HomeMy WebLinkAbout22-12 RESOLUTIONRESOLUTION NO. 22-12
A RESOLUTION AWARDING BID #12-07 AND AUTHORIZING THE
PURCHASE OF AGGREGATE MATERIALS FOR VARYING UNIT PRICES
FROM VARIOUS VENDORS, AS NEEDED THROUGH THE END OF
CALENDAR YEAR 2012
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid
#12-07 and authorizes the purchase of aggregate materials for varying unit prices from various
vendors, as shown in the attached Exhibit "A", as needed through the end of calendar year 2012.
PASSED and APPROVED this 17th day of January, 2012.
APPROVED:
ATTEST:
BY .441.1vL �L# � -� By:
0 ELD J 41► AN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
0
ave Levi:le
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
www.accessfayetteville.org
CITY COUNCIL AGENDA MEMO
To: Mayor and City Council
Thru: Don Marr, Chief of Staff
From: Terry Gulley, Transportation Services Director`"ya "
Date: January 17, 2012
Subject: A resolution awarding Bid 12-07, Aggregate Materials on a line item basis as specified in this memo,
authorizing the use of other bidders based on price and availability, and approving the purchase of aggregate
materials for the unit price amounts specified on the attached bid tabulation, as needed through the end of
calendar year 2012.
PROPOSAL:
The purchase of bulk construction materials and services is necessary to maintain the City's current
infrastructure and to implement the Capital Improvement Program projects outlined in the 2012 Annual Budget
& Work Program and five-year Capital Improvement Program.
Sealed formal bids for aggregate materials were publicly read and the results are attached to this memo. The
following in-house hauling costs were disclosed in the Invitation to Bid for Bid 12-07, Aggregate Materials.
City Costs:
i. City Staff — Maintenance Worker III (Truck Driver) = $14.28 / hour
ii. 10 -Wheel Dump Truck (15 ton capacity) = $10.36 / hour
iii. Tri -Axle Dump Truck (18 ton capacity) = $10.89 / hour
iv. 10 -Wheel Dump Truck (15 tons) + Truck Driver = $24.64 / hour
v. Tri -Axle Dump Truck (18 tons) + Truck Driver = $25.17 / hour
The following mileages were calculated based on the distance from each supplier's location to the City of
Fayetteville Transportation Division, utilizing Google Maps:
• APAC — Central, Inc. —17.1 miles, 22 minutes
• Northwest Arkansas Quarries — 15.5 miles, 27 minutes
• Rogers Group, Inc. (Lowell Quarry) — 15.8 miles, 29 minutes
• Rogers Group, Inc. (Hamstring Quarry) —10.1 miles, 19 minutes
The following City hauling costs were calculated based on the information shown above and added to the unit
price per ton in order to fairly evaluate the bids submitted by each potential supplier. The calculation method
consisted of converting the mileage and drive time to a percentage of an hour. The resulting percentages were
multiplied by the Tri -Axle Dump Truck + Truck Driver cost and divided the dump truck capacity to arrive at
THE CITY OF FAYETTEVILLE, ARKANSAS
the cost per ton added to the original unit price in each bid. Based on the aforementioned method of calculation,
the following unit costs were added to the unit bid prices for each potential supplier:
• APAC — Central, Inc. — $0.50 per ton
• Northwest Arkansas Quarries — $0.63 per ton
• Rogers Group, Inc. (Lowell Quarry — OPT 1) — $0.67 per ton
• Rogers Group, Inc. (Hamstring Quarry — OPT 2) — $0.45 per ton
RECOMMENDATION:
Staff recommends awarding the aggregate materials bid on a line item basis as follows:
1. Class 7 Base (SB -2): Primary Supplier: APAC — Central, Inc.
Secondary Supplier: Northwest Arkansas Quarries
2. Concrete Aggregate — 1.5": Primary Supplier: Northwest Arkansas Quarries
Secondary Supplier: APAC — Central, Inc.
3. Concrete Aggregate — 3/4": Primary Supplier: Northwest Arkansas Quarries
Secondary Supplier: Rogers Group, Inc. (Hamstring Quarry)
4. "B" Stone: Primary Supplier: Northwest Arkansas Quarries
Secondary Supplier: Rogers Group, Inc. (Hamstring Quarry)
5. Abrasives / Grit: Primary Supplier: Northwest Arkansas Quarries
Secondary Supplier: Rogers Group, Inc. (Hamstring Quarry)
6. Shot Rock: Primary Supplier: Rogers Group, Inc. (Hamstring Quarry)
Secondary Supplier: APAC — Central, Inc.
