implementation of the restoration plan. z Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 10 of 25 . Subtask 3.1 Conduct erosion potential inventory prior to restoration at restoration site, control site, and reference sites Subtask 3.2 Collect detailed cross section measurements Subtask 3.3 Collect and analyze riverbank materials for sediment and phosphorus Subtask 3.4 Collect detailed cross-section measurements one year after initial measurements Subtask 3.5 Collect fish samples at restoration site, control site, and reference site Subtask 3.6 Collect detailed cross section measurements immediately after construction Subtask 3.7 Collect fish samples one year after implementation at all sites Subtask 3.8 Collect detailed cross-section measurements one year following the post implementation measurements Subtask 3.9 Analyze data and prepare summary of results Deliverables: 1. Results of erosion potential inventory and predicted erosion rates prior to restoration 2. Graphs of detailed measurements before restoration and map of measurement locations 3. Results of pre -restoration fish sampling 4. Results of detailed measurements after restoration monitoring period Task 4: Develop Restoration Design Costs Federal Non -Federal Match Total $40,000 $17, 500 $57, 500 Objective: To a riverbank restoration plan using the natural channel design techniques Subtask 4.1 Collect and/or review reference reach data Subtask 4.2 Survey project site morphology Subtask 4.3 Develop bank restoration design plan Subtask 4.4 Develop bid specifications, prepare bid request, select contractor Subtask 4.5 Apply for permits Deliverables: 1. A summary of reference reach data that will be used for Restoration design Rol Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 11 of 25 . 2. A summary of the site geomorphology 3. A copy of the Restoration design plan 4. 404 permit application Task 5: Implement Restoration Design Costs Federal Non -Federal Match Total $197,810 $208,435 $406, 245 Objective: To implement a riverbank restoration plan using natural channel design techniques Subtask 5.1 Implement restoration design and provide construction oversight Subtask 5.2 Complete site re -vegetation and finishing activities Subtask 5.3 Inspection and maintenance Deliverables: 1. Photographs of construction activities and completed work 2. Photographs of the re -vegetated site 3. Written documentation of inspection results Task 6: Conduct Outreach Costs Federal Non -Federal Match Total $12,000 $2,000 $14,000 Objective: The objective of the public outreach task will be to promote awareness of riverbank restoration techniques using the natural channel design approach. Subtask 6.1 Develop and distribute information fact sheet Subtask 6.2 Conduct two site tours Subtask 6.3 Conduct a volunteer planting day Deliverables: 1) One project informational fact sheet 2) List participants who attend site tours 3) List of volunteer planting day participants Task 7: Reporting Costs Federal Non -Federal Match Total $27,848 $0 $27,848 Objective: Provide ANRC information regarding the progress of this project on a quarterly and annual basis and provide a Final Report detailing the project. 11 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 12 of 25 . Subtask 7.1 Quarterly Reports that include implementation documentation Subtask 7.2 Annual Reports Subtask 7.3 Attend and participate in annual project review meetings Subtask 7.4 Final Report Deliverables: 1. Quarterly Reports with implementation documentation 2. Annual Reports submitted by October 1 each year of the project 3. Presentation and a copy of presentation/documentation of project activities provided at annual review meetings 4. Final report summarizing project activities and presenting NPS reduction results 12 Project Title: White River Bank Restoration and Monitoring Project 11/1/2013 Version #: 1 Page 13 of 25 . Overall Schedule of Tasks and Outputs: Task Subtask Number Description Start Date Completion Date 1 1.1 Project Financial Review Oct 2013 Dec 2016 2 2.1 Develop APP for submittal to ANRC Oct 2013 Nov 2013 2.2 Edit QAPP per ANRC comments Nov 2013 Dec 2013 2.3 Submit final QAPP for approval Jan 2014 Mar 2014 3 3.1 Conduct erosion potential inventory prior to restoration at restoration site, control site, and reference sites Mar 2014 Jun 2014 3.2 Collect detailed cross section measurements Mar 2014 Jun 2014 3.3 