HomeMy WebLinkAbout39-12 RESOLUTIONRESOLUTION NO. 39-12
A RESOLUTION APPROVING AMENDMENT NO. 1 TO A
MEMORANDUM OF UNDERSTANDING WITH THE WATERSHED
CONSERVATION RESOURCE CENTER (WCRC) IN AN AMOUNT NOT TO
EXCEED $25,201.00 TO REPAIR PORTIONS OF THE NIOKASKA CREEK
RIPARIAN CORRIDOR THROUGH SWEETBRIAR PARK AND
SURROUNDING PROPERTIES DAMAGED IN APRIL 2011 FLOODS, AND
APPROVING A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves
Amendment No. 1 to a Memorandum of Understanding with the Watershed Conservation
Resource Center (WCRC) in an amount not to exceed $25,201.00, a copy of which is attached as
Exhibit "A", to repair portions of the Niokaska Creek riparian corridor through Sweetbriar Park
and surrounding properties damaged in April 2011 floods.
Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a
budget adjustment, a copy of which is attached as Exhibit "B".
PASSED and APPROVED this 21st day of February, 2012.
APPROVED: ATTEST:
By:
LI t ELD 1 ' .: AN, Mayor
By:\AAtIrOjttit\-_2
LISA BRANSON, Deputy City Clerk,„,,,, VI F iPt
V° a
THE CITY OF FAYETTEVILLE, ARKANSAS
AMENDMENT NO. 1
REPAIR OF NIOKASKA STREAM RESTORATION PROJECT IN
SWEETBRIAR PARK
STATE OF ARKANSAS
COUNTY OF WASHINGTON
This Amendment is written pursuant to the Memorandum of Understanding (MOU) as
described in Ordinance No. 5268 executed on September 1, 2009. The referenced MOU
pertains to a stream restoration project and associated services with the Watershed
Conservation Resource Center (WCRC) for the Niokaska Stream Restoration in Sweetbriar
Park. This Amendment entered into and executed on the date indicated below the signature
block by and between the City of Fayetteville and the Watershed Conservation Resource
Center sets forth the project description, project schedule and associated fees for these
services related to the Repair of the Niokaska Creek Stream Restoration located in
Sweetbriar Park.
Section I - Project Description
This project consists of repairs to a previously constructed streambank restoration project
along a section of Niokaska Creek in Sweetbriar Park and surrounding properties. WCRC
originally designed the project and performed the construction observation working closely
with the contractors. Severe flooding occurred in Washington County in April 2011, only one
month following implementation of the project. Although the project successfully protected
City park land, damage to the project occurred in several locations and the damage should
be addressed to maintain the integrity of the project. Repairs to rock structures and adjacent
constructed floodplains will be made. Native plant species will be replanted in the affected
areas to create a healthy riparian corridor along the stream corridor.
Section II - Project Timeframe
The project must be completed by or before October 12, 2012. Construction is anticipated
to begin in March 2012 and be complete by September 30, 2012.
Section III - Scope of Services
• Project administration includes financial tracking and reporting, procurement of
contractors and materials, and coordination among project partners and contractors.
All procurement measures must follow procedures approved by the City of
Fayetteville.
• A repair plan including all technical design elements will be developed.
• Implementation of streambank restoration repair includes obtaining U.S. Army Corps
of Engineers and ADEQ authorization, coordinating construction material deliveries,
THE CITY OF FAYETTEVILLE, ARKANSAS
securing equipment and contractor, overseeing heavy equipment construction,
performing minor construction, and re -vegetating site.
Section IV - Fees and Payments
WCRC will perform the above -referenced Scope of Services for a total cost NTE $25,201. A
breakdown of the estimated project expenses is shown in Attachment 1.
Section V - Memorandum of Understanding in Effect
Except as amended specifically herein, the Memorandum of Understanding Fayetteville
shall remain in full force as originally approved.
IN WITNESS WHEREOF, the parties hereto have caused this AMENDMENT to be duly
executed as of the date and year first herein written.
