Loading...
HomeMy WebLinkAbout192-12 RESOLUTIONRESOLUTION NO. 192-12 A RESOLUTION APPROVING AN AMENDMENT TO THE CONTRACT WITH GARVER, LLC FOR ADDITIONAL PROFESSIONAL ENGINEERING SERVICES ASSOCIATED WITH THE EXTENSION OF FRISCO TRAIL IN AN ADDITIONAL AMOUNT NOT TO EXCEED $26,500.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an amendment to the contract with Garver, LLC for additional professional engineering services associated with the extension of Frisco Trail in an additional amount not to exceed $26,500.00. PASSED and APPROVED this 2nd day of October, 2012. APPROVED: ATTEST: By: rON LD JO , , Mayor ....---- By: a L()/ SONDRA E. SMITH, City Clerk/Treasurer Matt MihalevichU"" Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 10/2/2012 City Council Meeting Date Agenda Items Only Engineering Division Action Required: Development Services Department A resolution approving contract amendment number 1 with Garver, LLC. for additional professional engineering services associated with the extension of Frisco Trail south from Martin Luther King Jr. Blvd. to Walker Park. in an amount not to exceed $26,500 for a total contract amount of $216,000. 26,500.00 Cost of this request 4470.9470.5814.05 Account Number 02016.1201 Project Number Budgeted Item x 216,000.00 Category / Project Budget 189,500.00 Trail Development Program Category / Project Name Trail Improvements Funds Used to Date Program / Project Category Name 26,500.00 Sales Tax Cap Imp Remaining Balance Fund Name Budget Adjustment Attached Depart t Director ty Attorney 9/13//2 - Date r 1-11/47._ Date 9-1/^7412, Finance and Internal Services Director Date Chief of S •ff Ma or ti -P7 Date 22e4 R Da Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in City Clerk's Office .,&urvt-/c6 . Comments: Revised January 15, 2009 v' awe. vile THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayetteville.org CITY COUNCIL AGENDA MEMO To: Mayor and City Council Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director e Chris Brown, City Engineer GO From: Matt Mihalevich, Trails Coordinator) Date: September 13, 2012 Subject: Engineering Contract Amendment with Garver, LLC. RECOMMENDATION Staff recommends a resolution approving contract amendment number 1 with Garver, LLC. for additional professional engineering services associated with the extension of Frisco Trail south from Martin Luther King Jr. Blvd. to Walker Park. in an amount not to exceed $26,500 for a total contract amount of $216,000. PROPOSAL: On March 20th, 2012 resolution number 57-12 authorized Garver, LLC to begin the design work on the '/2 mile Frisco Trail Southern Extension. This important trail extension is part of the 36 -mile Razorback Regional Greenway and will provide safe pedestrian and bicycle connections to the numerous residents and businesses around Walker Park, as well as the future Tsa La Gi (Cherokee) trail to be extended west along the old rail line south of MLK Jr. Blvd. Over the past several months, Garver has assisted the City with a series of public meetings for the trail alignment and highway crossings. The schematic design for the Frisco Trail Southern Extension was approved by the Fayetteville Street Committee on August, 28th 2012 following the recommendations from public surveys, Garver, the Active Transportation Advisory Committee, and the Parks and Recreation Advisory Board. The concept includes construction of a tunnel under MLK, installation of 3 new bridges at stream crossings, and installation of a pedestrian hybrid beacon signal at the proposed crossing of School Avenue (Hwy 71B). The administration requested staff to gather additional public input related to the trail alignment. Due to Garver's involvement with this process additional time was necessary resulting in increased cost; however, this has resulted in a well -vetted, comprehensive evaluation of the trail alignment and highway