HomeMy WebLinkAbout199-12 RESOLUTIONRESOLUTION NO. 199-12
A RESOLUTION APPROVING PAYMENT OF $4,019,094.00 TO THE
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
REPRESENTING THE CITY'S PORTION OF CONSTUCTION COSTS
RELATED TO IMPROVEMENTS TO STATE HIGHWAY 16, AND
APPROVING A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves
payment of $4,019,094.00 to the Arkansas State Highway and Transportation Department
representing the City's portion of construction costs related to improvements to State Highway
16.
Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a
budget adjustment, a copy of which is attached to this Resolution as Exhibit "A".
PASSED and APPROVED this 16th day of October, 2012.
APPROVED: ATTEST:
By:
SONDRA E. SMITH, City Clerk/Treasurer
poi 11Ilfrl►4
%,\.RK / T/.i �!i���i
•:' CAT Y O,c%`PG's.
FAYETTEVILLE
`
SPeS:` r i A NS .1* \-�S�
City of Fayetteville, Arkansas
Budget Adjustment Fonn
V11.0425
Budget Year
2012
Division: Utilities Director
Department: Utilities Director
Request Date
7127/2012
Adjustment Number
BUDGET ADJUSTMENT DESCRIPTION I JUSTIFICATION
This budget adjustment is to fund a cost share with AHTD for improvements to Hwy. 16. The City's portion of the cost
share is $4,019,094.00. There is $3,437,285.00 in project 060352300, and this BA will move the additional funds into
the project.
Division Head
Budget Director
C� iAt
Department ector
Fina
7/27/1z -
Date
Date
Date
`-PotaA OL _ P - z 26 °-
e Director Date
Date
Prepared By: Peggy Bell
Reference:
6fe1I.
Budget & Research Use Only
Type: A B C E
General Ledger Date.
Posted to General Ledger
Checked / Verified
Initial Date
Initial Date
Account Name
TOTAL: BUDGET ADJUSTMENT -
Increase / (Decrease) Project.Su#
Account Number Expense Revenue Number
Street improvements
4520.95540.5809.00 600,000 06035 2300
Street improvements
4520:9540.5809.00 (600,000) 06035 2200
J:1EXCEL1Hwy.16_.Armstrong to Stone BridgelBAForm Hwy.16 cost share AHTD09272012 1 of 1
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda items
and
Contracts, Leases or Agreements
Ito M./•012
42/777771z
City Council Meeting Date
Agenda Items Only
Engineering
Division
Action Required:
Development Services
Department
A resolution approving a payment of $4,019,094.00 to the Arkansas State Highway & Transportation Department for
the City's portion of the constructions costs associated with improvements to Hwy. 16 (Armstrong to Stonebridge).
The City has already deposited $980,906.00 with AHTD, bringing the total City expense to $5,000,000.00. Sweetsei
was the low bidder to the Highway Dept.
$4,019,094.00
Cost of this request
4520.9540.5809.00
Account Number
06035.2300
Project Number
Budgeted Item
5,000,000.00
Category / Project Budget
Hwy. 16 improvements
Program Category / Project Name
980,906.00 Transpoirtation Bonds
$
Funds Used to Date Program / Project Category Name
4,019,094.00 Street Sales Tax 2009
Remaining Balance Fund Name
Budget Adjustment Attached
X
01111,011,--
Date
11 2o-2oi1,--Date
Previous Ordinance or Resolution #
Original Contract Date:
! ._-eriginal Contract Number:
Date
4ctz..,,,,_,. - 7,i-zo►z
Finance and Internal Services Director Date
Received in City
Clerk's Office
lNYtfEfl
RES 111-10
RES 101-06
RES 202-10
Comments:
Revised January 15, 2009
111`eitteville
www.accessfayetteville.org
CITY COUNCIL AGENDA MEMO
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
Council Meeting of October 16, 2012
To: Mayor and City Council
Thru: Don Marr, Chief of Staff
Jeremy Pate, Development Services Director
From: Chris Brown, P.E., City Engineer eel
Date: September 27, 2012
Subject: Highway 16 Improvements -Armstrong Ave. to Stonebridge Rd.
PROPOSAL:
Improvements to Highway 16 are included in the City's Transportation Bond Program. Design and
construction of the project is being managed by the Arkansas Highway and Transportation Department
(AHTD). The City's agreement with AHTD is to share in all costs of the project, with the City's portion to be
capped at $5 million.
In 2010, a payment of $980,906 was made to the AHTD towards this $5 million commitment for right of way
and utility costs. Bids were taken on September 12th; Sweetser Construction was the low bidder at
$6,212,756.93. The total cost of the project, as detailed below, is $10.2 million.
Armstrcrl Ave.
040578
-Stone Bridge Fid. Sal. Secs.) (1 a eville) ($�_
Total ...... State Cid
P eim. Eng
438,294.12 $ 219,14
2` 9 147f
`ROW & Ut:i.
2,973,816,68
1 r466,9t 8.34
; $ 'i,486. 08.34
rtst.
$ 6,212,756.93
3# F06,3178.47
$ 3,105 378.4.8
Con t, Erg
621,275.69
+ 433,709 55
$ 187,566.14
Totals
$10,246,143.42
5,246,143.42.
5,000,000.00
Less City Uep�lt
... 980,906.00)
City's Remain ng Share .....$
4,019,094.00
Since the City's shared is capped at $5 million, the AHTD is requesting the remaining $4,019,094 due at this
time (See attached letter dated September 20`h from Frank Vozel, Deputy Director/Chief Engineer).
THE CITY OF FAYETTEVILLE, ARKANSA
RECOMMENDATION:
Staff recommends City Council approval of this payment to AHTD. Street Committee recommended approval
at the September 25th meeting.
BUDGET IMPACT:
The Transportation Bond Program includes funding in the amount of $5 million for this project. This payment
will be made from these funds.
RESOLUTION NO.
A RESOLUTION APPROVING PAYMENT OF $4,019,094.00 TO THE
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
REPRESENTING THE CITY'S PORTION OF CONSTUCTION COSTS
RELATED TO IMPROVEMENTS TO STATE HIGHWAY 16, AND
APPROVING A BUDGET ADJUSTMENT
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves
payment of $4,019,094.00 to the Arkansas State Highway and Transportation Department
representing the City's portion of construction costs related to improvements to State Highway
16.
Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a
budget adjustment, a copy of which is attached to this Resolution as Exhibit "A".
PASSED and APPROVED this 16th day of October, 2012.
APPROVED: ATTEST:
By: By:
LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer
RECEIVED ARKANSAS STATE HIGHWAY
SEP 2 1 2012 AND
ENGINEERING DIV, TRANSPORTATION DEPARTMENT
Scott E. Bennett
Director
Telephone (501) 569-2000
Voice/TTY 711
The Honorable Lioneld Jordan
Mayor of Fayetteville
113 West Mountain Street
Fayetteville, AR 72701
September 20, 2012
P.O. Box 2261
Little Rock, Arkansas 72203-2261
Telefax (501) 569-2400
www.arkansashighways.com
Re: Job 040578
F.A.P. STP -9142(26)
Armstrong Ave. -Stone Bridge Rd.
(Sel. Secs.) (Fayetteville) (S)
Washington County
Dear Mayor Jordan:
Sweetser Construction, Inc. of Fayetteville submitted the low bid of $6,212,756.93 for the referenced
project at the Department's September 12, 2012 letting. The Arkansas State Highway Commission
has tentatively accepted Sweetser Construction's proposal and will execute the contract upon receipt
of the City's remaining funds.
Currently, the total cost for all phases of this project is $10,246,143.04. As previously agreed, the
City is responsible for 50% of the cost of this project up to $5,000,000.00. A deposit of $980,906.00
for the City's share of preliminary engineering, right-of-way acquisition, and utility relocation costs
was previously received.
At this time, we request that you submit a check (made payable to the Arkansas State Highway and
Transportation Department) in the amount of $4,019,094.00. The contract will not be executed,
and construction cannot begin until your funds are received. Submittal of these funds to the
Department will be considered as your concurrence in the award of this contract.
We look forward to working with the City to complete the proposed improvements. Should you have
any questions or comments, please advise.
Sincerely,
c: Assistant Chief Engineer -Planning
Programs and Contracts
Fiscal Services (2)
Planning and Research
District 4
Job 040578 'C' File
Chris Brown, P.E., Fayetteville City Engineer
Frank Vozel
Deputy Director and
Chief Engineer
RESOLUTION NO. 111-10
A RESOLUTION AMENDING RESOLUTION 101-06 EXPRESSING THE
WILLINGNESS OF THE CITY OF FAYETTEVILLE TO PARTICIPATE IN
PARTIAL FUNDING OF THE PROPOSED WIDENING OF H:IGFIWAY 16
BE IT RESOLVEI) BY THE CITY COUNCIL OF TI CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas, hereby amends
Resolution 101-06 and expresses its willingness to participate in the partial funding of the
proposed widening of Highway 16 as provided herein.
Section 2. That the City Council of the City of Fayetteville, Arkansas, hereby expresses
its willingness to pay 50% of the costs for segments 1 and 2 of this project. up to a maximum of
$5,000,000.00, including all costs associated with construction, right-of-way acquisition, utility
adjustments and construction engineering. Should total costs for segments 1 and 2 be Less than
$10,000,000.00, the City agrees to cost share with the Arkansas Highway and Transportation
Department on a 50/50 basis for additional construction, design, right of way acquisition, or
other project development tasks for the unfunded portions of 1.5`h' Street and Happy Hollow
Road, up to a total cost of $10,000,000.00.
PASSED and APPROVED this 15th day of June, 2010.
APPROVED:
By:
ATTEST:
y:
SONDRA E. SMITH City Clerk/Treasurer
RESOLUTION NO. 202-10
A RESOLUTION AUTHORIZING PAYMENT TO THE ARKANSAS STATE
HIGHWAY AND TRANSPORTATION DEPARTMENT IN THE AMOUNT
OF $980,906.00 FOR A PORTION OF THE CITY'S FIFTY PERCENT (50%)
SHARE OF IMPROVEMENTS TO STATE HIGHWAY 16 FROM
ARMSTRONG AVENUE TO STONEBRIDGE ROAD
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas hereby authorizes
payment to the Arkansas State Highway and Transportation Department of $980,906.00 for a
portion of the City's fifty percent (50%) share of improvements to State Highway 16 from
Armstrong Avenue to Stonebridge Road.
PASSED and APPROVED this 16th day of November, 2010.
APPROVED:
ATTEST:
By: / Q JJ # J tycktit
SONDRA E. SMITH, City Clerk/Treasurer
USG ' \1 Y Quo•�,�
°F
4 �-A i
LLPPFAYETtEVILLEP •
9;
sI�
p�t1 y r
/"jV •RkAN5PP �
/�� rrP• 0
�'4 `NCr70NytiC►�`�
RESOLUTION NO. 101-06
A RESOLUTION EXPRESSING THE WILLINGNESS OF THE CITY
OF FAYE'FI EVILLE TO PARTICIPATE IN PARTIAL FUNDING
OF THE PROPOSED WIDENING OF HIGHWAY 16 FROM
HIGHWAY 71B EAST TO STONE BRIDGE ROAD,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
FAYETTEVILLE, ARKANSAS:
Section 1. That the City Council of the City of Fayetteville, Arkansas,
hereby expresses its willingness to participate in the partial funding of the
proposed widening of Highway 16 from Highway 71B east to Stone Bridge Road.
Section 2. That the City Council of the City of Fayetteville, Arkansas,
hereby expresses its willingness to pay 50% of the construction cost for this
project up to a maximum of $5,000,000.00, including all costs associated with
construction, right-of-way acquisition, utility adjustments and construction
engineering.
PASSED and APPROVED this 6th day of June, 2006.
