HomeMy WebLinkAbout158-13 RESOLUTIONRESOLUTION NO. 158-13 A RESOLUTION TO APPROVE AMENDMENT NUMBER 2 TO THE CONTRACT WITH GARVER, LLC FOR CONSTRUCTION PHASE SERVICES FOR THE FRISCO TRAIL EXTENSION PROJECT IN THE ADDITIONAL AMOUNT OF $109,100.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment Number 2 to the contract with Garver, LLC for construction phase services for the Frisco Trail Extension Project in the additional amount of $109,100.00. PASSED and APPROVED this 16th day of July 2013. APPROVED: ATTEST: 592 By:_Ltt� �Ps SONDRA E. SMITH, City Clerk/Treasurer `o%111i1U1nh C ;RK can y rig G'�° • ... • ' �� ��� Op is��",' , ``��� Matt Mihalevich�`� City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 7/16/2013 City Council Meeting Date Agenda Items Only Engineering Development Services Submitted By Division Department $ 109,100.00 $ 396,000.00 Frisco Trail (South to Walker Park) Cost of this request Category / Project Budget Program Category / Project Name 4470.9470.5814.05 $ 39,202.58 Trail Development Account Number Funds Used to Date Program / Project Category Name 02016 / 1201 $ 356,797.42 Sales Tax Cap Imp Project Number Remaining Balance Fund Name Budgeted Item Budget Adjustment Attached 57-12 Z7 /3 Previous Ordinance or Resolution # 192-12 Date Original Contract Date: Original Contract Number: Date Finan e and Internal Services Director Date Received in City _ 1 � ,n I I : , _ u Clerk's Office kv��i may, C Aieff Sta Date EMT EA Received in Mayor's Office av r Date Revised January 15, 2009 • ayl eVlle ARKANSAS® CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director Chris Brown, City Engineer cA3 From: Matt Mihalevich, Trails CoordinatorV11- Date: June 27, 2013 Subject: Construction Phase Services Amendment with Garver, LLC. RECOMMENDATION THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE Staff recommends a resolution approving amendment number 2 to the contract with Garver, LLC. for construction phase services for the Frisco Trail Extension in an additional amount not to exceed $109,100. PROPOSAL: On March 20t", 2012 resolution number 57-12 authorized Garver, LLC to begin the design work on the V2 mile Frisco Trail Southern Extension. On October, 2nd 2012 resolution number 192-12 added amendment number 1 to the original contract to include additional design services. Now that the project is ready for construction to begin, staff proposes to amend the original agreement for professional engineering services with Garver to include construction phase services. These services include but are not limited to daily inspection, construction observation, pay applications and record drawings as outlined in the attached scope of services. This important trail extension is part of the 36-mile Razorback Regional Greenway and will provide safe pedestrian and bicycle connections to the numerous residents and businesses around Walker Park, as well as the future Tsa La Gi (Cherokee) trail to be extended west along the old rail line south of MLK Jr. Blvd. BUDGET IMPACT: The majority of the funding for the trail project has been provided though the Northwest Arkansas Regional Planning Commission as part of the Razorback Regional Greenway. Funds in the amount of $109,100.00 for the construction phase services have been budgeted though the Trail Development Capital Improvement Program. RESOLUTION NO. A RESOLUTION TO APPROVE AMENDMENT NUMBER 2 TO THE CONTRACT WITH GARVER, LLC FOR CONSTRUCTION PHASE SERVICES FOR THE FRISCO TRAIL EXTENSION PROJECT IN THE ADDITIONAL AMOUNT OF $109,100.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section l: That the City Council of the City of Fayetteville, Arkansas hereby approves Amendment Number 2 to the contract with Garver, LLC for construction phase services for the Frisco Trail Extension Project in the additional amount of $109,100.00. PASSED and APPROVED this 16th day of July 2013. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer RESOLUTION NO.57-1.2 A RESOLUTION AUTHORIZING A CONTRACT WITH GARVER, LLC IN AN AMOUNT NOT TO EXCEED $189,500.00 FOR PROFESSIONAL ENGINEERING DESIGN SERVICES RELATED TO THE FRISCO TRAIL SOUTHERN EXTENSION, ACCEPTING A FIFTY PERCENT (50%) MATCHING GRANT FROM THE WALTON FAMILY FOUNDATION, INC., AND APPROVING A BUDGET ADJUSTMENT IN THE AMOUNT OF $216,000.00 RECOGNIZING REVENUE FROM THE WALTON FAMILY FOUNDATION, INC. AND THE HOME DEPOT FOUNDATION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby authorizes a contract with Garver, LLC in an amount not to exceed $189,500.00 for professional engineering design services related to the Frisco Trail southern extension. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby authorizes acceptance of a fifty percent (50%) matching grant from The Walton Family Foundation, Inc. to provide funding for the project. Section 3. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment in the amount of $216,000.00, a copy of which is attached as Exhibit "A", recognizing revenue from The Walton Family Foundation, Inc. and the Home Depot Foundation. PASSED and APPROVED this 20t' day of March, 2012. APPROVED_ ATTEST: ,By: a'a'd"e'- - I SONDRA E. SMITH, City Clerk/Treasurer rmr-Tr 'ILLF.A a o ,y t� RESOLUTION NO. 192-12 A RESOLUTION APPROVING AN AMENDMENT TO THE CONTRACT WITH GARVER, LLC FOR ADDITIONAL PROFESSIONAL ENGINEERING SERVICES ASSOCIATED WITH THE EXTENSION OF FRISCO TRAIL IN AN ADDITIONAL AMOUNT NOT TO EXCEED $26,500.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an amendment to the contract with Garver, LLC for additional professional engineering services associated with the extension of Frisco Trail in an additional amount not to exceed $26,500.00. PASSED and APPROVED this 2nd day of October, 2012. ATTEST: By: dlna" &tY m SONDRA E. SMITH, City Clerk/Treasurer l AMENDMENT TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES CITY OF FAYETTEVILLE FAYETTEVILLE, ARKANSAS CONTRACT AMENDMENT NO.2 Frisco Trail Extension This Contract Amendment No. 2, dated ,T,- 6 % i , 2013 shall amend the original contract between the CITY OF FAYETTEVLLE, ARKANSAS and GARVER, LLC, (Garver) dated March 20, 2012 for professional engineering services in connection with the Frisco Trail Extension from Martin Luther King, Jr. Boulevard to Walker Park, (the "Project"). This Contract Amendment No. 2 adds professional engineering services for the Construction Phase Services, as described herein. The contract is hereby modified as follows: SECTION 2 - BASIC SERVICES OF GARVER The following Sections add to corresponding Sections in the original contract. 2.1 General 2.1.1.3 The additional Scope of Services to be furnished by GARVER during the Construction Phase is included in Section 2.2 hereafter and in Appendix A and B attached hereto and made part of this Agreement. 2.2 Engineering Services — Frisco Trail Extension 2.2.2 GARVER will perform construction phase services as described in Appendix A as attached hereto and made a part of this Agreement. Contract Amendment No. 2 1 of 2 11047140 Frisco Trail Extension SECTION 5 — PAYMENTS TO GARVER 5.1 Compensation CITY OF FAYETTEVILLE shall pay GARVER an additional amount not to exceed $109,100 for construction phase services in accordance with the provisions described in the following paragraphs. CITY OF FAYETTEVILLE shall pay GARVER for time spent on the project at the rates shown in the attached Appendix B for each classification of GARVER's personnel plus reimbursable expenses, including but not limited to printing, courier service, reproduction, and travel. For informational purposes, a breakdown of GARVER's estimated costs is included in Appendix B. The rates shown in Appendix B will be increased annually with the first increase effective on or about July 1, 2013. Underruns in any phase may be used to offset overruns in another phase as long as the overall contract amount is not exceeded. IN TESTIMONY OF WHICH, this instrument has been executed on behalf of GARVER, and has been executed on behalf of the CITY OF FAYETTEVILLE, in three (3) counterparts, each of equal force, on the day and year first above written. CITY OF FA TTEVIL GARVER, LLC By: By: Mayor L6n Zordan Brock Hoskins, PE Title: Mayor ATTEST: Contract Amendment No. 2 Frisco Trail Extension Title: Executive Vice President ,za2_<S,:11__/_� ATTEST: �;0 ��� �.. • °G\T Y 0 ; SG•�� FAYETTEVILLE •�30 oft :y.kANSP, 11047140 APPENDIX A — SCOPE OF SERVICES Section 2.13 of the Scope of Services as contained in the original agreement shall be removed and replaced with this language: 2.13 Construction Phase Services During the construction phase of work, Garver will accomplish the following: 1. Issue a Notice to Proceed letter to the Contractor and attend preconstruction meeting. 2. Provide coordination of the construction with the franchise utilities. 3. Attend progress/coordination meetings with the City of Fayetteville/Contractor. 