Collect and analyze riverbank materials for sediment and phosphorus Mar 2014 July 2014 3.4 Collect detailed cross-section measurements one year after initial measurements Mar 2015 Jun 2015 3.5 Collect fish samples at restoration site, control site and reference site Aug 2014 Sept 2014 3.6 Collect detailed cross section measurements immediate) after construction Aug 2015 Sept 2015 3.7 Collect fish samples one year after implementation at all sites Aug 2016 Sept 2016 3.8 Collect detailed cross-section measurements one year following the post implementation measurements Aug 2016 Sept 2016 3.9 Anal ze data and prepare summa of results Mar 2014 Dec 2016 4 4.1 Collect and/or review reference reach data Mar 2014 July 2014 4.2 Survey project site geomorphology Mar 2014 July 2014 4.3 Develop restoration design plan Aug2014 Apr 2015 4.4 Develop bid specifications, prepare bid request, select contractor Feb 2015 May 2015 4.5 Apply for permits Feb 2015 May 2015 5 5.1 Implement restoration design and construction oversight Jun 2015 Sept 2015 5.2 Complete site re -vegetation and finishing activities Oct 2015 Feb 2016 5.3 Inspection and maintenance Aug2015 Dec 2016 6 6.1 Develop and distribute fact sheet Oct 2015 Dec 2016 6.2 Conduct two site tours Oct 2015 Dec 2016 6.3 Conduct volunteer planting day Oct 2015 Feb 2016 7 7.1 Quarterly Reports Oct 2010 Dec 2016 7.2 Annual Reports Oct 2014 Oct 2016 7.3 Annual Project Review Meeting Set 2014 Set 2016 7.4 Final Report Nov 2016 Mar 2016 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 14 of 25 . Schedule of Tasks and Outputs to be completed within 12 months of project start date Task Subtask Number Description Start Date Completion Date 1 1.1 Project Financial Review Year 1 Oct 2013 Oct 2014 2 2.1 Develop APP for submittal to ANRC Oct 2013 Nov 2013 2.2 Edit QAPP per ANRC comments Nov 2013 Dec 2013 2.3 Submit final QAPP for approval Jan 2014 Mar 2014 3 3.1 Conduct erosion potential inventory prior to restoration at restoration site, control site, and reference sites Mar 2014 Jun 2014 3.2 Collect detailed cross section measurements Mar 2014 Jun 2014 3.3 Collect and analyze riverbank materials for sediment and phosphorus Mar 2014 July 2014 3.5 Collect fish samples at restoration site, control site and reference site Aug 2014 Sept 2014 4 4.1 Collect and/or review reference reach data Mar 2014 July 2014 4.2 Survey ro'ect site geomorphologyMar 2014 July 2014 Schedule of Tasks and Outputs to be completed within 24 months of project start date Task Subtask Description Start Completion Number Date Date 1 1.1 Project Financial Review Year 2 Oct 2014 Oct 2015 3 3.4 Collect detailed cross-section measurements Mar 2015 Jun 2015 one year after initial measurements 3.5 Collect fish samples at restoration site, Aug 2014 Sept 2014 control site, and reference site 3.6 Collect detailed cross section measurements Aug 2015 Sept 2015 immediately after construction 4 4.3 Develop restoration design plan Aug2014 Apr 2015 4.4 Develop bid specifications, prepare bid Feb 2015 May 2015 request, select contractor 4.5 Apply for permits Feb 2015 May 2015 5 5.1 Implement restoration design and Jun 2015 Sept 2015 construction oversight Schedule of Task and Outputs to be completed within 36 months of project start date Task Subtask Description Start Completion Number Date Date 1 1.1 Project Financial Review Year 3 Oct 2015 Dec 2016 3 3.7 Collect fish samples one year after Aug 2016 Sept 2016 implementation at all sites 3.8 Collect detailed cross-section measurements Aug 2016 Sept 2016 one year followingthe post implementation Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 15 of 25 . measurements 3.9 Analyze data and prepare summary of results Mar 2014 Dec 2016 5 5.2 Complete site re -vegetation and finishing activities Oct 2015 Feb 2016 5.3 Inspection and maintenance Auq 2015 Dec 2016 6 6.1 Develop and distribute fact sheet Oct 2015 Dec 2016 6.2 Conduct two site tours Oct 2015 Dec 2016 6.3 Conduct volunteer planting day Oct 2015 Feb 2016 7 7.4 Final Report Nov 2016 Mar 2016 Coordination, Roles and Responsibilities: The Watershed Conservation Resource Center will be responsible for coordinating all activities associated with the project. The WCRC will insure that project milestones will be met according to the workplan schedule. WCRC staff Sandi Formica and Matt Van Eps will be co -principle investigators. Sandi Formica will