APPROVED:
By:
COODY, Mayor
ATTEST:
B
�,........... .
VI
FAYEITEVILLE:
VNANOS
RA SMITH, City Clerk
STATE HWY 16 IMPROVEMENTS
5. COLLEGE AVE. to STONEBRIOGE R0.
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
N/A Mayors Signature
City Council Meeting Date
Agenda Items Only
Engineering
Division
Action Required:
LL-Inipaueine4,4
KO- 12
Development Services
Department
Approval of Change Order No. 1 to the Contract between AHTD and Sweetser Construction on Improvements to
Highway 16
Cost of this request
4520.9540.5809.00
Account Number
06035.2300
Project Number
Budgeted Item 1--1
$
4,037,285.00
Category / Project Budget
Transportation Bonds
Program Category / Project Name
4,019,094.00 Transportation Bonds
Funds Used to Date Program 1 Project Category Name
18,191.00 Sales Tax Construction
Remaining Balance Fund Name
Budget Adjustment Attached
Date
Previous Ordinance or Resolution #
Original Contract Date:
/2//2originai Contract Number: •
Date
l2. -t8 -Lary
Finance and Internal Services Director Date
is-Mny
Date
Received in City l 3-12P03:.05 R C V D
Clerk's Office
Uv,
Comments:
Revised January 15, 2009
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
ARKANSAS
www.accessfayetteville.org
MEMO
Mayor's Approval Only
To: Mayor Jordan
Thru: Don Marr, Chief of Staff
Jeremy Pate, Development Services Director
From: Chris Brown, City Engineer v�
Date: December 18, 2012
Subject: Change Order No. 1 to Highway 16 Widening -Armstrong to Stonebridge
PROPOSAL
Improvements to Highway 16 are included in the City's Transportation Bond Program. Design and
construction of the project is being managed by the Arkansas Highway and Transportation Department
(AHTD). The City has agreed to pay up to $5 million towards the total cost of the project.
The City has submitted the full $5 million payment, and construction is underway by the contractor hired by
AHTD. The attached Change Order is to add a pay item for back fill for concrete drainage pipe under the
highway -this item was inadvertently left out of the contract originally.
RECOMMENDATION
Staff recommends approval of this Change Order. No additional cost to the City will result as of this Change
Order since the City has met its full obligation on the project.
BUDGET IMPACT
None.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
DISTRICT FOUR FORT SMITH
MEMORANDUM
January 4, 2013
TO: Mr. Mike Sebren, State Construction E
FROM: Joe Shipman, District Four Engineer
SUBJECT: Job No. 040578
FAP: STP -9142(26)
Armstrong Ave. -Stone Bridge Rd (Se! Secs)(Fayetteville)(S)
Hwy 16, Sections 3
Washington County
Attached for your review and processing is approved Change Order No. 1 on the
above referenced project.
EJS:s1
attachments
c: Resident Engineer #43
ARKANSAS STATE HIGHWAY 0qT� AND TRANSPORTATION DEPARTMENT
A DISTRICT FOUR
4019 TOWSON AVE. • FORT SMITH, AR 72901 • P.O. BOX 11170 • FORT SMITH, AR 72917-1170
TELEPHONE (479) 646-5501 • FAX (479) 646-8286
WASHINGTON - CRAWFORD - FRANKLIN - SEBASTIAN - LOGAN - SCOTT - POLK
January 4, 2013
Sweetser Construction, Inc.
590 West Poplar
Fayetteville, AR. 72703
Re: Job No. 040578
FAP: STP -9142(26)
Armstrong Ave -Stone Bridge Rd (Sel Secs)(Fayetteville)(S)
Highway 16, Section 3
Washington County
Dear Sir:
Attached for your information is approved Change Order No. 1 on the
abovereferenced project.
If additional information is needed, please contact Resident Engineer Jeff Stroud.
EJS:s1
c: State Construction Engineer
Resident Engineer #43
Sincere!
Johipman
Di_trict Four Engineer
ARKANSAS STATE HIGHWAY COMMISSION
CHANGE ORDER
Job Name Armstrong Ave. -Stone Bridge Rd.(Sel. Secs.)(Favetteville) (S) Route & Section Hwy. 16, Sec.
Job No. 040578 FAP No. STP -9142(26) County Washington Change Order No. 1
Changes on Entire Project
Description of Change: Establish and add to the Contract the Item "Flowable Select Material" and place at the
locations indicated on the enclosed Schedule of Work.
Reason for Change: The Flowable Select Material is needed for backfill for the pipe culvert crossings
throughout the project.
Attachments: Schedule of Work, Contractor's Letter
NOTE: UNIT PRICE FOR "FLOWABLE SELECT MATERIAL" IS CONTINGENT UPON THE EXECUTION OF
A SUPPLEMENTAL AGREEMENT.
SUMMARY
Item No.
Item
Unit
Unit
Price
PRESENT
REVISED
Quantity
Amount
Quantity
Amount
206
Flowable Select Material
C.Y.
105.00
0
0.00
619
64995.00
Division Construction
Roadwa ' esi• n
n a rable Lio• • i=rrdan
Y
Mayor, Cit etteville
difr
Authorized ti�3 f t 3
Date
1001_
Overrun $ 64995.00
Initials Remarks
ict4 Cb ti ew✓
Requested rziz8
strict engineer Resident Engineer
Job No. 040578
Schedule of Work
FLOWABLE SELECT MATERIAL
STATION
LOCATION
CU. YD.
25+18
Curtis Avenue
_
26
25+57
Curtis Avenue
15
29+82
Happy Hollow Road
15
50+54
Hwy. 265
62
51+17
Hwy.265
35
64+40
Stone Bridge Road
16
585+88
Hwy. 16
48
599+35
Hwy. 16
20
613+35
Hwy. 16
25
616+00
Hwy. 16
50
616+60
Hwy. 16
45
619+00
Hwy. 16
22
626+00
Hwy. 16
7
629+05
Hwy. 16
93
639+37
Hwy. 16
18
641+00
Hwy. 16
21
644+00
Hwy. 16
13
647+00
Hwy. 16
7
652+93
Hwy. 16
69
657+00
Hwy. 16
12
Total:
619
it ACCOIV4PANSD
.CHANGE ORDERO°.
10B No. .. P.' .-W!Z a[oM�/j' a
FAP •..•~./.�.4YTJ�P
vu
cointrY
November 29, 2012
SWEETSER CONSTRUCTION, INC.
GENERAL CONTRACTORS • LICENSED • INSURED
590 WEST 1'OI'LAR FAYL•TTEVILLE, AR 72703
TELEPHONE (479) 443-3026 • FAX (479) 442-11119
Mr. Jeff Stroud
AHTD District Four
3526 North Highway 112
Fayetteville, AR 72704
Re: Flowable Select Material Job No. 040578
Mr. Stroud,
Sweetser Construction, Inc. will furnish and install flowable select material as submitted
and approved for Job No. 040578 at a price of $105.00 per cubic yard at pipe crossings as
directed.
619 CY @ $105.00 = $64,995.00
If you have any questions please let me know.
Thanks,
Charles W. Miller
TO ACCOULIANit
CHANGE ORDER
JOB Na
PAP��p/�!'J'y(.Z6
tN
COUNTY ../ :til
DEC 0 7 2012
FAYETfEVILLE, AR
RE -43
CHECK LIST FOR CHANCE ORDERS
(To accompany the Change Order for concurrence and approval)
X Enter complete Job Name as shown on contract.
X Enter only FAP Number(s) involved in change, or FAP Number and
Non -Participating, as applicable.
N/A A summary of quantities and money value per each FAP if more than one
FAP Number or Non -Participating is involved.
X Describe all changes fully.
X What is being changed, added or deleted?
X What is the location of change or changes? (Station Number, distance left
or right of centerline.)
X What is the contract description (exact wording) of the Item or Items?
X Sketches.
X Include Job Number, FAP Numbers and Change Order Number.
If applicable, include:
X Existing and proposed details.
X Station numbers and dimensions.
N/A Plan view and Elevation view.
X Quantities and descriptions.
NOTE: If possible, make sketches on 8-I/2 x 11" sheets, suitable for reproduction.
X _ Reason for Change:
X What necessitated this change?
X Were other alternates considered?
X Was cost analysis made of other alternates? Are they attached?
X What would happen if this change is not made?
X Items should appear in the order as listed in the contract.
X Item Number, description, unit and unit prices for existing items should be
identical to those shown in the contract.
Page 1 of 2
CHECK LIST FOR CHANGE ORDERS
(continued)
X Supplemental Agreement Items:
X List Items last under summary.
X Include the following note on the face of the change:
"NOTE: UNIT PRICE(S) FOR [name of item(s)] IS/ARE CONTINGENT
UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT."
NOTE: Name of Items should be the exact wording as shown in summary.
N/A Include a Special Provision if new item is not included in the Standard
Specifications.
X Document the cost analysis of all negotiated prices. If the negotiated unit price
is less than or equal to the latest Weighted Average Unit Price and is considered
equitable, the cost analysis should not be attached to the Change Order, but should be
retained in the Resident Engineer's Change Order tiles.
[See subsection 104.03(a) of this manual].
X Check with the Construction Office to determine whether a Supplemental
Specification is required.
X Do not show total plan quantity in "Present Quantity" column unless revision
is for entire job.
X Change should reflect quantities involved within limits designated.
X CHECK ARITHMETIC!
N/A Right -of -Way Acquisition.
N/A When acquisition of additional right-of-way or construction easement is
involved, change order submitted will bear the notation: "APPROVAL OF
THIS CHANGE ORDER IS CONTINGENT ON THE ACQUISITION OF
ADDITIONAL RIGHT-OF-WAY/CONSTRUCTION EASEMENT."
N/A Attach sketch showing Job Number, FAP Number, Change Order Number,
location, dimensions and areas of additional R/W or Easement to be acquired.
N/A On Change Orders where additional time is allowed to complete the change
order work, full justification should be shown for the number of days added. An
analysis of time and a letter of concurrence from the contractor should be attached to
the proposed change order if contract time is extended. [See 108.06 of Standard
Specifications and subsection 104.03(a) of this manual.]
X Be sure the Job Number, Change Order Number, FAP Number, and County are
shown on ALL documents accompanying or attached to the Change Order.
X Check to determine whether this is a District Engineer Authorized Change Order
(under $75,000) or an Assistant Chief Engineer Authorized Change Order.
X If a District Engineer authorized Change Order, do ALL pertinent Divisions
concur with the Proposed Change Order?
X USE THE CORRECT CHANGE ORDER FORM!
Page 2 of 2
Stroud, Jeffrey D.
From: White, Kevin
Sent: Tuesday, December 04, 2012 12:45 PM
To: Stroud, Jeffrey D.; Change Orders; Earl, Mark S.
Subject: RE: 040578
Construction concurs.
Original Message
From: Stroud, Jeffrey D.
Sent: Tuesday, December 04, 2012 9:55 AM
To: Change Orders; White, Kevin; Earl, Mark 5.
Subject: FW: 040578
Your concurrence is requested for the enclosed change order.
Original Message
From: Adams, Chad D.
Sent: Monday, December 03, 2012 11:51 AM
To: Stroud, Jeffrey D.
Subject: FW: 040578
Okay.
Original Message
From: Stroud, Jeffrey D.
Sent: Monday, December 03, 2012 11:16 AM
To: Adams, Chad D.
Subject: 040578
Enclosed is draft change order for your review. Weighted average for 2012 is 126.46/CY.
I am checking with P & C to see if City of Fayetteville is paying for part of this so the mayor's concurrence may or may
not be required.
1
Stroud, Jeffrey D.
From: Earl, Mark 5.
Sent: Tuesday, December 04, 2012 3:27 PM
To: Stroud, Jeffrey D.
Cc: Gunn, Linda
Subject: RE: 040578
Roadway concurs with this change order.