4. Evaluate and respond to construction material submittals and shop drawings. Corrections or comments made by Garver on the shop drawings during this review will not relieve Contractor from compliance with requirements of the drawings and specifications. The check will only be for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor will be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner. Garver's review shall not constitute approval of safety precautions or constitute approval of construction means, methods, techniques, sequences, procedures, or assembly of various components. When certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, either directly or implied for a complete and workable system, Garver shall be entitled to rely upon such submittal or implied certification to establish that the materials, systems or equipment will meet the performance criteria required by the Contract Documents. 5. Issue instructions to the Contractor on behalf of the City of Fayetteville and issue necessary clarifications (respond to RFIs) regarding the construction contract documents. 6. Review the Contractor's progress payment requests based on the actual quantities of contract items completed and accepted, and will make a recommendation to the City of Fayetteville regarding payment. Garver's recommendation for payment shall not be a representation that Garver has made exhaustive or continuous inspections to (1) check the quality or exact quantities of the Work; (2) to review billings from Subcontractors and material suppliers to substantiate the Contractor's right to payment; or (3) to ascertain how the Contractor has used money previously paid to the Contractor. 7. Maintain a set of working drawings and prepare and furnish record drawings. 8. Provide full-time resident construction observation services for the 240-calendar day construction contract performance time. The proposed fee is based on approximately 4 hours per day, 5 days per week, during the 240-calendar day construction contract performance time. If the construction time extends beyond the time established in this agreement or if the City of Fayetteville wishes to increase the time or frequency of the observation, the City of Fayetteville will pay Garver an additional fee agreed to by the City of Fayetteville and Garver. 9. Provide up to 12 hours of survey crew time for field checking quantities, contractor's layout, etc. Appendix A - Scope of Services 1 of 2 11047140 Frisco Trail 10. When authorized by the City of Fayetteville, prepare change orders for changes in the work from that originally provided for in the construction contract documents. If redesign or substantial engineering or surveying is required in the preparation of these change order documents, the City of Fayetteville will pay Garver an additional fee to be agreed upon by the City of Fayetteville and Garver. 11. Participate in final project inspection, prepare punch list, review final project closing documents, and submit final pay request. Construction observation services will be provided by Garver's Resident Project Representative, who will provide or accomplish the following: • Consult with and advise the Owner during the construction period. • Coordinate with the firm providing construction materials quality assurance testing under separate contract with the Owner. • Maintain a file of quantities incorporated into the work, test reports, certifications, shop drawings and submittals, and other appropriate information. • Maintain a project diary which will contain information pertinent to each site visit. In performing construction observation services, Garver will endeavor to protect the Owner against defects and deficiencies in the work of the Contractor(s); but Garver cannot guarantee the performance of the Contractor(s), nor be responsible for the actual supervision of construction operations or for the safety measures that the Contractor(s) takes or should take. However, if at any time during construction Garver observes that the Contractor's work does not comply with the construction contract documents, Garver will notify the Contractor of such non-compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. Garver will also record the observance, the discussion, and the actions taken. If the Contractor continues without satisfactory corrective action, Garver will notify the Owner immediately, so that appropriate action under the Owner's contract with the Contractor can be taken. Appendix A - Scope of Services 2 of 2 11047140 Frisco Trail APPENDIX B Frisco Trail / 11047140 Garver Hourly Rate Schedule