crossings that allows the design team to now move forward confidently to final design. In addition, based on concerns from a affected property owner, the trail alignment has moved on the west side of 71B near 9th Street. This alignment change includes a new trail bridge that results in additional design, survey and geotechnical work. This contract amendment with Garver, LLC will cover the design cost for these unanticipated changes without changing the schedule for fmal construction documents. Trail design work is planned to be completed by the end of 2012, allowing construction to begin as early as 2013. Funding for construction is available though the Northwest Arkansas Regional Planning Commission as part of the Razorback Regional Greenway. THE CITY OF FAYETTEVILLE, ARKANSAS BUDGET IMPACT: No City funds are necessary for this request. Funds in the amount of $108,000 from the Home Depot Foundation will be combined with $108,000 from the Walton Family Foundation for a total budget of $216,000. The original contract with Garver, LLC was $189,500 therefore this contract amendment of $26,500 will reach the total budget of $216,000. A check for the Home Depot Foundation funds has been received and the Walton Family Foundation funds will be received as reimbursement on a quarterly basis. RESOLUTION NO. A RESOLUTION APPROVING AN AMENDMENT TO THE CONTRACT WITH GARVER, LLC FOR ADDITIONAL PROFESSIONAL ENGINEERING SERVICES ASSOCIATED WITH THE EXTENSION OF FRISCO TRAIL IN AN ADDITIONAL AMOUNT NOT TO EXCEED $26,500.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves an amendment to the contract with Garver, LLC for additional professional engineering services associated with the extension of Frisco Trail in an additional amount not to exceed $26,500.00. PASSED and APPROVED this 2nd day of October, 2012. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer AMENDMENT TO AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES CITY OF FAYETTEVILLE FAYETTEVILLE, ARKANSAS CONTRACT AMENDMENT NO. 1 Frisco Trail Extension This Contract Amendment No. 1, dated 0, , 2012 shall amend the original contract between the CITY OF FAYETTEVLLE, ARKANSAS and GARVER, LLC, (Garver) dated March 20, 2012 for professional engineering services in connection with the Frisco Trail Extension from Martin Luther King, Jr. Boulevard to Walker Park, (the "Project"). This Contract Amendment No. 1 adds professional engineering services for the Design Phase Services, as described herein. The contract is hereby modified as follows: SECTION 2 - BASIC SERVICES OF GARVER The following Sections add to corresponding Sections in the original contract. 2.1 General 2.1.1.2 The additional Scope of Services to be furnished by GARVER during the remainder of the Design Phase is included in Section 2.2 hereafter and in Appendix A and B attached hereto and made part of this Agreement. 2.2 Design Services 2.2.1 GARVER will perform additional engineering and related services in order to prepare drawings and related services as described in Appendix A. Contract Amendment No. 1 1 of 2 11047140 Frisco Trail Extension SECTION 5 — PAYMENTS TO GARVER 5.1 Compensation CITY OF FAYETTEVILLE shall pay GARVER an additional amount not to exceed $26,500 for a total amount not to exceed $216,000 in accordance with the provisions described in the following paragraphs. CITY OF FAYETTEVILLE shall pay GARVER for time spent on the project at the rates shown in attached Appendix B for each classification of GARVER's personnel plus reimbursable expenses, including but not limited to printing, courier service, reproduction, and travel. For informational purposes, a breakdown of GARVER's estimated costs is included in Appendix B. The rates shown in Appendix B will be increased annually with the first increase effective on or about June 1, 2013. Underruns in any phase may be used to offset overruns in another phase as long as the overall contract amount is not exceeded. IN TESTIMONY OF WHICH, this instrument has been executed on behalf of GARVER ENGINEERS, and has been executed on behalf of the CITY OF FAYETTEVILLE, in three (3) counterparts, each of equal force, on the day and year first above written. CITY OF FA ETTEVILLE GARVER, LLC By: B '" y: .z-�_ ATTEST: Brock Hoskins, PE Title: Sr. Vice President ATTEST: • •�S • •fes .FRVETTE Vit.L • Contract Amendment No. 1 p :• c. 2 of 2 SP Frisco Trail Extension �•�S' .