Thank you,
Mark Earl, P.E.
Senior Design Engineer
Roadway Design Division
Arkansas State Highway and Transportation Department P.O. Box 2261 Little Rock, AR 72203 Phone 501-569-2529
mark.earl@arkansashighways.com
Original Message
From: Stroud, Jeffrey D.
Sent: Tuesday, December 04, 2012 9:55 AM
To: Change Orders; White, Kevin; Earl, Mark S.
Subject: FW: 040578
Your concurrence is requested for the enclosed change order.
Original Message
From: Adams, Chad D.
Sent: Monday, December 03, 2012 11:51 AM
To: Stroud, Jeffrey D.
Subject: FW: 040578
Okay.
Original Message
From: Stroud, Jeffrey D.
Sent: Monday, December 03, 2012 11:16 AM
To: Adams, Chad D.
Subject: 040578
Enclosed is draft change order for your review. Weighted average for 2012 is 126.46/CY.
am checking with P & C to see if City of Fayetteville is paying for part of this so the mayor's concurrence may or may
not be required.
Chris Brown
o'fr
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
N/A Mayors Signature
City Council Meeting Date
Agenda Items Only
Engineering
Division
Action Required:
Development Services
Department
Approval of Change Order No.4 to the Contract between AHTD and Sweetser Construction on Improvements to
Highway 16. No Additional Cost to the City.
Cost of this request
4520.9540.5809.00
Account Number
06035.2300
Project Number
Budgeted Item
4,037,285.00
Category / Project Budget
4,019,094.00
Funds Used to Date
$ 18,191.00
Remaining Balance
Budget Adjustment Attached
Transportation Bonds
Program Category / Project Name
Transportation Bonds
Program / Project Category Name
Sales Tax Construction
Fund Name
Department Dire
Cityc�Tforney
t�.�JJ•—
Finance and Internal Services Director
Date
Date
3 -L9-2)1,3
Date
3-1 73
Date
Yc2
Dale
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
Received in C4)3-23-1 3 PO4 :4 7 RCVD
Clerk's Office I J _
Received in
Mayor's Office
Comments:
Revised January 15, 2009
a'F v eville
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
ARKANSAS
www.accessfayetteville.org
MEMO
Mayor's Approval Only
To: Mayor Jordan
Thru: Don Marr, Chief of Staff
Jeremy Pate, Development Services Director
From: Chris Brown, City Engineer
Date: March 27, 2013
Subject: Change Order No. X to Highway 16 Widening -Armstrong to Stonebridge
PROPOSAL
Improvements to Highway 16 are included in the City's Transportation Bond Program. Design and
construction of the project is being managed by the Arkansas Highway and Transportation Department
(AHTD). The City has agreed to pay up to $5 million towards the total cost of the project.
The City has submitted the full $5 million payment, and construction is underway by the contractor hired by
AHTD. The attached Change Order is to add pay items and quantities for striping that was originally left out of
the contract.
RECOMMENDATION
Staff recommends approval of this Change Order. No change in the City's obligation will result as of this
Change Order since the City has met its full obligation on the project.
BUDGET IMPACT
None.
ARKANSAS STATE HIGHWAY
AND TRANSPORTATION DEPARTMENT
DISTRICT FOUR
4019 TOWSON AVE. • FORT SMITH, AR 72901 • P.O. BOX 11170 • FORT SMITH, AR 72917-1170
TELEPHONE (479) 646-5501 • FAX (479) 646-8286
WASHINGTON - CRAWFORD -- FRANKLIN - SEBASTIAN - LOGAN - SCOTT - POLK
April 5, 2013
Sweetser Construction, Inc.
590 West Poplar
Fayetteville, AR. 72703
Re: Job No. 040578
FAP: STP -9142(26)
Armstrong Ave -Stone Bridge Rd (Sel Secs)(Fayetteville)(S)
Highway 16, Section 3
Washington County
Dear Sir:
Attached for your information is approved Change Order No. 4 on the
abovereferenced project.
if additional information is needed, please contact Resident Engineer Jeff Stroud.
Sincerely,
EJS:si
c: State Construction Engineer
Resident Engineer #43
District Four Engineer
ARKANSAS STATE HIGHWAY COMMISSION
CHANGE ORDER
Job Name Armstrong Ave. -Stone Bridge Rd.(Sel. Secs.)(Fayetteville) (S) Route & Section Hwy. 16. Sec. 3
Job No. 040578 FAP No. STP -9142(26) County Washington Change Order No. 4
Changes from Station 605+75 to Station 612+13
Description of Change: Establish and add to the Contract the items "Removal of Permanent Pavement Markings
(Words)" and "Removal of Permanent Pavement Markings (Arrow)". Provide additional ACHM Surface Course and
applicable Pavement Markings and accomplish from Sia. 605+75 to Sta. 612+63.
Reason for Change: The Removal of Permanent Pavement Markings were not accounted for in the contract. The
plan quantity of the other items at this location is insufficient to perform the planned work.
Attachments: Plan Sheet, Contractor's Letter
NOTE: UNIT PRICES FOR "REMOVAL OF PERMANENT PAVEMENT MARKINGS (WORDS)", AND
"REMOVAL OF PERMANENT PAVEMENT MARKINGS (ARROWS)" ARE CONTINGENT UPON THE
EXECUTION OF A SUPPLEMENTAL AGREEMENT.
SUMMARY
Item No.
Item
Unit
Unit
Price
PRESENT
REVISED
Quantity
Amount
Quantity
Amount
401
Tack Coat
Gal.
2.55
0
0.00
30
76.50
SPSS407
Mineral Aggregate In ACHM Surface
Ton
84.30
0
0.00
80.16
6757.49
Course (112")
SPSS407
Asphalt 8inder(PG76-22) in ACHM Surface
Ton
129.75
0
0.00
4.84
627.99
Course (112")
0.00
0.00
SS&719
Thermoplastic Pavement Marking White (4")
L.F.
0.40
80
32.00
280
112.00
SS&719
Thermoplastic Pavement Marking White (12")
L.F.
5.00
24
120.00
288
1440.00
SS&719
Thermoplastic Pavement Marking Yellow (4")
L.F.
0.40
310
124.00
1090
436.00
721
Raised Pavement Markers (Type II)
Each
7.00
6
_
42.00
21
147.00
604
Removal of Permanent Pavement Markings (Words)
Each
75.00
0
0.00
3
225.00
604
Removal of Permanent Pavement Markings (Arrows)
Each
195.00
0
0.00
3
585.00
Division Construction
Roadwa esig n
onorable IJo F . ordan
Mayor, City etteville
Authorized
District En
Date
318.00
10406.98
Overrun $ 10088.98
Initials Remarks
KW eoMcu✓
gf
Requested
roiAtlidor
4-13I13
Resident Engineer
Page 1 of 1
Kimberly Johnson - Hwy 16 -Change Order 2
From:
To:
Date:
Subject:
Attachments:
Chris Brown
Johnson, Kimberly
4/3/2013 12:24 PM
Hwy 16 -Change Order 2
040578 CO2.PDF
Attached for your files.
CB
»> "Stroud, Jeffrey D." <Jeffrey.Stroud@arkansashighways.com> 4/3/2013 11:21 AM »>
Chris,
def-C-is-6rder-hlo. 2 on Job No. 0405,8 that
guested. -We will provide executed copies of all approved change
orders in the future when they are received by our office.
Regarding the reference made by Kimberly Johnson, I had inadvertently
shown Change Order No. 2 on the attachments to Change Order No. 4 that I
just picked up. The attachments have been revised to reflect the correct
change order number.
Thanks
Jeff
Original Message
From: Maze, Teresa I.
Sent: Wednesday, April 03, 2013 11:16 AM
To: Stroud, Jeffrey D.
Subject:
file://C:IDocurnents and Settings\kjohnson\Local Settings\Temp\XPgrpwise1515C1F8BPA... 4/8/2013
CENT MARKINGS (HWY. 161
612.13
= 80 LIN. FT. 4" WHITE
WIDER = 310 LIN. FT. 4' YELLOW
T. r2 WHITE
(KERS
EACH
1 EACH
}
.tel
— Co --.-
CBANOE ORDER ,MO. (. w
IOB NO. 040578 ..
Fit ..«
s rp q/4 Z C•61
Irour¢zx
bfus
an
STA. (45475 TO 9M• 6(Z4 13
novice A orO J 41 MV MEµT
ei! larA1 S r Tis To REsTR (Prr
NT(gE,.a4REA
11
1',
11
1
1 1.
11
631
EXISTING STRIPING
STA. 6/0463 TV szs.6(zf13
PrZoV(WE AWL. AcyM
5uRFAC6 C'OUR -Cle)
ooR ALAN (N Lk(
LiNE'd4'
'-Tp'-0ET1
DOUBLE SOLID 4" YELLOW
March 11, 2013
AHTD District Four
Attn: Jeff Stroud
3526 North Highway 112
Fayetteville, AR 72704
e1eM1 eAaeta- eo4
SWEETSER CONSTRUCTION, INC.
GENERAL CONTRACTORS • LICENSE!) • INSURED
Re: AHTD 040578 Markings
590 WEST I'O1'LAIt • FAVE'V1'EVILLE. AIt 72703
TELEPHONE (479) 443-3026 • FAX (479) 442-0119
Jeff,
Please see the following prices for Thermoplastic removal on AHTD 040578.
3 EA — Removal of Thermoplastic Words
3 EA — Removal of Thermoplastic Arrows
If you have any questions please let me know.
Thanks,
Charles W. Miller
$210.00 EA = $630.00
$120.00 EA = $360.00
Total Price = $990.00
WO ACCOMPAN
E ANGE ORDER NO. Co
los NO. 0409' $ ..
FAP 577'-'414Z(4)
cOUNTY V/ sttif
FAYE -i EVIt LE, AR
RE -43
CHECK LIST FOR CHANGE ORDERS
(To accompany the Change Order for concurrence and approval)
X Enter complete Job Name as shown on contract.
X Enter only FAP Number(s) involved in change, or FAA Number and
Non -Participating, as applicable.
N/A A summary of quantities and money value per each FAP if more than one
FAP Number or Non -Participating is involved.
X. Describe all changes fully.
X What is being changed, added or deleted?
X What is the location of change or changes? (Station Number, distance left
or right of centerline.)
X What is the contract description (exact wording) of the Item or Items?
X Sketches.
X Include Job Number, FAP Numbers and Change Order Number.
If applicable, include:
X Existing and proposed details.
X Station numbers and dimensions.
X Plan view and Elevation view.
X Quantities and descriptions.
NOTE: If possible, make sketches on 8-1/2 x 11" sheets, suitable for reproduction.
X Reason for Change:
X What necessitated this change?
X Were other alternates considered?
X Was cost analysis made of other alternates? Are they attached?
X What would happen if this change is not made?
X Items should appear in the order as listed in the contract.
X Item Number, description, unit and unit prices for existing items should be
identical to those shown in the contract.
Page 1 of 2
CHECK LIST FOR CHANGE ORDERS
(continued)
X Supplemental Agreement Items:
X List Items last under summary.
X Include the following note on the face of the change:
"NOTE: UNIT PRICE(S) FOR name of item(s)] IS/ARE CONTINGENT
UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT."
NOTE: Name of Items should be the exact wording as shown in summary.
N/A Include a Special Provision if new item is not included in the Standard
Specifications.
X Document the cost analysis of all negotiated prices. If the negotiated unit price
is less than or equal to the latest Weighted Average Unit Price and is considered
equitable, the cost analysis should not be attached to the Change Order, but should be
retained in the Resident Engineer's Change Order files.
[See subsection 104.03(a) of this manual].
X Check with the Construction Office to determine whether a Supplemental
Specification is required.
X Do not show total plan quantity in "Present Quantity" column unless revision
is for entire job.
