HomeMy WebLinkAbout238-12 RESOLUTIONRESOLUTION NO. 238-12
A RESOLUTION TO SELECT THE SITE OF THE ENTERTAINMENT
DISTRICT PARKING DECK AND TO EXPRESS THE CITY COUNCIL'S
INTENT TO REPLACE ADMINISTRATIVE OFFICE AND PARKING
SPACES LOST THROUGH THIS PROJECT
WHEREAS, the City Administration and its engineering consultant have studied three
possible sites for the Entertainment District Parking Deck near the Walton Arts Center
performing arts theater which include:
a) Within the block which contains the Walton Arts Center performing arts
theater;
b) On a portion of the city parking lot known as the Walton Arts Center parking
lot; and
c) On the city parking lot east of School Avenue across from the Walton Arts
Center administration office; and
WHEREAS, the City Council has carefully studied the benefits and drawbacks of each
site and listened to extensive public comments about these possible sites.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby
determines that the Entertainment District Parking Deck shall be built within the
block which contains the Walton Arts Center Performing Arts Theater because
such site offers the preferred option for the Citizens and City of Fayetteville, the
Walton Arts Center, the Entertainment District businesses and patrons, and the
residents near one or more of the proposed sites.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby
expresses its intent:
1. To build comparable replacement offices in a liner building along the
parking deck for the Walton Arts Center Administration because of the
necessary removal of the current administration building;
2. To provide thirty-five (35) complimentary parking spaces for the
Walton Arts Center Administration's exclusive use 24 hours a day,
365 days a year in the parking deck or School Street lot to replace the
twenty-eight (28) spaces of uncovered parking that will be lost because
of this project;
3. To provide necessary and reasonable rent and moving expenses for
Walton Arts Center administrative personnel dislocated because of the
construction of this project;
4. To excavate and shell out about 4,500 square feet of space beneath the
office building with connection to the current backstage for the Walton
Arts Center to finish out and complete its backstage expansion project;
and
5. To work cooperatively with the Walton Arts Center Administration to
facilitate the joint construction projects in an attempt to minimize any
adverse effect upon the Walton Arts Center operations.
PASSED and APPROVED this 4th day of December, 2012.
APPROVED:
By.
IO ' LD JO ' . . , Mayor
ATTEST:
.-� By:,K_d..,A, E
SO DRA E. SMITH, City Clerk/Treasurer
David Jurgens
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
12/4/2012
City Council Meeting Date
Agenda Items Only
Parking
Division
Action Required:
Utilities
Department
City Council select the site for the entertainment district parking deck.
Cost of this request
Account Number
11028.1201
Project Number
Budgeted Item
XX
Category / Project Budget
Entertainment District Parking Facility
Program Category / Project Name
Entertainment District Parking Facility
Funds Used to Date Program / Project Category Name
Site Selection
Remaining Balance Fund Name
Budget Adjustment Attached
[AA
Departure t Directp�
.M -
City Attorney
Date
Id —15 62
Date
- -26 IL.
Finance and Internal Services Director Date
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
5457, 42-12
2/21/2012
Received in City 1 1-1 4 -1 2 P03: 1 8 R CV D
Clerk's Office
Comments:
Revised January 15, 2009
ave ev! le
Departmental Correspondence
ARKANSAS
www.accessfayetteville.org
LEGAL
DEPARTMENT
TO: Mayor Jordan
City Council
David Jurgens, Utilities Director
FROM: Kit Williams, City Attorney
DATE: December 4, 2012
Kit Williams
City Attorney
Jason B. Kelley
Assistant City Attorney
RE: Amendment of Resolution to select Entertainment District Parking Deck Site
The Walton Arts Center Administration requested that the City agree to do several
things if the parking deck is to be built on the block on which the Auditorium sits. This
land is owned as cotenants by the University and the City and leased to the Walton Arts
Center, Inc. (an agent for both the City and U of A). Pursuant to the Administration's
request, I have placed these requests within Section 2 of the Resolution for your approval.