be project manager and Matt Van Eps will be project engineer. Part-time staff and/or possible full-time employees will assist in the collection of field data, data analyses, and site preparation. The WCRC is responsible for project oversight, data collection, design, site preparation, public outreach, and all reporting. The City of Fayetteville will be providing cash and in -kind matching contributions to the project. The City's funding is currently projected. City Council approval is required to guarantee this funding. If the grant is selected, then the City staff will present the project to the City Council for funding consideration. Matching funds will be utilized throughout the project. In -kind contributions will consist of materials, equipment, and labor for portions of the preparation, construction, and re -vegetation activities. Additionally, the City of Fayetteville will be providing staff time to assist with project planning, coordination, carrying out site tours, assisting with volunteer days, and other project management functions. The City of Fayetteville's contractor for operating the Noland Waste Water Treatment Plant is CH2M Hill and will providing some of the in -kind services described above. Beaver Water District (BWD) was created under Arkansas Act 114 of 1957 for the purpose of providing inexpensive domestic water for the cities of Rogers, Bentonville, Springdale and Fayetteville, Arkansas. The water treatment industry utilizes a multiple barrier approach for public health protection. The first step in the multiple barrier approach is to protect the source of raw water for the drinking water utility. This source water protection program assures that the water entering the utility's water treatment facilities is suitable for use as a drinking water source. Other barriers incorporated in the approach include disinfection, treatment, distribution system monitoring and maintenance, and public education. Sedimentation and its associated contaminants are the primary cause of impairment in the Upper White River watershed and of degraded water quality in Beaver Reservoir. The White River Restoration Project will contribute to BWD's source water protection program by reducing significant sources of sediment from the watershed. BWD will contribute to the project by: • Conducting public awareness activities, including water quality education and outreach events for both WFWR and Beaver Lake, media coverage, preparation of fact sheets and other materials, and in -person presentations that are related to streambank erosion, 15 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 16 of 25 . streambank stabilization and restoration, Beaver Lake water quality, Non Point Source (NPS) pollution — causes and solutions; • Participating in project management and technical committees associated with the White River Restoration Project, water quality, NPS pollution, and best management practices; and • Providing engineering review of project elements Program personnel include Manager of Environmental Quality, Bob Morgan, PE; Staff Attorney, Colene Gaston, JD; Environmental Technician, Brad Hufhines; Environmental Technician, Ray Avery, EIT; Manager of Media Relations, Amy Wilson; and an Engineering Intern. Beaver Water District and Staff activities may include: • Watershed based citizen science and education events that provide public education activities that include information of streambank erosion, NPS pollution, best management practices, and water quality. • Cooperative agreement with the City of Fayetteville to reduce NPS nutrients within Beaver Lake Watershed that includes two stream restoration projects. • Training for volunteer scientists and environmental educators that include White River watershed. • Presentations to interested groups regarding protection of Beaver Lake that includes streambank erosion, NPS pollution, and stream restoration. • Participate in technical advisory committee and board of Directors of Beaver Lake Water Alliance. • Provide technical support to the WCRC in data collection and implementation of the White River Restoration Project The Arkansas Department of Environmental Quality will be providing in -kind match to the project by conducting fish sampling activities. ADEQ will provide equipment, labor, and data analysis that will help the project achieve stated outputs. The Beaver Watershed Alliance