HomeMy WebLinkAbout136-12 RESOLUTIONRESOLUTION NO. 136-12 A RESOLUTION ADOPTING THE 2013-2017 FIVE-YEAR CAPITAL IMPROVEMENTS PLAN BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby adopts the 2013-2017 Five -Year Capital Improvements Plan, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein. PASSED and APPROVED this 19th day of June, 2012. APPROVED: ATTEST: By: By: 124A 4.4k-) 6414;2K, , SONDRA E. SMITH, City Clerk/Treasurer Havv62e,r1 a/T"- >6.3,4„ 6/2 9/4z, 2013-2017: Five Year Capital Improvements Program Capital Improvements Projects By Project Area —All Funding Sources Project Area Bridge &Drainage Information Technology Other Parks Public Safety Solid Waste Trail Transportation Vehicles & Equipment Water & Sewer Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 360,000 360,000 360,000 360,000 360,000 1,800,000 620,000 520,000 455,000 390,000 2,935,000 930,000 875,000 649,000 646,000 4,101,000 904,000 829,000 835,000 851,000 4,860,000 1,157,000 1,180,000 1,226,000 2,045,000 6,726,000 200,000 524,000 138,000 275,000 2,986,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 2,352,000 2,616,000 2,978,000 2,385,000 12,470,000 3,177,000 4,529,000 3,637,000 18,633,000 5,832,000 5,753,000 5,835,000 29,113,000 950,000 1,001,000 1,441,000 1,118,000 1,849,000 1,548,000 2,139,000 4,365,000 2,925,000 5,883,000 5,810,000 20,654,000 16,899,000 17,563,000 18,602,000 18,094,000 91,812,000 Capital Improvements Projects Sales Tax Capital Improvements Fund By Project. Category Project Category CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Sales Tax Capital Improvements Funding - By Project Category Budget Budget Budget Budget Budget Total 2013 2014 2015 2016. 2017 2013-2017 Bridge & Drainage $360,000 $360,000 $360,000 $360,000 $360,000 $1,800,000 Fire 591,000 690,000 651,000 651,000 1,314,000 3,897,000 Information Tech. 950,000 620,000 520,000 455,000 390,000 2,935,000 Library 405,000 414,000 430,000 439,000 449,000 2,137,000 Other Capital 449,000 456,000 445,000 210,000 197,000 1,757,000 Parks & Recreation 178,000 184,000 89,000.75,000 71,000 597,000 Police 367,000 302,000 359,000 400,000 551,000 1,979,000 Street 100,000 100,000 100,000 100,000 100,000 500,000 IM.\\ 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 Transportation 1,957 000 2,221,000 2,484,000 2,845,000 2,251,000 11,7 58,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 2130 - PARKING FUND: Parking Improvements Parking & Telecommunications (D840) Parking Revenue PCI Compliance Upgrade 17 52,000 0 0 0 0 52,000 Parking Lot Improvements and Overlays 18 30,000 31,000 32,000 33,000 34,000 160,000 82,000 31,000 32,000 33,000 34,000 212,000 2130 - Parking Fund Total 82,000 31,000 32,000 33,000 34,000 212,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 2250 - PARKS DEVELOPMENT FUND: Parks & Recreation Improvements Parks & Recreation (D460) Community Park Improvements 19 700,000 683,000 700,000 673,000 420,000 3,176,000 Regional Park Development 20 563,000 0 0 87,000 360,000 1,010,000 Parks & Recreation Office Renovation 21 0 37,000 40,000 0 0 77,000 1,263,000 720,000 740,000 760,000 780,000 4,263,000 2250 - Parks Development Fund Total 1,263,000 720,000 740,000 760,000 780,000 4,263,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 2300 - IMPACT FEE FUND: Fire Improvements Fire Department (D300) Fire Impact Improvements 23 74,000 77,000 80,000 83,000 86,000 400,000 74,000 77,000 80,000 83,000 86,000 400,000 Police Improvements Police (D200) Police Impact Improvements 24 86,000 88,000 90,000 92,000 94,000 450,000 86,000 88,000 90,000 92,000 94,000 450,000 Water & Sewer Improvements Utilities Director (D900) Wastewater Impact Improvements 25 400,000 400,000 400,000 400,000 400,000 2,000,000 Water Impact Improvements 26 500,000 500,000 500,000 500,000 500,000 2,500,000 900,000 900,000 900,000 900,000 900,000 4,500,000 2300 - Impact Fee Fund Total 1,060,000 1,065,000 1,070,000 1,075,000 1,080,000 5,350,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 4470 - SALES TAX CAPITAL IMPROVEMENTS FUND: Bridae & Drainage Improvements Engineering (D610) Stormwater Quality Management 27 160,000 160,000 160,000 160,000 160,000 800,000 Other Drainage Improvements 28 200,000 200,000 200,000 200,000 200,000 1,000,000 360,000 360,000 360,000 360,000 360,000 1,800,000 Fire Improvements Fire Department (D300) Fire Apparatus Purchases 29 426,000 426,000 466,000 506,000 1,169,000 2,993,000 Fire Facility Maintenance 30 125,000 125,000 165,000 125,000 125,000 665,000 Fire Information Technology Updates 31 40,000 139,000 20,000 20,000 20,000 239,000 591,000 690,000 651,000 651,000 1,314,000 3,897,000 Information Technoloav Improvements Budget & Research (D540) Enterprise Data Warehouse System 32 97,000 0 0 0 0 97,000 Information Technology (D440) Exchange/Office Upgrade 33 220,000 150,000 150,000 0 0 520,000 Local Area Network (LAN) Upgrade 34 140,000 150,000 135,000 135,000 145,000 705,000 Data Center Relocation 35 220,000 0 0 0 0 220,000 Backup Storage Appliance 36 75,000 0 0 0 0 75,000 Microcomputer & Printer Replacements 37 68,000 90,000 75,000 75,000 75,000 383,000 Storage Area Network (SAN) 38 40,000 40,000 40,000 120,000 40,000 280,000 Geographic Information System (GIS) 39 50,000 70,000 75,000 75,000 80,000 350,000 AccessFayetteville Technical Improvements 40 25,000 100,000 30,000 30,000 30,000 215,000 Document Management 41 15,000 20,000 15,000 20,000 20,000 90,000 950,000 620,000 520,000 455,000 390,000 2,935,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 Library Improvements Library (D150) Library Materials Purchases 42 375,000 383,000 398,000 406,000 415,000 1,977,000 Library Computer Replacements 43 30,000 31,000 32,000 33,000 34,000 160,000 405,000 414,000 430,000 439,000 449,000 2,137,000 Other Capital Improvements Accounting & Audit (D510) Accounting Image Scanner & Check Sealer 44 5,000 5,000 0 0 0 10,000 Audit Expense 45 7,000 7,000 7,000 7,000 7,000 35,000 Building Maintenance (D530) Building Improvements 46 119,000 120,000 121,000 123,000 125,000 608,000 City Clerk/Treasurer (D130) Legislative Management/Agenda Routing 47 33,000 0 0 0 0 33,000 City Clerk Document Management Equipment 48 0 22,000 47,000 10,000 10,000 89,000 City Council iPads 49 0 7,000 0 0 0 7,000 Government Channel (D710) City Hall Audio -Visual Renovation 50 70,000 100,000 100,000 0 0 270,000 Television Center Equipment 51 50,000 50,000 50,000 50,000 50,000 250,000 Television Center Digital Conversion 52 75,000 75,000 100,000 0 0 250,000 Remote Meeting Recording 53 50,000 0 0 0 0 50,000 Location Production System 54 0 65,000 0 0 0 65,000 Digital Signage Implementation 55 0 0 15,000 15,000 0 30,000 Parking & Telecommunications (D840) Telecommunication Systems Upgrades 56 5,000 5,000 5,000 5,000 5,000 25,000 Purchasing (D550) Citywide Building Insurance Appraisal Study 57 35,000 0 0 0 0 35,000 449,000 456,000 445,000 210,000 197,000 1,757,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 Parks & Recreation Improvements Parks & Recreation (D460) Forestry, Safety and ADA 58 31,000 31,000 31,000 31,000 31,000 155,000 Native Grasses Program 59 10,000 10,000 10,000 10,000 10,000 50,000 Lights of the Ozarks 60 23,000 23,000 23,000 23,000 23,000 115,000 Tree Escrow 61 114,000 62,000 25,000 11,000 7,000 219,000 Fayetteville Senior Center Parking Lot & Drainage 62 0 58,000 0 0 0 58,000 178,000 184,000 89,000 75,000 71,000 597,000 Police Improvements Police (D200) Police Bulletproof Vests 63 10,000 11,000 42,000 10,000 10,000 83,000 Police Building Improvements 64 25,000 25,000 25,000 75,000 25,000 175,000 Police Technology Improvements 65 40,000 70,000 25,000 25,000 25,000 185,000 Police Unmarked Vehicles 66 57,000 72,000 72,000 72,000 126,000 399,000 Police Equipment Replacement 67 20,000 20,000 35,000 25,000 10,000 110,000 Police Specialized Equipment 68 55,000 64,000 32,000 28,000 85,000 264,000 Police Patrol Vehicle Electronic Upgrades 69 160,000 0 43,000 0 200,000 403,000 Police Network/Server Replacements 70 0 30,000 75,000 150,000 30,000 285,000 Police K-9 Replacement 71 0 10,000 10,000 0 0 20,000 Police Weapons Replacement 72 0 0 0 15,000 40,000 55,000 367,000 302,000 359,000 400,000 551,000 1,979,000 Street Improvements Engineering (D610) Street ROW/Intersection/Cost Sharing 73 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 Trail Improvements Transportation Services (D800) Trail Development 74 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 Transportation Improvements Transportation Services (D800) In -House Pavement Improvements 75 1,842,000 1,551,000 1,695,000 1,955,000 1,576,000 8,619,000 Sidewalk Improvements 76 115,000 520,000 639,000 740,000 525,000 2,539,000 Traffic Signal Improvements 77 0 150,000 150,000 150,000 150,000 600,000 1,957,000 2,221,000 2,484,000 2,845,000 2,251,000 11,758,000 4470 - Sales Tax Capital Improvements Fund Total 6,905,000 6,988,000 7,088,000 7,214,000 7,353,000 35,548,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 5400 - WATER & SEWER FUND: Wastewater Treatment Improvements Utilities Director (D900) Phosphorus Standards Management 79 50,000 50,000 50,000 50,000 50,000 250,000 Wastewater Treatment Plant (D930) Disinfection System Replacement - W.W.T.P. 80 1,000,000 0 0 0 0 1,000,000 Irrigation Reels - W.W.T.P. 81 151,000 161,000 0 0 0 312,000 Plant Pumps and Equipment - W.W.T.P. 82 200,000 225,000 225,000 225,000 225,000 1,100,000 Upgrade/Replace Lift Stations - W.W.T.P. 83 100,000 100,000 150,000 150,000 180,000 680,000 Building Improvements - W.W.T.P. 84 56,000 33,000 35,000 35,000 35,000 194,000 1,557,000 569,000 460,000 460,000 490,000 3,536,000 Water & Sewer Improvements Water & Sewer Maintenance (D910) Water System Rehabilitation and Replacement 85 1,010,000 1,150,000 2,095,000 1,825,000 2,055,000 8,135,000 Water/Sewer Relocate for Street Bonds 86 500,000 500,000 500,000 500,000 500,000 2,500,000 Sanitary Sewer Rehabilitation 87 1,210,000 1,000,000 1,200,000 1,250,000 1,250,000 5,910,000 Water/Sewer Impact Fee Cost Sharing 88 275,000 275,000 275,000 275,000 275,000 1,375,000 Water/Sewer Equipment Expansions 89 38,000 220,000 45,000 8,000 0 311,000 Baxter Water Tanks Painting 90 0 850,000 0 0 0 850,000 3,033,000 3,995,000 4,1 15,000 3,858,000 4,080,000 19,081,000 Water & Sewer Services Improvements Billing & Collections (D520) Printer Replacements 91 30,000 0 0 0 0 30,000 Business Office Improvements 92 20,000 20,000 20,000 20,000 20,000 100,000 Information Technology (D440) Business Office Technology Improvements 93 30,000 15,000 12,000 10,000 10,000 77,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 Water & Sewer Maintenance (D910) Water Meters 94 313,000 311,000 315,000 325,000 325,000 1,589,000 Backflow Prevention Assemblies 95 0 0 10,000 10,000 10,000 30,000 Water/Sewer Rate Study 96 0 0 0 170,000 0 170,000 393,000 346,000 357,000 535,000 365,000 1,996,000 5400 - Water & Sewer Fund Total 4,983,000 4,910,000 4,932,000 4,853,000 4,935,000 24,613,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 5500 - SOLID WASTE FUND: Solid Waste Improvements Solid Waste & Recycling (D920) Recycling Baler 97 538,000 0 0 0 0 538,000 Solid Waste Compactors 98 126,000 130,000 134,000 138,000 142,000 670,000 Solid Waste Facility - Transfer Station Expansion 99 635,000 0 0 0 0 635,000 Recycling Drop Off Facility (North / Central) 100 66,000 70,000 0 0 0 136,000 Recycling Improvements 101 28,000 0 0 0 0 28,000 Solid Waste Compost Site Slab Expansion 102 416,000 0 0 0 0 416,000 Solid Waste Mad Vac 103 40,000 0 0 0 0 40,000 Recycling Commercial Expansion (Organics) 104 0 0 390,000 0 0 390,000 Solid Waste Rate Study 105 0 0 0 0 133,000 133,000 1,849,000 200,000 524,000 138,000 275,000 2,986,000 5500 - Solid Waste Fund Total 1,849,000 200,000 524,000 138,000 275,000 2,986,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 5550 - AIRPORT FUND: Aviation Improvements Aviation (D810) Airport Self Serve Station Upgrade 107 10,000 0 0 0 0 10,000 Airport Roof Replacements 108 41,000 60,000 0 0 0 101,000 Airport Sprinkler System Replacement - White Hangar 109 65,000 0 0 0 0 65,000 Airport ARFF Personal Protective Gear Replacement 110 31,000 0 0 0 0 31,000 147,000 60,000 0 0 0 207,000 5550 - Airport Fund Total 147,000 60,000 0 0 0 207,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 9700 - SHOP FUND: Vehicles & Equipment Improvements Fleet Operations (D830) Fleet - Police/Passenger Vehicles 1 1 1 329,000 300,000 336,000 312,000 283,000 1,560,000 Fleet - Solid Waste Vehicles/Equipment 112 1,151,000 931,000 598,000 1,345,000 1,085,000 5,1 10,000 Fleet - Construction Equipment 113 437,000 0 587,000 123,000 195,000 1,342,000 Fleet - Backhoes/Loaders 114 608,000 463,000 381,000 182,000 414,000 2,048,000 Fleet - Other Vehicles and Equipment 115 969,000 205,000 123,000 732,000 608,000 2,637,000 Fleet -.Tractor/Mowers 116 267,000 161,000 179,000 248,000 57,000 912,000 Fleet - Light / Medium Utility Vehicles 117 604,000 760,000 740,000 762,000 596,000 3,462,000 Fleet - Heavy Utility Vehicles 118 0 105,000 233,000 825,000 399,000 1,562,000 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,000 9700 - Shop Fund Total 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,000 Funding Source / Category / Division CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total 2013 2014 2015 2016 2017 2013-2017 All Funding Sources - Total 20,654,000 16,899,000 17,563,000 18,602,000 18,094,000 91,812,000 AVIATION IMPROVEMENTS: Airport Aircraft Parking Ramp Rehabilitation Airport Corporate Hangar Construction Airport Obstruction Removal Airport Runway Extension EA/EIS Airport Widening of Taxiways B, C, & F FIRE IMPROVEMENTS: Fire Station #2 Replacement Kid's Safety Park & City Training Complex CAPITAL IMPROVEMENTS PROGRAM (2013-2017) UNFUNDED PROJECTS 500,000 652,000 260,000 150,000. 1,225,000 2,787,000 2,300,000 1,690,000 INFORMATION TECHNOLOGY IMPROVEMENTS: ERP Upgrade/Replacement Hansen Version 8 Upgrade LIBRARY IMPROVEMENTS: Library Computer Replacements Library Materials Purchases PARKS & RECREATION IMPROVEMENTS: Community Park Improvements Regional Park Development POLICE IMPROVEMENTS: Police Headquarters Building Police Records Management System Police Unmarked Vehicles 17,500,000 850;000 33,000 18,383,000 SOLID WASTE IMPROVEMENTS: Recycling Facility -'Construction / Demolition (C&D) Solid Waste Facility - Recycling Center (MRF) Expansion STREET IMPROVEMENTS: 3,990,000 Matching Funds for. Federal STP -A funding Razorback Road (Hwy 112) Improvements 1,000,000 195,000 1,195,000 1,560,000 4,985,000 6,545,000 6,250,000 1,250,000 TRANSPORTATION IMPROVEMENTS: Asphalt Plant In -House Pavement Improvements 85,000 Sidewalk Improvements 222,000 307,000 435,000 18,304,000 18,739,000 1,300,000 953,000 151,000 WATER & SEWER IMPROVEMENTS: Water Line Replacement, Gregg, Township Sycamore Water Line Replacement, MLK, Finger Rd Barbara Water/Sewer Relocation Old Wire, Mission - Crossover 1,500,000 1,775,000 5,030,000 TOTAL - UNFUNDED $ 70,155000 2013-2017 Five Year Capital Improvements Plan Proposed . aye evi ARKANSAS Kevin Springer Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 6/5/2012 City Council Meeting Date Agenda Items Only Budget & Research Division Action Required: Finance & Internal Services Department Approve a resolution adopting the Proposed 2013-2017 Five Year Capital Improvements Plan. N/A Cost of this request Account Number Project Number Budgeted Item Category / Project Budget Program Category / Project Name Funds Used to Date Program / Project Category Name Remaining Balance Fund Name Budget Adjustment Attached 4 Q- _ Department Director r'- Date Financ and Internal Services Director Date 541/2 -- Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in Cit' 5 I - 12 2 - ' Clerk's Office Comments: 11) At 1042, cc It. Revised January 15, 2009 RESOLUTION NO. A RESOLUTION ADOPTING THE 2013-2017 FIVE-YEAR CAPITAL IMPROVEMENTS PLAN BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby adopts the 2013-2017 Five -Year Capital Improvements Plan, a copy of which is attached to this Resolution as Exhibit "A" and incorporated herein. PASSED and APPROVED this 5th day of June, 2012. APPROVED: BY: LIONELD JORDAN, Mayor ATTEST: By: SONDRA E. SMITH, City Clerk/Treasurer CITY OF FAYETTEVILLE 2013 - 2017 Capital Improvements Plan Compiled by: Kevin Springer, Budget Director Barbara Fell, Senior Financial Analyst Liz Hutchens, Financial Analyst CITY OF FAYETTEVILLE, ARKANSAS 2013-2017 CAPITAL IMPROVEMENTS PROGRAM TABLE OF CONTENTS PAGE(S) INTRODUCTION Letter of Transmittal........................................................................................................ I -III Program Directional Information............................................................................... IV -V CIP Project Cost Table.................................................................................................... VI CIPResolution.................................................................................................................. VII COMPREHENSIVE DETAIL Summary of Project Requests......................................................................................1-3 ComprehensiveDetail................................................................................................ 4-16 PARKING FUND PROJECTS Parking Fund - Parking Improvements: ProjectDetails................................................................................................. 17-18 PARKS DEVELOPMENT FUND PROJECTS Parks & Recreation Improvements: ProjectDetails................................................................................................. 19-21 IMPACT FEE FUND PROJECTS Fire Improvements: ProjectDetails.......................................................................................................23 Police Improvements: ProjectDetails.......................................................................................................24 Water & Sewer Improvements: Project Details ........................ ................. 25-26 ........................................................ PAGE(S) SALES TAX CAPITAL IMPROVEMENTS FUND PROJECTS Bridge and Drainage Improvements: ProjectDetails................................................................................................. 27-28 Fire Improvements: ProjectDetails................................................................................................. 29-31 Information Technology Improvements: ProjectDetails................................................................................................. 32-41 Library Improvements: ProjectDetails.................................................................................................. 42-43 Other Capital Improvements: ProjectDetails................................................................................................. 44-57 Parks & Recreation Improvements: ProjectDetails................................................................................................. 58-62 Police Improvements: ProjectDetails................................................................................................. 63-72 Street Improvements: ProjectDetails.......................................................................................................73 Trail Improvements: ProjectDetails.......................................................................................................74 Transportation Improvements: ProjectDetails................................................................................................. 75-77 WATER & SEWER FUND PROJECTS Wastewater Treatment Improvements: ProjectDetails................................................................................................. 79-84 Water & Sewer Improvements: ProjectDetails................................................................................................. 85-90 Water & Sewer Services Improvements: ProjectDetails................................................................................................. 91-96 SOLID WASTE FUND PROJECTS Solid Waste Fund - Solid Waste Improvements: ProjectDetails...............................................................................................97-105 PAGE(S) AIRPORT FUND PROJECTS Aviation Improvements: Project Details............................................................................................. 107-1 10 SHOP FUND PROJECTS Vehicles & Equipment: Project Details............................................................................................. 1 1 1-1 18 UNFUNDED PROJECTS............................................................................................ 1 19-123 APPENDIX Listing Of Acronyms............................................................................................... 125-126 ProjectIndex.......................................................................................................... 127-128 THE CITY OF FAYETTEVILLE, ARKANSAS �ON �� BUDGET 113 RESEARCH MountainDIStreet West Street Fayetteville, AR 72701 P (479) 575-8347 ARKANSAS June 5,2012 Mayor Lioneld Jordan, Members of the City Council and Citizens of Fayetteville It is my pleasure to present the Proposed 2013-2017 Capital Improvements Plan (CIP) for the City of Fayetteville. The City began this very important CIP process in 1988 to provide a focused plan that identifies the City's infrastructure and capital needs and also identifies the funding to meet those needs. CIP Purpose The CIP is an essential mid-term planning tool used by Fayetteville in the budget process. It is a five year plan which addresses the capital needs of the City for future periods. The CIP is not an appropriation in itself or an authorization by the Council to expend funds. It is instead a future plan which must be re-evaluated and or adjusted each year prior to incorporation into the annual budget. Each year the plan must be evaluated in response to changes in economic conditions or project priority modifications. Once included in the annual budget it must be approved by the City Council and only at that time does it become an appropriation authorized for expenditure by the Council. What is Included in the CIP The City financial policy is to address the majority of capital needs on a pay as you go basis utilizing current revenue. Major capital programs which are to large to address with current revenue streams must be accommodated through the use of bond issues. Capital programs funded by previous bond issues such as the Waste Water Improvement Project and the Street and Trails Bond Program are, therefore, not included in this CIP. Similarly, grant funded programs are not included. Approval for and appropriation of funds for these programs are done by the City Council upon acceptance of the grant or authorization of the bond issue. The comprehensive CIP includes projects funded by several funds within the fund structure of the City most of which are restricted by use such as the Water & Sewer Fund, Solid Waste Fund, Street Fund and Shop Fund. Balances in these funds must be used for specific purposes. In contrast the Sales Tax Capital Fund is not restricted as to purpose and can be used in a more discretionary manner for general governmental purposes. THE CITY OF FAYETTEVILLE, ARKANSAS Summary of CIP by Project Area -All Funds The table provides a summary by project area of the comprehensive Capital Improvement Program for all funds for 2013-2017. It is estimated that a total of $91,812,000 will be required for that period. The largest portion of required capital ($29,113,000) can be attributed to water and sewer renovation and rehabilitation. Approximately $12,470,000 will be needed to keep the transportation and street improvement program at its current level. These two components account for 45.29% of the total comprehensive CIP. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) By Project Area - All Sources Budget Budget Budget Budget Budget Total Project Area 2013 2014 2015 2016 2017 2013-2017 Bridge & Drainage 360,000 360,000 360,000 360,000 360,000 1,800,000 Information Tech, 950,000 620,000 520,000 455,000 390,000 2,935,000 Other 1,001,000 930,000 875,000 649,000 646,000 4,101,000 Parks 1,441,000 904,000 829,000 835,000 851,000 4,860,000 Public Safety 1,118,000 1,157,000 1,180,000 1,226,000 2,045,000 6,726,000 Solid Waste 1,849,000 200,000 524,000 138,000 275,000 2,986,000 Trail 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,0M Transportation 2,139,000 2,352,000 2,616,000 2,978,000 2,385,000 12,470,0( Vehicles & Equip. 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,0Gu Water & Sewer 5,883,000 5,810,000 5,832,000 5,753,000 5,835,000 29,1 13,000 20,654,000 16,899,000 17,563,000 18,602,000 18,094,000 91,812,000 Summary of CIP Sales Tax Capital by Project Category The Sales Tax Capital Fund is funded through the use of a portion of a one cent sales tax that is also allocated to general fund operations. Forty percent (40%) of the revenue of this sales tax is used to fund the Sales Tax Capital Fund and 60% is allocated to the General Fund for operations. The fund constitutes approximately 39% of the total CIP. The following table provides a summary of project categories to be funded by the Sales Tax Capital Improvement Fund. THE CITY OF FAYETTEVILLE, ARKANSAS CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Sales Tax Capital Improvements Funding - By Project Category Project Category Budget 2013 Budget 2014 Budget 2015 Budget 2016 Budget 2017 Total 2013-2017 Bridge & Drainage $360,000 $360,000 $360,000 $360,000 $360,000 $1,800,000 Fire 591,000 690,000 651,000 651,000 1,314,000 3,897,000 Information Tech. 950,000 620,000 520,000 455,000 390,000 2,935,000 Library 405,000 414,000 430,000 439,000 449,000 2, 1'37,000 Other Capital 449,000 456,000 445,000 210,000 197,000 1,757,000 Parks & Recreation 178,000 184,000 89,000 75,000 71,000 597,000 Police 367,000 302,000 359,000 400,000 551,000 1,979,000 Street 100,000 100,000 100,000 100,000 100,000 500,000 Trail 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 Transportation 1,957,000 ,2,221,000 2,484,000 2,845,000 2,251,000 11,758,000 $6,905,000 $6,988,000 $7,088,000 $7,214,000 $7,353,000 $35,548,000 It should be noted that approximately 33% of this fund is allocated to transportation improvements. Almost $8,200,000 is anticipated to be allocated to the trails program. Enterprise Resource Planning (ERP) System Major programs that need to be addressed in the future will include a new Enterprise Resource Planning (ERP) System and a Police Records Management System. These systems will affect the operations of all city departments and will be a major undertaking. Also, decisions will have to be made concerning a Material Recovery Facility expansion for the Solid Waste & Recycling Division and consideration of the associated funding. Development of the CIP The CIP was developed by City Administration to address identified capital needs for the period, 2013-2017, within existing revenue. Direction to City staff has also been provided by the City Council through oversight committees specifically the City Council Street and Water & Sewer Committees. Input has also been provided by various advisory committees and boards. 4Q_JJ o Paul A. Becker Finance Director CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM DIRECTIONAL INFORMATION Introduction The Capital Improvements Program (CIP) for the City of Fayetteville examines the infrastructure and capital needs of the City for the next five years. The CIP will be reviewed and updated on an annual basis to reflect the changing needs of the community and changes in available monies for. financing capital projects. The City's philosophy concerning the use of the CIP is that it should be considered as a financial planning tool that lists the City's capital improvement projects, places the projects in a priority order, and schedules the projects for funding and implementation. The CIP should be considered as a major policy tool for the Mayor and City Council. Capital Improvement Policy The CIP is approached as a valuable tool to be used in the development of responsible and progressive financial planning. The program is developed in accordance with the financial policies of the City. The policies and the CIP form the basis for making various annual capital budget decisions and support the City's continued commitment to sound, long-range financial planning and direction. The City's official Capital Improvements Policy is as follows: • The City will prepare a biennial update of a five year CIP, which will provide for the orderly maintenance, replacement, and expansion of capital assets. • The CIP will identify long-range capita► projects and capital improvements of all types, which will be coordinated with the annual operating budget to maintain full utilization of available sources. When preparing the CIP, the City will seek to identify all viable capital projects and capital improvements required during the subsequent five year period. These projects and improvements will be prioritized by year and by funding source. Every attempt will be made to match projects and improvements with available funding sources. Future operating costs associated with a project or an improvement will also be given consideration in the establishment of priorities. • The City will seek Federal, State, and other funding to assist in financing capital projects and capital improvements. • The City will incorporate the reasonable findings and recommendations of the City's Boards, Commissions, Committees, and Citizens' task forces as they relate to capital projects and improvements. • The City will seek input on the establishment of projects and project priorities from the public by holding hearings. What Projects Are in the CIP Projects and their cumulative component areas totaling $10,000 or more should be included in the CIP. Projects costing less than $5,000 are not considered capital and are funded through program operating budgets. Projects that cost between $5,000 and $10,000 are handled through the budget process. Attempts will be made to fund these capital items through operating funds. Projects in the CIP can include: • obligations for labor and materials and contractors involved in completing a project • acquisition of land or structures • engineering or architectural services, professional studies, or other administrative costs • expenses for City vehicles and equipment • renovating or expanding City facilities, grounds, or equipment Financing The City finances capital improvements on essentially a pay-as-you-go basis utilizing revenue from the 1% City sales tax originally adopted in 1993, the 1% Parks Development (Hotel, Motel, Restaurant) sales tax adopted in 1996, and operating revenues from the Airport, Shop, Water & Sewer, and Solid Waste funds. The 1% City Sales Tax revenue is divided between General Fund operations and capital. The current split for 2013, which began with the 2008 budget, is 60% for General Fund and 40% for Sales Tax Capital Improvements Fund. Until 2008, the split as established in 2003 was equal. Prior to June 2003, the revenue was divided 75% for Sales Tax Capital Improvements Fund and 25% for General Fund. In addition, long-term debt is considered and utilized only when the City faces a project that is of such importance and sufficient financial magnitude as to warrant a bond issue. The CIP is not.a financing document in and of itself. Rather, the CIP is utilized as a planning document that places projects in the annual budget whereby funds are appropriated for them by the City Council. Prior to actual initiation of project work, required contracts are presented to the Mayor or City Council, as appropriate, for final approval of expending funds. Project Cost Determination All projects are costed using a "Basis of Cost Estimate" table that provides the estimated basis used for the requested funds. If two or more basis of cost estimates is used to calculate a funding request, the estimate that represents the majority of the estimated funds is used. Basis of Cost Estimate Table for CIP 2013-2017 Cost of Comparable Facility or Equipment Rule of Thumb Indicator, Unit Costs Cost Estimated by Engineer, Architect, or Vendor Preliminary Estimate Ball Park "Guesstimate" Priority Selection of Projects The CIP will rely on priorities defined by the Mayor, City Council, community, and City staff. As always, criteria such as government imposed mandates, usefulness to the community, and impact on operational expenses will be reviewed in establishing priorities. A priority is assigned to each project by year and by funding source. Projects for which no funding is anticipated to be available will be placed on an "Unfunded Projects List," which will identify the cost of the project. This list identifies the project as being viable, but one for which no funding is presently available. Unfunded projects may be funded if actual revenue is above projected revenue, if costs on funded projects are below budget, or if another funding source is identified. The Parks and Recreation Advisory Board, Airport Board, City Council Street Committee, City Council Water & Sewer Committee, and City Council Equipment Committee meetings all provide committee and public input and guidance regarding -parks, streets, bridge and drainage improvements, water and sewer improvements, and equipment purchases planned for the next five years. RESOLUTION NO. A RESOLUTION ADOPTING THE PROPOSED 2013-2017 FIVE YEAR CAPITAL IMPROVEMENTS PLAN. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby adopts the Proposed 2010-2014 Five Year Capital Improvements Plan. A copy of 2013- 2017 Five Year Capital Improvements Plan, marked Exhibit "A" is attached hereto and made a part hereof. PASSED and APPROVED this the _ day of , 2012. APPROVED: By: ATTEST: By': LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Summary of Project Requests - All Sources Project Requests Budget 2013 Budget 2014 Budget 2015 Budget 2016 Budget 2017 Total 2013-2017 Funded Project Requests. Parking $82,000 $31,000 $32,000 $33,000 $34,000 $212,000 Parks Development 1,263,000 720,000 740,000 760,000 780,000 4,263,000 Impact Fee 1,060,000 1,065,000 1,070,000 1,075,000 1,080,000 5,350,000 Sales Tax Capital Improvements 6,905,000 6,988,000 7,088,000 7,214,000 7,353,000 35,548,000 Water & Sewer 4,983,000 4,910,000 4,932,000 4,853,000 4,935,000 24,613,000 Solid Waste 1,849,000 200,000 524,000 138,000 275,000 2,986,000 Airport 147,000 60,000 0 .0 0 207,000 Shop 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,000 Total Funded $20,654,000 $16,899,000 $17,563,000 $18,602,000 $18,094,000 $91,812,000 Unfunded Project Requests Unfunded $8,053,000 $3,813,000 $23,437,000 $14,726,000 $20,126,000 $70,155,000 Total Unfunded $8,053,000 $3,813,000 $23,437,000 $14,726,000 $20,126,000 $70,155,000 Total $28,707,000 $20,712,000 $41,000,000 $33,328,000 $38,220,000 $161,967,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) By Project Area - All Sources Trail 8.92% Other 4.47% Information Technology 3.20% Bridge & Drainage 1.96% Water & Sewer 31.71 % Project Area Bridge & Drainage Information Technology Other Parks Public Safety Solid Waste Trail Transportation Vehicles & Equipment Water & Sewer Solid Waste 3.25% Vehicles & Equipment 20.29 % Transportation 13.58% Parks 5.29 % Public Safety 7.33% Budget 2013 Budget 2014 Budget 2015 Budget 2016 Budget 2017 Total 2013-2017 360,000 360,000 360,000 360,000 360,000 1,800,000 950,000 620,000 520,000 455,000 390,000 2,935,000 1,001,000 930,000 875,000 649,000 646,000 4,101,000 1,441,000 904,000 829,000 835,000 851,000 4,860,000 1,1 18,000 1,157,000 1,180,000 1,226,000 2,045,000 6,726,000 1,849,000 200,000 524,000 138,000 275,000 2,986,000 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 2,139,000 2,352,000 2,616,000 2,978,000 2,385,000 12,470,000 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,000 5,883,000 5,810,OO0 5,832,000 5,753,000 5,835,000 29,113,000 20,654,000 16,899,000 17,563,000 18,602,000 18,094,000 91,812,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Sales Tax Capital Improvements Funding - By Project Category Trail 23.03 % Street 1.41% Police 5.57 % Parks & Recreation 1.68 % Other Capital 4.94 % Library 6.01 % Project Category Bridge & Drainage Fire Information Technology Library Other Capital Parks & Recreation Police Street Trail Transportation Transportation 33.08 % Bridge & Drainage 5,06 % Fire 10.96 % Information Technology 8.26 % Budget 2013 Budget 2014 Budget 2015 Budget 2016 Budget 2017 Total 2013-2017 $360,000 $360,000 $360,000 $360,000 $360,000 $1,800,000 591,000 690,000 651,000 651,000 1,314,000 3,897,000 950,000 620,000 520,000 455,000 390,000 2,935,000 405,000 414,000 430,000 439,000 449,000 2,137,000 449,000 456,000 445,000 210,000 197,000 1,757,000 178,000 184,000 89,000 75,000 71,000 597,000 367,000 302,000 359,000 400,000 551,000 1,979,000 100,000 100,000 100,000 100,000 100,000 500,000 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 1,957,000 2,221,000 2,484,000 2,845,000 2,251,000 11,758,000 $6,905,000 $6,988,000 $7,088,000 $7,214,000 $7,353,000 $35,548,000 3 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Funding Source / Category / Division Page # , Budget 2013 Budget 2014 Budget 2015 Budget 2016 Budget 2017 Total 2013-2017 2130 - PARKING FUND: Parking Improvements Parking & Telecommunications (D840) Parking Revenue PCI Compliance Upgrade 17 52,000 0 0 0 0 52,000 Parking Lot Improvements and Overlays 18 30,000 31,000 32,000 33,000 34,000 160,000 82,000 31,000 32,000 33,000 34000 212,000 2130 - Parking Fund Total 82,000 31,000 32,000 33,000 34,000 212,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 2250 - PARKS DEVELOPMENT FUND: Parks & Recreation Improvements Parks & Recreation (D460) Community Park Improvements 19 700,000 683,000 , 700,000 673,000 420,000 3,176,000 Regional Park Development 20 563,000. 0 0 87,000 360,000 1,010,000 Parks & Recreation Office Renovation 21 0 37,000 40,000 0 0 77,000 1,263,000 720,000 740,000 760,000 780,000 4,263,000 2250 - Parks Development Fund Total 1,263,000 720,000 740,000 760,000 , 780,000 4,263,000 U CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 2300 - IMPACT FEE FUND: Fire Improvements Fire Department (D300) Fire Impact Improvements 23 74,000 77,000 80,000 83,000 86,000 400,000 74,000 77,000 80,000 83,000 86,000 400,000 Police Improvements Police (D200) Police Impact Improvements 24 86,000 88,000 90,000 92,000 94,000 450,000 86,000 88,000 90,000 92,000 94,000 450,000 Water & Sewer Improvements o. Utilities Director (D900) Wastewater Impact Improvements 25 400,000 400,000 400,000 400,000 400,000 2,000,000 Water Impact Improvements 26 500,000 500,000 500,000 500,000 500,000 2,500,000 900,000 900,000 900,000 900,000 900,000 4,500,000 2300 - Impact Fee Fund Total 1,060,000 1,065,000 1,070,000 1,075,000 1,080,000 5,350,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 4470 - SALES TAX CAPITAL IMPROVEMENTS FUND: Bridge & Drainage Improvements Engineering (D610) Stormwater Quality Management 27 160,000 160,000 160,000 160,000 160,000 800,000 Other Drainage Improvements 28 200,000 200,000 200,000 200,000 200,000 1,000,000 360,000 360,000 360,000 360,000 360,000 1,800,000 Fire Improvements Fire Department (D300) Fire Apparatus Purchases 29 426,000 426,000 466,000 506,000 1,169,000 2,993,000 Fire Facility Maintenance 30 125,000 125,000 165,000 125,000 125,000 665,000 Fire Information Technology Updates 31 40,000 139,000 20,000 20,000 20,000 239,000 591,000 690,000 651,000 651,000 1,314,000 3,897,000 Information Technology Improvements Budget & Research (D540) Enterprise Data Warehouse System Information Technology (D440) Exchange/Office Upgrade Local Area Network (LAN) Upgrade Data Center Relocation Backup Storage Appliance Microcomputer & Printer Replacements Storage Area Network (SAN) Geographic Information System (GIS) AccessFoyetteville Technical Improvements Document Management 32 97,000 0 33 220,000 150,000 34 140,000 150,000 35 220,000 0 36 75,000 0 37 68,000 90,000 38 40,000 40,000 39 50,000 70,000 40 25,000 100,000 41 15,000 20,000 950,000 620,000 0 0 0 97,000 150,000 0 0 520,000 135,000 135,000 145,000 705,000 0 0 0 220,000 0 0 0 75,000 75,000 75,000 75,000 383,000 40,000 120,000 40,000 280,000 75,000 75,000 80,000 350,000 30,000 .30,000 30,000 215,000 15,000 20,000 20,000 90,000 520,000 455,000 390,000 2,935,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 Library Improvements library (D150) Library Materials Purchases 42 375,000 383,000 398,000 406,000 415,000 1,977,000 Library Computer Replacements 43 30,000 31,000 32,000 33,000 34,000 160,000 405,000 414,000 430,000 439,000 449,000 2,137,000 Other Capital Improvements Accounting & Audit (D510) Accounting Image Scanner & Check Sealer 44 5,000 5,000 0 0 0 10,000 Audit Expense 45 7,000 7,000 7,000 7,000 7,000 35,000 Building Maintenance (D530) Building Improvements 46 119,000 120,000 121,000 123,000 125,000 608,000 o, City Clerk/Treasurer (D130) - Legislative Management/Agenda Routing 47 33,000 0 0 0 0 33,000 City Clerk Document Management Equipment 48 0 22,000 47,000 10,000 10,000 89,000 City Council iPads 49 0 7,000 0 0 0 7,000 Government Channel (D710) City Hall Audio -Visual Renovation 50 70,000 100,000 100,000 0 0 270,000 Television Center Equipment 51 50,000 50,000 50,000 50,000 50,000 250,000 Television Center Digital Conversion 52 75,000 75,000 100,000 0 0.' 250,000 Remote Meeting Recording 53 50,000 0 0 0 0 50,000 Location Production System 54 0 65,000 0 0 0 65,000 Digital Signage Implementation 55 0 0 15,000 15,000 0 30,000 Parking & Telecommunications (D840) Telecommunication Systems Upgrades 56 5,000 5,000 5,000 5,000 5,000 25,000 Purchasing (D550) Citywide Building Insurance Appraisal Study 57 35,000 0 0 0 0 35,000 449,000 456,000 445,000 210,000 197,000 1,757,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Funding Source / Category / Division Parks & Recreation Improvements Parks & Recreation (D460) Forestry, Safety and ADA Native Grasses Program Lights of the Ozarks Tree Escrow Fayetteville Senior Center Parking Lot & Drainage Page Budget Budget Budget Budget Budget Total # 2013 2014 2015 2016 2017 2013-2017 58 31,000 31,000 31,000 31,000 31,000 155,000 59 10,000 10,000 10,000 10,000 10,000 50,000 60 23,000 23,000 23,000 23,000 23,000 115,000 61 114,000 62,000 25,000. 11,000 7,000 219,000 62 0 58,000 0 0 0 58,000 178,000 184,000 89,000 75,000 71,000 597,000 Police Improvements Police (D200) Police Bulletproof Vests 63 10,000 11,000 42,000 10,000 10,000 83,000 ,o Police Building Improvements 64 25,000 25,000 25,000 75,000 25,000 175,000 Police Technology Improvements 65 40,000 70,000 25,000 25,000 25,000 185,000 Police Unmarked Vehicles 66 57,000 72,000 72,000 72,000 126,000 399,000 Police Equipment Replacement 67 20,000 20,000 35,000 25,000 10,000 110,000 Police Specialized Equipment 68 55,000 64,000 32,000 28,000 85,000 264,000 Police Patrol Vehicle Electronic Upgrades 69 160,000 0 43,000 0 200,000 403,000 Police Network/Server Replacements 70 0 30,000 75,000 150,000 30,000 285,000 Police K-9 Replacement 71 0 10,000 10,000 0 0 20,000 Police Weapons Replacement 72 .0 0 0 15,000 40,000 55,000 367,000 302,000 359,000 400,000 551,000 1,979,000 Street Improvements Engineering (D610) Street ROW/Intersection/Cost Sharing 73 100,000 100,000 100,000 100,000 100,000 500,000 100,000 100,000 100,000 100,000 100,000 500,000 Trail Improvements Transportation Services (D800) Trail Development 74 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail 'Page Budget Budget Budget Budget Budget Total Funding Source/Category/Division # 2013 2014 2015 2016 2017 2013-2017 1,548,000 1,641,000 1,650,000 1,679,000 1,670,000 8,188,000 Transportation Improvements Transportation Services (D800) In -House Pavement Improvements 75 1,842,000 1,551,000 1,695,000 .1,955,000 1,576,000 8,619,000 Sidewalk Improvements 76 115,000 520,000 639,000 740,000 525,000 2,539,000 Traffic Signal Improvements 77 0 150,000 150,000 150,000 150,000 600,000 1,957,000 2,221,000 2,484,000 2,845,000 2,251,000 11,758,000 4470 - Sales Tax Capital Improvements Fund Total 6,905,000 6,988,000 7,088,000 7,214,000 7,353,000 35,548,000 0 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Funding Source / Category / Division Page # Budget 2013 5400 - WATER & SEWER FUND: Wastewater Treatment Improvements Utilities Director (D900) Phosphorus Standards Management 79 50,000 Wastewater Treatment Plant (D930) Disinfection System Replacement - W,W,T,P. 80 1,000,000 Irrigation Reels - W.W.T.P. 81 151,000 Plant Pumps and Equipment - W.W.T.P. 82 200,000 Upgrade/Replace Lift Stations - W.W.T,P. 83 100,000 Building Improvements - W.W.T.P. 84 56,000 Water & Sewer Improvements Water & Sewer Maintenance (D910) Water System Rehabilitation and Replacement Water/Sewer Relocate for Street Bonds Sanitary Sewer Rehabilitation Water/Sewer Impact Fee Cost Sharing Water/Sewer Equipment Expansions Baxter Water Tanks Painting Water & Sewer Services Improvements 1,557,000 Budget Budget Budget Budget Total 2014 2015 2016 2017 2013-2017 50,000 50,000 50,000 50,000 250,000 0 0 0 0 1,000,000 161,000 0 0 0 312,000 225,000 225,000 225,000 225,000 1,100,000 100,000 150,000 150,000 180,000 680,000 33,000 35,000 35,000 35,000 194,000 569,000 460,000 460,000 490,000 3,536,000 85 1,010,000 1,150,000 2,095,000 1,825,000 2,055,000 8,135,000 86 500,000 500,000 500,000 500,000 500,000 2,500,000 87 1,210,000 1,000,000 1,200,000 1,250,000 1,250,000 5,910,000 88 275,000 275,000 275,000 275,000 275,000 1,375,000 89 38,000 220,000 45,000 8,000 0 311,000 90 0 850,000 0 0 0 850,000 3,033,000 3,995,000 4,115,000 3,858,000 4,080,000 19,081,000 Billing & Collections (D520) Printer Replacements 91 30,000 0 0 0 0 30,000 Business Office Improvements 92 20,000 20,000 20,000 20,000 20,000 100,000 Information Technology (D440) Business Office Technology Improvements 93 30,000 15,000 12,000 10,000 10,000 77,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Funding Source I Category / Division Water & Sewer Maintenance (D910) Water Meters Backtlow Prevention Assemblies Water/Sewer Rate Study 5400 - Water & Sewer Fund Total Page Budget Budget Budget Budget 'Budget Total # 2013 2014 2015 2016 2017 2013-2017 94 313,000 311,000 315,000 325,000 325,000 1,589,000 95 0 0 10,000 10,000 10,000 30,000 96 0 0 0 170,000 0 170,000 393,000 346,000 357,000 535,000 365,000 1,996,000 4,983,000 4,910,000 4,932,000 4,853,000 4,935,000 24,613,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 5500 - SOLID WASTE FUND: Solid Waste Improvements Solid Waste & Recycling (D920) Recycling Baler 97 538,000 0 0 0 0 538,000 Solid Waste Compactors 98 126,000 130,000 134,000 138,000 142,000 670,000 Solid Waste Facility - Transfer Station Expansion 99 635,000 0 0 0 0 635,000 Recycling Drop Off Facility )North / Central) 100 66,000 70,000 0 0 0 136,000 Recycling Improvements 101 28,000 0 0 0 0 28,000 Solid Waste Compost Site Slab Expansion 102 416,000 0 0 0 0 416,000 Solid Waste Mad Vac 103 40,000 0 0 0 0 40,000 Recycling Commercial Expansion )Organics) 104 0 0 390,000 0 0 390,000 Solid Waste Rate Study 105 0 0 0 0 133,000 133,000 1,849,000 200,000 524,000 138,000 275,000 2,986,000 5500 - Solid Waste Fund Total 1,849,000 200,000 524,000 138,000 275,000 2,986,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 5550 - AIRPORT FUND: Aviation Improvements Aviation (D810) Airport Self Serve Station Upgrade 107 10,000 0 0 0 0 10,000 Airport Roof Replacements 108 41,000 60,000 0 0 0 101,000 Airport Sprinkler System Replacement - White Hangar 109 65,000 0 0 0 0 65,000 Airport ARFF Personal Protective Gear Replacement 110 31,000 0 0 0 0 31,000 147,000 60,000 0 0 0 207,000 5550 - Airport Fund Total 147,000 60,000 0 0 0 207,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Funding Source / Category I Division Page Budget Budget Budget Budget Budget Total # 2013 2014 2015 2016 2017 2013-2017 9700 - SHOP FUND: Vehicles & Equipment Improvements Fleet Operations (D830) Fleet - Police/Passenger Vehicles 111 329,000 300,000 336,000 312,000 283,000 1,560,000 Fleet -Solid Waste Vehicles/Equipmen₹ 112 1,151,000 931,000 598,000 1,345,000 1,085,000 5,110,000 Fleet - Construction Equipment 113 437,000 0 587,000 123,000 195,000 1,342,000 Fleet - Backhoes/Loaders 114 608,000 463,000 381,000 182,000 414,000 2,048,000 Fleet - Other Vehicles and Equipment 115 969,000 205,000 123,000 732,000 608,000, 2,637,000 Fleet - Tractor/Mowers 116 267,000 161,000 179,000 248,000 57,000 912,000 Fleet - Light / Medium Utility Vehicles 117 604,000 760,000 740,000 762,000 596,000 3,462,000 Fleet - Heavy Utility Vehicles 118 0 105,000 233,000 825,000 399,000 1,562,000 9700 - Shop Fund Total 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,000 4,365,000 2,925,000 3,177,000 4,529,000 3,637,000 18,633,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Comprehensive Detail Page Budget Budget Budget Budget Budget Total Funding Source / Category / Division # 2013 2014 2015 2016 2017 2013-2017 All Funding Sources - Total E 20,654,000 16,899,000 17,563,000 18,602,000 18,094,000 91,812,000 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Parking Revenue PCI Compliance Upgrade Division: Parking & Telecommunications (D840) Funding: 2130 - Parking Category: Parking Improvements Rank: 1 Project #: 11009 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 52,000 2014 0 2015 0 2016 0 2017 0 Total $ 52,000 The PCI DSS is a multifaceted security standard that includes requirements for security management, policies, procedures, network architecture, software design and other critical protective measures. This comprehensive standard is intended to help organizations proactively protect customer account data. This upgrade to the existing PCI DSS Compliance is required to align content with the new PCI DSS version 2.0. Scheduled Implementation: Active Project This upgrade will be implemented in January 2013. Effect on Operations: This project has no significant affect on annual operations. f CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Parking Lot improvements and Overlays Division: Parking & Telecommunications (D840) Funding: 2130 - Parking Category: Parking Improvements Rank: 2 Project #: 06001 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 30,000 2014 31,000 2015 32,000 2016 33,000 2017 34,000 Total $ 160,000 The City currently has 12 public parking lots and one municipal parking deck that are in the Downtown Parking District and the Entertainment Parking District. The surface lots are all asphalt lots that periodically require general maintenance such as crack seal, seal coat, re -striping, pot hole patching, and bumper block replacement. These lots also require a complete asphalt overly on a less frequent basis. This parking lot maintenance schedule will provide an overlay of one parking lot annually and general maintenance of the other lots as needed. Scheduled Implementation: PlannedlProgrammed Project During the second quarter of 2013, staff will begin replacing the entrance and exit ramps at the municipal deck. Annual rotation of maintenance will continue for all parking to₹s. Effect on Operations: This project has no significant affect on annual operations. 