•, 4A N••�at,.� r, /4.••. . QV • 'Iflfllll{1►►►► 11047140 APPENDIX A — SCOPE OF SERVICES Amendment No. 1 2.1 General Generally, the scope of services is amended to include surveying, structural bridge design, and preparation of properly acquisition documents for the City of Fayetteville Frisco Trail for an additional alignment between the Campus Crest apartments and the intersection of School Avenue and 9`h Street, which will include an additional bridge over Tanglewood Branch creek crossing near School Avenue. 2.2 Surveys 2.2.1 Design Surveys Garver will provide additional field survey data for designing the project, and this survey will be tied to the Owner's control network. Garver will conduct field surveys, utilizing radial topography methods, at intervals and for distances along the project site as appropriate for modeling the existing ground, including locations of pertinent features or improvements. Garver will locate buildings and other structures, streets, drainage features, trees over eight inches in diameter, visible utilities as well as those underground utilities marked by their owners and/or representatives, and any other pertinent topographic features that may be present at and/or along the project site. Garver will establish control points for use during construction. 2.2.2 Property Surveys Garver will locate existing monumentation representing right of way and/or easements based on record data which will be provided by an abstractor under a subconsultant agreement with Garver. 2.3 Geotechnical Services Garver will subcontract with Grubbs, Hoskyn, Barton & Wyatt to provide geotechnical investigations and recommendations for the design of the additional bridge. 2.4 Coordination Coordination required for these additional services includes furnishing plans to all known utility owners potentially affected by the project at the conceptual and final stages of development. Garver will conduct a coordination meeting among all known affected utility owners to enable them to coordinate efforts for any necessary utility relocations. Garver will include the surveyed locations of the observable and marked utilities in the construction plans. Garver will also include proposed and/or relocated utility information in the construction plans as provided by the utility companies. Garver will furnish final plans to the following agencies: NWARPC, AHTD, ADEQ, COE, USFWS, for their review and comment as necessary. Appendix A - Scope of Services 1 of 3 11047140 Frisco Trail Extension Amendment No. 1 Garver will also attend coordination meetings with the City of Fayetteville and other agencies as required. Garver will prepare exhibits for these meetings when appropriate. 2.5 Environmental Services Garver will perform wetland delineation for the Tanglewood Branch creek crossing located near School Avenue. Garver will work to obtain a Nationwide Permit for the project from the US Army Corps of Engineers and to obtain clearance from the US Fish and Wildlife Service (USFWS) and the State Historic Preservation Office (SHPO) if necessary. In addition, Garver will provide design of BMP devices and stream bank stabilization as necessary to meet or exceed the requirements of the City of Fayetteville Streamside Protection Ordinance. 