7. Rip Rap — Limestone Primary Supplier: Northwest Arkansas Quarries
Secondary Supplier: APAC — Central, Inc.
Secondary suppliers are awarded for use on an "as needed" basis in the event that the primary supplier cannot
provide the necessary materials or services within the time frame required to complete a project.
BUDGET IMPACT:
Funds for the acquisition of these materials have been budgeted in various capital projects within the Sales Tax
Capital Improvements fund.
Terry Gulley
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
January 17, 2012
City Council Meeting Date
Agenda Items Only
Transportation
Division
Action Required:
Transportation Services
Department
A resolution awarding Bid 12-07, Aggregate Materials on a line item basis as specified on the attached memo,
authorizing the use of other bidders based on price and availability, and approving the purchase of aggregate
materials for the unit price amounts specified on the attached bid tabulation, as needed through the end of calendar
year 2012.
205, 575.00
Cost of this request
4470.9470.xxxx.xx
Account Number
Various
Project Number
Budgeted Item
X
Category / Project Budget
Various Capital Projects
Program Category / Project Name
Transportation Improvements
Trail Improvements
Funds Used to Date Program / Project Category Name
Sales Tax Capital Improvements
Remaining Balance Fund Name
Budget Adjustment Attached
Department ! rector
Ci y Attorney
Finance and Internal Services Director
/Z -LS -n
Date
Date
^3-261'1_
Date
Date
ate
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
Received 412Git.) - 11 P03:14 R C V D
Clerk's Office
Comments:
Revised January 15, 2009
RESOLUTION NO.
A RESOLUTION AWARDING BID #12-07 AND AUTHORIZING THE
PURCHASE OF AGGREGATE MATERIALS FOR VARYING UNIT PRICES
FROM VARIOUS VENDORS, AS NEEDED THROUGH THE END OF
CALENDAR YEAR 2012
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid
#12-07 and authorizes the purchase of aggregate materials for varying unit prices from various
vendors, as shown in the attached Exhibit "A", as needed through the end of calendar year 2012.
PASSED and APPROVED this 17th day of January, 2012.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
aye evde
ARKANSAS
Bid 12-07, Aggregate Materials
BID: 12-07
DATE: 12/14/11
2:00 PM
CITY OF FAYETTEVILLE
Item
DESCRIPTION
EstimatedQuarries
Tons
APAC - Central, Inc.
Northwest Arkansas
Rogers Group Inc.
Stone Gardens, LLC
PRICE PER EACH
EXTENDED PRICE
PRICE PER EACH
EXTENDED PRICE
PRICE PER EACH
EXTENDED PRICE
PRICE PER EACH
EXTENDED PRICE
1
Class 7 Base (SB -2) - includes wet and dry
30,000
$5.25
$157,500.00
$530
$159,000.00
$6.45
$193,500.00
No Sid
No Bid
2
Concrete Aggregate - 1.5"
500
$8.75
$4.375.00
$7.80
$3.900.00
No Bid
No Bid
No Bid
3
Concrete Aggregate - 314"
500
$9.00
$4,500.00
$8.60
$4,300.00
$9.00
$4,500.00
No Bid
No Bid
4
"B" Stone
2,500
$6.75
$16.875.00
$6.50
$16,250.00
$6.75
$16,875.00
No Bid
No Bid
5
Abrasives / Grit (1/4" chips)
500
57.50
$3,750.00
$5.25
$2,625.00
$6.00
$3,000.00
No Bid
No Bid
6
Shot Rock
500
$6.00
$3,000.00
$6.00
$3.000.00
$6.00
S3,000.00
No Bid
No Bid
7
Rip Rap - Limestone
1,500
$16.00
$24,000.00
$12.00
$18,000.00
No Bid
No Bid
No Bid
8
Rip Rap - HARD SANDSTONE: Rock shall have an average
diameter ranging from 6 inches to 24 inches. Rock can be
quarried, cut or fieldstone material but shall be brown in color No
limestone will be accepted.
400
$11.00
$4,400.00
$25.20
$10,080.00
No Bid
No Bid
$29.50
S11,800.00
TOTAL BASED BID =
"NOTICE: Bid award is contingent upon vendor meeting
CERTIFIED:
$218,400.00
8217,155.00
$220,875.00
WITNESS DATE
511,800.00