FOR THE CITY OF FAYETTEVILLE
B
Mayor
d Jordan
Date: cg /9---_
Attest: $,
Sondra Smith, City ler
FOR WATERSHED CONSERVATION RESOUCE CENTER
By:Attest:
Sandi Formica
Date: ,eS 0 Z°l 2_
iu _
THE CITY OF FAYETTEVILLE, ARKANSAS
Attachment 1
Estimated Project Budget for Niokaska Creek Stream Restoration Repairs at Sweetbriar Park
Task
Item
Units
Qty
Unit Cost Estimated Cost
($) ($)
01
U
Y Y
N L
Y as
o
a
z!�
L
0
1/1
W
3
.QCC OD
o
CO -C
v F
c
0
0
0
Repair of Area Near Waterline
Coarse Fill
yd3
70
40 $2,800.00
Large Boulders
ton
20
56 $1,120.00
Top Soil
yd3
40
25 $1,000.00
Excavator'
hr.
16
200 $3,200.00
Skidsteer'
hr.
16
125 $2,000.00
Protect Park Wetland Upstream
Rock Sill
ton
16
56 $896.00
Excavator'
hr.
5
200 $1,000.00
Skidsteer'
hr.
5
125 $625.00
Repair Downstream Vanes
Excavator
hr.
4
200 $800.00
Site Finishing
Labor
hr.
40
40
$1,600.00
=1,_;;:),;;;.
Design and Construction Oversight
Engineer PE
hr.
28
85 $2,380.00
Project Manager
hr.
28
100
$2,800.00
Upstream Repairs (Private Property)
Repair Upstream Bench
Top Soil
yd3
20
25 $500.00
Labor
hr.
40
40 $1,600.00
Jute Fiber Roll
ea.
1
100 $100.00
Equipment and Operator
Excavator'
hr.
4
200 $800.00
Skidsteer'
hr.
4
125 $500.00
Design and Construction Oversight
Engineer PE
hr.
8
85
$680.00
Project Manager
hr.
8
100 $800.00
Total Cost
$25,201.00
1 Cost includes equipment, fuel, and operator
City of Fayetteville, Arkansas
Budget Adjustment Form
V11.0425
Budget Year
2012
Division: Parks & Recreation
Department: Parks & Recreation
Request Date
2/2/2012
Adjustment Number
BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION
A budget adjustment to allocate funding from FEMA to Niokaska Creek Stream Resoration Demonstration in the
amount of $16,982. Moving $11,000 in funding from the 2012 Project that had been allocated for Niokaska Creek in
order to track the total project.
Alison Jumper
2/2/2012
Division Head
Date
2-z,i
Date
Connie Edmonston
Department Director;
Date
A3cui a .CLIA,2-7�zol�
Fin
e Director ® Date
Chi- o
a r
tall
Date
Prepared By: Tracie Martin
Reference:
tmartin
Budget & Research Use Only
Type: A B C
General Ledger Date
Posted to General Ledger
Checked / Verified
D E
Initial
Date
Initial
Date
Account Name
TOTAL BUDGET ADJUSTMENT 16,982
Account Number
16,982
Increase / (Decrease)
Expense Revenue
Project.Sub.
Number
Park improvements
Trans from Replacement
4470.9470.5806.00 16,982
4470.0947.6602.27
09025 . 0901
16,982 11020 . 4470
Greenspace Fees NE
Greenspace Fees NE
2250.0925.4419.01
2250.0925.4419.01
Contract services
Contract services
2250.9256.5315.00 11,000
11,000 09025 . 0901
(11,000) 02013 . 1201
09025 . 0901
2250.9256.5315.00 (11, 000)
02013 . 1201
EXHIBIT
3
K:\PARKS\sweetbriar\2009 stream restoration'April 2011 Flood Repair\Amendment No. 1\BA for 2.21.12 Niokaska 1 of 1
1--kuntAed01-//q/ic)—
-
Carole Jo s/Alison Jumper Park Planning
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
2/21/2012
City Council Meeting Date
Agenda Items Only
Submitted By
Division
Action Required:
Parks and Recreation
Department
.Parks and Engineering staff request approval of Amendment No. 1 pursuant to the Memorandum of Understanding
(MOU) as described in Ordinance No. 5268 with the Watershed Conservation Resource Center in an amount NTE
$25,201 with a 7.7% project contingency of $1,941 for a total project cost of $27,142 and approval of a budget
adjustment to repair portions of Niokaska Creek riparian corridor through Sweetbriar Park and surrounding
properties that were damaged during the flooding in April 2011 (see attached memo).