will provide volunteer assistance primarily associated with harvesting native plants that will be utilized as part of the river bank restoration project. They may also assist in the implementation of certain phases of the project. Public Participation Public participation will be encouraged through outreach activities that will provide education opportunities related to restoration of large rivers. Measures of Success and Performance Success of this project will be established through the documentation of sediment loading and erosion rates. If sediment loads reductions are determined to be greater than 80%, the project will be considered a success. Reference to Project in the NPS Management Program The proposed project would help to meet key elements that the state non -point source program must address. Specific elements that are addressed include: Element #3 (Strong working partnerships with appropriate state, Tribal, regional, and local entities, private sector groups, W Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 17 of 25 . citizens groups, and Federal agencies.) and Element #4 (The state program (a) abates water quality impairments from existing sources and (b) prevents significant threats to water quality from present and future activities.) Project Lead The Watershed Conservation Resource Center is the lead on this project. The contact for this project is: Sandi J. Formica, Executive Director Watershed Conservation Resource Center 380 W. Rock Street Fayetteville, AR 72701 Phone: (501) 352-5252; Fax: (928) 396-2546 formica watershedconservation.oro List of Attachments Attachment 1 Estimated Project Budget Attachment 2 Estimated "Other" Budget — City of Fayetteville Attachment 3 Estimated "Other" Budget — ADEQ Attachment 4 Estimated "Other" Budget — Beaver Water District Attachment 5 Estimated "Other" Budget — Beaver Watershed Alliance Attachment 6 Project Budget Justification Worksheet Literature Cited: ADEQ (ADEQ, 2008b), List of Impaired Waterbodies (303d List), 2008. http://www.adeq.state.ar. us/water/branch—planning/pdfs/303d—list-2008.pdf ADEQ (ADEQ, 2004), Environmental Preservation Division, S.J. Formica, M.A. Van Eps, M.A. Nelson, A.S. Cotter, T.L. Morris, J.M. Beck, West Fork - White River Watershed - Data Inventory and Non point Source Pollution Assessment, ANRC — EPA 319(h) Project Final Report, 2004. Beaver Water District, A.R. Lowell, 2008, Beaver Lake and Its Watershed 2008 Formica, S.J., Van Eps, M.A., 2010, West Fork White River Watershed Restoration of Priority Stream Reaches Project Plan, Watershed Conservation Resource Center 17 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 18 of 25 . Attachment 1 Estimated Project Budget Personnel Salary Project Manager $99,000 Project Engineer $82,000 Resource Specialist $33,600 Total, Personnel Fringe Benefits 44% Total Personnel including Fringe Travel In State Out of State Total Travel Equipment Total Equipment Supplies Misc. Supplies Office PC Software Total Supplies Contractual Financial Records Review Total Contractual m/yrs Cost Federal 0.2867 $28,387 $28,387 0.3936 $32,278 $32,277 0.4691 $15,762 $15,763 $76,427 $76,427 $33,628 $33,628 $110,055 $110,055 $5,000 $5,000 $0 $0 $5,000 $5,000 Construction The construction funds will cover a portion of the contractor expenses incurred for construction activities. It is estimated that the contractor costs for in -stream activity will approach $225,000 for heavy construction activity. Total Construction Other City of Fayetteville Beaver Water District ADEQ Beaver Watershed Alliance Volunteer Planting Day Total Other $2,000 $2,000 $2,000 $2,000 $7,500 $11,500 $4,000 $1,000 $1,000 $1,000 $1,000 $168,294 $168,294 $168,294 $168,294 Non Federal $0 $0 H $7,500 $7,500 $195,705 $195,705 $20,000 $20,000 $10,000 $10,000 $10,000 $10,000 $5,000 $5,000 $240,705 $0 $240,705 Total Direct Charges Indirect Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 19 of 25 . $536,554 $288,349 $248,205 $40,667 $40,667 $0 Grand Total $577,221 $329,016 $248,205 19 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 20 of 25 . Attachment 2 Estimated 'Other" Budget: City of Fayetteville Personnel Salary m/yrs Cost Federal Non Federal Total, Personnel $0 $0 $0 Fringe Benefits % $0 $0 Total Personnel including Fringe $0 $0 $0 Travel Total Travel $ $ $ Equipment Total Equipment $ $ $ Supplies Total Supplies $ $ $ Contractual Total