2.6 Drainage Study Garver will utilize the existing HEC -HMS and HEC -RAS hydrologic models for the design of a new bridge across the Tanglewood Branch creek crossing located near School Avenue. Modeling parameters, such as areas, slopes, drainage paths, and distances will be obtained from Owner -provided planimetric contour maps and aerial photos and verified by field investigations. Runoff characteristics for non-developed areas will be based on current land - use plans. Garver will utilize the modified HEC -RAS hydraulic model for design of the creek crossing and trail construction within the designated FEMA floodplain/floodway to achieve a "No -Rise" in the water surface elevation during the 100 -year rainfall event. The remainder of the drainage system for the project will be designed in accordance with the City of Fayetteville Drainage Criteria Manual. Garver will develop a drainage report including the following: • Existing HEC -HMS model data. • HEC -RAS modified model results and supporting data. • Drainage Computations for minor crossings and the MLK Jr. Tunnel. • Summary of Results. Garver will coordinate with COE to acquire a Nationwide permit for Spout Springs Branch Creek crossing. 2.7 Schematic Study No additional services are required for the schematic study phase. 2.8 Conceptual Design (30% Submittal) No additional services are required for the conceptual design phase. Appendix A - Scope of Services 2 of 3 11047140 Frisco Trail Extension Amendment No. 1 2.9 Preliminary Design (60% Submittal) The preliminary design phase submittal will include an additional bridge structure, Drainage Study, and COE Nationwide permit. The preliminary design phase will represent approximately 60 percent of final construction contract plans. This submittal will not include technical specifications or "front end" contract documents. Garver will not begin final design until the preliminary design is approved by the City of Fayetteville in writing. Garver will furnish plans to AHTD and COE for their review and comment. 2.10 Final Design (90% & 100% Submittals) During the final design phase of the project, Garver will conduct additional final designs to prepare construction plans and specifications, for one construction contract, including final construction details and quantities, technical specifications, special provisions, and opinion of probable construction cost. Garver will also perform final field inspection with the City of Fayetteville, make any needed plan changes as a result of the final field inspection and/or special easement acquisition considerations, and prepare the construction documents as required to advertise for bids. Garver will also prepare, submit, and coordinate approval of a Stormwater Pollution Prevention Plan (SWPPP) and Short -Term Activity Authorization (STAA) with ADEQ. 2.11 Property Acquisition Documents Garver will provide additional mapping as required for preparing Right-of-Way/Easement acquisition documents for the City of Fayetteville's use in acquiring the property. Documentation will include an individual tract map with description of temporary and permanent acquisition for each property. The City of Fayetteville will provide a standard easement acquisition document or "go-by" example for use by Garver. The fee for providing property acquisition documentation is based on permanent right of way and temporary construction easements for no more than two (2) additional properties. Property acquisition document preparation will begin after receiving the City of Fayetteville's comments from the Preliminary Design review. Appendix A - Scope of Services 3 of 3 11047140 Frisco Trail Extension Amendment No. 1 APPENDIX B Frisco Trail / 11047140 Garver Hourly Rate Schedule Classification Rates Engineers 1 Architects E-1 $ 90.00 E-2 $ 105.00 E-3 $ 126.00 E-4 $ 147.00 E-5 $ 180.00 E-6 $ 220.00 Planners P-1 $ 107.00 P-2 $ 128.00 Designers D-1 $ 84.00 D-2 $ 115.00 Technicians T-1 $ 73.00 T-2 $ 95.00 Surveyors S-1 $ 43.00 S-2 $ 54.00 S-3 $ 71.00 S-4 $ 102.00 S-5 $ 130.00 2 -Man Crew (Survey) $ 164.00 3 -Man Crew (Survey) $ 203.00 2 -Man Crew (GPS Survey) $ 184.00 3 -Man Crew (GPS Survey) $ 223.00 Construction Observation C-1 $ 81.00 C-2 $ 112.00 C-3 $ 148.00 Administration X-1 $ 51.00 X-2 $ 68.00 X-3 $ 115.00 Agreement for Professional Services Project Name Garver Project No. 11047140 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 1 FEE SUMMARY Title I Services Geotechnical Services (G,H,B&W) Record Research (3 -Parcels) Utility Marking Signalization Design Surveys Drainage Study Electrical Design Schematic Design Conceptual Design Preliminary Design Final Design Property Acquisition Documents Bidding Services Subtotal for Title I Services Title II Services Original Amendment No. 1 Total Estimated Fees Estimated Fees Estimated Fees $8,100.00 $2,700.00 $10,800.00 $1,500.00 $150.00 $1,650.00 $700.00 $300.00 $1,000.00 $10,000.00 $0.00 $10,000.00 $24,350.00 $9,300.00 $33,650.00 $4,650.00 $2,000.00 $6,650.00 $10,400.00 $0.00 $10,400.00 $14,500.00 $0.00 $14,500.00 $14,800.00 $0.00 $14,800.00 $34,200.00 $2,750.00 $36,950.00 $56,400.00 $7,700.00 $64,100.00 $5,150.00 $1,600.00 $6,750.00 $4,750.00 $0.00 $4,750.00 $189,500.00 $26,500.00 $216,000.00 Construction Materials Testing Construction Phase Services Subtotal for Title II Services $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 X:\2011\11047140 -Fayetteville Frisco Multi -Use Trail\Contracts\Client\Amendment 1\APPENDIX B - Garver Fee Spreadsheet - Frisco Trail Amendment -1 xlsx CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 1 SURVEYS WORK TASK DESCRIPTION E-6 E-5 E-4 S-5 S-4 S-3 S-2 S-1 2 -Man Crew (Survey) 3 -Man Crew (Survey) 2 -Man Crew (GPS Survey) 3 -Man Crew (GPS Survey) $220 00 $180 00 $147.00 $130.00 $102 00 $71.00 $54 00 $43 00 $164 00 $203 00 $184 00 $223 00 hr hr nr hr hr nr hr hr hr hr hr hr 1. Surveys - Topographic Horizontal and Vertical Control1 4 Topographic Surveys 21 20 Locate Utilities 1 8 Date ProcesnrrgrDTM Preparefion 12 Subtotal -Surveying 0 0 0 3 14 0 0 0 32 0 0 0 2. Surveys -Property r Coordinate Title Research with Abstractor 1 1 Field Research 1 1 2 Field Ties to Existing Monumentation 1 1 4 Analyze Title Data and Property Delineation 1 3 Data Processing 1 Suulo10I - Surveying 0 0 0 4 7 0 0 06 0 0 0 Hours Salary Costs 0 7 21 0 0 38 0 MANHOUR SUBTOTALS 0 66 $0.00 $0 00 SO 00 $910 00 $2,142 00 $0 00 $0 00 $0 00 96,232 00 80,00 $0 00 $0.00 59,264.00 SUBTOTAL - SALARIES: gIRECT HOPI -LABOR EXPENSES Document Printing/Reproduction/Assembly $10 00 Postage/Freight/Courier $0 00 Travel Costs $6 00 69.284.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: 516.00 TOTAL FEE: 59.300.00 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 1 DRAINAGE STUDY WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 P-2 P-1 D-2 D-1 T-2 T-1 $220 00 $180 00 $147 00 8126,00 $105 00 $90 00 $128,00 $107 00 $115.00 584 00 $95 00 $73 00 hr hr hr hr hr hr hr hr hr hr hr N 1. Civil Engineering Review and modify HEC -HMS hydraulic model provided by City for Tanglewood Branch Bridge 3 10 i Prepare draft and final report for City and COE permit 1 2 Subtotal- CIO Engineering 0 4 0 0 120 0 0 0 0 0 0 Hours Salary Costs 0 4 0 0 12 0 0 0 MANHOUR SUBTOTALS 0 16 $0.00 $720 00 50.00 $0 00 51,260 00 $0 00 $0 00 $0.00 50 00 $0.00 $0.00 $0.00 81 9E10.00 SUBTOTAL - SALARIES: DIRECT 11O161/ OR EXPENSES Duument Pr mlingrRupuQdubtionlAssembly $20 00 Postage/Freight/Courier 50 00 Travel Costs $0-00 51,980.00 SUBTOTAL - DIRECT NON -LABOR EXPENSES: 520.00 TOTAL FEE: 82,000.00 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 1 PRELIMINARY DESIGN WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 T-2 T-1 X-1 $220.00 $180.00 $147.00 5126.00 $105.00 $90.00 $95.00 $73.00 551.00 hr hr hr hr hr hr hr hr hr 1. Civil Engineering Subtotal - Civil Engineering 0 0 0 0 0 0 0 0 0 2. Structural Engineering Prefabricated Truss