15,041.00
5,180.00
4,980.00
Cost of this request
4470.9470.5806.00
2250.9256.5314.00
4470.9470.5817.00
Account Number
09025.0901
09025.0901
02097.1
Project Numbers
Budgeted Item
X
216,202.00
15,896.00
439,317.00
Category / Project Budget
195,058.90
2,605.50
289,316.97
Funds Used to Date
21,143.10
13,290.50
$ 150,000.03
Remaining Balance
Budget Adjustment Attached
Niokaska Creek Stream Restoration
Demonstration
Niokaska Creek Stream Restoration
Demonstration
Stormwater Quality
Management/Nutrient Reduction
Program Category / Project Name
Sales Tax Capital Improvements
Park Land Dedication Funds (NE)
Sales Tax Capital Improvements
Program / Project Category Name
Sales Tax/Grant
Park Land Dedication Funds (NE)
Sales Tax
Fund Name
Fin -ate- and Internal Services Director
•1@R-Zo12,
Date
Comments:
Date
ate
Previous Ordinance or Resolution # 5268
Original Contract Date:
Original Contract Number:
Received in
Mayor's Office
Revised January 15, 2009
ave ev! le
CITY COUNCIL AGENDA MEMO
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
To: Mayor Lioneld Jordan and City Council
Thru: Don Marr, Chief of Staff
Connie Edmonston, Parks and Recreation Di ector
Jeremy Pate, Development Services Director
Alison Jumper, Park Planning Superintendent M
From: Carole Jones, Park Planner II�°�,
Date: February 3, 2012
Subject: Repair portions of Niokaska Creek riparian corridor through Sweetbriar Park and
surrounding properties that were damaged during the flooding in April 2011
Agenda Request for February 21, 2012 Meeting
PROPOSAL:
Sweetbriar Park contains 4.05 acres and is located at 2645 E. Sweetbriar Drive. The park is situated in the
northeast quadrant of town east of Old Missouri Road and south of Joyce Boulevard. Niokaska Creek, a
tributary to Mud Creek, flows through Sweetbriar Park. The creek is located within the Illinois River
Watershed.
On September 1, 2009, the City Council passed Ordinance Number 5268 approving a Memorandum of
Understanding (MOU) with the Watershed Conservation Resource Center to restore an approximately 1,600 -
foot section of Niokaska Creek that was incised and had several banks eroding into the park land and
surrounding residential yards (see attached ordinance).
Construction of the orginal project was completed in March 2011. WCRC designed the orginal project and
performed the construction observation working closely with the contractors. Severe flooding occurred in
Washington County in April 2011, only one month following construction. Although the project successfully
protected City park land and surrounding properties, damage to the project occurred in several locations and the
damage should be addressed to maintain the integrity of the project.
Staff is requesting approval of Amendment No. 1 pursuant to the Memorandum of Understanding (MOU) as
described in Ordinance No. 5268 with the Watershed Conservation Resource Center. This amendment includes
repairing a portion of a previously constructed streambank restoration project along a section of Niokaska Creek
in Sweetbriar Park and surrounding properties. Repairs to rock structures and adjacent constructed floodplains
will be made. Native plant species will be replanted in the affected areas to create a healthy riparian corridor
along the stream corridor. The scope of the amendment generally includes the design of the repairs,
implementation and project administration including financial tracking and reporting, procurement of
THE CITY OF FAYETTEVILLE, ARKANSAS
contractors and materials, and coordination among project partners and contractors. All procurement measures
must follow procedures approved by the City of Fayetteville.