X .Change should reflect quantities involved within limits designated.
X CHECK ARITHMETIC!
N/A Right -of -Way Acquisition.
N/A When acquisition of additional right-of-way or construction easement is
involved, change order submitted will bear the notation: "APPROVAL OF
THIS CHANGE ORDER IS CONTINGENT ON THE ACQUISITION OF
ADDITIONAL RIGHT-OF-WAY/CONSTRUCTION EASEMENT."
N/A Attach sketch showing Job Number, FAP Number, Change Order Number,
location, dimensions and areas of additional R/W or Easement to be acquired.
N/A On Change Orders where additional time is allowed to complete the change
order work, full justification should be shown for the number of days added. An
analysis of time and a letter of concurrence from the contractor should be attached to
the proposed change order if contract time is extended. [See 108.06 of Standard
Specifications and subsection 104.03(a) of this manual.]
X Be sure the Job Number, Change Order Number, FAP Number, and County are
shown on ALL documents accompanying or attached to the Change Order.
X Check to determine whether this is a District Engineer Authorized Change Order
(under $75,000) or an Assistant Chief Engineer Authorized Change Order.
X If a District Engineer authorized Change Order, do ALL pertinent Divisions
concur with the Proposed Change Order?
X USE THE CORRECT CHANGE ORDER FORM!
Page 2 of 2
Chris Brown
Submitted By
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
N/A Mayors Signature
City Council Meeting Date
Agenda Items Only
Engineering
Division
Development Services
Department
Action Kequirea:
Approval of Change Order No.2 to the Contract between AHTD and Sweetser Construction on Improvements to
Highway 16
Cost of this request
4520.9540.5809.00
Account Number
06035.2300
Project Number
Budgeted Item I�
$ 4,037,285.00
Category / Project Budget
$ 4,019,094.00
Funds Used to Date
$ 18,191.00
Remaining Balance
Budget Adjustment Attached
t�f!
Department Di ctor Date
1 !3
ney Date
404 Q l-z9-2ot3
Finance and Internal Services Director Date
1- 7�-U13
Date
/J
Date
Comments:
Revised January 15, 2009 .uluuIr
Transportation Bonds
Program Category! Project Name
Transportation Bonds
Program 1 Project Category Name
Sales Tax Construction
Fund Name
Previous Ordinance or Resolution # I I t— lea+
Original Contract Date:
Original Contract Number:
Received in City 01-25-13PO4:24 R C .Q
Clerk's Office
Received in
Mayor's Office
Wtville
-ARKANSAS
MEMO
To: Mayor Jordan
Thru: Don Marr, Chief of Staff
Jeremy Pate, Development Services Directort�
From: Chris Brown, City Engineer
Date: January23, 2013
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
Subject: Change Order No. 2 to Highway 16 Widening -Armstrong to Stonebridge
PROPOSAL,
Mayor's Approval Only
Improvements to Highway 16 are included in the City's Transportation Bond Program. Design and
construction of the project is being managed by the Arkansas Highway and Transportation Department
(AHTD). The City has agreed to pay up to $5 million towards the total cost of the project.
The City has submitted the full $5 million payment, and construction is underway by the contractor hired by
AHTD. The attached Change Order is to change some of the storm drain piping from pipe culverts to box
culverts. This is a net reduction to the contract amount.
RECOMMENDATION
Staff recommends approval of this Change Order. No change in the City's obligation will result as of this
Change Order since the City has met its full obligation on the project.
BUDGET IMPACT
None.
ARKANSAS STATE HIGHWAY COMMISSION
CHANGE ORDER
Job Harm Armtmcn Ave -Stone Brio a RdASe1 Se SF (S) Route & Section Hwy 16. Sec 3
Job No. 040578 FAP No. STP-9142(263_ CountyWashinnton Change Order No. 2
Changes from Station 629+05 to Station 630+35
Description of Change: Delete the planned 73" X 45" Reinforced Concrete Arch Pipe Culvert (Class III & IV) and the
734 X 45" Flared End Section for Reinforced Concrete Arch Pipe Culvert and place Precast Reinforced Concrete Box
Culvert (6'X4'), 76" X 48' Reinforced Concrete Horizontal Elliptical Pipe Culvert (Class Ill) and 76" X 48" Flared End
Section for Reinforced Concrete Horizontal Elliptical Pipe Culvert as indicated on the enclosed Schedule of Work.
Reason for Change: The Contractor has requested to substitute the precast concrete box culverts and e:Latical pipe
cutverts in I,eu of the concrete arch pipe culvert and tared end sections at no additional cost. The Department has
degerrr ned that the precast concrete box culverts and e�ptcat pipe cu verts will provide greater drainage capacity.
Attachments: Special Provision, Schedute of Worts. Plan Sheet, Inter Office Memorandum, Contractor's Letter
NOTE: UNIT PRICES FOR "76" X 48REINFORCED CONCRETE HORIZONTAL ELLIPTICAL PIPE CULVERTS
(CLASS W. "76" X 48" FLARED END SECTION FOR REINFORCED CONCRETE HORIZONTAL ELLIPTICAL
PIPE CULVERTS" -PRECAST REINFORCED CONCRETE BOX CULVERTS (6'X4')", AND "PRECAST
REINFORCED CONCRETE BOX CULVERTS (6'X4') (CO 2)"ARE CONTINGENT UPON THE EXECUTION OF A
SUPPLEMENTAL AGREEMENT.
SUMMARY
Item No.
Item
Unit
Unit
Price
PRESENT
REVISED
Quany
Amount
Quantity
Amount
SS&606
73'X45" Rein orced Concrete Arch
L.F.
285.00
102
23070.00
0
0.00
Prpe Cu verts (Class Ill
SS&&CS
(73X45` Reinforced Concrete Arch
LF.
32&00
70
22960.00
0
0.00
IRpe Cu!ets (Class M
605
73"X45` Flared End Section for
I Each
3100.00
2
6200.00
0
0.00
Reinforced Concrete Arch Pipe Culverts
SS&606
76X48' Reinforced Concrete Horizontal
L.F.
285.00
0
0.00
8
2280.00
Elliptical Pipe Culverts LClass III
606
76X48" Flared End Section for Reinforced
Each
3100.00
0
0.00
1
3100.00
Concrete Horizontal Elliptical Pipe Culverts
SP&607
Precast Reinforced Concrete Box
L.F.
285.00
0
0.00
1003
28500.00
Culverts (6'X4'
SP&fir' IPrecast
Reinforced Concrete Box
L.F.
328.00
0
0.00
70
22950.00
Gu<verts 6'X< (CO 2
5820.00j I 55540.00(
Underrun S 1390.00
Date
Initials Remarks
i 3
t&-] CowaClr
Requested ,4ji
cMfLauJ9
Resident Engineer
12-16-04 Rev.
Page 1 of 2
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
t ._ .s;'.t-= t1'=. SPECIAL PROVISION
(N! DER NO. ... JOB 040578
0B N L' .............. PRECAST REINFORCED CONCRETE BOX CULVERTS
AP... T.P914r...
'OUNz�c
Section 607 Precast Reinforced Concrete Box Culverts of the Standard
Specifications for Highway Construction, Edition of 2003, is hereby modified as follows:
Subsection 607.01 Description is deleted and the following substituted therefor:
607.01 Description. This item shall consist of the installation of precast reinforced
concrete box culverts according to these specifications, of the type, size, and dimensions
shown on the plans, and in conformity with the location, lines and grades shown on the
plans, or as directed.
Subsection 607.02 Materials is expanded to include the following:
Tolerances for fitting of joints between upper and lower halves of culvert sections
and end joints between consecutive culvert sections shall be such that when sections are
joined together there is not more than '/2 inch (12mm) separation between mating surfaces
at any location.
The Contractor shall provide the Engineer with copies of all necessary
manufacturer's details and installation manuals prior to the installation of the precast
reinforced concrete box culvert on the project. These materials shall remain the property
of the Department.
Subsection 607.03 Construction Requirements is modified as follows:
Structural excavation and channel change excavation shall be as shown on Standard
Drawing RCB-2.
Structural excavation and structural backfill shall be according to Section 801,
except that payment will be considered included in the price bid per linear foot (meter) for
Precast Reinforced Concrete Box Culverts. If the Engineer determines that undercutting is
necessary, undercut and backfill will be measured and paid for in accordance with Section
801.
Channel change excavation and backfill shall be measured and paid for in
accordance with Section 2I0.
Staggering of joints in culvert sections during installation and/or use of specially
shaped sections may be necessary. The Contractor shall be responsible for determining the
availability of special castings and furnishing the manufacturer information necessary to
produce the sections. Locations of holes for pipe culvert connections shall be the
responsibility of the Contractor.
At pipe culvert connections the space between the pipe and precast box shall be
filled with concrete grout as approved by the Engineer.
Headwalls, wingwalls and toewalls for the culvert shall be constructed in
accordance with the Standard Drawings shown in the plans. Payment for the materials,
labor, and incidentals required for headwall and wingwall construction will be considered
included in the price bid per linear foot (meter) for Precast Reinforced Concrete Box
Culverts.
12-16-04 Rev.
Page 2 of 2
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
SPECIAL PROVISION
JOB 040578
PRECAST REINFORCED CONCRETE BOX CULVERTS
Subsection 607.04 Method of Measurement and Basis of Payment is deleted and the
following substituted therefor:
607.04 Method of Measurement. Precast Reinforced Concrete Box Culverts will
be measured by the linear foot (meter) measured parallel to the flow line of the box culvert.
For multiple barrel culverts, the measured length will be the sum of lengths of the
individual single barrels.
Subsection 607.05 is added as follows:
607.05 Basis of Payment. Work completed and accepted and measured as
provided above will be paid for at the contract unit price bid per linear foot (meter) for
Precast Reinforced Concrete Box Culverts of the size specified, which price shall be full
compensation for structural excavation; for preparing the bedding; for disposing of excess
material; for furnishing, transporting, and placing all materials; for headwall, wingwall and
toewall construction when required; and for all labor, equipment, tools, and incidentals
necessary to complete the work.
Payment will be made under:
Pay Item
Pay Unit
Precast Reinforced Concrete Box Culverts Linear Foot (Meter)
'x ____' ( mm x mm)
ao ACCOMPAt
CHANGE (VDER NOi r.rw
JOB NO. ...oa.057 ...
FAP , STP: q 14Z,C,
COUNTY
precastboxculvt_new.doc
/
k
0
d
•
z
$
kCl)
TO ACCOMPAN
ChANGE ORDER NO.
SOB NO 5-7.860
,P
cOUKTY.t 4i y
2 2 2
O
/ 7 ■
0
0
N
Q
b
m
2 Cl)
vaff7
q3 0
� �
U
2 § t
9 2 a •?
co
W k
fEK
LO
c Cl)
O=t
=
co
U
$ $ a
$ k
7
u cn o ±
b
«
o
C
4-'
tx
U)
_
O
0
w ( k
3
% w
~
Q Q
)
=
Q
�
a22
C
§ §
CC
\ �%%
---
aC
--
a)
o
@ @
O O
o
k
t c
e
« 0 —
2
STA. 626+00 - CONSTRUCT
DJ. ON LT. WITH 8' EXTENSION
& 24" x 300' PIPE OUTLET
CONNECT TO D.I. c STA. 629+05 LT
TYC=4'x 4'
TY MO = 410.
H= 5'O'
STA.626+78 - IN PLACE
18" x 40' RC PIPE CULVERT
LT. SIDE DRAIN
'REMOVE AND CONSTRUCT
APPROACH = 30 CU. YDS.
STA.627+52 - CONSTRUCT
jUV% NON I, T. 10 CU. YOS.