Classification Rates Engineers /Architects E-1............................................................................... $ 90.00 E-2............................................................................... $ 105.00 E-3............................................................................... $ 126.00 E-4............................................................................... $ 147.00 E-5............................................................................... $ 180.00 E-6............................................................................... $ 220.00 Planners' P-1............................................................................ $ 107.00 P-2............................................................................... $ 128.00 Designers D-1............................................................................... $ 84.00 D-2............................................................................... $ 115.00 Technicians T-1............................................................................... $ 73.00 T-2............................................................................... $ 95.00 S-1............................................................................... $ S-2............................................................................... $ S-3............................................................................... $ S-4............................................................................... $ 43.00 54.00 71.00 102.00 S-5............................................................................... $ 130.00 2-Man Crew (Survey)....................................................... $ 164.00 3-Man Crew (Survey)....................................................... $ 203.00 2-Man Crew (GPS Survey) ................................................ $ 184.00 3-Man Crew (GPS Survev)................................................ $ 223.00 construction Upservation C-1............................................................................... $ 81.00 C-2............................................................................... $ 112.00 C-3............................................................................... $ 148.00 Administration X-1............................................................................... $ 51.00 X-2............................................................................... $ 68.00 X-3............................................................................... $ 115.00 Agreement for Professional Services Frisco Trail Garver Project No. 11047140 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO.2 FEE SUMMARY Original Amendment No. 1 Amendment No. 2 Total Title I Services Estimated Fees Estimated Fees Estimated Fees Estimated Fees Geotechnical Services (G,H,B&lam $8,100.00 $2,700.00 $0.00 $10,800.00 Record Research (3-Parcels) $1,500.00 $150.00 $0.00 $1,650.00 Utility Marking $700.00 $300.00 $0.00 $1,000.00 Signalization Design $10,000.00 $0.00 $0.00 $10,000.00 Surveys $24,350.00 $9,300.00 $0.00 $33,650.00 Drainage Study $4,650.00 $2,000.00 $0.00 $6,650.00 Electrical Design $10,400.00 $0.00 $0.00 $10,400.00 Schematic Design $14,500.00 $0.00 $0.00 $14,500.00 Conceptual Design $14,800.00 $0.00 $0.00 $14,800.00 Preliminary Design $34,200.00 $2,750.00 $0.00 $36,950.00 Final Design $56,400.00 $7,700.00 $0.00 $64,100.00 Property Acquisition Documents $5,150.00 $1,600.00 $0.00 $6,750.00 Bidding Services $4,750.00 $0.00 $0.00 $4,750.00 Subtotal for Title I Services $189,500.00 $26,500.00 $0.00 $216,000.00 Title II Services Construction Materials Testing $0.00 $0.00 $0.00 $0.00 Construction Phase Services $0.00 $0.00 $109,100.00 $109,100.00 Subtotal for Title II Services $0.00 $0.00 $109,100.00 $109,100.00 X:\2011\11047140 -Fayetteville Frisco Multi -Use Trail\Contracts\Client\Amendment 2\APPENDIX 6 -Full Time CPS CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 2 CONSTRUCTION PHASE SERVICES WORK TASK DESCRIPTION ES E-5 E4 E-3 E-2 E-1 T-2 T-1 S-5 S-0 2-Man Crew (Survey) C-2 C-1 X-1 $231.00 $189.00 $155.00 $133.00 $111.00 $95.00 $100.00 $77.00 $137.00 $108.00 $173.00 $118.00 $86.00 $54.00 hr hr m hr hr hr hr hr hr hr hr hr hr hr 1. Civil Engineering Preconstruction Meeting 3 3 Utility Coordination 8 4 Monthly Pay Request Reviews 12 24 Shop Drawings/Material Submittals 6 8 On -Site Meetings and assistance as needed 12 24 20 Resident Construction Observation (172 days at 4 hourstday) 688 Survey Crew