1143 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Community Park Improvements Division: Parks & Recreation (D460) Funding: 2250 - Parks Development Category: Parks & Recreation Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 700,000 2014 683,000 2015 700,000 2016 673,000 2017 420,000 Total $ 3,176,000 These projects are needed to improve and expand facilities in order to meet the current needs of citizens. For 2013: Wilson Park Improvements - remodel pool buidings; Walker Park - new concession stand. 2014: Lake Fayetteville Improvements - Lake Fayetteville softball complex drainage and remodel concession, restroom, and playground; Veterans Park - small pavilion and parking improvements. 2015: Gulley Park Improvements - trail and lighting replacement, new pavilion and restrooms, and additional parking. 2016: Wilson Park Improvements - remodel rockhouse, restrooms, and tennis and basketball courts; YRCC Improvements - flooring and outside facilities. 2017: White River Improvements - develop multi -use fields, remodel pump station, add parking lot, pavilion, sidewalks and improve river access. In addition to the $3,176,000 funded in the 2013-2017 period, there is $435,000 in funding in the unfunded project list. Scheduled Implementation: New Project Request 2013 - Walker Park concession stand construction and Wilson Park pool house renovation. 2014 - Lake Fayetteville Improvements. 2015 - Gulley Park Improvements. 2016 - Wilson Park rockhouse, restrooms, and tennis and basketball courts and YRCC Improvements. 2017 - White River Improvements. Effect on Operations: Annual utility cost will increase at Wilson by lighting the tennis/basketball courts. Upgrading the Gulley Park trail lights to energy efficient LED lights should result in a net savings of $6,845. 19 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Regional Park Development Division: Parks & Recreation (D460) Funding: 2250 - Parks Development Category: Parks & Recreation Improvements Rank: 2 Project #: 02002 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Project Cost 2013 $ 563,000 2014 0 2015 0 2016 87,000 2017 360,000 Total $ 1,010,000 Description: This project is for the development of the Regional Park which includes constructing soccer, softball and baseballs fields, playgrounds, pavilions, trails, volleyball, basketball and tennis courts, parking, roads, utility infrastructure, gardens, an amphitheatre and more. Scheduled Implementation: Active Project The construction of the park will begin in 2014 for Phase One and will be ongoing for multiple years as funding is available for additional phases. Phase One construction will need to be completed by 2017 when the Lewis Soccer Complex lease agreement expires. Undetermined future funding sources will dictate the scheduled implementation. Effect on Operations: This park will require two additional staff members, a vehicle, two mowers and utility expenses in 2015. In 2017, two additional staff members, a mower, a ballfield groomer, and utility expenses will be needed as the final phases are completed. 20 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Parks & Recreation Office Renovation Division: Parks & Recreation (D460) Funding: 2250 - Parks Development Category: Parks & Recreation Improvements Rank: 3 Project #: 02014 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 0 2014 37,000 2015 40,000 2016 0 2017 0 Total $ 77,000 This project will address the space issues by adding square footage to accommodate a conference/training room that is capable of holding the staff. Upgrades will be made to the break room, locker room, shower, and office storage to better meet the staff size and needs. Updates will also be made to the existing office space and reception area to create a more inviting and comfortable environment for the public as well as office staff. Renovation to the existing canopy in the shop yard is also necessary due to attrition and previous damage to support poles. Scheduled Implementation: Active Project The canopy structure in the shop yard will be renovated in 2012. Plans for the office renovation will be reviewed and developed in 2012. Construction will begin in 2014. Effect on Operations: There will be no impact to budgeted operation costs. 9 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fire Impact Improvements Division: Fire Department (D300) Funding: 2300 - Impact Fee Category: Fire Improvements Rank: 1 Project #: 07003 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 74,000 2014 77,000 2015 80,000 2016 83,000 2017 86,000 Total $ 400,000 The purpose of this project is to accumulate funding for fire projects that are associated with the increase in developments throughout the City. The funding for this project comes from impact fees collected from developments. Scheduled Implementation: NA Effect on Operations: NA Active Project 23 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Division: Funding: Category: Rank: Project Type: Description: Police Impact Improvements Police (D200) 2300 - Impact Fee Police Improvements 1 Project #: 07001 Replacement: _ Timeframe: On -Going Expansion: X Project Cost 2013 $ 86,000 2014 88,000 2015 90,000 2016 92,000 2017 94,000 Total $ 450,000 The purpose of this project is to accumulate funding for police projects that are associated with the increase in developments throughout the City. The funding for this project comes from impact fees collected from developments. Scheduled Implementation: Active Project NA Effect on Operations: NA 24 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Division: Funding: Category: Rank: Project Type: Wastewater Impact Improvements Utilities Director (D900) 2300 - Impact Fee Water & Sewer Improvements 1 Project #: 07004 Replacement: _ Timeframe: On -Going Expansion: X Project Cost 2013 $ 400,000 2014 400,000 2015 400,000 2016 400,000 2017 400,000 Total $ 2,000,000 Description: The purpose of this project is to accumulate funding for wastewater projects that are associated with the increase in developments throughout the City. The funding for this project comes from impact fees collected from developments. Scheduled Implementation: Active Project NA Effect on Operations: NA 25 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water Impact Improvements Division: Utilities Director (D900) Funding: 2300 - Impact Fee Category: Water & Sewer Improvements Rank: 1 Project #: 07002 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Project Cost 2013 $ 500,O00 2014 500,000 2015 500,000 2016 500,000 2017 500,000 Total $ 2,500,000 Description: The purpose of this project is to accumulate funding for water projects that are associated with the increase in developments throughout the City. The funding for this project comes from impact fees collected from developments. Scheduled Implementation: NA Effect on Operations: NA Active Project 26 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Stormwater Quality Management Division: Engineering (D610) Funding: 4470 - Sales Tax Capital Improvements Category: Bridge & Drainage Improvements Rank: 1 Project #: 02097 Project Type: Replacement: X Timeframe: Multi Year Expansion: X Project Cost 2013 $ 160,000 2014 160,000 2015 160,000 2016 160,000 2017 160,000 Total $ 800,000 Description: This project includes activities required by the EPA National Pollutant Discharge Elimination System (NPDES) Phase II Stormwater Permit Regulations as administered by the Arkansas Department of Environmental Quality (ADEQ) and other projects focused on improving water quality. Scheduled Implementation: Active Project This project includes activities which are ongoing and renewed on an annual basis. A water quality sampling project which is mandated by ADEQ will be initiated in 2012 and will become an annually renewed project. The water quality improvement project funds will be utilized as appropriate opportunities such as matching grant opportunities arise. Estimated costs are based on existing contracts and programs which are planned to continue. Effect on Operations: None. 27 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Other Drainage Improvements Division: Engineering (D610) Funding: 4470- Sales Tax Capital Improvements Category: Bridge & Drainage Improvements Rank: 2 Project #: 02108 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: This project will fund drainage improvements as needed. Project Cost 2013 $ 200,000 2014 200,000 2015 200,000 2016 200,000 2017 200,000 Total $ 1,000,000 Scheduled Implementation: Active Project A study of various drainage basins to develop cost estimates and priorities for construction. Identification of projects and construction of improvements will occur throughout the CIP Program years. Effect on Operations: Effects on operations will depend on specific projects, but will generally reduce costs by correcting problems and reducing maintenance labor and material costs to the Transportation Division. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fire Apparatus Purchases Division: Fire Department (D300) Funding: 4470 - Sales Tax Capital Improvements Category: Fire Improvements Rank: 1 Project #: 03019 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 426,000 2014 426,000 2015 466,000 2016 506,000 2017 1,169,000 Total $ 2,993,000 This project is for the replacement of fire apparatus that are past their useful life and to acquire apparatus for expansion stations in the future. Given the number of apparatus in the current fleet, an annual replacement program is necessary to avoid having to purchase multiple apparatus in one fiscal year. Scheduled Implementation: Active Project 2013: Requested funding for half of the amount necessary to replace Unit 28 with a Quint Ladder Apparatus. 2014: Replace Unit 28 - 1998 KME Renegade, Model CMFD with a Quint Ladder Apparatus. 2015: Replace Unit 30 - 2000 Freightliner FL -80 Pumper with an E-1 Cyclone II Pumper. 2016: Replace Unit 31 - 2001 HME Central 1981 with an E-1 Cyclone II Pumper. 2017: Replace Unit 24 - 1992 Pierce TeleSquirt with an Aerial Platform Apparatus. Effect on Operations: The fire apparatus replacements listed above are not expected to impact the operating budget as no significant change in maintenance costs is expected. 29 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fire Facility Maintenance Division: Fire Department (D300) Funding: 4470 - Sales Tax Capital Improvements Category: Fire Improvements Rank: 2 Project #: 02006 Project Type: Replacement: X Timeframe: On -Going Expansion: X Project Cost 2013 $ 125,000 2014 125,000 2015 165,000 2016 125,000 2017 125,000 Total $ 665,000 Description: This project is for major repairs to existing facilities that cannot be funded through the normal operating budget. Repairs include but are not limited to roofing, plumbing or drainage repairs and replacements, remodeling, fencing, driveway replacements, generators, stability assessments, fire escape replacements, and structural repairs to stations. This project allows for necessary repairs to the Fire Department's multiple fire stations, office locations, and facilities. Scheduled Implementation: Active Project Staff has identified several repairs needed at Station 1, the Fire Prevention Bureau, and other sub- stations. In 2013, staff intends to install fencing at Stations 6 and 7, begin a stability assessment and roof replacement at Station 1, and replace the Fire Prevention Bureau driveway. In 2014, replacement of the fire escape and remodel of the kitchen will be needed at Station 1. In 2015-2017, a generator at the Fire Prevention Bureau and dormitory improvements at Station 1 will be needed. Effect on Operations: N/A 30 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fire Information Technology Updates Division: Fire Department (D300) Funding: 4470 - Sales Tax Capital Improvements Category: Fire Improvements Rank: 3 Project #: 10017 Project Type: Replacement: X Timeframe: On -Going Expansion: X Project Cost 2013 $ 40,000 2014 139,000 2015 20,000 2016 20,000 2017 20,000 Total $ 239,000 Description: This project will allow for the replacement of systems as they become technologically obsolete or inoperable without interrupting daily operations. With the computer devices in front line apparatus as well as all fire stations, staff is currently supporting over 80 computers and mobile devices. Scheduled Implementation: Active Project In 2013 - begin replacing the Mobile Data Terminals (MDT's). In 2014, the Fire and Police Departments have identified a need to move from the current records management software platform to a Windows based software platform. Effect on Operations: The annual SSMA for additional records management software modules would begin at the time of delivery and would be prorated to run concurrently with the department's existing SSMA. The cost of years two through eight is estimated to increase by 8% annually over the prior year. KI1 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Enterprise Data Warehouse System Division: Budget & Research (D540) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 97,000 2014 0 2015 0 2016 0 2017 0 Total $ 97,000 This Citywide Enterprise Content Management (ECM) Workflow solution combines the technologies of document imaging, document management and workflow which will enable the City to streamline business processes and accelerate the completion of critical business tasks by automating daily activities. Workflow is an electronic document routing system that enables users to process work more efficiently, faster, and more accurately than with traditional paper processing. Workflow streamlines collaboration and accelerates the completion of critical business tasks. This project will involve the acquisition of a SharePoint 2010 Enterprise system with Excel Services, Visio Services, Powerpivot server, and Reporting Services (SSRS). Scheduled Implementation: Active Project Effect on Operations: 32 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Exchange/Office Upgrade Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 220,000 2014 150,000 2015 150,000 2016 0 2017 0 Total $ 520,000 As the City has grown, a current, robust, and standarized email platform that can easiliy integrate with other applications within the City is needed. In addition to an aging email system, the City has several out -dated versions of the productivity suite Microsoft Office. This leads to inefficiency and problems across the City regarding version incompatibility and functionality issues. By standardizing on the current version of Microsoft Office, the City will gain efficiency and collaboration through the new software. The City can obtain a Microsoft Enterprise Agreement that will bundle both the email and office upgrades to provide significant discounts and provide software assurance for the next five years. The Microsoft Enterprise Agreement would include upgrading all desktops to the current version of windows, Client access licenses for Windows Server, Exchange Server, SharePoint Server, Lync Server, System Center Configuration Manager, and Microsoft Forefront. Scheduled Implementation: New Project Request Effect on Operations: 33 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Local Area Network (LAN) Upgrade Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 2 Project #: 02056 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 140,000 2014 150,000 2015 135,000 2016 135,000 2017 145,000 Total $ 705,000 This project is to upgrade and expand the City's Local Area Network (LAN)/Network infrastructure. The LAN is used by every division in the City across thirty locations connecting approximately 850 devices. While most components of the LAN are on a three to five year lifecycle, staff must also consider increases in the system's user base and advances in technology that create a need for hardware and operating system upgrades. In the next five years, staff will replace most of the existing servers, switches, and other network hardware. Staff also has plans to add technology that will increase the speed and reliability of the different aspects of the LAN. Specifically, a fault tolerant firewall, redundant and/or battery protected power supplies for all infrastructure equipment, a separate network for backups, network management and testing tools, WAN optimization hardware, additional monitoring and alerting, and tools to help manage and deploy security policy. Scheduled Implementation: Effect on Operations: Active Project 34 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Data Center Relocation Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 3 Project #: XXXXX Project Type: Replacement: _ Timeframe: Single Year Expansion: X Description: Project Cost 2013 $ 220,000 2014 0 2015 0 2016 0 2017 0 Total $ 220,000 This project is for the relocation of the City's primary data center to the vacant Emergency Response Station at Drake Field. For 2012/2013, $120,000 is slated in the Data Center Upgrade project for replacing the AC and UPS units. If funds are spent in the existing facility, it will be a sunk cost as staff will not be able to relocate those items. An additional $50,000 is required for the initial move/installation of all existing equipment into the ERS facility. This is a much better facility in the long term as it is owned by the City, it provides better physical security, and greater disaster recovery options. Scheduled Implementation: New Project Request The move would take place in the first quarter of 2013 when the EJ Ball lease expires in February. Staff currently has a CIP # 12001 for Data Center Upgrades to replace the existing AC units, and has planned replacement of the UPS batteries pending additional funding for this project in 2013. Effect on Operations: There will be no significant change over the current annual hardware maintenance expense for data center equipment. Connectivity cost are estimated at approximately $5,000/month. Rent would be eliminated completely which is currently increasing 3% per year. Due to the sizing and efficiency of the new AC and UPS units, utility cost are estimated to decrease by 50%. 35 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Division: Funding: Category: Rank: Project Type: Description: Backup Storage Appliance Information Technology (D440) 4470 - Sales Tax Capital Improvements Information Technology Improvements 4 Project #: XXXXX Replacement: _ Timeframe: Single Year Expansion: X Project Cost 2013 $ 75,000 2014 0 2015 0 2016 0 2017 0 Total $ 75,000 Currently, all data is backed up to the existing tape library. As the overall size of the data increases, the reliability and speed of tape backup becomes problematic. The proposed backup appliance replaces the existing tape library with a more efficient disk -based backup solution allowing for reduced backup windows, longer data retention, and increased data integrity. Scheduled Implementation: First Quarter of 2013. Effect on Operations: New Project Request No software maintenance will be required until 2016. 36 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Microcomputer & Printer Replacements Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 5 Project #: 02057 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 68,000 2014 90,000 2015 75,000 2016 75,000 2017 75,000 Total $ 383,000 This project is for the replacement of failing and outdated personal computers (PC's) and AS/400 system and network printers. In order to make use of increased functionality of new PC software, PC hardware must be continuously evaluated and updated. This project will fund the continued rollout of virtual desktops allowing a standardized desktop to be deployed across the City. The workload for system printers has steadily decreased since the implementation of the Electronic Document Management System. This reduction has extended the life on most of the system printers. The life cycle for the large volume printers has increased from approximately five years to ten years. Scheduled Implementation: Active Project Annual funding is for PC replacements with additional funding added in 2014 for replacement printers. Effect on Operations: This project has no significant direct cost on operations. Indirectly, newer, faster machines increase end user productivity and reduce time spent maintaining equipment. Additionally, many PC's will be replaced with virtual desktops that require significantly less staff time deploying and maintaining. 