STA. 629*05 - CONSTRUCTS
D.L ON LT. W17H 4' EXTENSION
& 76" x40" x 8' R.C. STUB INLET
WITH FES R�ppX
& r x 4-" x 70' R.C. RiPE� OUTLET
CONNECT TO 0.4. a STA. 629+46 RT.
TY�C'6x7'x 4'
H.
DROP INLET ON LT. WITH
18" x 164' R.C. PIPE INLET AND
x 2.5' R.C. ARCH PIPE INLET
72" x 45" x 16' R,C. ARCH PIPE OUTLET
REMOVE
STA.629+35 - IN PLACE
DROP INLET ON LT. WITH
73' x 45" x 52' R.C. ARCH PIPE OUTLET
-R61t0atE,��
STA.. 630+28 CONSTRUCT J
APPROACH ON LT.: 0 CU. `k0§ ' ti
STA. 630.74 - CONS TRUC
APPROACH ON LT.: IS CU YDS.
STA. 631+00 - CONS
Dr WITH 8' EJE
& 24 x PIPE O
CONNECT TCi. DJ. o 25 LT.
TYC = 4'x
i Y 1110 = 4'
" i or
STA. 632+08 - CONSTRUCT STA.635+74 CONSTRUCT STA. 638+04 - CONSTRUCT
APPROACH ON LT. = 10 CU. YDS. TYPE 4 WHEELCHAIR 0.1. ON LT. WITH 4' EXTENSION
RAMP = 7.3 50. YDS. CONNECT TO TOP OF R.C. BOX
STA. 636+60 CONSTRUCT TY C 2 4' x 4'
STA. CONSTRUCT TYPE 2 WHEELCHAIR H = 2'2
DJ.ON LTLT., W WITH 8' EXTENSION
& 24" x d9' PIPE OUTLET RAMP = 4.150. YDS. STA. 638+37 - CONSTRUCT
CONNECT TO D.1. 0 STA, 633+50 LT. D.I. ON LT. WITH 6' EXTENSION
TY C = 4' x 4' STA. 636+23 - IN PLACE & 54' x 16' R.C. PIPE OUTLET
TY MO • 4' 1.0. DROP INLET ON L7. WITH CONNECT TO R.C. BOX
N= 3' U• 18" x 47' R.C. PIPE OUTLET a STA. 638+04 LT.
STA. 633+12 - CONSTRUCT REMOVE TY C' 6' x 6'
TY MO = 6' I.D.
APPROACH ON LT. = 20 CU. YDS. H = 7' 3"
STA, 637+01- IN PLACE STA. 638+76 - CONSTRUCT
STA. 633+50 - CONSTRUCT DROP INLET ON LT. WITH DJ. ON LT. WITH 4' EXTENSION
D.L ON LT. WITH 8' EXTENSION 18' x 65' R.C. PIPE OUTLET & 54" x 32' R.C. PIPE OUTLET
& 24" x 88' PIPE OUTLET REMOVE CONNECT TO 0.1 o STA. 638+37 LT.
CONNECT TO D.I. a STA. 634+45 LT. TY C = 6' x 6'
TY C = 4' x 4' STA. 638+55 - IN PLACE TY MO = 6' LD.
TY MO = 4' I.D. DROP INLET ON LT. WITH H = 6' 9'
H. 3' IS" x 35' R.C. PIPE OUTLET
REMOVE STA. 634*20 - N PLACE
STA. 634+45 - CONSTRUCT IN" x 35' CM PIPE CULVERT
D.I. ON LT. WITH 8' EXTENSION STA. 638+52 - N PLACE LT. SIDE DRAIN
& 24- x 244' R.C. PIPE OUTLET DROP INLET ON LT. WITH REMOVE AND CONSTRUCT
CONNECT TO D.L V STA. 637*00 LT. I8' x 29' R.C. PIPE OUTLET APPROACH = 10 CU. YDS.
TY C • 4' X 4' REMOVE
TY MO = 4' LD. STA. 639+92 - CONSTRUCT
H- 3' 7" 0.1. ON LT. WITH 4' EXTENSION
TA. 634+55 - N PLACE STA. 637+00 - CONSTRUCT & 30" x 3' R.C. STUB INLET
D INLET ON LT. ACE 0.1. ON LT. WITH 8' EXTENSION WITH FES
& 30" x 88 PIPE OUTLET & 48- x 10' PIPE OUTLET
18" IIS' R.C. PIPE OUTLET CONNECT TO R.C. BOX CONNECT TO DJL 0 Sip, 638*76 LT.
REM VE TYSCA_638X044 LT. TY C = 4' x 6'
STA. 6 CONSTRUCT TY MD a 5' IA. TY 110 a 6• LD.
H= 5 10'
TYPE 2 ELCHAIR RAMP = 3.3 SO. YDS. H. 3' 11" '
STA. +6 t STA. 637+34 — CONSTRUCT
YPE 4 WHE BRA 50, Yr. APPROACH ON LT. - CU. YDS.
DR r WITH 7 A _ Y
REM, fiO .C. PIP OUTLET .EO �HW x 5)
.85" x�
STA. 635+70 CONSTRUCT ,
TYPE 4 WHEELCHAIR RAMP = .8 Sp. S. I sc rl I
\ I
p � � " Jr{lJ
F
.tl 16
46-
o
CA►R]PY OLE
v 1
PAY£q ! I &E P F
In .ri . 1'A YF j P1R' C 1
I � . I ,
'
J 1 I
1 CAR 11A$/ 8 ¢ J"}
I
1 �
' I ( PA1ii(wc
, x
FA. 6t5+12 CO TRUCT
(PE WHEEL fIAIR RAMP =1.6 50. Y '
TA. 125+78 CONSTRUCT .7j )
YPE 3 WHEELCHAIR R = 7.6 SO. YDS. r �-
TA, 626400 ICONSTRUCT
1. ON RT. WIT 8' EXTENSION STA. 629+35 - IN PLA E
24' x 55' FCC. PIPE OUTLET DROP INLET ON AT. WITH
R•4,Q�LT. 18" x 188' R.C. PIPE INLET AND
�,i a9�ti 1�_il 73" x 45' x 80'R.C.ARCH PIIPE
MANGE ORDER MO• •' 2 REMOVE
W STA. 628+94 - CONSTRUCT
ccB NO ..%./�rj-'77 • • �• APPROACH ON RT. = S Cu. YDS.
Al' . • •� J.I...r�rL r.6 ds•(Y )—OROP6NLET7. 84ON RT PLACE
' RE" x 45" x 10' R.C. PIPE OUTLET
.OUNTY .:{ ; •
.,REMOVE
/ � 1
x I 1
I I �
1 I
380' TA
t r
STAxi6�29+21- CO STRUC
APPROACH ON R .' 55 C YDS.
STA. 638.04 - PLACE
TRPL 10' x 6' x 3' R.C. X CULVERT
WITH 3:1 WINGS L . & AT.
RETAIN & EXTE 25'LT
050 = ITOO_CFS D.4 = L7 S0. ML
51*. 629+46 - CONSTRUCT
0.1. 084, RT. WITH 4' EXTENSION
NNETOJUNCTION 4' BOX
CONNECT
TYPE E 0 STA.630+35 PT.
TV T.
7'It
514. 630'35 CONS CT
JUNCTION o�ON RT,_-
TYP Exx,7 xx7 STUB
H .
APPROACH ON RT. 2 15 CU. YDS.
QO ACCOMPAN
CHANGE ORDER NO .Z
JOB NO. ,... Z&. e.
GrJasfi ' u
627+00 628.00 629.00 630.00 631.00 632.00 633.00 634.00 63
627.00 628.00 629.00 630.00 631.00 632.00 633.00 634.00 6c
STA. 628
98.15 BEGU
SUPEREL
NATION
S.
INS.
SE TYPE
SE TYPE
BEDDING.
BEDDING,
NLESS 0
NLESS 0
RWtSE S
RERWISE S
CIFIED.
ECIFIED.
STA. 633
STA. 635
STA. 640
48.15 MAX.
71.20 UAX
21.20 END
SUPERELE
SUPERELE
SLIPERELE
ATION 10.1
ATION t0.
ATION
STA
29+05
53
15
TOP ELE
F.L. ELE
INLET EL
.=1207.80
.= 1201•
V.=1202.5
o
o
o
VC -4
e-.2
0'
STA.
3I+00
TA. 632+2
M
r STA
� TOP E
633+50
EV.=1203.9
TOP ELE
.=1205.87
TO
ELEV.=120
.37
> F.L. EL
V.=1200.0
O
0
/
a.
STA. 6
TOP ELEV
F.L. ELEV
4+45
1200.45
=d96.5T
1.
O
4_x p
24x
21' 0 0.4
CC
IC 53.63
VC•200'
CD
e•-0.93'
>
C>
a
>J
a
r
>
J
'A.6
6+00
ELE
.=1215.53
ELE
.=1211.87
00
a
VC -4
e-2.2
0'
S
TOP
F L
F.L.
A 629+45
cV,=12Q7
eN = 1
65
ST
TOP
F.L. E
OUTLET
.630+34
EV.=1207.1
EV.' 114
ELEV.=u99
57
30
MN
>
1
jw
a
0
.93'
X4x 71•
�x 82•
0.24
�
eC
__!2.I4_________
w
a
J
INTEROFFICE MEMORANDUM
January 3, 2013
TO: Mr. Mike Sebren, State Construction Engineer
FROM: Trinity Smith, Engineer of Roadway Design
SUBJECT: Response for Substitution of Precast Reinforced Concrete Box Culverts
for Arch Pipe Culverts
Job No. 040578
Armstrong Ave. -Stone Bridge Rd. (Sel. Secs.) (Fayetteville) (S)
Hwy. 16, Section 3
Washington County
Hydraulics has reviewed the request to substitute a 6'x4' RCB for the planned 60" equivalent
arch pipe. Since the box culvert has a greater opening the substitution is acceptable.
If the 6'x4' box section is used, the proposed 60" equivalent arch or elliptical pipe outlet will
have cleanout issues. Hydraulics recommends extending the 6'x4' box section to the outlet.
If you have any questions, please call Mark Earl at 2589.
1/¢/2.
MSE
ja; D 4
1243
�o.-►ie.�t7•! «+•� a.T"' �a�6oc..0 atA1
IQrs a4$wy Ub4T Pe CA M4TiFr TX'c C&-jTA4<7d_
,rE.M I W�rSrE
Irk ACCOMFA
GE ORDER NOO
IQB N . 04-057
EAP 9/4,ZC26
COUNTY
RECEIVED
JAN 04 2012
AHTO
CONSTRUCTION DIVISION
V
SWEETSER CONSTRUCTION, INC.
GENERAL CONTRACTORS • LICENSED • INSURED
�GEaER�
590 WEST POPLAR EAYG-rI'EVILLE, AR 72703
TELEPHONE (479) 443-3426 • FAX (479) 442,)119 K •�4�Ec y u"�j7yT
1l"
December 19, 2012
AHTD District Four
Attn: Jeff Stroud
3526 N. Hwy 112
Fayetteville, AR 72704
Re: AHTD 040578 Drainage
Jeff,
Please see the following request for your review and approval to change some of the
drainage for AHTD 040578 from arched pipe to box culvert at no additional cost to the
state. We believe the state will end up with a much better finished product.
If you have any questions please give me a call.
Thanks,
Charles W. Miller
f t'O 21. ' oMP-.1t
ME .�NGE ORDER NO.
JOB NO. 5? , .. .
>AP
COUNTY ..Jd. .�
PO Box I082 - 3725 South McCollum Ave. - Fayetteville, AR 72702
PH. (479) 521-0504 • FAX (479) 443-5533
set Sijp,TE Op1i
AR N AS
REGISTERED r
PROFESSIONAL
ENGIN1=1rR
i,qN o. 9 4327 r P� 6
�
Re: AHTD Job #040578 /
Highway 16 (Armstrong Avenue to Stone Brige Road - Fayetteville)
Request to substitute the specified 60" Reinforced Concrete Arch Pipe with
6'x4' Precast Reinforced Concrete Box Culverts j7 - 2 -1 Z
(Hwy. 16 - Sta 629+05 to Sta 630+35, Sheets 83 and 84 - 152 LF)
December 12, 2012
Jeff Stroud, P.E.
