Loading...
HomeMy WebLinkAbout24-12 RESOLUTIONRESOLUTION NO. 24-12 A RESOLUTION AWARDING BID #12-10 AND AUTHORIZING THE PURCHASE OF DRAINAGE PIPE FOR VARYING UNIT PRICES FROM VARIOUS VENDORS FOR USE IN OZARK REGIONAL TRANSIT NEW FREEDOM PROJECTS AND OTHER CITY PROJECTS, AS NEEDED THROUGH THE END OF CALENDAR YEAR 2012 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #12-10 and authorizes the purchase of drainage pipe for varying unit prices from various vendors, as shown in the attached Exhibit "A", for use in Ozark Regional Transit New Freedom Projects and other City projects, as needed through the end of calendar year 2012. PASSED and APPROVED this 17th day of January, 2012. APPROVED: ATTEST: By: �L � By: etaw 444A-' IO LD J ti tii� Mayor SONDRA E. SMITH, City Clerk/Treasurer cyAi. 1Je Bid 12-10, Drainage Pipe for ORT New Freedom Project BID: 12-10 DATE: 12116/11 TIME: 2:00 PM CITY OF FAYETTEVILLE Item 7Y Sire Measure Description EstOty Unit of Measure Hanson Pipe & Precast HD Supply Waterworks Keeling Company Scurlock Industries of Fayetteville, Inc. Water Products Unit IMce Extended PHca Unit Prka 1 Extended Prim use! PNta fasaced Priem Unit Moe 1 Extended Prom Unit Poet J Erie ed Prva 1 15 n -.•nett• Circular Reinforced Concrete Pipe, Class III FO Feel $ 12 92 $ 1.162 80 $ 10 30 $ 927 00 N/A N/A $ 9 25 1 $ 832 50 N/A 1 N/A 2 t8- 0_.,,,,1,,, Circular Reinforced Concrete Pipe, Class III 780 Feet $ 14.52 5 2,613 60 $ 14 00 1 $ 2,520 00 N/A N/A $ 11 15 1 $ 2007 00 N/A N/A 3 pa Circular Reinforced Concrete Pipe. Class 11 pgn Feet $ 23 01 $ 4,141 80 $ 20 00 1 5 1600 00 N/A N/A $ 16.25 1 $ 2,925 00 N/A N/A 4 30- t -;_,.r.,, Circular Reinforced Concrete Pipe. Class III 45 Feet $ 33 13 $ 1,490 05 $ 30 00 $ 1,350 00 N/A N/A $ 24 00 J $ 1.08000 N/A N/A 5 36 cs,,,,,N, Circular Reinforced Concrete Pipe, Class III 45 Feel S 45 61 $ 2,052 45 $ 44 00 $ 1,980 00 N/A N/A 5 35 95 1 $ 1,617 75 N/A N/A 6 42- ,„tart, Circular Reinforced Concrete Pipe Class III 45 Feel $ 56 96 $ 2,563 20 5 52 00 $ 2 340.00 N/A N/A $ 45 40 1 $ 2,043 00 N/A N/A 7 48' -„c-_-<-r Circular Reinforced Concrete Pipe, Class III 45 Feet 5 72 22 $ 3.249 90 $ 66 00 15 2,970 00 N/A N/A $ 55.15 1 5 2,481 75 N/A 1 N/A 8 t5- t,,,T,.S. Flared End Section, Circular Reinforced Concrete, Class III 2 cath $ 296.02 $ 592 04 $ 269 00 f 5 538 00 N/A N/A N/A NIA $ 210 00 $ 420 00 $ 34000 (S 68000 N/A NIA ( N/A N/A 9 18- ,-„ Flared End Section, Circular Reinforced Concrete Class111 1 n,,,., $ 32467 $ 649.34 $ 294.00 $ 588.00 10 24- ,. Flared End Section Circular Reinforced Concrete Class 111 2 Each 5 368 49 S 736 98 3 334 00 5 666 DO N/A NIA $ 305 00 $ 610 00 NlA N/A 11 39. y, v. Flared End Section, Circular Reinforced Concrete. Class III path $ 410 09 S 820 18 S 372 00 ( $ 744.00 N/A N/A 5 360 00 $ 720.00 NIA N/A 12 36" Aa,x. Flared End Section. Circular Reinforced Concrete, Class 111 Earl, $ 990 56 5 1,981 12 9 680 00 5 1,360 00 N/A NIA 5 675 00 S 1,350.00 N/A NIA 13 42" o. Flared End Section, Circular Reinforced Concrete, Class III 2 Each 9 990.56 S 1,981 12 9 899 00 $ 1,798 00 N/A N/A 5 875 00 1 $ 1.75000 N/A NIA 14 46 no„rih Flared End Section, Circular Reinforced Concree C a,sl•I 2 Each 5 1,16665 $ 2,33330 S 1,06000 3 2.12000 N/A N/A 9 1.035 00 1 $ 2.070.00 NIA N/A 15 14' x 23 arra a s.;- Horizontal Elliptical Reinforced Concrete Pipe, Class III 20 Feel 5 26 10 $ 2,349.00 N/A N/A N/A NIA $ 21 75 15 1.957.50 NIA N/A i6 19' x 30- a.. a .5,0- Horizontal Elliptical Reinforced Concrete Pipe. Class III 90 p„,,t 9 36 40 $ 3 276 00 NIA NIA N/A N/A N/A NtA NIA NIA $ 23 501 5 2.115 00 $ 33 00 J 5 1,485 00 $ 48 75 1 $ 2,193 75 N/A N/A N/A N/A N/A N/A 17 24'• x 3B• 29- a 45- ,_ a. - fiva Crc" Horizontal Elliptical Reinforced Concrete Pipe Class III Horizontal Eltpbcal Reinforced Concrete Pipe Class III 45 45 pee, Feet 5 43 90 $ 60 14 5 1,975 50 , $ 2,706 30 N/A N/A NIA N/A t8 19 .,a x 53" m., A Spz. Horizontal Elliptical Reinforced Concrete Pipe. Clan III 45 Feel $ 77 95 $ 3,507 75 N/A 1 N/A N/A NIA $ 63 50 1 S 2.857.50 N/A N/A 20 38" x 60 Rise a span Horizontal Elliptical Reinforced Concrete Pipe. Class 111 45 Feet $ 99 12 $ 4,460 40 N/A 1 NIA N/A NIA $ 78 50 1 $ 3,532.50 N/A 1 N/A 21 4- 2a' - Tapered End Section, Horizontal Elliptical RCP. Class III 2cert. $ 365 33 9 730 66 N/A I N/A N/A N/A S 300 00 1 $ 600.00 N/A N/A 22 19- x 30' as_ . spur, Tapered End Section. Horizontal Elliptical RCP. Cies, 111 Each 5 492 72 $ 985 44 N/A 1 NIA N/A NIA 5 350 00 S 700.00 N/A 1 NIA 23 24- x 38' ac<a Ra. Tapered End Section, Horizontal 61100,01 RCP, Class 111 Each 9 548 19 S 1,096 38 N/A ! N/A N/A N/A 5 450 00 1 S 900.00 N/A 1 NIA 24 29" x 45" :in, .. „, Tapered End Section, Horizontal Elliptical RCP, Class III cacti $ 1,001 05 5 2,002.10 NIA N/A N/A NIA S 600 00 J 5 1,200.00 N/A l N/A 25 34' 53, .._ s , ,,, Tapered End Section, Horizontal Elliptical RCP. Class III 2 Each 5 1.324 13 5 2 648 26 N/A 1 NIA N/A N/A S 750 00 1 9 1,50000 NIA N/A 26 38"x60" azcas..,n tapered End Section,'Honzontal Eltipucat RCP, Class tit 2 Each S 1.56026 S 3,12052 NIA i NIA N/A N/A S 875 00 1 9 1.750.00 N/A ; N/A 27 15' .,r,,, Plastic Pioe 100 1 ,... NIA ISA 3 5 90 1 5 590 00 6 B92 $ 689 20 $ 5 60 1 5 560.00 $ 6 93 F S 693 00 28 15- ,M.,,y„ Plastic Pipe 500 Feel N/A N/A S 9.33 1 9 4,665 00 9 389 5 4,694 50 S 6 05 1 S 4,02500 S 9.44 : $ 4,720 00 29 24' ,xm,n Plastic Pipe 500 Feet N/A N/A 5 14 98 ; 5 7.490 00 15 057 $ 7.528 50 5 14 30 J S 7,150.00 5 1514 j $ 7,570 00 30 39' nx,or,. Plastic Pipe 200 Feet N/A N/A 5 23 90 1 5 4 780 00 24 042 $ 4.808 40 5 19 80 1 5 3.960 00 5 24.17 { $ 4.834 00 31 36- ps*va• Plastic Pipe On Fee, N/A N/A S 28 52 3 5 2 852 00 28 674 $ 2 867 40 5 25.85 1 $ 2 585 00 5 28 82 } 5 2 882 00 32 42' ._,-.a. Plastic Pioe 59 Feer NA N/A 5 38 00 5 2.280 00 38 228 S 2.293 68 5 35 20 1 5 2,112 00 5 38 43 i $ 2.305 80 33 48' _.