37 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Storage Area Network (SAN) Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 6 Project #: 09031 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 40,000 2014 40,000 2015 40,000 2016 120,000 2017 40,000 Total $ 280,000 This project provides storage for the City's increasing data needs. In order to provide fast, reliable access to data, a centralized enterprise class storage system is required. As the City utilizes technology and applications to increase efficiencies and productivity, more data is produced. This project expands on an existing enterprise class storage system with an expected major upgrade after three (3) years. Scheduled Implementation: Active Project Add drives and enclosures over the next three (3) years with a major upgrade in 2016. Effect on Operations: . No significant change over the current annual software maintenance expense. 38 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Geographic Information System (GIS) Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 7 Project #: 02055 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 50,000 2014 70,000 2015 75,000 2016 75,000 2017 80,000 Total $ 350,000 Geographic Information Systems (GIS) are organized collections of computer hardware, software, geographic data, and personnel designed to efficiently capture, store, update, manipulate, analyze, and display all forms of geographically referenced information. This system provides necessary information for planning, engineering, Hansen, and public utility projects. Additionally, GlS provides applications to assist many city divisions including Police, Fire, Transportation, and Parks & Recreation. This project is to upgrade and expand the City's base GIS computer hardware, software, and data collection systems to accommodate growth in the system's applications and user base. Scheduled Implementation: Active Project N/A Effect on Operations: Additional hardware and software may be accompanied by increased maintenance costs. 39 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: AccessFayetteville Technical Improvements Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 8 Project #: 04047 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 25,000 2014 100,000 2015 30,000 2016 30,000 2017 30,000 Total $ 215,000 This project provides funding for technical improvements, enhancements, third party applications, and maintenance of the AccessFayetteville website. AccessFayetteville utilizes a commercial Content Management System (CMS) that is configured and maintained by staff. The CMS allows end users to add, edit, and approve the content that is displayed on the website. Scheduled Implementation: Active Project Annual upgrades will continue in years: 2013, 2015, 2016, and 2017. Additional funding is requested in 2014 primarily for professional services to assist with migrating the accessFayetteville site to a new content management system. Effect on Operations: No significant impact. 40 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Document Management Division: Information Technology (D440) Funding: 4470 - Sales Tax Capital Improvements Category: Information Technology Improvements Rank: 9 Project #: 02094 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 15,000 2014 20,000 2015 15,000 2016 20,000 2017 20,000 Total $ 90,000 This project is to add additional scanners and licenses as new applications are added to the Electronic Document Management System (EDMS). Each year several new applications are added to the system. Users that need to scan and index documents require a license. Scheduled Implementation: Active Project N/A Effect on Operations: Annual maintenance will increase as hardware and software licenses are added. 41 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Library Materials Purchases Division: Library (D150) Funding: 4470 - Sales Tax Capital Improvements Category: Library Improvements Rank: 1 Project #: 02049 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 375,000 2014 383,000 2015 398,000 2016 406,000 2017 415,000 Total $ 1,977,000 This project provides library materials including literature, non-fiction, reference resources, media, e - books, and parenting resources. The Fayetteville Public library seeks to provide a collection of library materials at a level commensurate with benchmark cities and the national average for cities with a population of 50,000 to 99,000 and operating budgets of $3.5-$4.2 million. Over 1.2 million items were borrowed in 2011, a 20.2% increase over 2010. This upward trend is projected to continue, e.g. in the first two months of 2012 there has been 6.3% increase in circulation compared with 2011. Additionally, a 31% increase in holds placed demonstrates unfilled demand. In addition to the $1,977,000 funded in the 2013-2017 period, there is $222,000 in funding in the unfunded project list. Scheduled Implementation: Active Project Effect on Operations: 42 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Library Computer Replacements Division: Library (D150) Funding: 4470 - Sales Tax Capital Improvements Category: Library Improvements Rank: 2 Project #: 04004 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 30,000 2014 31,000 2015 32,000 201,6 33,000 2017 34,000 Total $ 160,000 This project provides rotational replacement of computer resources. Public access computing is a core service ensuring all residents have computer and high speed connectivity. Uses include job searches; classes; email; research; shopping; writing; school assignments; etc. Usage grew at an average of 3% annually and 43 additional computing stations were added. The library must continually upgrade or replace public computing stations every three years to continue to provide quality access and support. In addition to the $160,000 funded in the 2013-2017 period, there is $85,000 in funding in the unfunded project list. Scheduled Implementation: Effect on Operations: Active Project 43 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Accounting Image Scanner & Check Sealer Division: Accounting & Audit (D510) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: X Description: Project Cost 2013 $ 5,000 2014 5,000 2015 0 2016 0 2017 0 Total $ 10,000 This project is to purchase an image scanner for EDMS and to replace the check folder/sealer for the Accounting & Audit Division. Staff currently utilizes the copier for scanning which wears out the document feeder. This scanner will delay the purchase of a new copier. The check folder/sealer is for the City's payroll checks and W2s. The current sealer was purchased in 2007 and needs to be replaced. Scheduled Implementation: New Project Request The scanner will be purchased in January 2013. The check sealer will be replaced during the first half of 2014. Effect on Operations: An annual maintenance contract will be required paid by the Accounting and Audit Division. 44 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Audit Expense Division: Accounting & Audit (D510) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 2 Project #: 07038 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: , Project Cost 2013 $ 7,000 2014 7,000 2015 7,000 2016 7,000 2017 7,000 Total $ 35,000 This is the annual expense related to the audit of the Sales Tax Capital Improvements Fund. Scheduled Implementation: Active Project Effect on Operations: 45 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Building Improvements Division:. Building Maintenance (D530) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 1 Project #: 02046 Project Type: Replacement: X Timeframe: Multi Year Expansion: Project Cost 2013 $ 119,000 2014 120,000 2015 121,000 2016 123,000 2017 125,000 Total $ 608,000 Description: This project consists of the repair and replacement of damaged and worn roofs, HVAC systems, and provides for other improvements such as remodels to City owned buildings. Scheduled Implementation: Active Project During the upcoming years, staff plans to continue to work in house and through contractors on the City's replacement needs. Effect on Operations: Replacement of older equipment should result in the reduction of overall maintenance expense. 46 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Legislative Management/Agenda Routing Division: City Clerk/Treasurer (D130) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: _ Timeframe: Single Year Expansion: X Description: Project Cost 2013 $ 33,000 2014 0 2015 0 2016 0 2017 0 Total $ 33,000 The City currently employs a paper -based legislative management system whereby agenda items are developed, documented, managed and routed for approvals. The proposed system will replace the paper -based system by establishing an electronic, digital method to create, route, compile and archive all documents associated with agenda creation. It will also create an electronic 'portal' by which the staff, elected officials, and public can access legislative and agenda items and all their supporting documentation, without using staff time. Approval routing becomes automatic without the need for staff involvement. Agenda creation, publication, and distribution becomes automatic. The system will integrate with open -government systems already in place to provide more immediate and relevant access to meeting records, minutes, and video and upgrades to allow the use of mobile devices for agenda management, agenda distribution and playback of video and audio recordings. Scheduled Implementation: Effect on Operations: New Project Request 47 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: City Clerk Document Management Equipment Division: City Clerk/Treasurer (D130) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 2 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 $ 0 2014 22,000 2015 47,000 2016 10,000 2017 10,000 Total $ 89,000 This project is for equipment used for document management. Purchases include: 1) two high capacity scanners to replace two 1610 scanners for electronic retrieval. 2) one microfilm reader and one microfilm reader printer to be able to read documents from microfilm that were archived prior to the implementation of the Electronic Document Management System (EDMS). 3) one OCE large format scanner to scan large sets of plans from various departments. Scheduled Implementation: Active Project This project is to replace two Kodak i610 scanners in 2014 and in 2015. Replace the OCE large format scanner in 2015. Replace the microfilm reader printer in 2016 and the microfilm reader in 2017. Effect on Operations: N/A CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: City Council iPads Division: City Clerk/Treasurer (D130) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 3 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 $ 0 2014 7,000 2015 0 2016 0 2017 0 Total $ 7,000 This project is to purchase nine (9) iPads to replace City Council laptops that were purchased in January 2009. Scheduled Implementation: New Project Request Laptops normally need to be replaced after five years. The City Council laptops have been in use since 2009. Staff will move to ipads with replacement in 2014. Effect on Operations: N/A CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: City Hall Audio -Visual Renovation Division: Government Channel (D710) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 70,000 2014 100,000 2015 100,000 2016 0 2017 0 Total $ 270,000 This project is to replace the Audio/Visual systems in the meeting rooms in City Hall. The components and systems are no longer able to meet the needs of many people who do presentations. The systems are inconsistent from room to room and do not interact with any other systems, including video production and new technology cannot be integrated. The goal is to replace the A/V components with a system -based approach that will bring the installations up to date, and allow for future expansion and capacity. This will make the operation of systems consistent from room to room and to provide for better ergonomics and ease of use, integrate the systems with other presentation and distribution systems, and modernize the systems overall. Scheduled Implementation: New Project Request Effect on Operations: 50 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Television Center Equipment Project Cost Division: Government Channel (0710) 2013 $ 50,000 Funding: 4470 - Sales Tax Capital Improvements 2014 50,000 2015 50,000 Category: Other Capital Improvements 2016 50,000 Rank: 2 Project #: 02061 2017 50,000 Project Type: Replacement: X Timeframe: On -Going Total $ 250,000 Expansion: Description: The Television Center replaces equipment on an ongoing basis. This equipment includes production technology, studio equipment, lighting, sound, signal processing, telecasting equipment, etc. The Center also provides small equipment support for the Audio/Visual needs of the Administration, replacing needed equipment when necessary, such as projectors, screens, PA systems, and other A/V support equipment. Scheduled Implementation: Active Project Acquisition occurs throughout the year, according to need. Effect on Operations: This project has no net impact on operational budgets. 51 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Television Center Digital Conversion Division: Government Channel (D710) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 3 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: X Project Cost 2013 $ 75,000 2014 75,000 2015 100,000 2016 0 2017 0 Total $ 250,000 Description: This project is to convert the Television Center to digital technology. The video production and telecasting industry made the conversion to digital technology several years ago. The systems used are still analog technology which are non -replaceable should the equipment fail. Scheduled Implementation: New Project Request This project will be incrementally budgeted over three (3) years to balance the impact on the budget, with expenditures and implementation occurring in the third year. The budget figures are based on today's technology. Due to the rapid change in technology, final budgetary figures will need to be established closer to implementation. Effect on Operations: This project will have no net affect on operational costs. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Remote Meeting Recording Division: Government Channel (D710) . Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 4 Project #: XXXXX Project Type: Replacement: _ Timeframe: Single Year Expansion: X Description: Project Cost 2013 $ 50,000 2014 0 2015 0 2016 0 2017 0 Total $ 50,000 This project is to purchase remote recording technology that will streamline the entire workflow from recording to telecast for meetings that occur in Room 326 or Room 1 1 1 for telecast on the Government Channel. The current process requires an average of two to four hours of additional staff time to prepare each meeting for telecast. Scheduled Implementation: This project will be implemented in 2013. Effect on Operations: New Project Request While this project will have no net affect on operational budgets, it will expand the capacity of the current staff of the Government Channel to provide enhanced and/or expanded services with the some number of staff. 53 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Division: Funding: Category: Rank: Project Type: Description: Location Production System Government Channel (D710) 4470 - Sales Tax Capital Improvements Other Capital Improvements 5 Project #: XXXXX Replacement: _ Timeframe: Single Year Expansion: X Project Cost 2013 $ 0 2014 65,000 2015 0 2016 0 2017 0 Total $ 65,000 This project is to purchase a location production system that will allow staff to record an event and have a finished production at the end of the event. This will save time and help make operations more efficient. The system will also allow the telecast of on -location events and meetings 'live' when that capability becomes available. Currently it can take up to a week to turn around a program that was shot on location to be ready for telecast. Scheduled Implementation: This project will be implemented during 2014. New Project Request Effect on Operations: This project will have no anticipated affects on operational budgets. 54 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Digital Signage Implementation Division: Government Channel (D710) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 6 Project #: XXXXX Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 0 2014 0 2015 15,000 2016 15,000 2017 0 Total $ 30,000 This project is for digital signage which is a cost-effective means for the City to communicate t.o the public timely and relevant information. Digital signage allows information and messages to be easily changed and updated, helping ensure accuracy and immediacy. Digital displays offer many advantages over printed posters, handbills and permanent signs. The information can be changed quickly and easily, there is no waste, it helps reduce paper costs and distribution costs are minimal. This project will provide digital sign installation at every point of public contact in a City building, e.g. City Hall, Police Department, District Court, Animal Shelter, etc. Scheduled Implementation: New Project Request The project will be implemented over two years to distribute the impact on both the budget and staff time. Planning and installation will be done in-house. Effect on Operations: This project will have no net affect on operational costs. 55 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Telecommunication Systems Upgrades Division: Parking & Telecommunications (D840) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 1 Project #: 04001 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 5,000 2014 5,000 2015 5,000 2016 5,000 2017 5,000 Total $ 25,000 In 2012, the City purchased the new Cisco Telecommunications System. All equipment hardware and software will be covered under warranty for a 5 -year period. These funds in the CIP will be utilized for any additional equipment needed for further improvements or expansions such as added positions, new features that are offered, etc. These funds will also cover the cost of additional licenses needed for cell phone users to integrate back into the system. Scheduled Implementation: Active Project The Cisco Telecommunications System was purchased in April 2012. Installation will begin in June 2012 and be completed by October 2012. Effect on Operations: This project will have significant efficiencies in staff productivity and work load reduction. 56 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Citywide Building Insurance Appraisal Study Division: Purchasing (D550) Funding: 4470 - Sales Tax Capital Improvements Category: Other Capital Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: _ Timeframe: Single Year Expansion: X Description: Project Cost 2013 $ 35,000 2014 0 2015 0 2016 0 2017 0 Total $ 35,000 This project is for third party insurance appraisals of city buildings and contents to update values. The City's buildings and contents were last evaluated and inspected for value and risk in 1999 and were conducted by the Arkansas Insurance Department. The department no longer has the manpower to provide this service. Scheduled Implementation: New Project Request First quarter of 2013. Effect on Operations: Insurance premiums may change once the City's property is properly and fully insured. 57 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Forestry, Safety and ADA Division: Parks & Recreation (D460) Funding: 4470 - Sales Tax Capital Improvements Category: Parks & Recreation Improvements Rank: 1 Project #: 02045 Project Type: Replacement: X Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 31,000 2014 31,000 2015 31,000 2016 31,000 2017 31,000 Total $ 155,000 Funds in this project are used for new tree plantings, tree replacements, the annual Celebration of Trees required for the Tree City designation, and motorpool for forestry equipment to remove and grind hazardous trees and education. Funds are also used to reforest areas within parks to reduce the amount of turf that requires mowing. Additionally, funds are used to remodel parks where needed to improve safety and gain ADA compliance, such as swings, older play equipment and sidewalk connections. Scheduled Implementation: Active Project This project is ongoing each year. The annual Celebration of trees is hosted in the fall each year. Effect on Operations: This project will have no operational effects. 58 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Native Grasses Program Division: Parks & Recreation (D460) Funding: 4470 - Sales Tax Capital Improvements Category: Parks & Recreation Improvements Rank: 2 Project #: 02014 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 10,000 2014 10,000 2015 10,000 2016 10,000 2017 10,000 Total $ 50,000 A prairie restoration project was initiated in 2010 at Lake Fayetteville. Approximately 30 acres are being converted to native prairie and oak savannah habitat. Project funds will be used to purchase gross and wildflower seeds, native plants and trees, and conduct prescribed burns and vegetative management. These funds will also be used to fund establishment of native plants in other park areas that are converted to low maintenance, natural areas or where invasive plant species are removed to enhance the environment and protect the City's historical heritage. Scheduled Implementation: Active Project Establishment of native plants at the prairie restoration site is on going. Prescribed burns will be conducted as needed to control invasive plants. Establishment of native plants in parks is on going as park areas are identified. Effect on Operations: Parks staff partners with the Fayetteville Natural Heritage Association, the Enviornmental Study Center, and other interested volunteer groups to offset additional labor that is outside of budgeted expenses. 59 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Lights of the Ozarks Division: Parks & Recreation (D460) Funding: 4470 - Sales Tax Capital Improvements Category: Parks & Recreation Improvements Rank: 3 Project #: 02001 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 23,000 2014 23,000 2015 23,000 2016 23,000 2017 23,000 Total $ 115,000 The Lights of the Ozarks display is an extremely popular yearly event that takes place from Thanksgiving to New Years Eve. Approximately 500,000 lights are displayed around the down -town square where an estimated 200,000 people come to view the display. 2011 marked the first year that the light display was 100% LED lights. Scheduled Implementation: Active Project Parks staff begins installing lights in early October. The installation process takes six (6) weeks. The lights have historically been turned on the Saturday night before Thanksgiving. Lights are turned on nightly beginning at 5:00 pm until 1:00 am. The lights are turned off for the last time at 12:00 on New Years Eve. Parks staff removes the lights in the first week of January. Removal typically takes two weeks. Effect on Operations: No additional funding will be needed for operations. 60 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Tree Escrow Division: Parks & Recreation (D460) Funding: 4470 - Sales Tax Capital Improvements Category: Parks & Recreation Improvements Rank: 4 Project #: 08001 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 114,000 2014 62,000 2015 25,000 2016 11,000 2017 7,000 Total $ 219,000 The project funds are used to plant trees in street rights -of -way with seasonal staff or by contract, and to purchase equipment to maintain the trees or to contract for maintenance of the trees. Funds in the project are contributed by developers to meet the requirements of the Tree Preservation and Protection Ordinance and must be used within seven years from receipt. Scheduled Implementation: Active Project Trees are planted as funding is available, typically in the fall each year. Effect on Operations: There is no impact on operations with this project. Funds from Tree Escrow are used to contract out maintenance or to hire seasonal staff to maintain the trees. After three years, the right-of-way trees are maintained by Transportation. M. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fayetteville Senior Center Parking Lot & Drainage Division: Parks & Recreation (D460) Funding: 4470 - Sales Tax Capital Improvements Category: Parks & Recreation Improvements Rank: 5 Project #: XXXXX Project Type: Replacement: _ Timeframe: Single Year Expansion: X Description: Project Cost 2013 $ 0 2014 58,000 2015 0 2016 0 2017 0 Total $ 58,000 This project is for improvements to the Fayetteville Senior Activity and Wellness Center including the expansion of the parking lot for an additional 15 spaces and the Fayetteville Senior Center Drainage Project. Current parking at the Center is insufficient to accommodate the large percentage of the clientele that qualify for handicapped parking. The lack of level handicapped parking creates serious accessibility issue for elderly clients. Inadequate drainage on the north side of the center results in flooding of the building and parking lot during heavy rains.'The flooding has caused significant damage to the building and the flooded lot creates an accessibility hazard for elderly clients. Scheduled Implementation: New Project Request Both projects are scheduled to be completed in 2014. Effect on Operations: These improvements will not result in any additional operations or maintenance costs. 62 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Bulletproof Vests Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 10,000 2014 11,000 2015 42,000 2016 10,000 2017 10,000 Total $ 83,000 Description: This project provides the 50% local match and any shortfall from federal funding for the purchase of bulletproof vests for new officers, the replacement of expired bulletproof vests for veteran officers, and new/replacement tactical bulletproof vests for the members of the Emergency Response Team. Scheduled Implementation: New Project Request The below annual funding schedule is basedon the expiration dates of existing bulletproof vests and a projection of new officers being placed into service for the Department. Effect on Operations: This project should not increase operations funding. 63 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Building Improvements Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 2 Project #: 02047 Project Type: Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 25,000 2014 25,000 2015 25,000 2016 75,000 2017 25,000 Total $ 175,000 Description: This project covers the cost of major repairs; security door lock systems; major plumbing and electrical issues; roof repairs and replacement; minor re -models for the main police facility, and buildings at the radio tower sites and warehouse. Scheduled Implementation: Active Project Examples of project expenses are: 2013 - add shelving to the warehouse for evidence and records storage. 2014 - the awning on the north side of the Police Building is scheduled to be replaced. The roof on the main Police facility will reach end of projected life in 2016. Effect on Operations: This project should not increase operations funding. 64 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Technology Improvements Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 3 Project #: 06002 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 40,000 2014 70,000 2015 25,000 2016 25,000 2017 25,000 Total $ 185,O00 This is an on -going project for replacement of obsolete or malfunctioning department desktop computers, software, printers, and other peripheral equipment. The replacement of video storage cabinets is added to this project for 2014. Patrol vehicles are equipped with video recording devices that capture traffic stops and other relevant events. This video is uploaded to disk -based storage cabinets of sufficient capacity to accommodate video uploads for a period of one year. Video is then accessible over the network by authorized personnel for review and dissemination per law enforcement requirements. Scheduled Implementation: Active Project An average of twenty desktop computers and two printers are deployed throughout the year. The video storage cabinets are scheduled to be completed within the first quarter of 2014. Effect on Operations: This project is not expected to have any increase in operations. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Unmarked Vehicles Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 4 Project #: 06003 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 57,000 2014 72,000 2015 72,000 2016 72,000 2017 126,000 Total $ 399,000 Unmarked vehicles are a necessity for a progressive police department. The Department utilizes unmarked vehicles for a variety of tasks including: gathering intelligence for investigation of narcotics, theft, vandalism, domestic terrorism, and civil disobedience; conducting pre -raid intelligence for the deployment of the Emergency Response Team; and conducting alcohol enforcement patrols and any activity that must be kept covert to be effective. The Department is recommending a three year replacement for vehicles used in undercover capacities and a five year replacement for vehicles used less frequently in an undercover capacity. Investigators use the same vehicles to affect arrests and to conduct surveillance. In addition to the $399,000 funded in the 2013-2017 period, there is $33,000 in funding in the unfunded project list. Scheduled Implementation: Active Project 2013 - replace one undercover vehicle and four investigative vehicles. 2014 - replace two undercover vehicles and two administrative vehicles. 2015 - replace one undercover vehicle and two administrative vehicles. 2016 - replace one administrative vehicle and two investigative vehicles. 2017 replace two undercover vehicles, two administrative vehicles, and three investigative vehicles. Effect on Operations: These are replacement vehicles, the only effect on operational expense would be change in market cost for operations. 66 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Equipment Replacement Division: Police (D200) Funding: 4470 - Soles Tax Capital Improvements Category: Police Improvements Rank: 5 Project #: 11006 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 20,000 2014 20,000 2015 35,000 2016 25,000 2017 10,000 Total $ 110,000 This project will allocate funds for the replacement of police operating equipment such as a paper shredder, document scanners, uninterrupted power supplies, security/surveillance cameras, etc. Without this funding source, staff would not be able to maintain the current level of operations due to routine equipment failure. Other specific replacement items are: 1) the addition of one document scan station with Electronic Document Management System (EDMS) license. 2) obsolete hand-held computers and thermal citation printers for E -ticketing. 3) hand-held traffic radar units. These radar units are essential for verification a vehicle was speeding in violation of the posted speed limit. 4) a digital transcorder for undercover narcotics investigations that is used for live audio recording of covert operations. This piece of equipment both transmits and records conversations during undercover buys. The recordings are used for evidentiary purposes in court after a suspect has been arrested. Scheduled Implementation: Active Project Purchase EDMS scanner and license in 2013, replace other operating equipment as needed in remaining years. Handheld computers will be replaced beginning in the second quarter of 2013 and the thermal printers will be replaced beginning in the second quarter of 2016. Radar replacement will be scheduled in the first quarter of 2015. The current surveillance equipment will need to be replaced in 2014 and 2015. Effect on Operations: Annual software ($500), supplies ($500) and hardware maintenance ($1,000) will increase in 2013 for the additional EDMS scan station. Other replacements have no effect on operations. 67 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Specialized Equipment Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: Project Type: Description: l: Project #: 02062 Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 55,000 2014 64,000 2015 32,000 2016 28,000 2017 85,000 Total $ 264,000 This project is to replace outdated and/or malfunctioning equipment used during police operations. Examples of this equipment include tasers, traffic control equipment, bicycle replacement, wireless remote surveillance cameras, crisis negotiation throw phone, ballistic shields, ERT equipment, and other items used in police operations. Tasers are issued to all patrol officers for a less -than -lethal alternative to subdue combative suspects. Tasers provide an increase in safety for both the officers and the combative suspects by minimizing the need for physical altercations. Scheduled Implementation: Active Project 2013 - tasers, bicycles, barricades/cones, CNT throw phone, and ERT ballistic shields. 2014 - tasers, speed displays, bicycles, barricades/cones, and wireless remote camera. 2015 - bicycles, FLIR camera, barricades/cones, and law enforcement data logger. 2016 - bicycles, traffic barricades/cones, ERT robot, wireless remote camera, and ERT ballistic shields. and 2017 - speed display, bicycles, barricades/cones, and ERT ballistic shields. Effect on Operations: This project should not increase operations funding. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Division: Funding: Category: Rank: Police Patrol Vehicle Electronic Upgrades Police (D200) 4470 - Sales Tax Capital Improvements Police Improvements ►A Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 $ 160,000 2014 0 2015 43,000 2016 0 2017 200,000 Total $ 403,000 This project provides for the replacement of various electronic equipment used in police patrol vehicles. Equipment to be replaced includes: 1) mobile computer terminals (MCT). Staff expects these MCTs to be obsolete and/or malfunctioning and are necessary to support ongoing Police Department operations. 2) replacement of the modem/routers that provide a secure, wireless network connection from the mobile data terminals to the department's internal network and Global Positioning System (GPS) tracking data to central dispatch's Automatic Vehicle Location system (AVL). 3) replacement of mobile video recorders (MVR). MVRs are an important component of each patrol unit by documenting evidence to support prosecution and makes citizen complaints more easily investigated. Scheduled Implementation: Planned/Programmed Project Current MCTs were installed in 2008 and have a life expectancy of five (5) years. The current MCT will be replaced in the first quarter of 2013. Modems/routers will be completed by the second quarter of 2015. New MVRs will be purchased in 2017. Effect on Operations: Three years of maintenance will be included with the purchase of these MCTs. Maintenance beyond this time will be included in the operating budget at that time. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Network/Server Replacements Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 8 Project #: 0 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 0 2014 30,000 2015 75,000 2016 150,000 2017 30,000 Total $ 285,000 This project is for the scheduled replacement of obsolete computer equipment. The network and core switches that support on -going Police Department operations and provide connectivity between all desktop computers and records management servers need to be replaced. Upgrades/updates of firmware are no longer available after five years of operations. The replacement of obsolete equipment and the purchase of additional capacity is needed to meet the department's server computing and data storage requirements. Server virtualization allows a single physical server computer's CPU, memory, and storage resources to be shared among multiple logical guest operating systems. Scheduled Implementation: fl Planned/Programmed Project The network switches were replaced in 2009 and will be beyond their life expectancy by the end of 2013. Replacement of network switches will begin during the third quarter of 2014 and replacement of core switches will begin during the first quarter of 2015. Replacement of servers will begin during the third quarter of 2016. Effect on Operations: No impact on operations. Maintenance included in purchase price. Maintenance and technical support annual subscription for the virtual server. 70 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police K-9 Replacement Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 9 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 0 2014 10,000 2015 10,000 2016 0 2017 0 Total $ 20,000 This project is for two (2) police canines that will reach retirement age in the coming years. Police canines are a critical support service to the Patrol Division. Canines are used to locate missing persons, articles or narcotics, conduct building searches, and track fleeing suspects. A replacement program must be anticipated for the canine program. Currently, cost to purchase and train a new canine and handler is $10,000 per canine. Scheduled Implementation: New Project Request Staff has scheduled to replace one canine in each budget year of 2014 and 2015 as current canines are six and seven years old and should be retired. Effect on Operations: This project should have no increase in opertions funding. 71 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Police Weapons Replacement Division: Police (D200) Funding: 4470 - Sales Tax Capital Improvements Category: Police Improvements Rank: 10 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 0 2014 0 2015 0 2016 15,000 2017 40,000 Total $ 55,000 This project is a scheduled replacement of the firearms used by the Police Department. These firearms include weapons used by the Emergency Response Team (ERT) and the standard duty hand guns issued to all police officers. Weapons used by the ERT have several thousand rounds of ammunition fired through them each year due .to the amount of training and qualifications required. The ERT weapons are scheduled to be replaced every six years resulting in funds needed in 2016. Staff's standard duty hand guns are scheduled for replacement every ten years based on the recommendations from the manufacturer and law enforcement weapons experts. 2017 is the scheduled replacement year for the standard duty hand guns. Scheduled Implementation: New Project Request Emergency Response Team weapons will be replaced in 2016 and the standard duty hand guns will be replaced in 2017. Effect on Operations: This project should not increase operations funding. 72 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Street ROW/Intersection/Cost Sharing Division: Engineering (D610) Funding: 4470 - Sales Tax Capital Improvements Category: Street Improvements Rank: 1 Project #: 02116 Project Type: Replacement: Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 100,000 2014 100,000 2015 100,000 2016 100,000 2017 100,000 Total $ 500,000 This project is to provide funding for the acquisition of miscellaneous street rights -of -way, construction of miscellaneous street projects, and -cost sharing for developer projects. Scheduled Implementation: Active Project This funding will be used on an as -needed basis, primarily as a method to cost share with development projects to complete needed street improvements as development occurs. Effect on Operations: Dependent on projects selected, but generally operation/maintenance costs will be reduced by street improvements. 73 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Trail Development Division: Transportation Services (D800) Funding: 4470 - Sales Tax Capital Improvements Category: Trail Improvements Ronk: 1 Project #: 02016 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Project Cost 2013 $ 1,548,000 2014 1,641,000 2015 1,650,000 2016 1,679,000 2017 1,670,000 Total $ 8,188,000 Description: This project is to provide funding to increase production of the trails program. Funding provides resources for new trail development and asphalt replacement on existing trails. Scheduled Implementation: Active Project Proposed trail construction for the next five years will add more than nine additional miles to the system. Those trails include Tsa-La-Gi Trail (1.67 miles), Town Branch Trail (1.79 miles), Shiloh Trail (1.53 miles), Niokaska Creek Trail (1.28 miles), Hamestring Creek Trail (0.41 miles), and Clabber Creek Trail (2.62 miles). Effect on Operations: Immediate maintenance costs include replacing missing/damaged signs, removing leaves, mud, gravel, new vegetation, fallen trees, graffiti, litter and debris, repainting worn pavement markings, trimming trees, shrubs, and grass to maintain sight distance, and general maintenance of amenities such as picnic tables, kiosks, and benches. Utilities costs increase as lighting is added. Long term maintenance costs include asphalt resurfacing, chip and/or crack sealing, and repairing eroded areas. 74 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: In -House Pavement Improvements Division: Transportation Services (D800) Funding: 4470 - Sales Tax Capital Improvements Category: Transportation Improvements Rank: 1 Project #: 02052 Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 1,842,000 2014 1,551,000 2015 1,695,000 2016 1,955,000 2017 1,576,000 Total $ 8,619,000 This project provides resources for the systematic overlay of existing streets and includes curb cuts, curb and guttering, pavement striping, and preparation costs for overlays. The goal of this project is to overlay a minimum of 150,000 square yards of asphalt each year. Overlaying each street within a 15 year cycle is intended to optimize the longevity of roadways and minimize significant maintenance requirements resulting in fewer complete renovations at a substantially greater cost. In addition to the $8,619,000 funded in the 2013-2017 period, there is $953,000 in funding in the unfunded project list. Scheduled Implementation: Active Project Transportation reviews the need for street overlays in the latter part of each year and presents a recommendation to the Street Committee. The Street Committee presents its recommendation to City Council for its approval by resolution. Effect on Operations: Maintenance costs will be reduced on each street overlaid. This project estimates a saving of $300,000 when compared to contract pricing for the same work. 75 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Sidewalk Improvements Division: Transportation Services (D800) Funding: 4470 - Sales Tax Capital Improvements Category: Transportation Improvements Rank: 2 Project #: 02053 Project Type: Replacement: X Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 115,000 2014 520,000 2015 639,000 2016 740,000 2017 525,000 Total $ 2,539,000 This project is to provide funding to improve the connectivity of the sidewalk system by constructing new and repairing existing sidewalks. In addition to the $2,539,000 funded in the 2013-2017 period, there is $151,000 in funding in the unfunded project list. Scheduled Implementation: Active Project Transportation reviews sidewalk needs in conjunction with the street overlay program on a yearly basis. The annual work plan is presented to City Council for its approval by resolution. Effect on Operations: Construction of new sidewalks will not immediately result in additional operating costs. 76 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Traffic Signal Improvements Division: Transportation Services (D800) Funding: 4470 - Sales Tax Capital Improvements Category: Transportation Improvements Rank: 3 Project #: 02063 Project Type: Replacement: X Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 0 2014 150,000 2015 150,000 2016 150,000 2017 150,000 Total $ 600,000 This project provides funding for the installation of new traffic signals, upgrades to existing traffic signals, and other improvements which enhance the safety and movement of pedestrians and vehicles. Locations are determined as warrants are met as specified in the FHWA Manual on Uniform Traffic Control Devices and when related street projects are completed. Scheduled Implementation: Active Project The implementation of a wireless Ethernet traffic signal communication system has started and is scheduled to continue during the next few years. Effect on Operations: Based on installation of one traffic signal per year/utility cost, etc. 77 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Phosphorus Standards Management Division: Utilities Director (D900) Funding: 5400 - Water & Sewer Category: Wastewater Treatment Improvements Rank: I Project #: 10027 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 50,000 2014 50,000 2015 50,000 2016 50,000 2017 50,000 Total $ 250,000 This project supports efforts by the City operating independently or as part of a regional Northwest Arkansas team relating to phosphorus and other potential changes to stream standards, water quality standards and regulations, and wastewater discharge requirements. Some of the funds may be paid into regional efforts coordinated through Northwest Arkansas Regional Planning, the Northwest Arkansas Council, or other similar cooperative efforts. Scheduled Implementation: Active Project This project is underway and may continue for a number of years. Effect on Operations: N/A 79 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Disinfection System Replacement - W.W.T.P. Division: Wastewater Treatment Plant (D930) Funding: 5400 - Water & Sewer Category: Wastewater Treatment Improvements Rank: 1 Project #: 10008 Project Type: Replacement: X Timeframe: Expansion: Description: Project Cost 2013 $ 1,000,000 2014 0 2015 0 2016 0 2017 0 Total $ 1,000,000 This project is to replace the ultraviolet disinfection system that is the final treatment unit in the wastewater treatment process. It disinfects the treated wastewater, as required by the NPDES discharge permit, prior to discharging it to the environment. The existing system was installed at the Noland WWTP in 1999, and has become increasingly difficult and costly to maintain. The system was a first generation unit, and parts are no longer available and technical support is very difficult to obtain. Scheduled Implementation: Active Project Ongoing- prototype new technology has been tested at the Noland WWTP in 2011. Effect on Operations: Reduction in costs for maintenance, but operational costs are expected to remain the same. 80 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Irrigation Reels W.W.T.P. Division: Wastewater Treatment Plant (D930) Funding: 5400 - Water & Sewer Category: Wastewater Treatment Improvements Rank: 2 Project #: 11010 Project Type: Replacement: X Timeframe: Expansion: Description: Project Cost 2013 $ 151,000 2014 161,000 2015 0 2016 0 2017 0 Total $ 312,000 This project is for the replacement of twelve existing irrigation reels at the Biosolids Management Site. The irrigation reels are used to apply treated wastewater to the land application site, as described in the State approved Waste Management Plan and the State Land Application Permit. The effluent irrigation helps to minimize discharge to the White River during the summer months, therefore reducing the nutrient loadings of ammonia and phosphorus to the receiving stream. It also helps to stimulate growth of the bermuda grass, therefore enhancing phosphorus uptake from the soil and increasing hay production. Scheduled Implementation: Active Project Four reels will be purchased in 2013 and in 2014. Effect on Operations: Besides minimizing costs in maintenance and repairs, the replacement of these reels allows the Noland WWTP to continue the nutrient uptake on the land application site. Irrigation also helps minimize discharge to the White River thus lowering phosphorus contribution to the receiving stream. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Plant Pumps and Equipment - W.W.T.P. Division: Wastewater Treatment Plant (D930) Funding: 5400 - Water & Sewer Category: Wastewater Treatment Improvements Rank: 3 Project #: 02069 Project Type: Replacement: X Timeframe: Expansion: Description: Project Cost 2013 $ 200,000 2014 225,000 2015 225,000 2016 225,000 2017 225,000 Total $ 1,100,000 This project allows WWTP personnel to adopt to the needs of each season and year and still maintain compliance. Many pieces of the WWTP equipment are essential to the wastewater treatment process. The equipment may suffer catastrophic failure and become unusable with little advance warning. The plant cannot operate and continue to produce permit complying effluent without adequate equipment. Scheduled Implementation: Active Project 2013 - Noland Effluent Pond fence, Noland Filter Building cell 4 and 6, Noland Influent PS 1 motor 5, Noland Aeration Basin control panel for oxic mixing motor 3, Influent PS I motor 2. 2014 - Noland Aeration Basin mixers. 2015 -Noland Pond Return Pump 1 and 2. 2016: Noland Influent Building Exhaust Fan, Noland Aeration Basin oxic motor 14, 15, and 2. 2017 - Noland Aeration Basin drain pump, Noland Chlorine Building 2 -ton crane, Noland Influent PS 1 pump 3, 4, and 5, Noland Post Aerator motor 1 and 2. Effect on Operations: Replacing equipment before it becomes an emergency can significantly reduce operating costs. RN CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Upgrade/Replace Lift Stations - W.W.T.P. Division: Wastewater Treatment Plant (D930) Funding: 5400 - Water & Sewer Category: Wastewater Treatment Improvements Rank: 4 Project #: 02068 Project Type: Replacement: X Timeframe: Expansion: Description: Project Cost 2013 $ 100,000 2014 100,000 2015 150,000 2016 150,000 2017 180,000 Total $ 680,000 The lift stations provide a vital function in the overall treatment of wastewater. The stations are exposed to extreme wear conditions and pumps, motors, electrical systems and other components must be replaced or upgraded routinely. Additionally, new developments within the City increase the flow to various stations requiring additional or higher capacity equipment. Scheduled Implementation: Active Project Ongoing - Replacement of aging pumps, pump controllers and motors, and adding mixers to lift stations 6, 7, 9, and 12. Effect on Operations: Timely repairs and replacement of lift station equipment helps keep the number of sewer overflows to a minimum, prevents catastrophic failures, and prolongs he overall life of the lift stations. Each overflow is a specific violation of federal law. 83 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Building Improvements - W.W.T.P. Division: Wastewater Treatment Plant (D930) Funding: 5400 - Water & Sewer Category: Wastewater Treatment Improvements Rank: 5 Project #: 02032 Project Type: Replacement: X Timeframe: Multi Year Expansion: Project Cost 2013 $ 56,000 2014 33,000 2015 35,000 2016 35,000 2017 35,000 Total $ 194,000 Description: This project is for structural maintenance, repair, and replacement of the existing buildings or parts of the buildings at both wastewater treatment plants. Scheduled Implementation: Active Project In 2013 the two roll up doors at the Biosolids Management Site will be replaced. Replace seven 14' rolling bay door controllers and tensioning mechanisms at the maintenance shop, blower building, and influent pump station #1 at the Noland WWTP. Two each will be replaced from 2014-2016 and one in 2017. Effect on Operations: There is no significant effect on operations. 84 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water System Rehabilitation and Replacement Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Improvements Rank: 1 Project #: 12009 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 1,010,000 2014 1,150,000 2015 2,095,000 2016 1,825,000 2017 2,055,000 Total $ 8,135,000 This project provides for upgrading, replacing, or rehabilitating existing water infrastructure consisting of water storage, pumping, and distribution assets system wide. Specific work will be determined based on the need to stop leaks, reduce water loss, increase local or area flow and/or pressure in areas with insufficient capacity, in order to meet current and projected future domestic, commercial, and industrial flow, and fire flow demands. Projects may create loops, purchase easements, and replace or rehabilitate existing pipes, pump stations, and/or storage assets. This project may use water/sewer funds, impact fees and cost shares where appropriate. Scheduled Implementation: Active Project This is an ongoing project that combines several previous similar projects. Effect on Operations: N/A 85 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water/Sewer Relocate for Street Bonds Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Improvements Rank: 2 Project #: 1 101 1 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 500,000 2014 500,000 2015 500,000 2016 500,000 2017 500,000 Total $ 2,500,000 This project is for various water and sewer relocations for street bond and other transportation projects where the street bond fund does not have sufficient funds to cover the utility relocations. Projects are to be paid first from any remaining water/sewer revenue bond funds, if available. Capacity increases should be paid from impact fee funds, if available. Scheduled Implementation: Active Project To be determined based on the schedules for various transportation projects. Effect on Operations: N/A 86 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Division: Funding: Category: Rank: Sanitary Sewer Rehabilitation Water & Sewer Maintenance (D910) 5400 - Water & Sewer Water & Sewer Improvements Project Type: Replacement: X Expansion: Description: Project #: 02017 Timeframe: On -Going Project Cost • 2013 $ 1,210,000 2014 1,000,000 2015 1,200,000 2016 1,250,000 2017 1,250,000 Total $ 5,910,000 This project analyzes, repairs, upgrades, and repairs and replaces sewer collection system components to ensure adequate capacity and reduce storm and groundwater flows entering the system. Negotiations with ADEQ produced an agreement that as long as the City continues rehabilitation, no enforcement action will be initiated. Rehabilitation is required system wide and increases the capacity of the overall system by reducing demand used by infiltration and inflow. This project includes replacing, lining, and bursting existing sewer mains and manholes, upgrading lift stations, installing some main extensions and relief lines/capacity upgrades, upgrading the system model, purchasing easements, and sanitary sewer evaluation studies. All WSIP work was sized based on continuing the sewer rehabilitation program. As this may include capacity increases, impact fees may be spent. Scheduled Implementation: Active Project Industry standards and Fayetteville experience establish that all the collection system requires full evaluation every 10- 15 years. In order to prevent future recurrence of SSOs, certain maintenance type contracts are executed annually, including cured in place pipe repairs, and in the future, pipe bursting and manhole repairs. Effect on Operations: N/A 87 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water/Sewer Impact Fee Cost Sharing Division: Wafer & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Improvements Rank: 4 Project #: 04039 Project Type: Replacement: X Timeframe: On -Going Expansion: X Project Cost 2013 $ 275,000 2014 275,000 2015 275,000 2016 275,000 2017 275,000 Total $ 1,375,000 Description: This project involves all cases where impact fees are used to cost share with and thus supplement other funding sources to increase capacity in either the water distribution, pumping and storage system or the wastewater collection and treatment system. Scheduled Implementation: Active Project As needed. Effect on Operations: N/A CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water/Sewer Equipment Expansions Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Improvements Rank: 5 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: X Project Cost 2013 $ 38,000 2014 220,000 2015 45,000 2016 8,000 2017 0 Total $ 311,000 Description: This project is for expansion equipment for the Water/Sewer Operations Division. It includes two trailers, a trackhoe and trailer, replacement sewer camera equipment, computers for field crews/trucks, new equipment to meet evolving stormwater regulations, and other equipment as identified through time. Scheduled Implementation: Previously Requested/Not Approved Expansions will be phased through several years as needed. 2013 - mobile data terminals and/or gps equipment, trailer for mini -excavator, and sewer camera equipment: 2014 - mobile date terminals and/or gps equipment for crews and a trackhoe: 2015 - underground boring and leak detection equipment: 2016 - sewer camera and boring equipment and mobile crew date terminals and/or gps equipment. Effect on Operations: N/A e CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Baxter Water Tanks Painting Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Improvements Rank: 6 Project #: XXXXX Project Type: Replacement: X Timeframe: Multi Year Expansion: Description: Project Cost 2013 $ 0 2014 850,000 2015 0 2016 0 2017 0 Total $ 850,000 This project is to paint the 5 million gallon and 1 million gallon water tanks on Baxter Lane to eliminate and prevent internal and external corrosion. These tanks were last painted in the 1970's. It also includes upgrading the ladder fall protection, upgrading vents, and modifying the external access and ladder to meet security requirements. Scheduled Implementation: Previously RequestedlNot Approved N/A Effect on Operations: N/A Fl 90 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Printer Replacements Division: Billing & Collections (D520) Funding: 5400 - Water & Sewer Category: Water & Sewer Services Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: X Project Cost 2013 $ 30,000 2014 0 2015 0 2016 0 .2017 0 Total $ 30,000 Description: This project is to purchase one new IBM Blue Bar Printer and one replacement printer for the Billing and Collections Division. The existing printer is aging and somewhat unreliable. The additional printer will be utilized in the front office area of Billing and Collections for more efficiency. Scheduled Implementation: Purchases will be made in 2013. Effect on Operations: Addition of one new maintenance contract. New Project Request CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Business Office Improvements Division: Billing & Collections (O520) Funding: 5400 - Water & Sewer Category: Water & Sewer Services Improvements Rank: 2 Project #: 03038 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 20,000 2014 20,000 2015 20,000 2016 20,000 2017 20,000 Total $ 100,000 This project is for various improvements in business office hardware, software, communications, computers, safety features, and office configuration. Examples of specific improvements include the purchase of advanced communications capability to improve customer service and employee efficiency, and installation of an emergency alarm system to notify the Police Department in the event of an unsafe condition or a disruptive customer. This project should leverage technological improvements. Scheduled Implementation: Active Project This is an ongoing project aimed at making continuous deliberate improvements. Effect on Operations: Increases in operational efficiency as determined by the specific improvements made. 92 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Business Office Technology Improvements Division: Information Technology (D440) Funding: 5400 - Water & Sewer Category: Water & Sewer Services Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 30,000 2014 15,000 2015 12,000 2016 10,000 2017 10,000 Total $ 77,000 The purpose of this project is to upgrade technology in the business office including: hardware and software forcustomer swipe and pay stations at each of the cash registers and new customer counter kiosks and software for customer self services applications; camera surveillance system; and PC and cash register receipt printer replacements. Scheduled Implementation: New Project Request N/A Effect on Operations: N/A 93 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water Meters Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Services Improvements Rank: i Project #: 02065 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 313,000 2014 311,000 2015 315,000 2016 325,000 2017 325,000 Total $ 1,589,000 This project is for the replacement o₹ old water meters that are no longer repairable, expansion meters for new water service, and for purchasing new meters with technological advancements over older style meters. In addition, it includes replacing hand held and remote style meter reading mechanisms. Scheduled Implementation: Active Project This is an ongoing project that allows gradual replacement and upgrading the meter reading system with a distributed capital and operational cost. Effect on Operations: N/A 94 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Backflow Prevention Assemblies Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Services Improvements Rank: 2 Project #: 02066 Project Type: Replacement: X Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 0 2014 0 2015 10,000 2016 10,000 2017 10,000 Total $ 30,000 This project is for installation and/or replacement of backflow prevention assemblies on City facilities to meet backflow prevention requirements from City ordinances and the Arkansas Department of Health regulations. Scheduled Implementation: Active Project This is an ongoing and continuous project. Effect on Operations: N/A 95 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Water/Sewer Rate Study Division: Water & Sewer Maintenance (D910) Funding: 5400 - Water & Sewer Category: Water & Sewer Services Improvements Rank: 3 Project #: 02064 Project Type: Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 0 2014 0 2015 0 2016 170,000 2017 0 Total $ 170,000 Description: This project is to conduct a water and sewer rate study which is required every three to five years. Scheduled Implementation: Active Project This project should be initiated in the end of 2016, and completed in 2017. Effect on Operations: N/A CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Recycling Baler Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 538,000 2014 0 2015 0 2016 0 2017 0 Total $ 538,000 The recycling program needs a second baler for processing recyclable materials from programs and services. A second baler would provide additional processing capacity and add a back up when baler issues occur to keep materials moving through the facility. A second baler including an in - ground pit conveyor system would enable the division to keep up with future growth in recycling services. Scheduled Implementation: New Project Request The location of this baler has not been determined. Any cost related to the facility in which the baler will be located is not part of this project. Project to begin after the above has been determined. Effect on Operations: The effects would be increased utilities (1 K), costs for P.M. (800), and baling wire (7,100K) for holding product together. 97 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Solid Waste Compactors Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 2 Project #: 10001 Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 126,000 2014 130,000 2015 134,000 2016 138,000 2017 142,000 Total $ 670,000 This project is for the purchase of compactors. The drop box program utilizes compactor boxes to efficiently handle solid waste from large quantity generators. Compactor boxes decrease the frequency of collection and are serviced with existing drop box trucks. The aesthetics are improved by having a compactor as opposed to multiple dumpsters to service and many businesses desire this type of collection. The division is competitively pursuing accounts currently serviced by private franchised haulers. Five additional compactors figured each year for years 2013 thru 2017 for new service and replacement of aging units. Scheduled Implementation: Active Project Compactor boxes purchased as needed due to customer demand. Effect on Operations: Increased business to the drop box program will provide additional revenue. The existing drop box fleet will service the compactors purchased or leased by businesses. A fleet expansion will be required when business generated increases to 30 loads per day. Fuel was figured to double based on extra collections across several programs at 663 gallons per month with a current price of $3.50 per gallon used and increased by 3% for each year after. 98 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Solid Waste Facility - Transfer Station Expansion Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 3 Project #: XXXXX Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 635,000 2014 0 2015 0 2016 0 2017 0 Total $ 635,000 This project is for the expansion of the transfer station. The existing transfer station was built in 1996 so repairs and modifications will be needed in the future. The expansion would occur if a new recycling facility were built. A new roof for the facility is needed due to leaks and expansion would include a new floor, deconstruction and electrical replacement, new pumping system, and new walls and doors. Scheduled Implementation: New Project Request Implementation would occur as needed due to deterioration or expansion. In house engineering staff will provide the engineering and design work. Effect on Operations: Personnel and equipment already and place and no expansions needed. Operations would be improved to meet stricter regulations through ADEQ permitting requirements. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Recycling Drop Off Facility (North / Central) Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 4 Project #: XXXXX Project Type: Replacement: _ Timeframe: On -Going Expansion: X Description: Project Cost 2013 $ 66,000 2014 70,000 2015 0 2016 0 2017 0 Total $ 136,000 This project is to provide a recycling drop off facility. Recycling drop offs provide the most cost effective option for expanding the recycling program to service multi -family and others not serviced through the curbside program. Expanding drop offs to other areas in the City will provide more convenient opportunities to recycle, expand recycling and environmental education opportunities, and increase volunteer opportunities. Drop off size can be functional in a 200 x 200' area; however, landscaping and educational components should be considered. This project could include a land purchase based on site availability. Scheduled Implementation: Previously Requested/Not Approved The north/central expansion is planned to begin in 2012. This will be on ongoing project once the site is built and operating. Effect on Operations: Drop off sites are operationally efficient due to using the existing division's fleet with no vehicle expansions planned at this time. Personnel expansion will be necessary based on projected future service levels associated with additional collections. Fuel in the drop box program will increase due to service collections from the new site. r 100 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Recycling Improvements Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 5 Project #: 03016 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 28,000 2014 0 2015 0 2016 0 2017 0 Total $ 28,000 This project was initially to be used for recycling truck modifications. The division is in greater need of replacing the conveyor belt feeding the recycling baler. Significant repairs have been experienced in 2012 resulting in downtime and recycling materials not being able to be processed daily as needed. This project would enable the purchase of the new conveyor belt for recycling processing. Scheduled Implementation: Active Project The project is on -going. Effect on Operations: The effect of the project would be to update processing equipment in the MRF to support on -going operations. No new vehicles or employees needed. 101 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Solid Waste Compost Site Slab Expansion Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 6 Project #: 10002 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 416,000 2014 0 2015 0 2016 0 2017 0 Total $ 416,000 This project is to concrete the current composting pad to improve operations thereby increasing productivity and quality for the end product. Storm water improvements will be accomplished by engineered design for better storm water handling and compliance with the industrial storm water permit for the site administered through ADEQ. Increased waste diversion through composting of organic wastes would also be feasible and would require modifying the composting permit from a class "Y", designating yard waste only, to a class "O" for organics. Site construction will occur over a multi -year period to allow operations to continue. An organics composting operation requires frequent turning of rows which is presently hindered by rain events rendering the pad unusable for the compost row turner. Turning of rows allows more oxygen into the process thereby reducing odors, which will be a major concern when operating a class "O" facility. Scheduled Implementation: Active Project On -going. Effect on Operations: Improved operations allowing more frequent turning of rows will use more fuel for the row turner, otherwise, operations associated with the composting program will continue as normal. Over time, more tonnage will be diverted as customers sign on to the program, thereby increasing waste diversion and generating additional revenue. The Solid Waste and Recycling Resource Management Plan outlines increased diversion potential through expanding to commercial organics collection. 102 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Solid Waste Mad Vac Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 7 Project #: XXXXX Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 40,000 2014 0 2015 0 2016 0 2017 0 Total $ 40,000 This project purchases a replacement for the existing MadVac unit that is currently used to clean the downtown and Dickson Street areas. Scheduled Implementation: New Project Request Upon administrative approval. Effect on Operations: Fleet charges of Maintenance at $190/month, Replacement at $400/month, Overhead at $49/month and Insurance at $15/month would be expected. 