as needed (12 hours max.) 1 12 Prepare Change Orders as needed 6 6 Final Project Inspection and Punchlist 2 4 4 Record Drawings 2 4 6 Subtotal - Civil Engineering 0 14 0 0 65 73 0 6 1 0 12 688 0 0 2. Structural Engineering Response to Inquiries 2 8 Shop Drawings 2 16 10 Subtotal -Structural Engineering 0 1 4 24 0 10 0 0 0 0 0 0 0 0 0 3. Electrical Engineering Response to Inquiries 4 2 Shop Drawings 6 4 Subtotal -Electrical Engineering 0 0 0 1 10 0 6 0 0 0 0 0 0 0 0 MANHOUR SUBTOTALS Hours 0 18 24 10 75 79 0 6 1 0 12 688 0 0 913 Salary Costs $0.00 $3,402.00 $3,720.00 $1,330.00 $8,325.00 $7,505.00 $0.00 $462.00 $137.00 $0.00 $2,076.00 $81,184.00 $0.00 $0.00 $108,141.00 SUBTOTAL - SALARIES: $108,141.00 Document Printing/Reproduction/Assembly $220.00 Postage/Freight/Courier $29.00 Survey Supplies $10.00 Travel Costs $700.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $959.00 TOTAL FEE: $109,100.00 AMENDMENT TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES CITY OF FAYETTEVILLE FAYETTEVILLE, ARKANSAS CONTRACT AMENDMENT NO.2 Frisco Trail Extension This Contract Amendment No. 2, dated P 2013 shall amend the original contract between the CITY OF FAYETTEVLLE, ARKANSAS and GARVER, LLC, (Garver) dated March 20, 2012 for professional engineering services in connection with the Frisco Trail Extension from Martin Luther King, Jr. Boulevard to Walker Park, (the "Project'). This Contract Amendment No. 1 adds professional engineering services for the Design Phase Services, as described herein. The contract is hereby modified as follows: SECTION 2 - BASIC SERVICES OF GARVER The following Sections add to corresponding Sections in the original contract. 2.1 General 2.1.1.3 The additional Scope of Services to be furnished by GARVER during the Construction Phase is included in Section 2.2 hereafter and in Appendix A and B attached hereto and made part of this Agreement. 2.2 Engineering Services — Frisco Trail Extension 2.2.2 GARVER will perform construction phase services as described in Appendix A as attached hereto and made a part of this Agreement. Contract Amendment No. 2 1 of 1 11047140 Frisco Trail Extension SECTION 5 — PAYMENTS TO GARVER 5.1 Compensation CITY OF FAYETTEVILLE shall pay GARVER an additional amount not to exceed $109,100 for construction phase services in accordance with the provisions described in the following paragraphs. CITY OF FAYETTEVILLE shall pay GARVER for time spent on the project at the rates shown in the attached Appendix B for each classification of GARVER's personnel plus reimbursable expenses, including but not limited to printing, courier service, reproduction, and travel. For informational purposes, a breakdown of GARVERN estimated costs is included in Appendix B. The rates shown in Appendix B will be increased annually with the first increase effective on or about July 1, 2013. Underruns in any phase may be used to offset overruns in another phase as long as the overall contract amount is not exceeded. IN TESTIMONY OF WHICH, this instrument has been executed on behalf of GARVER, and has been executed on behalf of the CITY OF FAYETTEVILLE, in three (3) counterparts, each of equal force, on the day and year first above written. CITY OF FAYETTEVILLE GARVER, LLC By: By: Mayor Lioneld Jordan 7 D. ttoldqOE Title: Manor Title: Sr. Vice President ATTEST: Contract Amendment No. 2 2 of 2 11047140 Frisco Trail Extension APPENDIX A — SCOPE OF SERVICES Section 2.13 of the Scope of Services as contained in the original agreement shall be removed and replaced with this language: 2.13 Construction Phase Services During the construction phase of work, Garver will accomplish the following: 1. Issue a Notice to Proceed letter to the Contractor and attend preconstruction meeting. 2. Provide coordination of the construction with the franchise utilities. 3. Attend progress/coordination meetings with the City of Fayetteville/Contractor. 4. Evaluate and respond to construction material submittals and shop drawings. Corrections or comments made by Garver on the shop drawings during this review will not relieve Contractor from compliance with requirements of the drawings and specifications. The check will only be for review of general conformance with the design concept of the project and general compliance with the information given in the contract documents. The Contractor will be responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of all other trades, and performing his work in a safe and satisfactory manner. Garver's review shall not constitute approval of safety precautions or constitute approval of construction means, methods, techniques, sequences, procedures, or assembly of various components. When certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, either directly or implied for a complete and workable system, Garver shall be entitled to rely upon such submittal or implied certification to establish that the materials, systems or equipment will meet the performance criteria required by the Contract Documents. 