A portion of the project which is located along the park property is eligble for funding from FEMA. The
remainder of the repairs are not eligble for funding from FEMA because the structures are located within the
channel of the stream or are located on private property.
RECOMMENDATION:
Parks and Engineering staff request approval of Amendment No. 1 pursuant to the Memorandum of
Understanding (MOU) as described in Ordinance No. 5268 with the Watershed Conservation Resource Center
in an amount NTE $25,201 with a 7.7% project contingency of $1,941 for a total project cost of $27,142 and
approval of a budget adjustment to repair portions of Niokaska Creek riparian corridor through Sweetbriar Park
and surrounding properties that were damaged during the flooding in April 2011.
BUDGET IMPACT:
The cost of $25,201 is accounted for in project numbers 09025.0901 - Niokaska Creek Stream Restoration
Demonstration ($20,221) and 02097.1 - Stormwater Quality Management/Nutrient Reduction ($4,980).
Attachments:
Staff Review Form
Ordinance No. 5268
Amendment No. 1
Purchase Requisition
Budget Adjustment
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
2/21/2012
City Council Meeting Date
Agenda Items Only
Carole Joys/Alison Jumper Park Planning,
Submitted By
Division
Action Required:
Parks and Recreation
Department
Parks and Engineering staff request approval of Amendment No. 1 pursuant to the Memorandum of
(MOU) as de.cribed in Ordinance No. 5268 with the Watershed Conservation Resource Center in -n amount NTE
$25,201 and - • proval of a budget adjustment to repair portions of Niokaska Creek riparian corn.. r through
Sweetbriar Park nd surrounding properties that were damaged during the flooding in April 20 (see attached
memo).
nderstanding
,041.00
$ 216,202.00
$ 15,896.00
$ 439,317.00
Cost of this request
Category / Project Budget
Nio ska Creek Stream Restoration
Demonstration
4470.9470.5806.00
2250.9256.5314.00
4470.9470.5817.00
Account Number
09025.0901
09025.0901
195,058.90
2,605.>''0
289,3 -..97
Funds Used to D
02097.1
21,143.10
$ 13,290.50
Project Numbers Rem
Budgeted Item mai Budge
150,000.03
iokaska Creek Stream Restoration
Demonstration
Stormwater Quality
Management/Nutrient Reduction
Program Category / Project Name
Sales Tax Capital Improvements
Park Land Dedication Funds4N-
Sales Tax Capital Improvements
Program / Project Category Name
Sales Tax/Grant
Park Land Dedication Funds (N-.
Sales Tax
lance Fund Name
djustment Atta
e
EMI
Previou
Ordinance or Resolution # 5268
De.a t Director
tract Date:
Original Contra
t Number:
ity Attorney
Finance and Internal Servi
s Director
Date Received in
Clerk's Offi
Received in
Mayor's Office
Comments:
(JE)
(N E)
Revised January 15, 2009
veTartareville
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
ARKANSAS
www.accessfayetteville.org
CITY COUNCIL AGENDA MEMO
To:
Thru:
From:
Date:
Subject:
Mayor Lioneld Jordan and City Council
Don Marr, Chie • f Staff
Connie Edmonsto Parks and Recreation Director
Jeremy Pate, Devel•.ment Services Director U\
Alison Jumper, Park lanning Superintendent G�
Carole Jones, Park Pla er II
February 3, 2012
Repair portions of Niokaska
surrounding properties that w
Agenda Request for February
reek riparian
e damaged
, 2012
PROPOSAL:
Sweetbriar Park contains 4.05 acres and is locate
northeast quadrant of town east of Old Missou
tributary to Mud Creek, flows through Swee
Watershed.
c s ridor through Sweetbriar Park and
ring the flooding in April 2011
eting
2645 E. Sweetbriar Drive. The park is situated in the
Ro: d and south of Joyce Boulevard. Niokaska Creek, a
riar P. k. The creek is located within the Illinois River
On September 1, 2009, the City Counci passed Ordinan•- Number 5268 approving a Memorandum of
Understanding (MOU) with the Watersh=d Conservation Reso_ rce Center to restore an approximately 1,600 -
foot section of Niokaska Creek that as incised and had se eral banks eroding into the park land and
surrounding residential yards (see atta ed ordinance).