103 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Recycling Commercial Expansion (Organics) Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 8 Project #: XXXXX Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Project Cost 2013 $ 0 2014 0 2015 390,000 2016 0 2017 0 Total $ 390,000 Description: This project would allow for the purchase of 200 four cubic yard organic dumpsters for the collection of organics from grocery stores, schools and restaurants. Scheduled Implementation: New Project Request The Solid Waste and Recycling Resource Management Plan includes organic recycling as a means to increase diversion. Compost facility improvements will need to be completed first before a program can be initiated. These improvements are in a current project and scheduled for completion. Effect on Operations: A new commercial truck and employee would be needed. Employee costs based on starting pay at $12.83 and 33% increase for benefits. Motor pool figured on current fleet costs for a commercial front loader and increased by 3% per year to year 2015 and then 3% per year after that. Fuel figured using current fleet records of highly used commercial front loader with 5,280 gallons per year and multiplied by $5 per gallon for year 2015 and then figured at 3% inflation for each subsequent year. 104 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Solid Waste Rate Study Division: Solid Waste & Recycling (D920) Funding: 5500 - Solid Waste Category: Solid Waste Improvements Rank: 9 Project #: 10004 Project Type: Replacement: _ Timeframe: Multi Year Expansion: X Description: Project Cost 2013 $ 0 2014 0 2015 0 2016 0 2017 133,000 Total $ 133,000 A solid waste rate study will evaluate Solid Waste program costs, A study has not been conducted since 2000 with commercial rates not increasing since that time. The rate study is necessary to ensure costs are properly allocated between customer classes and to fund future growth. A rate study should be performed every five years. Scheduled Implementation: Active Project A rate study will be implemented at the beginning of 2017. Effect on Operations: A rate study will provide information to maintain future growth within the division. Rate increases will be necessary to maintain operations related to the division. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Airport Self Serve Station Upgrade Division: Aviation (D810) Funding: 5550 - Airport Category: Aviation Improvements Rank: 1 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 $ 10,000 2014 0 2015 0 2016 0 2017 0 Total $ 10,000 The project will provide for replacing the existing fuel dispensers with two new digital meter/dispensers to modernize the existing facility with newer more reliable technology. Scheduled Implementation: New Project Request The project is tentatively scheduled to begin in early 2013 with completion likely within 90 days of initiating the project. Effect on Operations: Reduction of maintenance and repair, and inventory loss expense of the existing equipment. 107 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Airport Roof Replacements Division: Aviation (D810) Funding: 5550 - Airport Category: Aviation Improvements Rank: 2 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 $ 41,000 2014 60,000 2015 0 2016 0 2017 0 Total $ 101,000 This project will replace roofs on four buildings. The roofs to be replaced are the flat roof membranes on the buildings currently occupied by the Ozark Military Museum and the FAA Facilities Maintenance. These buildings were the original terminal and boarding area structures constructed in the 1960s. Spot maintenance has been performed to repair leaks but the roof exhibits enough deterioration that a new roof is warranted. The replacement or refurbishing the standing seam metal roofs on buildings currently occupied by Devol Aviation Aircraft Maintenance and Wings Avionics Inc. These roofs have required continued repair and maintence annually. Tenant complaints of leaks that threaten damage to their customer's aircraft at times has created the impetus to consider a full-scale replacement or some other long-term solution to the problem. Scheduled Implementation: New Project Request The roof replacements for the Ozark Military Museum and FAA Facilities Maintenance are tentatively scheduled to begin early in 2013 with completion within 90 days. The roof replacements for the Devol Aviation Aircraft Maintenance and the Wings Avionics Inc. buildings are tentatively scheduled to begin early in 2014 with completion within 90 days. Effect on Operations: Reduced maintenance costs and time spent repairing leaks on the buildings annually. 108 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Airport Sprinkler System Replacement - White Hangar Division: Aviation (D810) Funding: 5550 - Airport Category: Aviation Improvements Rank: 3 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 $ 65,000 2014 0 2015 0 2016 0 2017 0 Total $ 65,000 The project will replace the fire protection sprinkler system in the historic white hangar. The existing system has been in a deteriorated condition for at least a decade. Repairs have been made as needed, fixing leaks and replacing sections of piping and the system is tested regularly to ensure its functionality. However, due to the obsolete design as a "dry system," the piping is corroded throughout. The leaks and breaks that have occurred in the piping are almost exclusively due to this corrosion of the steel piping. The building is a unique historic structure that should be preserved. The fire protection sprinkler system is integral to protecting the building and its contents. Scheduled Implementation: New Project Request The project is scheduled to begin in late 2013 with completion likely within 90 days of initiating the project. Effect on Operations: Reduced maintenance costs. 109 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Airport ARFF Personal Protective Gear Replacement Division: Aviation (D810) Funding: 5550 - Airport Category: Aviation Improvements Rank: 4 Project #: XXXXX Project Type: Replacement: X Timeframe: Single Year Expansion: Description: Project Cost 2013 . $ 31,000 2014 0 2015 0 2016 0 2017 0 Total $ 31,000 Replacement of twelve sets of personal protection firefighting suits used by the Aircraft Rescue and Fire Fighting (ARFF) crews. Scheduled Implementation: New Project Request The equipment will be ordered from the vendor in early 2013. Effect on Operations: None. 110 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Police/Passenger Vehicles Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 1 Project #: 02081 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 329,000 2014 300,000 2015 336,000 2016 312,000 2017 283,000 Total $ 1,560,000 The purpose of this project is to replace obsolete or high maintenance vehicles which are no longer suited for service. The following are scheduled for replacement in 2013: two sedans, one mid -size sport utility, and seven police patrol units. Scheduled Implementation: Active Project Scheduled for replacement: 2013 - 2 sedans, 1 mid -size sport utility, and 7 police patrol units. 2014 - 2 sedans, 2 motorcycles, and 5 Police patrol units. 2015-2 compact sport utility, 1 mid -size sport utility, 2 mid -size sedans, and 5 police patrol units. 2016 - 2 compact sport utility, 1 mid -size sedan, and 6 police patrol units. 2017 - 1 compact sport utility, 2 mid -size sedan, and 6 police patrol units. Effect on Operations: All vehicles to be replaced in 2013 are paying motor pool charges in 2012 so there will be no noticeable effect on funds. I CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Solid Waste Vehicles/Equipment Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 2 Project #: 02082 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 1,151,000 2014 931,000 2015 598,000 2016 1,345,000 2017 1,085,000 Total $ 5,1 10,000 The purpose of this project is to replace obsolete or high maintenance vehicles which are no longer suited for service. The following are scheduled for replacement.in 2013: two front loads, one rear load, and two side load refuse trucks. Scheduled Implementation: Active Project Schedules for replacement: 2013 - 2 front load, 1 rear load, and 2 side load refuse trucks. 2014 - 2 rear load and 1 front load refuse truck and 1 compost grinder. 2015-3 recycle trucks and 1 compost bagger. 2016 - 3 recycle trucks, 1 compost row turner, 1 front loader, 1 roll -off truck, and 1 container carrier truck. 2017 - 3 recycle trucks, 1 front load refuse truck, and 1 roll -off truck. Effect on Operations: All vehicles to be replaced in 2013 are paying motor pool charges in 2012 so there will be no noticeable effect on funds. 112 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Construction Equipment Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 3 Project #: 02077 Project Type: Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 437,000 2014 0 2015 587,000 2016 123,000 2017 195,000 Total $ 1,342,000 Description: The purpose of this project is to replace obsolete or high maintenance construction equipment which is no longer suited for regular line service. The following are scheduled for replacement in 2013: one grader and one track dozer. Scheduled Implementation: Active Project The following are scheduled for replacement: 2013 - 1 grader and 1 track dozer. 2015 -1 dozer, 1 truck mounted excavator, and 1 compact excavator. 2016 - 2 compact excavators. 2017 - 2 excavators, (one small, one medium size). Effect on Operations: All vehicles to be replaced in 2013 are paying motor pool charges in 2012 so there will not be a noticeable effect on funds. l�Ic3 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Backhoes/Loaders Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 4 Project #: 02076 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 608,000 2014 463,000 2015 381,000 2016 182,000 2017 414,000 Total $ 2,048,000 The purpose of this project is to replace obsolete or high maintenance backhoes or loaders which are no longer suited for regular line service. The following are scheduled for replacement in 2013: four backhoes, one skid steer loader, and two front end loaders. Scheduled Implementation: Active Project The following are scheduled for replacement: 2013 - 4 backhoes, 1 skid steer loader, 2 front end loaders. 2014-4 backhoes, 2 skid steer loaders, 1 track front end loader. 2015-2 front end loaders, 1 toolcat loader, 1 compact track loader, 1 compact backhoe. 2016 - 2 Backhoes. 2017 - 2 Backhoes, 1 front end loader, 2 skid steer loaders. Effect on Operations: For 2013 replacement charges will increase: unit 657 is $7,500 (Transportation - 2100-4130). CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Other Vehicles and Equipment Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements. Rank: 5 Project #: 02080 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 969,000 2014 205,000 2015 123,000 2016 732,000 2017 608,000 Total $ 2,637,000 The purpose of this project is to replace obsolete or high maintenance vehicles and equipment which are no longer suited for regular service. The following are scheduled for replacement in 2013: one patch truck, one cement mixer, three sweepers, two trailers, one brush chipper, one sewer television camera van, and one air compressor. Scheduled Implementation: Active Project Scheduled for replacement: 2013 - patch truck, cement mixer, 3 sweepers, 2 trailers, chipper, sewer TV camera van, air compressor. 2014-5 Bobcat attachments, implement hauler, 2 generators, aerator, air compressor, message sign, semi trailer. 2015 -roller, air compressor, message sign, impl hauler, chipper. 2016 - sewer cleaner, 2 forklifts, 4 impl. haulers, stump grinder, semi trlr, concrete saw, paver, 4 plows, 4 spreaders. 2017 - sweeper, curb mach, roller, trailer. Effect on Operations: For 2013 replacement will increase: unit 86 is $10,000 (Split Trans - 2100.4120 - $7,000/WS - 5400.4410 - $3,000): unit 88 is $2,250 (Trans - 2100,4120): unit 91 is $1,400 (WS - 5400.4410): unit 9012 is $72 (WS - 5400.4410): unit 9056 is $1,250 (SW - 5500.5010): unit 9055 is $500 (Split Parks - 2250.9250 - $250/Trans - 2100.4120 - $250). Total increase for 2013 is approximately $18,820. 115 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Tractor/Mowers Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 6 Project #: 02083 Project Type: Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 267,000 2014 161,000 2015 179,000 2016 248,000 2017 57,000 Total $ 912,000 Description: The purpose of this project is to replace obsolete or high maintenance vehicles which are no longer suited for service. The following are scheduled for replacement in 2013: two tractors, one round hay baler, two multi - deck mowers, and three zero turn mowers. Scheduled Implementation: Active Project Scheduled Replacements: 2013 - 2 tractors, 1 round hay baler. 2 multi -deck mowers, and 3 zero turn mowers. 2014 - 6 zero turn mowers, 2 brush hogs, 2 discbines, and 2 bunker rakes. 2015 - 2 small tractors, 1 large tractor, 1 multi -deck mower, and 3 zero turn mowers. 2016 - 2 tractors, 1 manure spreader, and 4 zero turn mowers. 2017 - 1 hay rake and 4 zero turn mowers. Effect on Operations: All vehicles to be replaced in 2013 are paying motor pool charges in 2012 so there will be no noticeable effect on funds. 116 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Light / Medium Utility Vehicles Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 7 Project #: 02078 Project Type: Replacement: X Timeframe: On -Going Expansion: Project Cost 2013 $ 604,000 2014 760,000 2015 740,000 2016 762,000 2017 596,000 Total $ 3,462,000 Description: The purpose of this project is to replace obsolete or high maintenance vehicles which are no longer suited for regular service. The following are scheduled for replacement in 2013: four service body trucks, one dump truck, seven compact pickup trucks, and five full size pickup trucks. Scheduled Implementation: Active Project The following are scheduled for replacement: 2013 - 17 trucks. 2014 - 22 trucks. 2015 - 21 trucks. 2016 - 20 trucks. 2017 - 14 trucks. Effect on Operations: For 2013 replacement will increase: for unit 2017 is $357 (Building Safety - 1010.6400): unit 2020 is $378 (Meter Operations - 5400.1820): unit 2044 is $315 (Building Safety - 1010.6400): unit 2048 is $324 (Meter Maintenance - 5400.1830): and unit 2069 is $522 (Meter Operations - 5400.1820). Total increase in 2013 approximately $1,896. 117 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) Project Title: Fleet - Heavy Utility Vehicles Division: Fleet Operations (D830) Funding: 9700 - Shop Category: Vehicles & Equipment Improvements Rank: 8 Project #: 02079 Project Type: Replacement: X Timeframe: On -Going Expansion: Description: Project Cost 2013 $ 0 2014 105,000 2015 233,000 2016 825,000 2017 399,000 Total $ 1,562,000 The purpose of this project is to replace obsolete or high maintenance vehicles which are no longer suited for regular service. Scheduled Implementation: Active Project The following are scheduled for replacement: 2013 - no purchases. 2014 - 1 dump truck. 2015 - 1 dump truck and 1 semi truck/tractor. 2016 - 5 dump trucks and 1 semi truck/tractor. 2017 - 3 dump trucks. Effect on Operations: For 2013: No vehicles are slated for replacement in this project. CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) UNFUNDED PROJECTS Category AVIATION IMPROVEMENTS: Unfunded 2013-2017 Airport Aircraft Parking Ramp Rehabilitation $ 500,000 This project consists of resurfacing approximately 33,500 square yards of concrete aircraft parking apron adjacent to the Airport Terminal building. Constructed in the 1970s, the existing apron exhibits worsening surface deterioration, spalling, potholes and cracks that result in small loose pieces of rock and concrete being shed from the surface. Such debris can pose serious hazards to aircraft if it is kicked up by powerful helicopter bladewash, aircraft jetwash, propwash, or ingested into turbine engines. The risk of such an event remains relatively small as long as the surface is monitored and kept swept by airport maintenance. However, until the surface is stabilized, there exists an increasing potential for damage to aircraft. Airport Corporate Hangar Construction 652,000 This project is to construct an 80' X 100' commercial hangar building for an aviation business prospect. The project relies on recruiting a new or relocating an aviation business to Drake Field by 2015 and assumes there are no vacant buildings of sufficient size available. The purpose of the project is to attract an aviation business lessee and utilize local and grant resources to construct the building, in order to generate positive cashflow for the airport, increase aircraft activity, and contribute to the growth of the local economy. Airport Obstruction Removal 260,000 This project consists of survey, appraisal, acquisition of aviation easements and removal of obstructions primarily in the approach surfaces to Runway 34. The approach surfaces to both runway ends extend over private property. Aviation easements provide for the right of the airport to remove obstructions on private property for protection of the approaches. A scaled -down project is also contemplated consisting of removal of obstructions only. Elimination of acquisition of easements may be necessary depending on the amount of available outside funding for the project. In this scenario, the airport would negotiate a one-time permission to remove specific obstructions from private property. In either case, the project is anticipated to be funded with an 80/20% grant from the AR Department of Aeronautics with the 20% local match provided from the Airport Fund. Airport Runway Extension EA/EIS 150,000 This project will provide for an Environmental Assessment or Environmental Impact Statement, as appropriate for the initial planning toward a 1,000 foot extension to the runway. The study and report o₹ findings will provide the information required by EPA regulations and determine the necessity/feasibility of proceeding with the project further. The project is eligible for a 95/5% grant from the FAA with the 5% local match provided by the Arkansas Department of Aeronautics. Airport Widening of Taxiways B. C. & F 1,225,000 This project will widen the remaining 40 foot width sections of the taxiway to 50 feet. Fifty feet is the minimum taxiway width for large aircraft such as 8737s and DC -9s. Currently, the north end of parallel Taxiway "B" restricts access to the Runway 16 Threshold for some aircraft because of its 40 foot width. Aircraft must cross the runway on one of the 50 foot width perpendicular taxiways, "D" or "E" in order to access Taxiway "A" to the RW 16 Threshold. Additionally, perpendicular taxiways "C" and "F" need to be widened to accommodate large aircraft exiting the runway after landing. Total - Aviation Improvements 2,787,000 FIRE IMPROVEMENTS: Fire Station #2 Replacement 2,300,000 This project is for the replacement of Fire Station #2. The station was built in 1968 and although there have been some improvements over the years since, it has reached its life expectancy and needs a major remodel or replacement. There is $2,300,000 in funding in the unfunded project list. 119 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) UNFUNDED PROJECTS Category Kid's Safety Park & City Training Complex This request is for a safety training complex for all City departments including'a kid's safety village that can serve as a destination theme park for families in the tri-state area. The Fire Department does not have dedicated training grounds to safely practice the skills needed for fireground operations and other emergency responses. A training facility will create a realistic environment which will equal lives and property saved as well as reduced firefighter injuries. City -owned property has been identified in several locations that will fit the need for a future training site convieniently shared by many divisions. A Safety Training Complex could include areas for all City Departments to perform training in a safe environment. Safety training for trenches, confined space entry, emergency driving, structural collapse, heavy equipment, construction sites,and hazardous materials, would be of value to all departments. Total - Fire Improvements INFORMATION TECHNOLOGY IMPROVEMENTS: ERP Upgrade/Replacement This project is for upgrading/replacing the current Financial, HR, and Utility Billing system with a commercial Enterprise Resource Planning (ERP) system. The City's current system was purchased in 1992 and has reached its end of life. Hansen Version 8 Upgrade This project is to upgrade the City's existing Hansen software to the latest version. Hansen/Infor Version 8, released in 2004, is a ground up re -write of software applications utilizing Microsoft.Net technology with zero legacy code. Hansen 8 provides many enhancements over the existing Hansen version 7. The Hansen 8 software portion of the upgrade is free because the City is a current maintenance customer. The expense is associated with professional services required to setup and migrate existing data and application to the new version. Hansen originally set a 2010 expiration date which supports the version of Hansen applications that is currently running, but that date was retracted when Hansen was purchased by Info Technologies. No new expiration date has been set, but development on the current version has stopped. This upgrade requires Hansen services to re -write the City's custom applications and migrate data. Total - Information Technology Improvements LIBRARY IMPROVEMENTS: Library Computer Replacements This project provides rotational replacement of computer resources. Public access computing is a core service ensuring all residents have computer and high speed connectivity. Uses include job searches; classes; email; research; shopping; writing; school assignments; etc. Usage grew at an average of 3% annually and 43 additional computing stations were added. The library must continually upgrade or replace public computing stations every three years to continue to provide quality access and support. In addition to the $160,000 funded in the 2013-2017 period, there is $85,000 in funding in the unfunded project list. Library Materials Purchases This project provides library materials including literature, non-fiction, reference resources, media, e -books, and parenting resources. The Fayetteville Public library seeks to provide a collection of library materials at a level commensurate with benchmark cities and the national average for cities with a population of 50,000 to 99,000 and operating budgets of $3.5-$4.2 million. Over 1.2 million items were borrowed in 2011,0 20.2% increase over 2010. This upward trend is projected to continue, e.g. in the first two months of 2012 there has been 6.3% increase in circulation compared with 2011. Additionally, a 31% increase in holds placed demonstrates unfilled demand. In addition to the $1,977,000 funded in the 2013-2017 period, there is $222,000 in funding in the unfunded project list. Unfunded 2013-2017 1,690,000 3,990,000 1,000,000 195,000 1,195,000 85,000 222,000 120 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) UNFUNDED PROJECTS Unfunded Category 2013-2017 Total - Library Improvements 307,000 PARKS & RECREATION IMPROVEMENTS: Community Park Improvements 435,000 These projects are needed to improve and expand facilities in order to meet the current needs of citizens. For 2013: Wilson Park Improvements - remodel pool buidings; Walker Park - new concession stand. 2014: Lake Fayetteville Improvements - Lake Fayetteville softball complex drainage and remodel concession, restroom, and playground; Veterans Park - small pavilion and parking improvements. 2015: Gulley Park Improvements - trail and lighting replacement, new pavilion and restrooms, and additional parking. 2016: Wilson Park Improvements - remodel rockhouse, restrooms, and tennis and basketball courts; YRCC Improvements - flooring and outside facilities. 