Someone will need to move to amend the Resolution in your packet to this enlarged
Resolution.
The Walton Arts Center has requested that the City pay for, construct, or provide
the following:
(1) A replacement office building for its administrative staff for its current
administration building which must be demolished to build the parking deck.
(2) Provide 35 free parking spaces within the parking deck (with some possibly
in the School Street parking lot) for the Walton Arts Center Administration's exclusive
use 24 hours a day, 365 days a year to replace the 28 uncovered parking spaces in its
two small parking lots by its current administration building.
(3) Excavation (including possible blasting) so that the Walton Arts Center can
expand its backstage area.
(4) Construct a shell (walls and doorway) next to the Walton Arts Center in its
excavated area to assist in the Walton Art Center's backstage expansion.
(5) Reasonable rent and moving expenses for Walton Arts Center
Administrative staff displaced by the construction to the deck and their replacement
building.
The law requires that bond proceeds must be used solely for the purposes
stated within the bond ordinance and notice to investors. These express purposes are
for construction of a public parking deck. Therefore, the City probably cannot use bond
proceeds for some of the items requested by the Walton Arts Center.
I do not believe that the additional excavation and the construction of a shell
building to be used for the expansion of the Walton Arts Center backstage area (not for
the parking deck) can be paid for with bond proceeds. Our Bond Counsel Gordon
Wilbourn shares this opinion. We are also somewhat concerned about the year or so of
office rent and moving expenses (in and out) for the Walton Arts Center administrative
staff. If the City Council wants to supply these items to the Walton Arts Center, it should
not use bond proceeds, but other city revenue or reserves to pay for these requests.
Gordon and I believe that replacing the existing administrative building which
must be demolished to build the parking deck is probably within the purposes of the
bonds and thus could be paid out of bond proceeds. This replacement building should be
just that, a replacement not a larger or improved building. If the Walton Arts Center
wants an enlarged or improved building, it should pay for the increased costs. The City
could pay for these increased costs, but it could not use bond proceeds.
I am somewhat concerned that the Walton Arts Center wants us to dedicate to its
exclusive use more parking spaces than it is losing. Our bonds are to pay for a public
parking deck, not a private parking deck for the Walton Arts Center Administration. If
the City Council wants to provide 25% more exclusive parking to the Walton Arts Center
Administration than the construction of the deck is removing, I believe the City should
invest funds other than bond funds for the cost of these seven additional spaces.
When we look at the entire cost of this project and divide it by the number of parking
spaces created, a per space figure can be ascertained. Multiply that by seven and that is
the amount that needs to come from a revenue source other than the bonds. If we agreed
only to provide the same number (28) of parking spaces lost to the construction of the
parking deck, then there would be no need for this other funds payment.
2
RESOLUTION NO.
A RESOLUTION TO SELECT THE SITE OF THE ENTERTAINMENT
DISTRICT PARKING DECK AND TO EXPRESS THE CITY COUNCIL'S
INTENT TO REPLACE ADMINISTRATIVE OFFICE AND PARKING
SPACES LOST THROUGH THIS PROJECT
WHEREAS, the City Administration and its engineering consultant have studied three
possible sites for the Entertainment District Parking Deck near the Walton Arts Center
performing arts theater which include:
(a) Within the block which contains the Walton Arts Center performing arts
theater;
(b) On a portion of the city parking lot known as the Walton Arts Center parking
lot; and
(c) On the city parking lot east of School Avenue across from the Walton Arts
Center administration office; and
WHEREAS, the City Council has carefully studied the benefits and drawbacks of each
site and listened to extensive public comments about these possible sites.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines
that the Entertainment District Parking Deck shall be built within the block which contains the
Walton Arts Center Performing Arts Theater because such site offers the preferred option for the
Citizens and City of Fayetteville, the Walton Arts Center, the Entertainment District businesses
and patrons, and the residents near one or more of the proposed sites.