Construction of the orginal projec was completed in March 2011. CRC designed the orginal project and
performed the construction obse ation working closely with the co tractors. Severe flooding occurred in
Washington County in April 20 1, only one month following construction. Although the project successfully
protected City park land and s ounding properties, damage to the project c ccurred in several locations and the
damage should be addressed • maintain the integrity of the project.
Staff is requesting approv
described in Ordinance
repairing a portion of a
in Sweetbriar Park a
will be made. Nativ
along the stream
implementation
1 of Amendment No. 1 pursuant to the Memorandu
o. 5268 with the Watershed Conservation Resource Cen
reviously constructed streambank restoration project along
surrounding properties. Repairs to rock structures and adjace
plant species will be replanted in the affected areas to create a h
orridor. The scope of the amendment generally includes the d
d project administration including finiancial tracking and reportin
of Understanding (MOU) as
r. This amendment includes
section of Niokaska Creek
constructed floodplains
althy riparian corridor
ign of the repairs,
procurement of
THE CITY OF FAYETTEVILLE, ARKANSAS
contractors and materials, and coordination among project partners and contractors. All procurement measures
must follow procedures approved by the City of Fayetteville.
A portion of the project which is located along the park property is eligble fo - funding from FEMA. The
remainder of the repairs are not eligble for funding from FEMA because the s ctures are located within the
channel of the stream or are located on private property.
RECOMMENDATION:
Parks and Engineering staff req - st approval of Amendment N s . 1 pursuant to the Memorandum of
Understanding (MOU) as described i Ordinance No. 5268 with th-, atershed Conservation Resource Center
in an amount NTE $25,201 and appro :1 of a budget adjustment . repair portions of Niokaska Creek riparian
corridor through Sweetbriar Park and su ounding properties th t were damaged during the flooding in April
2011.
BUDGET IMPACT:
The cost of $25,201 is accounted for in proj ct numb s 09025.0901 - Niokaska Creek Stream Restoration
Demonstration ($20,221) and 02097.1 - Stormw.. er Q ity Management/Nutrient Reduction ($4,980).
Attachments:
Staff Review Form
Ordinance No. 5268
Amendment No. 1
Purchase Requisition
Budget Adjustment
RESOLUTION NO.
A RESOLUTION APPROVING AMENDMENT NO. 1 TO A
MEMORANDUM OF UNDERSTANDING WITH THE WATERSHED
CONSERVATION RESOURCE CENTER (WCRC) IN AN AMOUNT NOT TO
EXCEED $25,201.00 TO REPAIR PORTIONS OF THE NIOKASKA CREEK
RIPARIAN CORRIDOR THROUGH SWEETBRIAR PARK AND
SURROUNDING PROPERTIES DAMAGED IN APRIL 2011 FLOODS, AND
APPROVING A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves
Amendment No. 1 to a Memorandum of Understanding with the Watershed Conservation
Resource Center (WCRC) in an amount not to exceed $25,201.00, a copy of which is attached as
Exhibit "A", to repair portions of the Niokaska Creek riparian corridor through Sweetbriar Park
and surrounding properties damaged in April 2011 floods.
Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a
budget adjustment, a copy of which is attached as Exhibit "B".
PASSED and APPROVED this 20 day of February, 2012.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
ORDINANCE NO. 5268
AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND APPROVING A MEMORANDUM OF
UNDERSTANDING WITH THE WATERSHED CONSERVATION
RESOURCE CENTER (WCRC) IN THE AMOUNT OF $188,000.00 FOR A
STREAM RESTORATION DEMONSTRATION PROJECT ON NIOKASKA
CREEK THROUGH SWEETBRIAR PARK.
WHEREAS, the Watershed Conservation Resource Center possesses unique expertise
and resources ideally suited to meet the City of Fayetteville's need for stream restoration as part
of the Stormwater Phase II permit requirements; and
WHEREAS, the Watershed Conservation Resource Center can perform this work at a
significant savings to the citizens of Fayetteville.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby determines
an exceptional situation exists in which competitive bidding is deemed not feasible or practical
and therefore waives the requirements of formal competitive bidding and approves a
Memorandum of Understanding (marked as Exhibit "A" attached hereto and made a part hereof)
between the City of Fayetteville, Arkansas and the Watershed Conservation Resource Center
(WCRC) in the amount of $188,000.00 for a Stream Restoration Demonstration Project on
Niokaska Creek through Sweetbriar Park.
PASSED and APPROVED this 1st day of September, 2009.
APPROVED:
ATTEST:
By:
SONDRA E. SMITH, City Clerk/Treasurer
ORDINANCE NO. 5268
AN ORDINANCE WAIVING THE REQUIREMENTS OF FORMAL
COMPETITIVE BIDDING AND APPROVING A MEMORANDUM OF
UNDERSTANDING WITH THE WATERSHED CONSERVATION
RESOURCE CENTER (WCRC) IN THE AMOUNT OF $188,000.00 FOR A
STREAM RESTORATION DEMONSTRATION PROJECT ON NIOKASKA
CREEK THROUGH SWEETBRIAR PARK.
WHEREAS, the Watershed Conservation Resource Center possesses unique expertise
and resources ideally suited to meet the City of Fayetteville's need for stream restoration as part
of the Stormwater Phase II permit requirements; and
WHEREAS, the Watershed Conservation Resource Center can perform this work at a
significant savings to the citizens of Fayetteville.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby determines
an exceptional situation exists in which competitive bidding is :deemed not feasible or practical
and therefore waives the requirements of formal competitive bidding and approves a
Memorandum of Understanding (marked as Exhibit "A" attached hereto and made a part hereof)
between the City of Fayetteville, Arkansas and the Watershed Conservation Resource Center
(WCRC) in the amount of $188,000.00 for a Stream Restoration Demonstration Project on
Niokaska Creek through Sweetbriar Park.
PASSED and APPROVED this 1St day of September, 2009.
APPROVED:
ATTEST:
By:
SONDRA E. SMITH, City Clerk/Treasurer
eVille Purchase Order (PYO) Request ;
(Nof a Purchase Orderjr
d unless medical or 1099semcb related (Ca11x256 with quest on
e Porches"ng,e maiic Purchasng@cLfayetteviile ar us, , ,
All purchases under $2500 shall h
All PO, Request shall: be scanned to
Vendor #:Vendor Name:
16441
Watershed Conservation Resource Center
Requisition No.:
KU Number:
Address:
380 W. Rock St.
Fob Point:
Mail
Yes:
'Taxable
Yes:
`nate:
2121/2012
'xpected uelroery nate:
No:
No:
Quotes Attached
Yes:
No:
City:
Fayetteville
Requester:
Carole Jones, Park Planner II
Item
Description
antity
State:
AR
Unit of Issue
Unit Cost
Extended Cost
Zip Code:
72701
Ship to code: Divison He
Requester's Employee #: Extension:
3003
• • royal:
472
Account Numbers Project/Subproject #
Inventory #
Fixed Asset #
1
Niokaska Stream Restoration
Repair in Sweetbriar Park
1
Lot
$15,041.00
$15,041.00
4470.9470.5806.00
09025.0901
2
Niokaska Stream Restoration
Repair in Sweetbriar Park
1
Lot
$5,180.00
$5,180.00
2250.9256.5314.00 09025.0901
3
Niokaska Stream Restoration
Repair in Sweetbriar Park
1
Lot
$4,980.00
$4,980.00
4470.9470.5817.00 02097.1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Shipping/Handling
3peciai Instructions:
Lot
$0.00
Tax is included in the contract price.
Approvals:
Mayor:
Finance & Internal Services Director:
Dispatch Manager:
Department Director:
Budget Manager:
Utilities Manager:
Subtotal:
Tax:
Total:
$25,201.00
$25,201.00
Purchasing Manager:
IT Manager:
Other:
Revised 1/2/2008