=.,,u. Plastic Pipe 60 Feel N/A 1 N/A $ 40 85 j 5 2.451 00 41 068 $ 2.464 08 5 44 SO 1$ 2,670 00 S 41 26 15 2,476 80 34 15- 0, Flared End Section Plastic Pipe 7 Each NIA N/A 9 105 00 1 5 212 00 103 151 $ 206 30 N/A 1 NIA 5 105.00 1 5 210 00 35 18- 1 q,a-,;.y. Flared End Section Plastic Pipe - Each NIA N/A 5 142 00 1 5 284 00 138 560 S 277 '2 N/A 1 N/A 5 14100 { $ 282 00 36 24^ p,y.y,r,„ Flared End Section, Plastic Pipe Eat,; N/A NIA 5 181.00 J $ 362 00 177 824 $ 355 65 N/A 1 NIA $ 18103 1 $ 362 00 37 3D- 1 sN-at. Flared End Section, Plastic Pipe Each NIA NIA $ 441 00 1 $ 882 00 432 384 $ 864 77 N/A 1 N/A 6 43900 1 $ 878 00 38 36' �_;:u, Flared End Section Plastic Pipe 2 Each NIA N/A S 467 00 1 S 934 00 457 814 $ 915 63 N/A 1 NIA S 465 00 I S 630 00 39 42' O,-._,,,,„ Flared End Section, Plasbe Pipe 2 Each N/A N/A N/A 1 NIA N/A N/A NIA 1 N/A N/A 1 N/A 40 48' as -..•u- Flared End Section Plastic Pipe 2 Each NIA N/A N/A J N/A N/A N/A N/A 1 N/A N/A I NIA Total Bid Price = $55,226.99 ( $51,285.00 $27,965.23 $64.440.25 , $28,143.60 'NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formai authorization by City officials. 1,'1 /7/ DlTrE Terry Gulley Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements January 17, 2012 City Council Meeting Date Agenda Items Only Transportation Division Action Required: Transportation Services Department A resolution awarding Bid 12-10 for and approving the purchase of eee drainage pipe for varying unit prices as shown on the attached bid tabulation for use in Ozark Regional Transit New Freedom Projects and other City projects, as needed through the end of calendar year 2012. 66,846.24 Cost of this request 2100.5530.5216.00 Account Number 09030 Project Number Budgeted Item X 243,939.71 Category / Project Budget ORT Sidewalks & Pads Grant Program Category / Project Name Materials and Supplies Funds Used to Date Program / Project Category Name 243,939.71 Street Remaining Balance Fund Name Budget Adjustment Attached Finance and Internal Services Director Date Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in City 1 2 -2? -1 1 P0 3: 13 R Clerk's Office tiwt? Comments: Revised January 15, 2009 ave evfle CITY COUNCIL AGENDA MEMO THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE To: Mayor and City Council Thru: Don Marr, Chief of Staff From Terry Gulley, Transportation Services Director--- Date: irectorDate: January 17, 2012 Subject: A resolution awarding Bid 12-10 for and approving the purchase of drainage pipe for varying unit prices as shown on the attached bid tabulation for use in Ozark Regional Transit New Freedom Projects and other City projects, as needed through the end of calendar year 2012. PROPOSAL: City Council approved an agreement with Ozark Regional Transit on November 3, 2009 (Res. No. 220-09) to utilize $387,500 in Federal Transit Administration grant funds for sidewalk, transit shelter and bench concrete pad construction. These New Freedom funds will enable the City to construct these amenities in the proximity to bus stops. Sealed formal bids for drainage pipe for ORT were publicly read and the results are attached to this memo. RECOMMENDATION: Staff recommends a resolution awarding Bid 12-10 for and approving the purchase of drainage pipe for varying unit prices as shown on the attached bid tabulation for use in Ozark Regional Transit New Freedom Projects and other City projects, as needed through the end of calendar year 2012. BUDGET IMPACT: Funds for the acquisition of the materials have been budgeted in the ORT