5. Issue instructions to the Contractor on behalf of the City of Fayetteville and issue necessary clarifications (respond to RFls) regarding the construction contract documents. 6. Review the Contractor's progress payment requests based on the actual quantities of contract items completed and accepted, and will make a recommendation to the City of Fayetteville regarding payment. Garver's recommendation for payment shall not be a representation that Garver has made exhaustive or continuous inspections to (1) check the quality or exact quantities of the Work; (2) to review billings from Subcontractors and material suppliers to substantiate the Contractor's right to payment; or (3) to ascertain how the Contractor has used money previously paid to the Contractor. 7. Maintain a set of working drawings and prepare and furnish record drawings. 8. Provide full-time resident construction observation services for the 240-calendar day construction contract performance time. The proposed fee is based on approximately 4 hours per day, 5 days per week, during the 240-calendar day construction contract performance time. If the construction time extends beyond the time established in this agreement or if the City of Fayetteville wishes to increase the time or frequency of the observation, the City of Fayetteville will pay Garver an additional fee agreed to by the City of Fayetteville and Garver. 9. Provide up to 12 hours of survey crew time for field checking quantities, contractor's layout, etc. Appendix A - Scope of Services 1 of 2 11047140 Frisco Trail 10. When authorized by the City of Fayetteville, prepare change orders for changes in the work from that originally provided for in the construction contract documents. If redesign or substantial engineering or surveying is required in the preparation of these change order documents, the City of Fayetteville will pay Garver an additional fee to be agreed upon by the City of Fayetteville and Garver. 11. Participate in final project inspection, prepare punch list, review final project closing documents, and submit final pay request. Construction observation services will be provided by Garver's Resident Project Representative, who will provide or accomplish the following: • Consult with and advise the Owner during the construction period. • Coordinate with the firm providing construction materials quality assurance testing under separate contract with the Owner. • Maintain a file of quantities incorporated into the work, test reports, certifications, shop drawings and submittals, and other appropriate information. • Maintain a project diary which will contain information pertinent to each site visit. In performing construction observation services, Garver will endeavor to protect the Owner against defects and deficiencies in the work of the Contractor(s); but Garver cannot guarantee the performance of the Contractor(s), nor be responsible for the actual supervision of construction operations or for the safety measures that the Contractor(s) takes or should take. However, if at any time during construction Garver observes that the Contractor's work does not comply with the construction contract documents, Garver will notify the Contractor of such non-compliance and instruct him to correct the deficiency and/or stop work, as appropriate for the situation. Garver will also record the observance, the discussion, and the actions taken. If the Contractor continues without satisfactory corrective action, Garver will notify the Owner immediately, so that appropriate action under the Owner's contract with the Contractor can be taken. Appendix A - Scope of Services 2 of 2 11047140 Frisco Trail a JAuJ- APPENDIX B Frisco Trail / 11047140 Garver Hourly Rate Schedule Classification Rates E-1............................................................................... $ 90.00 E-2............................................................................... $ 105.00 E-3............................................................................... $ 126.00 E-4............................................................................... $ 147.00 E-5............................................................................... $ 180.00 E-6............................................................................... $ 220.00 „.. P-1.................................................................. ....... $ 107.00 P-2............................................................................... $ 128.00 D-1............................................................................... $ 84.00 D-2............................................................................... $ 115.00 T-1............................................................................... $ 73.00 T-2............................................................................... $ 95.00 S-1............................................................................... $ 43.00 S-2............................................................................... $ 54.00 S-3............................................................................... $ 71.00 S-4............................................................................... $ 102.00 S-5............................................................................... $ 130.00 2-Man Crew (Survey)..... .................................................. $ 164.00 3-Man Crew (Survey)....................................................... $ 203.00 2-Man Crew (GPS Survey) ................................................ $ 184.00 3-Man Crew (GPS Survey) ................................................ $ 223.00 C-1.......................................................................... $ 81.00 C-2............................................................................... $ 112.00 C-3............................................................................... $ 148.00 X-1............................................................................... $ 51.00 X-2............................................................................... $ 68.00 X-3............................................................................... $ 115.00 Agreement for Professional Services Frisco Trail Garver Project No. 11047140 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 2 FEE SUMMARY Original Amendment No. 1 Amendment No. 2 Total Title I Services Estimated Fees Estimated Fees Estimated Fees Estimated Fees Geotechnical Services (G,H,B&W) $8,100.00 $2,700.00 $0.00 $10,800.00 Record Research (3-Parcels) $1,500.00 $150.00 $0.00 $1,650.00 Utility Marking $700.00 $300.00 $0.00 $1,000.00 Signalization Design $10,000.00 $0.00 $0.00 $10,000.00 Surveys $24,350:00 $9,300.00 $0.00 $33,650.00 Drainage Study $4,650.00 $2,000.00 $0.00 $6,650.00 Electrical Design $10,400.00 $0.00 $0.00 $10,400.00 Schematic Design $14,500.00 $0.00 $0.00 $14,500.00 Conceptual Design $14,800.00 $0.00 $0.00 $14,800.00 Preliminary Design $34,200.00 $2,750.00 $0.00 $36,950.00 Final Design $56,400.00 $7,700.00 $0.00 $64,100.00 Property Acquisition Documents $5,150.00 $1,600.00 $0.00 $6,750.00 Bidding Services $4,750.00 $0.00 $0.00 $4,750.00 Subtotal for Title I Services $189,500.00 $26,500.00 $0.00 $216,000.00 Title 11 Services Construction Materials Testing $0.00 $0.00 $0.00 $0.00 Construction Phase Services $0.00 $0.00 $109,100.00 $109,100.00 Subtotal for Title II Services $0.00 $0.00 $109,100.00 $109,100.00 X:\2011\11047140 -Fayetteville Frisco Multi -Use Trail\Contracts\Client'Amendment 2\APPEN DIX B- Full Time CPS CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 2 CONSTRUCTION PHASE SERVICES WORK TASK DESCRIPTION Monthly Pay Request Reviem Shop Drawngs/Material Submittals On -Site Meetings and assistance as needed I, Survey Crew as needed (12 hours Prepare Change Orders as needed Final Project Inspection and Purchrist Record Drawings R o�oo��0000®moo Response to Inquiries Shop DfaWngs Subtotal - Structural Engineering oo�o�000000000 j3. Electrical Engineering Response to Inquiries 00000000000000 Hours Salary Costs SUBTOTAL -SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly Postage/Freight/Courier Survey Supplies Travel Costs 0 18 24 10 75 79 0 $0.00 $3.402.00 $3.720.00 $1.330.00 $8,325.00 $7,505.00 $0.00 $108,141.00 $220.00 $29.00 $10.00 $700.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: $959.00 TOTAL FEE: y $109,100.00 6 1 0 12 6118 0 0 $462.00 $137,00 $0.00 $2.076.00 381.184.00 $0.00 SO.i MANHOUR SUBTOTALS BE