Arkansas Highway and Transportation Department
Resident Engineer, District #4
3526 North Highway 112
Fayetteville, AR 72704
Dear Mr. Stroud,
Scurlock would like to substitute the above referenced 60" Reinforced Concrete Arch Pipe with 6'x4'
Precast Reinforced Concrete Box Culverts, The 6'x4' boxes will have a greater water -way area and
have similar dimensions to the 60" Arch pipe (Total Span: 86" vs. 85", Flowline to outside top of
box/pipe: 55" vs. 51 "). The 6'x4' boxes will be designed for minimal cover (0-4').
This request covers the 70 LF of cross drain from the drop inlet at Sta 629+05 LT to the drop inlet at
Sta 629+46 RT, as well as the 82 LF of storm drain from the drop inlet at Sta 629+46 RT to the drop
inlet at Sta 630+35 RT. For the stub inlet at drop inlet Sta 629+05 LT (8 LF), and for the stub outlet at
drop inlet Sta 630+35 RT (12 LF), Scurlock will provide 60" horizontal elliptical pipe (76"x48") with
flared end sections.
Please find attached the output of the BOXCAR software we used to perform the structural analysis for
the above referenced precast box culverts. Also attached is the welded wire steel layout for the boxes,
as well as the box culvert'cover sheet'. Design parameters were taken from project plans forwarded to
our office.
If additional information is needed, please contact me.
Sincere)
Jonathan (J.) Strain, P.E.
Scurlock Industries of Fayetteville, Inc.
attachments
ftQ ACCOMxA1'
PAIGE ORDER NO ,2
FOB NO. ,
EAP ...��
covr�zY
Building Quality Concrete Storrs & Sanitary Sewers, Manholes, Drop inlets & Concrete Products Since 1953.
CHECK LIST FOR CHANGE ORDERS
(To accompany the Change Order for concurrence and approval)
X Enter complete Job Name as shown on contract.
X Enter only FAP Number(s) involved in change, or FAP Number and
Non -Participating, as applicable.
N/A A summary of quantities and money value per each FAP if more than one
FAP Number or Non -Participating is involved.
X Describe all changes fully.
X What is being changed, added or deleted?
X What is the location of change or changes? (Station Number, distance left
or right of centerline.)
X What is the contract description (exact wording) of the Item or Items?
X Sketches.
X Include Job Number, FAP Numbers and Change Order Number.
If applicable, include:
X Existing and proposed details.
X Station numbers and dimensions.
X Plan view and Elevation view.
X Quantities and descriptions.
NOTE: If possible, make sketches on 8-1/2 x 11" sheets, suitable for reproduction.
X Reason for Change:
X What necessitated this change?
X Were other alternates considered?
X Was cost analysis made of other alternates? Are they attached?
X What would happen if this change is not made?
X Items should appear in the order as listed in the contract.
X Item Number, description, unit and unit prices for existing items should be
identical to those shown in the contract.
Page 1 of 2
CHECK LIST FOR CHANGE ORDERS
(continued)
X Supplemental Agreement Items:
X List Items last under summary.
X Include the following note on the face of the change:
"NOTE: UNIT PRICE(S) FOR [name of item(s)] IS/ARE CONTINGENT
UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT."
NOTE; Name of Items should be the exact wording as shown in summary.
X Include a Special Provision if new item is not included in the Standard
Specifications.
X Document the cost analysis of all negotiated prices. If the negotiated unit price
is less than or equal to the latest Weighted Average Unit Price and is considered
equitable, the cost analysis should not be attached to the Change Order, but should be
retained in the Resident Engineer's Change Order files.
[See subsection 104.03(a) of this manual].
X Check with the Construction Office to determine whether a Supplemental
Specification is required.
X Do not show total plan quantity in "Present Quantity" column unless revision
is for entire job.
X Change should reflect quantities involved within limits designated.
X CHECK ARITHMETIC!
N/A Right -of -Way Acquisition.
N/A When acquisition of additional right-of-way or construction easement is
involved, change order submitted will bear the notation: "APPROVAL OF
THIS CHANGE ORDER IS CONTINGENT ON THE ACQUISITION OF
ADDITIONAL RIGHT-OF-WAY/CONSTRUCTION EASEMENT."
N/A Attach sketch showing Job Number, FAP Number, Change Order Number,
location, dimensions and areas of additional R/W or Easement to be acquired.
N/A On Change Orders where additional time is allowed to complete the change
order work, full justification should be shown for the number of days added. An
analysis of time and a letter of concurrence from the contractor should be attached to
the proposed change order if contract time is extended. [See 108.06 of Standard
Specifications and subsection 104.03(a) of this manual.]
X Be sure the Job Number, Change Order Number, FAP Number, and County are
shown on ALL documents accompanying or attached to the Change Order.
X Check to determine whether this is a District Engineer Authorized Change Order
(under $75,000) or an Assistant Chief Engineer Authorized Change Order.
X If a District Engineer authorized Change Order, do ALL pertinent Divisions
concur with the Proposed Change Order?
X USE THE CORRECT CHANGE ORDER FORM!
Page 2 of 2
Stroud, Jeffrey D.
From: Perkins, Brooke
Sent: Wednesday, January 23, 2013 10:46 AM
To: Stroud, Jeffrey D.
Cc: White, Kevin; Earl, Mark S.; Smith, Trinity D.; Martin, Chuck L.
Subject: RE: 040578 CO 2
Roadway concurs.
Brooke Perkins, P.E.
Staff Design Engineer
Roadway Design Division
Arkansas State Highway and Transportation Department Brooke.Perkins@arkansashighways.com
(501) 569-2529
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Wednesday, January 23, 2013 10:20 AM
To: Perkins, Brooke
Cc: White, Kevin
Subject: RE: 040578 CO 2
Brooke,
Changes made to flow lines and stub outlet at Sta. 630+34 Rt. per your request. Your concurrence is requested.
Thanks for your help with this.
Jeff
-----Original Message -----
From: Perkins, Brooke
Sent: Tuesday, January 22, 2013 2:32 PM
To: Stroud, Jeffrey D.
Cc: Earl, Mark S.
Subject: FW: 040578 CO 2
Jeff,
See the flow line elevations below from Mark. This should solve the problem of the box culvert fitting under the road on
the left side.
Please submit a revised change order with the stub out changed to a box culvert as well.
Thanks,
Brooke Perkins, P.E.
1
Stroud, Jeffrey D.
From:
Perkins, Brooke
Sent:
Tuesday, January 22, 2013 2:32 PM
To:
Stroud, Jeffrey D.
Cc:
Earl, Mark S.
Subject:
FW: 040578 CO 2
Jeff,
See the flow line elevations below from Mark. This should solve the problem of the box culvert fitting under the road on
the left side.
Please submit a revised change order with the stub out changed to a box culvert as well.
Thanks,
Brooke Perkins, P.E.
Staff Design Engineer
Roadway Design Division
Arkansas State Highway and Transportation Department Brooke.Perkins@arkansashighways.com
(501) 569-2529
-----Original Message -----
From: Earl, Mark S.
Sent: Tuesday, January 22, 2013 2:25 PM
To: Perkins, Brooke
Subject: RE: 040578 CO 2
I recommend the fc
Sta. 629+05 Lt.
F.L. OUT = 1201.30
Sta. 629+45 Rt.
F.L. IN = 1200.59
F.L. OUT = 1199.77
)flowing flow line elevation modifications:
-roP i r
tzo?.8o
120 6 c , �, n
Sta. 630+34 Rt. +'
F.L. IN = 1199.57
F.L. OUT =1199.30
This is for the 6'x4' box sections and will maintain the same entrance HGL elevation at the arch pipe inlet at Sta. 629+05
Lt.
Thank you,
Mark Earl, P.E.
1
Staff Hydraulic Engineer
Roadway Design Division
Arkansas State Highway and Transportation Department P.O. Box 2261 Little Rock, AR 72203 Phone 501-569-2589
mark.earl@arkansashighways.com
-----Original Message -----
From: Perkins, Brooke
Sent: Tuesday, January 15, 2013 3:59 PM
To: Earl, Mark S.
Subject: FW: 040578 CO 2
Mark,
Scott said that you had already looked at this change order and you wrote a letter back to them about it. I was already
looking at it before I knew that and I found that a 6x4 box culvert will not fit under the road on the left side when leaving
the drop inlet on the left. I told Jeff Stroud that and he wants to know if the slope of the right side lateral box culvert
could be flattened so that the cross drain could be lowered so that it would fit. I cannot find your design on this system
on EDM. I told Jeff Stroud that the letter you previously sent said the stub out would need to be the box culvert instead
of the elliptical pipe. I also told Jeff that we would have to wait until you got back and looked at the design to see if the
slope of the boxes could be flattened.
If the slope can be flattened so that the box will fit, then Jeff will send a revised change order showing the stub out as a
box as well.
Please let me know if you have any questions.
Thanks,
Brooke Perkins, P.E.
Staff Design Engineer
Roadway Design Division
Arkansas State Highway and Transportation Department Brooke.Perkins(@arkansashighways.com
(501) 569-2529
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Tuesday, January 15, 2013 2:16 PM
To: White, Kevin; Perkins, Brooke
Subject: RE: 040578 CO 2
Corrections have been made. Enclosed is change order for your concurrence.
-----Original Message -----
From: White, Kevin
Sent: Wednesday, January 09, 2013 10:03 AM
To: Stroud, Jeffrey D.; Adams, Chad D.
Subject: RE: 040578 CO 2
in the Description of Change, the precast box culvert is referred to as a precast pipe culvert. Also, instead of using the
word "offered" I would recommend using the word "requested".
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Tuesday, January08, 2013 3:55 PM
To: Adams, Chad D.; White, Kevin
Subject: FW: 040578 CO 2
I have revised and included a revised version for your review,
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Tuesday, January 08, 2013 3:37 PM
To: Adams, Chad D.
Subject: 040578 CO 2
Another change order for your review.
Stroud, Jeffrey D.
From:
White, Kevin
Sent:
Wednesday, January 16, 2013 9:07 AM
To:
Stroud, Jeffrey D.
Subject:
RE: 040578 CO 2
Jeff,
The order of the new items in the supplemental agreement not should be the same order they are listed in the
Summary. Other than that, with that change made, Construction will concur with the change order.
Kevin
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Tuesday, January 15, 2013 2:16 PM
To: White, Kevin; Perkins, Brooke
Subject: RE: 040578 CO 2
Corrections have been made. Enclosed is change order for your concurrence.
-----Original Message
From: White, Kevin
Sent: Wednesday, January 09, 2013 10:03 AM
To: Stroud, Jeffrey D.; Adams, Chad D.
Subject: RE: 040578 CO 2
In the Description of Change, the precast box culvert is referred to as a precast pipe culvert. Also, instead of using the
word "offered" I would recommend using the word "requested".
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Tuesday, January 08, 2013 3:55 PM
To: Adams, Chad D.; White, Kevin
Subject: FW: 040578 CO 2
I have revised and included a revised version for your review.
-----Original Message -----
From: Stroud, Jeffrey D.
Sent: Tuesday, January 08, 2013 3:37 PM
To: Adams, Chad D.
Subject: 040578 CO 2
Another change order for your review.
City of Fayetteville Staff Review Form
AWTD
Chris Brown
Submitted By
City Council Agenda Items
and
Contracts, Leases or Agreements
NIA Mayors Signature
City Council Meeting Date
Agenda Items Only
Engineering
Division
ncuun RCQUItCU.