Sidewalks & Pads Grant project. Grant funds are required to be spent by September 1, 2012. RESOLUTION NO. A RESOLUTION AWARDING BID #12-10 AND AUTHORIZING THE PURCHASE OF DRAINAGE PIPE FOR VARYING UNIT PRICES FROM VARIOUS VENDORS FOR USE IN OZARK REGIONAL TRANSIT NEW FREEDOM PROJECTS AND OTHER CITY PROJECTS, AS NEEDED THROUGH THE END OF CALENDAR YEAR 2012 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #12-10 and authorizes the purchase of drainage pipe for varying unit prices from various vendors, as shown in the attached Exhibit "A", for use in Ozark Regional Transit New Freedom Projects and other City projects, as needed through the end of calendar year 2012. PASSED and APPROVED this 17th day of January, 2012. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer le THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTI, ENT CORRESPONDENCE ARKANSAS ww accessfayetteville.org CITY COUNCILAGENDA MEMO To: Mayor aridity Council Thru: Don Marr, Chief of Staff From Terry Gulley, Transportation Services Directof i4 Date: January 17, 2012 Subject: A resolution awarding Bid 12-10 for and app varying unit prices as sho\vn on the attache New Freedom Projects an other City pr ving the purchase of concrete drainage pipe for id tabulation for use in Ozark Regional Transit ects, as needed through the end of calendar year 2012. PROPOSAL: City Council approved an agreement with Ozar utilize $387,500 in Federal Transit Administr pad construction. These New Freedom fun to bus stops. Sealed formal bids for drai this memo. RECOMMENDATION: Staff recommends a resolutio awarding Bid 12-10 for and approving the purchase of concrete drainage pipe for varying unit prices as sho on the attached bid tabulation for ► e in Ozark Regional Transit New Freedom Projects and other City projects, as needed through the end of calen. . r year 2012. egional Transit on November 3, 2009 (Res. No. 220-09) to tion rant funds for sidewalk, transit shelter and bench concrete will en ble the City to construct these amenities in the proximity age pipe for RT were publicly read and the results are attached to BUDGET IMPACT: Funds for the acquisition of the materials have been budgeted in the OR', Sidewalks & Pads Grant project. Grant funds are required to be spent by September 1, 2012. RESOLUTION NO. A RESOLUTION AWARDING BID #12-10 AND AUTHORIZING THE PURCHASE OF CONCRETE DRAINAGE PIPE FOR VA /SING UNIT PRIC FROM VARIOUS VENDORS FOR USE IN OZ • REGIONAL TRANS NEW FREEDOM PROJECTS AND OTHER CI PROJECTS, AS NEEDED THROUGH THE END OF CALENDAR YEAR 012 BE IT ' .OLVED BY THE CITY C I NCIL OF THE CITY OF FAYETTEVILLE, A NSAS: Section 1. That theity Council of the City • ' Fayetteville, Arkansas hereby awards Bid #12-10 and authorizes the urchase of concrete rainage pipe for varying unit prices from various vendors, as shown in\the attached Exhi t "A", for use in Ozark Regional Transit New Freedom Projects and other Ci .rojects, as n -ded through the end of calendar year 2012. PASSED and APPROVED . i 7th day of January, 2012. APPROVED: / ATTEST: By: By: LIONELD JO ' 1 AN, Mayor SONDRA E. SMITH, City Clerk/Treasurer