Contractual $ $ $ Construction Total Construction $ $ $ Other City of Fayetteville — Cash Match Funding for implementation and maintenance activities including the portion of contractor expenses not covered by federal funds, purchase of materials and other construction expenses. Materials purchased with these funds include rock, plants, seed, and erosion control. In -Kind Match will be provided in the form of equipment, $195,705 $195,705 labor, and materials that will be used for obtaining and transporting construction materials and assisting with site preparation, construction, and revegetation. In -Kind match will also be provided by the city's wastewater treatment plant contractor that manages the facility and former land application sites. Staff will assist with site access, technical assistance, project planning, and outreach activities. Total Other $195,705 $ $195,705 Total Direct Charges $195,705 $ $195,705 Indirect $0 $0 $0 Grand Total $195,705 $ $195,705 20 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 21 of 25 . Attachment 3 Estimated "Other" Budget: Arkansas Dept. Environmental Quality Personnel Salary m/yrs Cost Federal Non Federal Total, Personnel $0 $0 $0 Fringe Benefits % $0 $0 Total Personnel including Fringe $0 $0 $0 Travel Total Travel $ $ $ Equipment Total Equipment $ $ $ Supplies Total Supplies $ $ $ Contractual Total Contractual $ $ $ Construction Total Construction 1$ $ $ Other ADEQ — In -Kind Match will be provided in the form of equipment, labor, and materials that will be required for collection of fish samples and analysis of collected data to $10,000 $10,000 determine improvements in the fish community associated with river bank restoration activities. Total Other $10,000 $ $10,000 Total Direct Charges $10,000 $ $10,000 Indirect $0 $0 $0 Grand Total $10,000 $ $10,000 21 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 22 of 25 . Attachment 4 Estimated "Other" Budget: Beaver Water District Personnel Manager of Environmental Quality Environmental Technician Total, Personnel Fringe Benefits 30.5% Total Personnel with Fringe Total Travel Equipment Total Equipment Supplies Total Supplies Contractual Total Contractual Construction Total Construction Other Total Other Total Direct Charges Indirect Grand Total Salary m/yrs Cost Federal Non Federal $86,112 0.0697 $6,000 $0 $6,000 $49,261 0.1893 $9,326 $9,326 $15,326 $0 $15,326 $4,674 $ $4,674 $20,000 $20,000 $0 $ $0 $20,000 $ $20,000 $0 $0 $0 $20,000 $ $20,000 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 23 of 25 . Attachment 5 Estimated "Other" Budget: Beaver Watershed Alliance Personnel Salary m/yrs Cost Federal Non Federal Total, Personnel $0 $0 $0 Fringe Benefits % $0 $0 Total Personnel including Fringe $0 $0 $0 Travel Total Travel $ $ $ Equipment Total Equipment $ $ $ Supplies Total Supplies $ $ $ Contractual Total Contractual $ $ $ Construction Total Construction $ $ $ Other Beaver Watershed Alliance — In -Kind Match will be provided in the form of equipment and labor for collection $10,000 $10,000 and planting of native species in the restoration area as part of the re -vegetation effort. Total Other $10,000 $ $10,000 Total Direct Charges $10,000 $ $10,000 Indirect $0 $0 $0 Grand Total $10,000 $ $10,000 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 24 of 25 . Attachment 6 PROJECT BUDGET JUSTIFICATION WORKSHEET BUDGET CATEGORIES INFORMATION (FROM SF424A, SECTION B TOTALS) Enter Total Program Costs, i.e., Federal and Non -Federal Funds Combined (Attach Separate Sheet(s) if necessary) OBJECT CLASS CATEGORIES: a. Personnel: (Program Staffing — include and indicate vacant positions) Position Title Number in Position Class Annual Salary Rate Work Years Personnel Costs (1) (2) (3) (4) (5) Project Manager $99,000 0.2867 $28,387 Project Engineer $82,000 0.3936 $32,277 Resource Specialist $33,600 0.4691 $15,763 Personnel Category Totals $76,427 b. Fringe Benefits: Total $33,628 c. Travel: Include estimates of In -State and Out of State travel including if appropriate, mileage in State or private vehicles, Per Diems, air fare and conference fees. In State $5,000 TRAVEL: TOTAL $5,000 d. Equipment: (1) List each item costing $5,000 or more to be purchased for this project: (2) List items costing less than $5,000. You may list items by groups, as appropriate. COMBINED EQUIPMENT TOTAL $0 e. Supplies: List by groups, as appropriate Misc. Supplies (rebar, stakes, flagging, wading boots, tools) $2,000 Office PC $2,000 Software (Rivermorph and Autocad Civil3D) $7,500 SUPPLIES TOTAL $11,500 f. Contractual: List each planned contract separately, type of service to be procured, proposed procurement method (i.e. small purchase, formal advertising, competitive negotiations or non-competitive negotiations) and the estimated cost. Also, please indicate if the proposed contract performance period will go beyond the budget period of assistance for which this application is submitted. Financial Records Review $1,000 COMBINED CONTRACTUAL TOTAL $1,000 g. Construction: Contractor Expenses: The construction funds will cover a portion of the contractor expenses incurred for construction activities. It is estimated that the contractor costs for in -stream activity will approach $140,000 for heavy construction activity. $168,294 TOTAL CONSTRUCTION $168,294 Project Title: White River Bank Restoration and Monitoring Project 11/8/2012 Version #: 1 Page 25 of 25 . h. Other: Explain by major categories any items not included in above standard budget categories. Caution: Do not include or propose as a direct project cost, any cost that is indirect in nature (see OMB Circular A-87) or is included in the indirect cost pool on which the indirect cost rate (item j) is based. City of Fayetteville Cash Match $195,705 Beaver Water District In -kind Match $20,000 ADEQ Fish Sampling $10,000 Beaver Watershed Alliance In -kind Match $10,000 Volunteer Day $5,000 OTHER TOTAL $240,705 i. TOTAL DIRECT CHARGES: (Sum of Items a. through h.) $536,554 j. INDIRECT COSTS: (Attach a copy of your latest indirect cost agreement) $40,667 k. TOTAL PROPOSED PROGRAM COSTS (Sum of Items I and j.) $577,221 SHARE: FEDERAL 57% $329,016 GRANTEE 43% $248,205 Project Personnel Justification Summary: Sandi I Formica, executive director of the WCRC has B.S. and M.S. degrees in Chemical Engineering, with an emphasis on the transport of contaminants in the water, soil, and air. She will be the overall project manager. She will oversee the data collection, evaluation, and analysis portions of the project. Ms. Formica has been the project manager of numerous 319 projects developed to address non -point source pollution on a watershed basis. She was the principal investigator and developed the overall approach to assessing nutrients and sediment on a watershed basis that will be utilized for this project. Ms. Formica possesses unique technical skills developed over many years experience in the field of environmental and watershed management. Ms. Formica has extensive training in the area of fluvial geomorphology and stream restoration and has assisted in the development and instruction of basic field techniques to determine stream morphology course. Matthew A. Van Eps, associate director of the WCRC is a registered Professional Engineer in the State of Arkansas who holds a M.S. Degree in Environmental Engineering. He will be responsible for managing field data collection activities, data analysis, development of t he natural channel design, and implementation of the design. He has 8 years of technical and practical experience utilizing the watershed approach. He has been the project engineer for numerous successfully completed studies including watershed assessments. He has extensive experience in collecting and analyzing fluvial geomorphology data for estimating streambank erosion and stream stability. Mr. Van Eps has extensive training in the area of fluvial geomorphology and stream restoration and has assisted in the development and instruction of basic field techniques to determine stream morphology course. The resource specialist will have a degree or be in the process of fulfilling the requirements for a degree in natural sciences or in an engineering discipline. The resource specialist will provide assistance for field data collection activities and during data analysis. 25 � - ) ƒ ) § C F § f 0 q R �k� 2 " \ 2 § E - � ■ ■ ' £ �§ ■ ■ / ) I p_Cc,b CL CL mco " 2 [ £ k § - \ 8 E � _ ® / e 2 k / ' \ k \ � k \ o / t \ / � § 'Ile e � �8 2 o # § �ƒ JE�) f Cl) �) :■2 Go D ] �) - U. - ' 2 �22 =8) o _ � ~ j § & 2 ^ ■ - � @ � ] ® § k 2 ' $ (( V § cm_ E m — 2 § £ £ �_ I / a ; 0 2 \ / 1 \ U ■ 1 d fA m 2 00 \ / JAL ) ok% z`- § -�z o 2 ° ° C \ 2 .. %J2 z a ) ® ■/ �.• u22 22 [ k 2# n v■■ - _ 2 £ ID & % CL co 2 6 L NIX G 2 ƒ ƒ DIU — ~ n - ° © 1— ° ° e _