2017: White River Improvements - develop multi -use fields, remodel pump station, add parking lot, pavilion, sidewalks and improve river access. In addition to the $3,176,000 funded in the 2013-2017 period, there is $435,000 in funding in the unfunded project list. Regional Park Development 18,304,000 This project is for the development of the Regional Park which includes constructing soccer, softball and baseballs fields, playgrounds, pavilions, trails, volleyball, basketball and tennis courts, parking, roads, utility infrastructure, gardens, an amphitheatre and more. Total - Parks & Recreation Improvements 18,739,000 POLICE IMPROVEMENTS: Police Headquarters Building 17,500,000 This project is to construct a new police headquarters building. The current facility is overcrowded, has poor public access, and high maintenance costs. A needs study was completed in 2004 noting the police facility should be 66,000 square feet. The current facility is 24,000 square feet. Police Records Management System This project is for the scheduled replacement of the Police Records Management System which supports ongoing Police Department needs. This system stores and provides access to all law enforcement records used to dispatch public safety personnel to incidents and manages records in case investigations/evidence, arrests, tickets, accidents, training/certification, etc. This project includes the replacement of both primary and secondary data servers. The current AS/400 data servers were placed into service in the first quarter of 2005 and will be beyond their service life by 2014. This project will move records from an AS/400 data server to a Microsoft data platform server because the AS/400 is becoming an obsolete platform. Police Unmarked Vehicles Unmarked vehicles are a necessity for a progressive police department. The Department utilizes unmarked vehicles for a variety of tasks including: gathering intelligence for investigation of narcotics, theft, vandalism, domestic terrorism, and civil disobedience; conducting pre -raid intelligence for the deployment of the Emergency Response Team; and conducting alcohol enforcement patrols and any activity that must be kept covert to be effective. The Department is recommending a three year replacement for vehicles used in undercover capacities and a five year replacement for vehicles used less frequently in an undercover capacity. Investigators use the same vehicles ₹o affect arrests and to conduct surveillance. In addition to the $399,000 funded in the 2013-2017 period, there is $33,000 in funding in the unfunded project list. Total - Police Improvements 850,000 33,000 18,383,000 121 CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) UNFUNDED PROJECTS Unfunded Category 2013-2017 SOLID WASTE IMPROVEMENTS: Recycling Facility - Construction / Demolition (C&D) 1,560,000 This project creates a construction and demolition program to recycle construction debris of concrete, lumber, scrap metal, etc. which could divert 4,000-6,000 tons annually from the land fill. The project would provide material recovery for L.E.E.D. certified building projects undertaken by the City and others. Diversion from the landfill would also help the City reach diversion goals adopted through the Solid Waste and Recycling Resource Management Plan. New equipment needed would include a backhoe, loader, excavator, concrete crusher, twelve 40 yard boxes and a wood grinder. The estimate uses the following assumptions 1) it will be built at the existing Tyson facility using existing roads and concrete slabs, 2) it excludes any off site development related costs, such as road improvements, utility upgrades, etc., and 3) excludes demolition of the existing Tyson facility. Solid Waste Facility - Recycling Center (MRF) Expansion 4,985,000 The need ₹o expand the recycling facility exists due to growth in the City and the need for expanded commercial recycling services as described in the Solid Waste and Recycling Resource Management Plan. The new facility incorporates a second baler for operations, extra storage space for bales of recyclables, and space for sorting equipment of bottles and containers enabling the growth of commercial recycling services. Construction cost was estimated at $100 per square foot for the warehouse area and $135 per square foot for the office area. Total square feet is 40,500 for an estimated cost of (4.17M). A loader and scales are also included. The estimate uses the following assumptions 1) it will be built at the existing Tyson facility using existing roads and concrete slabs, 2) it excludes any off site development related costs, such as road improvements, utility upgrades, etc., and 3) excludes demolition of the existing Tyson facility. Total - Solid Waste Improvements 6,545,000 STREET IMPROVEMENTS: Matching Funds for Federal STP-A funding 6,250,000 This project provides matching funds for anticipated federal aid funding that will be available to the City beginning in federal fiscal year 2013. This funding may be used for a variety of projects and is anticipated to be, on average, $1 million per year. A 20% local match is required for use of these funds. The funding will flow through the Arkansas State Highway and Transportation Department and through the Northwest A.,kansas Regional Planning Commission. Razorback Road (Hwy 112) Improvements 1,250,000 This project is to widen Razorback Road, through the University of Arkansas's campus, from Hwy 180 (Martin Luther King Boulevard) to Maple Street to four or five lanes with sidewalks. There is $1 million in federal aid available, which will do only a portion of the entire segment. The request is for the required 20% snatch of $250,000. Total - Street Improvements 7,500,000 TRANSPORTATION IMPROVEMENTS: Asphalt Plant 1,300,000 This project would provide funding for the purchase and installation of an asphalt plant to supply asphalt to the in-house overlay and street patch programs. Ipz CITY OF FAYETTEVILLE, ARKANSAS CAPITAL IMPROVEMENTS PROGRAM (2013-2017) UNFUNDED PROJECTS Unfunded Category 2013-2017 In -House Pavement Improvements 953,000 This project provides resources for the systematic overlay of existing streets and includes curb cuts, curb and guttering, pavement striping, and preparation costs for overlays. The goal of this project is to overlay a minimum of 150,000 square yards of asphalt each year. Overlaying each street within a 15 year cycle is intended to optimize the longevity of roadways and minimize significant maintenance requirements resulting in fewer complete renovations at a substantially greater cost. In addition to the $8,619,000 funded in the 2013-2017 period, there is $953,000 in funding in the unfunded project list. Sidewalk Improvements 151,000 This project is to provide funding to improve the connectivity of the sidewalk system by constructing new and repairing existing sidewalks. In addition to the $2,539,000 funded in the 2013- 2017 period; there is $151,000 in funding in the unfunded project list. Total - Transportation Improvements 2,404,000 WATER & SEWER IMPROVEMENTS: Water Line Replacement, Gregg, Township - Sycamore 1,500,000 This project installs approximately 4,500 feet of 18" water line on Gregg Avenue between Township Street and Sycamore Street. The project is required to: increase transmission capacity to the center of town; replace the existing 8" water line that is over 100 years old and which suffers age related breaks; and reinforce fire and domestic flows to the hilltop areas east of Gregg Avenue. This transmission line will complete the 18" loop from the existing 24" line on Sycamore to the existing 36" transmission main on Van Asche Drive. The line will be designed such that taps are not made directly on the 18" line. The cost is based on an existing preliminary design. This is entirely a capacity increase; water impact fees should be used to the maximum extent possible. Water Line Replacement, MLK, Finger Rd - Barbara 1,775,000 This project is to install 14,500' of 12" and 8" water line on Martin Luther King Boulevard from Finger Road to Barbara Street and on One Mile Road and connect loops in the area. The project is required because the soil is very corrosive and the existing 12" water line experiences significant breaks that disrupt water service, resulting in costly repairs and creating dangerous traffic situations. Water/Sewer Relocation Old Wire, Mission - Crossover 5,030,000 This project is to replace and relocate the existing water and sewer lines on Old Wire Road from Mission Boulevard to Township Street, as required when Old Wire Road is widened to three or four lanes. This project involves intermittent sections of both water and sewer mains from 6" to 36" in diameter. Water relocation will include the 1968 36" transmission main, which cannot have taps made on it, and smaller lines for service connections. The cost estimate is based on 13,700 feet of water line and 4,000 feet of sewer line. The water/sewer work will be funded in part by the road widening project. Total - Water & Sewer Improvements 8,305,000 TOTAL -UNFUNDED $ 70,155,000 123 LISTING OF ACRONYMS AC..........................................................................................................................................Air Conditioning ADA...............................................................................................................Americans with Disabilities Act ADEQ..............................................................................Arkansas Department of Environmental Quality ADH............................................................................................................ Arkansas Department of Health AHTD.................................................................................Arkansas Highway Transportation Department A/V............................................................................................................................................... Audio/Visual ARFF.................................................................................................................. Air Rescue and Fire Fighting AVL................................................................................................................... Automatic Vehicle Location CIP.............................................................................................................. Capital Improvements Program CMS.............................................................................................................. Content Management System DOT............................................................................................................... Department of Transportation ECM........................................................................................................ Enterprise Content Management EDMS..................................................................................... Electronic Document Management System EPA......................................................................................................... Environmental Protection Agency ERP..................................................................................................................Enterprise Response Planning ERT..................................................................................................................... Emergency Response Team FAA..............................................................................................................Federal Aviation Administration FAR.................................................................................................................... Federal Aviation Regulation FEMA.......................................................................................Federal Emergency Management Agency FHWA.........................................................................................................Federal Highway Administration FTE.................................................................................................................................... Full -Time Equivalent GA.....................................................................................................................................General Aviation GIS............................................................................................................. Geographic Information System GPS........................................................................................................................ Global Positioning System HR....................................................................................................................................... Human Resources HMR.................................................................................................................... Hotel/Motel Restaurant Tax HVAC....................................................................................... Heating, Ventilation, and Air Conditioning IT.............................................................................................................................Information Technology LAN.................................................................................................................................. Local Area Network LED.................................................................................................................................. Light Emitting Diode LEED............................................................................................................ Low Energy Electron Diffraction MCT..................................................................................................................... Mobile Computer Terminal MDT.............................................................................................................................. Mobile Date Terminal MLK..................................................................................................................................... Martin Luther King MRF..................................................................................................................... Materials Recovery Facility MVR........................................................................................................................... Mobile Video Recorder NPDES............................................................................National Pollutant Discharge Elimination. System NWARPC................................................................Northwest Arkansas Regional Planning Commission 125 LISTING OF ACRONYMS, (continued) PC.....................................................................................................................................Personal Computer PEG............................................................................................................. Public/Education/Government PCI DSS..........................................................................Payment Card Industry Data Security Standard ROW............................................................................................................................................ Right -of -Way SSMA........................................................................................................... SQL Server Migration Assistant SSO....................................................................................................................... Sanitary Sewer Overflow SSRS............................................................................................................. SQL Server Reporting Services STP............................................................................................................Surface Transportation Program UPS................................................................................................................Uninterruptible Power Source UV.................................................................................................................................................... Ultra Violet W/S.............................................................................................................................................. Water/Sewer WAN............................................................................................................................Wireless Area Network WSIP.......................................................................................Wastewater Systems Improvement Project WWTP............................................................................................................... Wastewater Treatment Plant YRCC............................................................................................Yvonne Richardson Community Center Project Index AccessFayetteville Technical Improvements...................................40 Accounting Image Scanner & Check Sealer.....................................44 Airport ARFF Personal Protective Gear Replacement ..........................110 Airport Roof Replacements ..................................................108 Airport Self Serve Station Upgrade.........................................107 Airport Sprinkler System Replacement - white Hangar ........................109 AuditExpense...............................................................45 Backflow Prevention Assemblies..............................................95 Backup Storage Appliance....................................................36 Baxter water Tanks Painting.................................................90 Building Improvements.......................................................46 Building Improvements - W.W.T.P..............................................84 Business office Improvements................................................92 Business office Technology Improvements.....................................93 City Clerk Document Management Equipment....................................48 City Council iPads..........................................................49 City Hall Audio -Visual Renovation...........................................50 Citywide Building Insurance Appraisal Study.................................57 Community Park Improvements.................................................19 Data Center Relocation......................................................35 Digital Signage Implementation..............................................55 Disinfection System Replacement - W.W.T.P...................................80 Document Management.........................................................41 Enterprise Data warehouse System............................................32 Exchange/office upgrade.....................................................33 Fayetteville senior center Parking Lot & Drainage ...........................62 Fire Apparatus Purchases....................................................29 Fire Facility Maintenance...................................................30 Fire Impact Improvements ....................................................23 Fire Information Technology updates.........................................31 Fleet - Backhoes/Loaders...................................................114 Fleet - construction Equipment.............................................113 Fleet - Heavy utility vehicles.............................................118 Fleet - Light / Medium utility vehicles....................................117 Fleet - other vehicles and Equipment.......................................115 Fleet - Police/Passenger vehicles..........................................111 Fleet - solid waste vehicles/Equipment.....................................112 Fleet - Tractor/Mowers.....................................................116 Forestry, Safety and ADA....................................................58 Geographic Information system (GIs).........................................39 In -House Pavement Improvements..............................................75 Irrigation Reels - W.W.T.P..................................................81 Legislative Management/Agenda Routing.......................................47 Library Computer Replacements...............................................43 Library Materials Purchases.................................................42 Lights of the Ozarks........................................................60 Local Area Network (LAN) Upgrade............................................34 Location Production System..................................................54 Microcomputer & Printer Replacements........................................37 Native Grasses Program......................................................59 other Drainage Improvements.................................................28 Parking Lot Improvements and overlays.......................................18 Parking Revenue PCI Compliance Upgrade.......................................17 Parks & Recreation Office Renovation........................................21 Phosphorus standards Management.............................................79 Plant Pumps and Equipment - W.W.T.P.........................................82 Police Building improvements................................................64 Police Bulletproof vests....................................................63 127 Project Index Police Equipment Replacement................................................67 Police Impact Improvements..................................................24 Police K-9 Replacement......................................................71 Police Network/Server Replacements..........................................70 Police Patrol vehicle Electronic upgrades...................................69 Police Specialized Equipment................................................68 Police Technology Improvements..............................................65 Police unmarked vehicles.....................................................66 Police Weapons Replacement..................................................72 Printer Replacements........................................................91 Recycling Baler ...................................................... ......97 Recycling Commercial Expansion (organics)..................................104 Recycling Drop off Facility (North / Central)..............................100 Recycling Improvements .....................................................101 Regional Park Development...................................................20 Remote Meeting Recording....................................................53 Sanitary Sewer Rehabilitation...............................................87 sidewalk Improvements.......................................................76 solid waste Compactors......................................................98 Solid waste compost site slab Expansion....................................102 Solid waste Facility - Transfer Station Expansion ...........................99 Solid waste Mad vac........................................................103 solid waste Rate study.....................................................105 storage Area Network (SAN)..................................................38 Stormwater Quality Management...............................................27 Street Row/Intersection/cost sharing........................................73 Telecommunication systems upgrades..........................................56 Television center Digital Conversion........................................52 Television center Equipment.................................................51 Traffic Signal Improvements... ........................................ ..77 Trail Development...........................................................74 Tree Escrow.................................................................61 upgrade/Replace Lift Stations - W.W.T.P.....................................83 wastewater Impact Improvements..............................................25 water Impact Improvements...................................................26 water Meters................................................................94 water system Rehabilitation and Replacement.................................85 water/Sewer Equipment Expansions............................................89 water/Sewer Impact Fee cost sharing.........................................88 water/Sewer Rate study......................................................96 water/Sewer Relocate for Street Bonds.......................................86