L0 (o
WI1 rOY-F S
111 -12 -
Development Services
Department
Approval of Change Order No.6 to the Contract between AHTD and Sweetser Construction on Improvements to
Highway 16. No Additional Cost to the City.
Cost of this request
4520.9540.5809.00
Account Number
06035.2300
Project Number
Budgeted Item
$ 4,037,285.00
Category / Project Budget
$ 4,019,094.00
Funds Used to Date
$ 18,191.00
Remaining Balance
Budget Adjustment Attached
05f
Department Di ctor Date
City Attorney Date
Ct 5-t't-2o13
Finance and Internal Services Director Date
Date
D e
Transportation Bonds
Program Category ! Project Name
Transportation Bonds
Program 1 Project Category Name
Sales Tax Construction
Fund Name
Previous Ordinance or Resolution #
Original Contract Date:
Original Contract Number:
Received in City35-13-1 3P0329 RCVD
Clerk's Office
Received in
Mayor's Office
Revised January 15, 2009
•
Zayi.Lie
S
MEMO
To: Mayor Jordan
Thru: Don Marr, Chief of Staff
Jeremy Pate, Development Services Director pti
From: Chris Brown, City Engineer
Date: May 9, 2013
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
Subject: Change Order No. 6 to Highway 16 Widening -Armstrong to Stonebridge
Mayor's Approval Only
PROPOSAL
Improvements to Highway 16 are included in the City's Transportation Bond Program. Design and
construction of the project is being managed by the Arkansas Highway and Transportation Department
(AHTD). The City has agreed to pay up to $5 million towards the total cost of the project.
The City has submitted the full $5 million payment, and construction is underway by the contractor hired by
AHTD. The attached Change Order is to add pay items and quantities for undercut and backfill that was
originally left out of the contract. These items are necessary due to the presence of unsuitable subgrade material
found on the project.
RECOMMENDATION
Staff recommends approval of this Change Order. No change in the City's obligation will result as of this
Change Order since the City has met its full obligation on the project.
BUDGET IMPACT
None.
ARKANSAS STATE HIGHWAY COMMISSION
CHANGE ORDER
Job Name Armstrong Ave. -Stone Bridge Rd.(Sel. Secs )(Fayetteville) (S) Route & Section Hwy. 16.. 3
Job No. 040578 FAP No. STP-9142(26) County Washington Change Order No. 6
Changes on Station 584+00 to Station 594+00
Description of Change: Add 1500 Cu. Yds. of Unclassified Excavation and Compacted Embankment and
accomplish from Station 584+00 to Station 594+00.
Reason for Change: Unsuitable material has been encountered which cannot be processed in place and
requires undercutting.
Attachments: None
Item No. I Item
210 Unclassified Excavation
210 Compacted Embankment
Division Construction
Materials Division
Authorized Jj
V--"-
7Engineer
SUMMARY
Unit Unit
Price
Cu. Yd. 7.00
Cu. Yd. 8.50
PRESENT
REVISED
Quantity
Amount
Quantity
Amount
0
0.00
1500
10500.00
0
0.00
1500
12750.00
0.40
23250.00
Overrun $ 23250.00
Date Initials Remarks
Requested57/'2.Z_/'f
Resident Engineer
CHECK LIST FOR CHANGE ORDERS
(To accompany the Change Order for concurrence and approval)
X Enter complete Job Name as shown on contract.
X Enter only FAP Number(s) involved in change, or FAP Number and
Non -Participating, as applicable.
N/A A summary of quantities and money value per each FAP if more than one
FAP Number or Non -Participating is involved.
X Describe all changes fully.
X What is being changed, added or deleted?
X What is the location of change or changes? (Station Number, distance left
or right of centerline.)
X What is the contract description (exact wording) of the Item or Items?
N/A Sketches.
NIA Include Job Number, FAP Numbers and Change Order Number.
If applicable, include:
X Existing and proposed details.
X Station numbers and dimensions.
N/A Plan view and Elevation view.
X Quantities and descriptions.
NOTE: If possible, make sketches on 8-1/2 x II" sheets, suitable for reproduction
X Reason for Change:
X What necessitated this change?
X Were other alternates considered?
X Was cost analysis made of other alternates? Are they attached?
X What would happen if this change is not made?
X Items should appear in the order as listed in the contract.
X Item Number, description, unit and unit prices for existing items should be
identical to those shown in the contract.
Page 1 of 2
CHECK LIST FOR CHANGE ORDERS
(continued)
N/A Supplemental Agreement Items:
N/A List Items last under summary.
N/A Include the following note on the face of the change:
"NOTE: UNIT PRICE(S) FOR name of items IS/ARE CONTINGENT
UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT."
NOTE: Name of Items should be the exact wording as shown in summary.
N/A Include a Special Provision if new item is not included in the Standard
Specifications.
N/A Document the cost analysis of all negotiated prices. If the negotiated unit price
is less than or equal to the latest Weighted Average Unit Price and is considered
equitable, the cost analysis should not be attached to the Change Order, but should be
retained in the Resident Engineer's Change Order files.
[See subsection 104.03(a) of this manual].
X Check with the Construction Office to determine whether a Supplemental
Specification is required.
X Do not show total plan quantity in "Present Quantity" column unless revision
is for entire job.
X Change should reflect quantities involved within limits designated.
X CHECK ARITHMETIC!
NIA Right -of -Way Acquisition.
N/A When acquisition of additional right-of-way or construction easement is
involved, change order submitted will bear the notation: "APPROVAL OF
THIS CHANGE ORDER IS CONTINGENT ON THE ACQUISITION OF
ADDITIONAL RIGHT-OF-WAY/CONSTRUCTION EASEMENT."
N/A Attach sketch showing Job Number, FAP Number, Change Order Number,
location, dimensions and areas of additional R/W or Easement to be acquired.
N/A On Change Orders where additional time is allowed to complete the change
order work, full justification should be shown for the number of days added. An
analysis of time and a letter of concurrence from the contractor should be attached to
the proposed change order if contract time is extended. [See 108.06 of Standard
Specifications and subsection 104.03(a) of this manual.]
X Be sure the Job Number, Change Order Number, FAP Number, and County are
shown on ALL documents accompanying or attached to the Change Order.
X Check to determine whether this is a District Engineer Authorized Change Order
(under $75,000) or an Assistant Chief Engineer Authorized Change Order.
X If a District Engineer authorized Change Order, do ALL pertinent Divisions
concur with the Proposed Change Order?
X USE THE CORRECT CHANGE ORDER FORM!
Page 2 of 2
City of Fayetteville Staff Review Form
City Council Agenda Items
and
Contracts, Leases or Agreements
N/A Mayors Signature
City Council Meeting Date
Agenda Items Only
Chris Brown vfi Engineering Development Services
Submitted By Division Department
$ 13,448,020.00 Transportation Bonds
Cost of this request Category! Project Budget Program Category I Project Name
4520.9540.5809.00 $ 11,602,773.00 Transportation Bonds
Account Number Funds Used to Date Program / Project Category Name
06035.2300 $ 1,845,247.00 Sales Tax Construction
Project Number
Budgeted Item
Remaining Balance
Budget Adjustment Attached
RDepartment Dr ctor Date
-'1- (3
Cit orney Date
As4JM4)ec
Fin ce and Internal Services Director
Date
Fund Name
Previous Ordinance or Resolution # 1"l ' 1
Original Contract Date:
Original Contract Number:
Received inLCity.77—j 3P01:33 RCVJ
Clerk's Office
Received in ED
Mayor's Office oZ
Revised January 15,
•
a e'ttVt1e
WARKANSAS
MEMO
To: Mayor Jordan
Thru: Don Marr, Chief of Staff
Jeremy Pate, Development Services Director
From: Chris Brown, City Engineer
Date: June 27, 2013
THE CITY OF FAYETTEVILLE, ARKANSAS
DEPARTMENT CORRESPONDENCE
Subject: Change Order No. 7 to Highway 16 Widening -Armstrong to Stonebridge
Mayor's Approval Only
PROPOSAL
Improvements to Highway 16 are included in the City's Transportation Bond Program. Design and
construction of the project is being managed by the Arkansas Highway and Transportation Department
(AHTD). The City has agreed to pay up to $5 million towards the total cost of the project.
The City has submitted the full $5 million payment, and construction is underway by the contractor hired by
AHTD. The attached Change Order is to establish a price for Class IV concrete pipe, to be used in lieu of a
higher class originally specified. Higher class pipe is required where pipes are shallow, in order to handle more
intense loading from traffic that is experienced at shallower depths.
RECOMMENDATION
Staff recommends approval of this Change Order. This is a slight reduction ($180) to the overall contract
amount.
BUDGET IMPACT
None.
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT
DISTRICT FOUR FORT SMITH
MEMORANDUM
July 15, 2013
TO: Mr. Mike Sebren, State Construction Engineer
FROM: Chad Adams, District Four Engineer
SUBJECT: Job No. 040578
FAP: STP-9142(26)
Armstrong Ave. -Stone Bridge Rd (Sel Secs)(Fayettevife)(S)
Hwy 16, Sections 3
Washington County
Attached for your review and processing is approved Change Order No. 7 on the
above referenced project.
DCA:sl
attachments
c: Resident Engineer #43
ARKANSAS STATE HIGHWAY COMMISSION
CHANGE ORDER
Job Name Armstrong Ave. -Stone Bridge Rd,(Sel. Sees.)(Fayetteville) (S) Route & Section Hwy. 16, Sec. 3
Job No. 040578 FAP No. STP-9142(26) County Washington Change Order No. 7
Changes at Station 615+82
Description of Change: Establish and add to the Contract the item "44" X 27" Reinforced Concrete Arch Pipe
Culvert (Class IV)" and place as indicated on the enclosed plan sheet at Station 615+82.
Reason for Change: The fill height over this pipe is such that a Class IV pipe may be utilized in lieu of the
planned Class V pipe.
Attachments: Plan Sheet, Contractor's Letter
NOTE: UNIT PRICE FOR "44"X 27" REINFORCED CONCRETE ARCH PIPE CULVERT (CLASS IV)" IS
CONTINGENT UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT.
SUMMARY
Item No.
Item
Unit
Unit
Price
PRESENT
REVISED
Quantity
Amount
Quantity
Amount
SS&606
44" X 27" Reinforced Concrete Arch
L.F.
159.50
30
4785.00
0
0.00
Pipe Culvert (Class V)
SS&606
44" X 27" Reinforced Concrete Arch
L.F.
153.50
0
0.00
30
4605.00
Pipe Culvert (Class 1V
Division Construction
Hbnoiable Lion���
Mayor, City of a eville
Authorized
District Engineer
I 4/ts5.UU I +000.UU
Underrun $ 180.00
Date Initials Remarks
b S r' ktil
6 I`
Requested
Resident Engineer
ARKANSAS STATE HIGHWAY
AND TRANSPORTATION DEPARTMENT
DISTRICT FOUR
808 FRONTIER ROAD • BARLING, AR 72923 • P. O. BOX 11170 • FORT SMITH, AR 72917-1170
TELEPHONE (479) 484-5306 • FAX (479) 484-5300
WASHINGTON - CRAWFORD - FRANKLIN - SEBASTIAN - LOGAN - SCOTT - POLK
July 15, 2013
Sweetser Construction, Inc.
590 West Poplar
Fayetteville, AR. 72703
Re: Job No. 040578
FAP: STP-9142(26)
Armstrong Ave -Stone Bridge Rd (Sel Secs)
(Fayetteville)(S)
Highway 16, Section 3
Washington County
Dear Sir:
Attached for your information is approved Change Order No. 7 on the
abovereferenced project.
If additional information is needed, please contact Resident Engineer Jeff Stroud.
Sincerely,
Cha Adams
District Four Engineer
c: State Construction Engineer
Resident Engineer #43
ARKANSAS STATE HIGHWAY COMMISSION
CHANGE ORDER
Job Name Armstrong Ave. -Stone Bridge Rd.(Sel. Secs.)(Fayetteville)(S) Route & Section 16, Section 3
Job No. 040578 FAP No STP-9142(26) County Washington
Changes located at Station 615+82 — Change Order No. 7
DESCRIPTION OF CHANGE: Establish and add to the Contract the item "44"x27" Reinforced Concrete Arch Pipe
Culvert (Class IV)" and place as indicated on the enclosed plan sheet at Station 615+82.
REASON FOR CHANGE: The fill height over this pipe is such that a Class IV pipe may be utilized in lieu of the planned
Class V pipe.
ATTACHMENTS: Plan Sheet, Contractor's Letter
NOTE: UNIT PRICE FOR "44" X 27" REINFORCED CONCRETE ARCH PIPE CULVERTS (CLASS IV)" IS
CONTINGENT UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT.
SUMMARY
Ite N
m o.
Item
unit
Unit
Price
PRESENT
REVISED
Quantity
Amount
Quantity
Amount
SS&8013
44" X 27" Reinforced Concrete Arch Pipe
Culvert (Class V)
IF
159.50
30.OOL
4,785.00
0.00
0
SS&606
44" X 27" Reinforced Concrete Arch Pipe
LF 153.50 1 OOOI n nn -in
[___$4,785.00 f $4,605.00
Underrun $180.00
Concurrence By:
ROADWAY
CONSTRUCTION
MAYOR, CITY OF FAYETTEVILLE
Authorized -1 15 ( g
Chad Adams, Engineer
Date Initials Remarks
6/25/2013 BP Concur
6/25/2013 KW Concur
7/1/2013 LJ Honorable Lioneld Jordan -Concur
Page 1 of 1
Requested Slat
Jeff Stroud, Resident Engineer
Ver: 6/10/2013
'I
June 14, 2013
AHTD District Four
Attn: Jeff Stroud
3526 North Highway 112
Fayetteville, AR 72704
SWEETSER CONSTRUCTION, INC.
GENERAL CONTHACTOI(S • LICENSEr) • INSURED
590 WEST I'DI'LAIU • FAYE{'I'EVILLE. Ali 72703
TELEFiiONE (4741 443_3026 • rA!C c479 442—01 i9
Re: AHTD 040578 Price for Drainage
Jeff,
The price for 30 L.F. of "44" X 27" Reinforced Concrete Arch Pipe Culvert (Class IV)" would be
$1.5350 per LF = $4,605.00 (A reduction of $6.00 per LF)
Thanks,
a
Charles W. Miller
io ACCOMP
iG ORDER p06.7.
JOBNO. ...............a
PAP
COUNTY
113*21- IN PLACE
KET ON LT. WITH
64R.C. PIPE OUTLET
13+35 - CONSTRUCT
LT. WITH 4' EXTENSION
Ii 84' R.C. PIPE OUTLET
Cf TO OJ. o STA. 612+69 RT.
4' x 4'
■ 4' LD.
160 - CONSTRUCT
NN ON LT. - 65 CU. YOS.
+66 - CONSTRUCT
'H ON LT. = 10 CU. YOS.
STA. 612+13
,
STA.615*44 - CONSTRUCT
D.I. ON LT. WITH 4' EXTENSION
& OPENING IN BACK
& 36" x 32' R.C. PIPE OUTLET
CONNECT TO JUNCTION BOX
TYPE ST C STA.615+82 I.T.
TY C = 4' x 4'
TY MO = 5' I.D.
H- 4'8
STA. 615*66 CONSTRUCT
TYPE 2 WHEELCHAIR RAMP a 8.150. YDS.
STA.615+82 - CONST CT
JUCTION BOX ON LT.
& 44" x 27" x 30' R.C. ARCH STUB IN
WITH ES
CONNECT TO D.I. o STA. 616+35 LT.
!(FST = 6' x 4'
NN 0"
STA. 615+94 - IN PLACE
24" x 61' RC PIPE CULVERT AND
STA.616+95 - CONSTRUCT
D.I. ON LT. WITH 4' EXTENSION
24" x 35' RC PIPE CULVERT ,
I
1 & 36" x 29' PIPE OUTLET
LT. SIDE DRAINS
CONNECT TO D.L a STA. 616+53 LT.
REMOVE
TYC=4'x4'
1 TY MO = 5' I.D.
STA. 616+11 CONSTRUCT 1
l H- 4 8"
TYPE 2 WHEELCHAIR t
RAMPS = 6.2 SO. YOS.
I STA. 617+29 - IN PLACE
Bi" x 16' RC PIPE CULVERT
STA. 616+35 • CONSTRUCT
{ LT.SIOE DRAB)
0.1. ON LT. WITH 4' EXTENSIONI
REMOVE AND CONSTRUCT
& 36" x 12' PIPE OUTLET
I APPROACH : 0 CU. YOS.
CONNECT TO JUNCTION BOX
TYPE E O STA. 616+53 LT. I
STA.617+37 - IN PLACE
TY C = 4' x 4'
18" x 16' RC PIPE CULVERT
TY MO = 5' 1.0.I
LT.SIOE DRAIN
H= 4 II- 1
1 REMOVE AND CONSTRUCT
STA. 616+53 - CONSTRUCT 1
1 APPROACH = 0 CU. YOS.
UNCTION BOX ON LT. 1
TH BACK I
STA. 618+00 CONSTRUCT
C NECT TTO O EXISTING R.L. BOX
D.L ON LT. WITH B' EXTENSION
1
TY E E = 4' x 4' 1
WITH OPENING IN BACK
H - 8"
1 A 30" x 99' PIPE OUTLET
CONNECT TO 0.1. a STA. 616+60 LT.
STA. 6 +60 - CONSTRUCT I
I TY C 4' x 4'
TY MO = 5' 1.0.
0.1. ON T. WITH S' EXTENSION
I H= 3' I1"
& 36" 7 78' R.C. STUB OUTLET,
1
WITH F S _ 1
4
ISTA. STRU
TY MO 0.
I TYPE WHEG CHAIR A P= 7. 0.
H= 6'8 I
1.
II
4
1
9 �l
1
c
$ �
i
Ia,
—x
I
t
I..
} .
+ 110UE
L 6
� r �
� pevcD
D = -15' - �D•�I I
T 37.78'
PC 07+52.34
PT 612+15.88 FR , a
H EXISTING vA11T
RAMP a 8.3 SO. YDS.
REMOVAL AND DISPOSAL OF FENCE
5TA.
STA.
SIDE
LIN. FT.
615+70
00
RT.
68
611*88
LT.
8
619+25
RT.
R
620+32
LT.
22
621*85
622+27
LT,
79
622+88
633+44
LT.
69
624+38
625+15
IT.
106
INSTALL WIRE FENCE
STA. STA. SIDE TYPE GATE
624+47 625+16 IT. C
VACANT
1
ANOE ORDER NO. .,
JOB NO... ate..` .....
PAP ..
COUNTY ..
B1
51*. 611.62 - IN PLACE
DROP INLET ON RT.
RETAIN
STA.617+68 - IN PLACE
DROP INLET 35' RT. WITH
18" x 94' R.C. PIPE OUTLET
REMOVE
STA.617+68 - IN PLACE
DROP INLET 23' RT. WITH
IS" x T' R.G. PIPE OUTLET
REMOVE
ST
DR
18"
RE
IB"
RE
I8"
RE
ST
TYI
RAI
ST1
JLtl
COt
TYF
H =
Si'
D.F.
A
C01
TY
TY
H=
STA
YDS. 18"
IT,
REM
APP
`•1 o i
vK 3 F3+R5 `r
CD`�CRell
I
i L
I i
psa� K� t ST .616."t TR T
TY ? W ELCHAIR TAMP c 6.;
I ( 1
STA. 612+69 - CONSTRUCX
D.I. ON RT. WITH 4' EXTENS`
& 18' x 95' PIPE OUTLET
CONNECT TO D.L C STA. 6A+64 R1
TYC = 4'x 4'
TY MO a 4I.D.
1 A.615+36 STRUCT
APPROACH ON RT.: 125 CU. YOS
51*. 616453 - IN PLACE
3' x 3' x 44' R.C. BOX CULVERT
WITH 3d WINGS ON RT.
REMOVE 9' LT. AND
EXTEND 44'RT.
050 = 44.8 CFS D.A. - 19.0 ACR
CHECK LIST FOR CHANGE ORDERS
(To accompany the Change Order for concurrence and approval)
X Enter complete Job Name as shown on contract.
X Enter only FAP Number(s) involved in change, or FAP Number and
Non -Participating, as applicable.
N/A A summary of quantities and money value per each FAP if more than one
FAP Number or Non -Participating is involved.
X Describe all changes fully.
X What is being changed, added or deleted?
X What is the location of change or changes? (Station Number, distance left
or right of centerline.)
X What is the contract description (exact wording) of the Item or Items?
X Sketches.
X Include Job Number, FAP Numbers and Change Order Number.
If applicable, include:
X Existing and proposed details.
X Station numbers and dimensions.
X Plan view and Elevation view.
X Quantities and descriptions.
NOTE: If possible, make sketches on 8-1/2 x II" sheets, suitable for reproduction.
X Reason for Change:
X What necessitated this change?
X Were other alternates considered?
X Was cost analysis made of other alternates? Are they attached?
X What would happen if this change is not made?
X Items should appear in the order as listed in the contract.
X Item Number, description, unit and unit prices for existing items should be
identical to those shown in the contract.
Page 1 of 2
CHECK LIST FOR CHANGE ORDERS
(continued)
X Supplemental Agreement Items:
X List Items last under summary.
X Include the following note on the face of the change:
"NOTE: UNIT PRICE(S) FOR [name of item(s)] IS/ARE CONTINGENT
UPON THE EXECUTION OF A SUPPLEMENTAL AGREEMENT."
NOTE: Name of Items should be the exact wording as shown in summary.
N/A Include a Special Provision if new item is not included in the Standard
Specifications.
X Document the cost analysis of all negotiated prices. If the negotiated unit price
is less than or equal to the latest Weighted Average Unit Price and is considered
equitable, the cost analysis should not be attached to the Change Order, but should be
retained in the Resident Engineer's Change Order files.
[See subsection 104.03(a) of this manual].
X Check with the Construction Office to determine whether a Supplemental
Specification is required.
X Do not show total plan quantity in "Present Quantity" column unless revision
is for entire job.
X Change should reflect quantities involved within limits designated.
X CHECK ARITHMETIC!
N/A Right -of -Way Acquisition.
N/A When acquisition of additional right-of-way or construction easement is
involved, change order submitted will bear the notation: "APPROVAL OF
THIS CHANGE ORDER IS CONTINGENT ON THE ACQUISITION OF
ADDITIONAL RIGHT-OF-WAY/CONSTRUCTION EASEMENT."
N/A Attach sketch showing Job Number, FAP Number, Change Order Number,
location, dimensions and areas of additional R/W or Easement to be acquired.
N/A On Change Orders where additional time is allowed to complete the change
order work, full justification should be shown for the number of days added. An
analysis of time and a letter of concurrence from the contractor should be attached to
the proposed change order if contract time is extended. [See 108.06 of Standard
Specifications and subsection 104.03(a) of this manual.]
X Be sure the Job Number, Change Order Number, FAP Number, and County are
shown on ALL documents accompanying or attached to the Change Order.
X Check to determine whether this is a District Engineer Authorized Change Order
(under $75,000) or an Assistant Chief Engineer Authorized Change Order.
X If a District Engineer authorized Change Order, do ALL pertinent Divisions
concur with the Proposed Change Order?
X USE THE CORRECT CHANGE ORDER FORM!
Page 2 of 2