Bridge (Tanglewood Branch) Preliminary Layout 1 2 6 6 Preliminary Typical Section 1 2 3 2.5 Subtotal - Structural Engineering 0 2 4 0 9 0 8.5 0 0 Hours Salary Costs 0 2 4 0 9 0 8.5 0 MANHOUR SUBTOTALS 0 24 50.00 5360.00 5588.00 50.00 5945.00 50.00 5807.50 50.00 50.00 52,700.50 SUBTOTAL - SALARIES: DIRECT NON -LABOR EXPENSES Document Printing/Reproduction/Assembly Postage/Freight/Courier Travel Costs $30.00 50.00 $19.50 52.700.50 SUBTOTAL - DIRECT NON -LABOR EXPENSES: 549.50 TOTAL FEE: 52.750.00 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 1 FINAL DESIGN WORK TASK DESCRIPTION E-6 E-5 E-4 E-3 E-2 E-1 P-2 P-1 D-2 D-1 T-2 T-1 6220 00 5180 00 $147 00 6126 00 5105 00 590 00 $128 00 $107 00 5115,00 584.00 595 00 $73 00 hr hr hr hr hr hr hr hr hr hr nr hr 1. Clvil Engineering S6bIntd • CiVlf Enginearing0 0 0 0 0 0 0 0 0 0 0 0 2. Structural Engineering Prefabricated Truss Bridge (Tanglewood Branch) Bridge Layout 1 1 9 5 Abutment/Piling Analysis & Design 1 2 9 Truss Typical Section1 1 2 2 5 Rail Details 1 1 2 1 Boring Logs 1 2 1 Abutment/Wingwall Details 1 2 10 5 Joint Details 1 1 2 1 Sub[ptnl • Slruc[tval Engineering 0 6 9 0 36 00 0 0 0 15.5 0 Hours Salary Casts 0 6 9 0 36 0 0 0 15.5 MANHOUR SUBTOTALS D 67 50 00 51.080.00 51.327.00 50.00 53.760.00 5000 5000 5000 50.00 5000 51.47250 50 00 57,655.50 SUBTOTAL - SALARIES: DIRECT NON•LABOR EXPENSES DOcumenl Print inglRtproducoon/Assernbly $44.50 Postage/Freight/Courier 50 00 Travel Costs $0 00 57.655.50 SUBTOTAL -DIRECT NON -LABOR EXPENSES: $44.50 TOTAL FEE: 57,700.00 CITY OF FAYETTEVILLE FRISCO TRAIL - AMENDMENT NO. 1 PROPERTY ACQUISITION DOCUMENTS WORK TASK DESCRIPTION E-6 E-5 E-4 S-5 S-4 S-3 S-2 S-1 2 -Man Crew (Survey) 3 -Man Crew (Survey) 2 -Man Crew (GPS Survey) 3 -Man Crew (GPS Survey) $220.00 5180.00 $147 00 $130 00 $102 00 $71 00 $54.00 $43 00 5164 00 5203 00 5184 00 $223 00 hr hr hr hr hr hr hr hr hr hr hr hr 1. Acquisition Documents Permanent Right -of -Way Acquisition Documents (3 Parcels) 3 8 Coordination with Owner 1 Revisions after negotiations 1 1 Subtotai- Civil Engineering 0 0 0 5 9 0 0 0 0 0 0 0 Hours Salary Costs 9 0 0 MANHOUR SUBTOTALS 0 14 50.00 $0.00 $0.00 $650 00 $918.00 $0 00 50.00 50 00 $0 00 50 00 $0 00 $0 00 51,568.00 SUBTOTAL - SALARIES: DIRECT NON.LABOR EXPENSES Document Printing/Reproduction/Assembly Postage/Freight/Courier Travel Costs $22 00 50 00 $10 00 51,568.00 SUBTOTAL- DIRECT NON -LABOR EXPENSES: 530.00 TOTAL FEE: 51,600.00 VENDOR NO. ..x�.,'' PURCHASE ORDER ER 52650 Garver Engineers 2049 E Joyce Blvd Ste 400 Fayetteville AR 72703 Each Package Must Be Marked PURCHASE ORDER # Exactly As Shown Here cny of Fayetteville, Arkansas 12-0000177-001 DATE 3/27/12 FOB Fyv TERMS NET 30 DAY Unit OOttyy Ob. Issue of ReceMed Descrlpden and Account Number Unit Price TOTALS 1.00 JOB a) Engineering Serivces Related to 189500.00 189500.00 Frisco Trail (South) Per RFQ #11-01 Res #57-12 Contract #2237 4470.9470.5814.05 020161201 Change Order #1 Please add line item b) Amendment #1 to Contract #2237 for additional engineering services in the amount of $26,500.00 for a total contract amount of $216,000.00 SHIP TO: Transportation Dept 1525 S Happy Hollow Rd Fayetteville AR 72701 Nelson, .1 Sales Tax Total: $.00 Purchase Order Total: 189500.00 DEPARTMENT VEIFICATTON ADDITIONAL APPROVAL �y RECEIVED �� y ct 13 f 1 2 CHECK aY DEPT HEAD APPROVAL � �� DOES NOT MEET PURCHASING POLICY AMOUNT TO PAY $ i Y1�E tr1 a CONTRACT PAYMENT OTHER AIP VERIFICATION APPROVED BY PURCHASING VERIFICATION PRICE CHANGE VERIFICATION PROJECT 0 THIS PAYMENT $ PREVIOUS PAYMENT(S) $ RETURN CHECK TO TOTAL PYMT(S) $ SEND COPY TO BALANCE $ DEPT COPY V" - :- s�1 r Propo.x . tait1m ; - New Sidewalk T. i . Or Connection r t' �J1' 4 r J1 ! s: $rl L7th24-4:St.-Lf� n 4" rw 1 t rte; \; ' V.(' :4 N r 3-4 1N 1! ': ' 4 ' • Wje Frisco Trail MLK Jr. South to Walker Park CONCEPTUAL TRAIL LAYOUT AUGUST 2012 J 4bt 0 100 200