Section 2: That the City Council of the City of Fayetteville, Arkansas hereby expresses
its intent:
1. To build comparable replacement offices in a liner building along
the parking deck for the Walton Arts Center Administration because of
the necessary removal of the current administration building;
2. To provide thirty-five (35) complimentary parking spaces for the
Walton Arts Center Administration's exclusive use 24 hours a day, 365
days a year in the parking deck or School Street lot to replace the
twenty-eight (28) spaces of uncovered parking that will be lost because
of this project;
3. To provide necessary and reasonable rent and moving expenses for
Walton Arts Center administrative personnel dislocated because of the
construction of this project;
4. To excavate and shell out about 4,500 square feet of space beneath
the office building with connection to the current backstage for the
Walton Arts Center to finish out and complete its backstage expansion
project; and
5. To work cooperatively with the Walton Arts Center Administration
to facilitate the joint construction projects in an attempt to minimize
any adverse effect upon the Walton Arts Center operations.
PASSED and APPROVED this 4th day of December, 2012.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
va'�lte eville
www.accessfayetteville.org
To: Fayetteville City Council
Thru: Mayor Lioneld Jordan
Don Marr, Chief of Staff
From: David Jurgens, Utilities Director
Date: November 14, 2012
Subject: Downtown Municipal Parking Deck Location Selection
CITY COUNCIL AGENDA MEMO
MEETING DATE OF DECEMBER 4, 2012
THE CITY OF FAYETTEVILLE, ARKANSAS
RECOMMENDATION
City Staff and consultant parking deck team request the City Council select the site for the entertainment district
parking deck.
BACKGROUND
The combined staff and consultant parking deck team have been working for several months to develop the
information required to allow the City Council to choose the site for the entertainment district parking deck. As
part of the process, the team also worked closely with Boora Architects, who developed the Walton Arts Center
(WAC) short and mid range expansion plans. These plans include two alternatives - one including a parking
deck on the block which contains the WAC, and the other with no deck included on the same block.
DISCUSSION
A presentation of location alternatives for the downtown municipal parking deck is proposed to be given on
Tuesday, November 27, 2012 at the Agenda Session meeting. The consultant's detailed report will be provided
at that time. The presentation and report will provide background information and a matrix comparing the three
primary lots being considered - the WAC lot (the large parking lot west of West Avenue), the Theater lot (the
southeast corner of the block on which the Walton Arts Center is located), and the East lot (the existing parking
lot east of South School Avenue across from the Walton Arts Center administration offices). On Tuesday,
December 4, 2012 at the City Council meeting, Council will be requested to decide on a site location for the
proposed parking deck.
BUDGET IMPACT
No direct appropriation will be approved with this decision. When this decision is made, staff will bring
forward a contract for final design of the facility on the chosen lot.
Parking Deck Location Alternatives Presentation CCMemo 14Nov12
RESOLUTION NO.
A RESOLUTION TO SELECT THE SITE OF THE ENTERTAINMENT
DISTRICT PARKING DECK
WHEREAS, the City Administration and its engineering consultant have studied three
possible sites for the Entertainment District Parking Deck near the Walton Arts Center
performing arts theater which include:
(a) Within the block which contains the Walton Arts Center performing arts
theater;
(b) On a portion of the city parking lot known as the Walton Arts Center parking
lot; and
(c) On the city parking lot east of School Avenue across from the Walton Arts
Center administration office; and
WHEREAS, the City Council has carefully studied the benefits and drawbacks of each
site and listened to extensive public comments about these possible sites.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FAYETTEVILLE, ARKANSAS:
Section 1: That the City Council of the City of Fayetteville, Arkansas hereby determines
that the Entertainment District Parking Deck shall be built on or at
because such site offers the preferred option for the
Citizens and City of Fayetteville, the Walton Arts Center, the Entertainment District businesses
and patrons, and the residents near one or more of the proposed sites.
PASSED and APPROVED this 4th day of December, 2012.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer