HomeMy WebLinkAbout93-11 RESOLUTIONRESOLUTION NO. 93-11 A RESOLUTION AWARDING BID #11-37 AND AUTHORIZING A CONTRACT WITH DEAN CROWDER CONSTRUCTION, INC. IN THE AMOUNT OF $3,815,173.70 FOR CONSTRUCTION OF IMPROVEMENTS TO CATO SPRINGS ROAD AND RAZORBACK ROAD TO SCHOOL AVENUE, APPROVING A FIVE PERCENT PROJECT CONTINGENCY, AND APPROVING A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-37 and authorizes a contract with Dean Crowder Construction, Inc. in the amount of $3,815,173.70 for construction of improvements to Cato Springs Road and Razorback Road to School Avenue. A copy of the contract is attached as Exhibit "A". Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a five percent project contingency. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached as Exhibit "B". PASSED and APPROVED this 7t' day of June, 2011. APPROVED: B rr O ELDJI�;.i ATTEST: By: SONDRA E. SMITH, City Clerk/Treasurer 51111illllf!!!!!�� r� . a E�t4VTR� ;Z,\CYpFS(i'. :FAYETTEVILLE DOCUMENT 00500 — AGREEMENT BETWEEN OWNER AND CONTRACTOR Contract Name/Title: CATO SPRINGS ROAD IMPROVEMENTS, RAZORBACK ROAD TO SCHOOL AVENUE. Contract No.: THIS AGREEMENT is dated as of the. 1 It' day of LOU -in the year 20fl by and between The City of Fayetteville, Arkansas and .(hereinafter called Contractor). ARTICLE 1- WORK 1.01 Contractor shall compete all Work as specified or indicated in the Contract Documents. The work under this Contract includes, but is not limited to: Repair, widening, and overlay of approximately 5280 LF of Cato Springs Road, construction of a pedestrian bridge, and construction of associated earthwork, curb and gutter, sidewalk, underground drainage, drainage swales, driveways, fencing, 12 inch water line and appurtenances, 8 inch waterline and appurtenances, 8 inch sanitary sewer, sanitary sewer manholes, water/sanitary sewer services, and miscellaneous related items. Refer to Section 00400 -Bid Form for quantities: ARTICLE 2 - ENGINEER 2.01 The Contract Documents have been prepared by GARVER. GARVER assumes all duties and responsibilities, and has the rights and authority assigned to Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3 - CONTRACT TIME 3.01 TIME OF THE ESSENCE: A. All time limits for milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 00500 Agreement Cato Springs Road Improvements 00500 - 1 Garver Project No. 0605-1700 b EXHIBIT A DOCUMENT 00500 — AGREEMENT (continued) 3.02 DATES FOR SUBSTANTIAL COMPLETION AND FINAL PAYMENT: A. The Work will be Substantially Completed within 150 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS for Erosion Control, Clearing and Grubbing, and Water and Sewer. B. The Work will be Substantially Completed within 450 calendar days after the date when the Contract Times commence to run as provided in the GENERAL CONDITIONS, and completed and ready for final payment in accordance with the GENERAL CONDITIONS within 480 calendar days after the date when the Contract Times commence to run. 3.03 LIQUIDATED DAMAGES: A. Owner and Contractor recognize that time is of the essence of this Agreement and that The City of Fayetteville will suffer financial loss if the Work is not completed within the time specified above, plus any extensions thereof allowed in accordance with the GENERAL CONDITIONS. The parties also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by The City of Fayetteville if the Work is not Substantially Completed on time. Accordingly, instead of requiring any such proof, The City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay The City of Fayetteville Seven Hundred Fifty Dollars ($750.00) for each calendar day that expires after the time specified above in Paragraph 3.02 for Substantial Completion until the Work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the time specified in Paragraph 3.02 for completion and readiness for final payment or any proper extension thereof granted by The City of Fayetteville, Contractor shall pay The City of Fayetteville Seven Hundred Fifty Dollars ($750.00) for each calendar day that expires after the time specified for completion and readiness for fmal payment. 00500 Agreement Cato Springs Road Improvements 00500 - 2 Garver Project No. 0605-1700 DOCUMENT 00500 -- AGREEMENT (continued) ARTICLE 4 - CONTRACT PRICE 4.01 The CITY OF FAYETTEVILLE agrees to pay, and the CONTRACTOR agrees to accept, as full and final compensation for all work done under this agreement, the amount based on the prices bid in the Proposal (BID FORM) which is hereto attached, for the actual amount accomplished under each pay item, said payments to be made in lawful money of the United States at the time and in the manner set forth in the Specifications. 4.02 As provided in the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in the General Conditions. Unit prices have been computed as provided in the General Conditions. ARTICLE 5 - PAYMENT PROCEDURES 5.01 SUBMITTAL AND PROCESSING OF PAYMENTS: A. Contractor shall submit Applications for Payment in accordance with the GENERAL CONDITIONS. Applications for Payment will be processed by Engineer as provided in the GENERAL CONDITIONS. 5.02 PROGRESS PAYMENTS, RETAINAGE: A. The City of Fayetteville shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment as recommended by Engineer, on or about the 15th day of each month during construction. All such payments will be measured by the schedule of values established in the GENERAL CONDITIONS (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in each case, 00500 Agreement Cato Springs Road Improvements 00500 - 3 Garver Project No. 0605-1700 DOCUMENT 00500 — AGREEMENT (continued) less the aggregate of payments previously made and less such amounts as Engineer shall determine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS. a. 95% of Work Completed (with the balance being retainage); and b. 100% of Equipment and Materials not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to The City of Fayetteville as provided in the GENERAL CONDITIONS. 2. Upon Substantial Completion, The City of Fayetteville shall pay an amount sufficient to increase total payments to Contractor to 95% of the Contract Price (with the balance being retainage), less such amounts as Engineer shall determine, or The City of Fayetteville may withhold, in accordance with the GENERAL CONDITIONS. 5.03 FINAL PAYMENT: A. Upon final completion and acceptance of the Work in accordance with the GENERAL CONDITIONS, The City of Fayetteville shall pay the remainder of the Contract Price as recommended by Engineer and as provided in the GENERAL CONDITIONS. ARTICLE 6 - CONTRACTOR'S REPRESENTATIONS 6.01 In order to induce The City of Fayetteville to enter into this Agreement, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents including the Addenda and other related data identified in the Bid Documents. B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. 00500 - 4 Garver Project No. 0605-1700 00500 Agreement Cato Springs Road Improvements DOCUMENT 00500 — AGREEMENT (continued) C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. D. Contractor has carefully studied all: (1) Reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) Reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Contractor acknowledges that The City of Fayetteville and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the Site. E. Contractor has obtained and carefully studied (or assumes responsibility of having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, and furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto. F. Contractor does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performing and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 00500 Agreement Cato Springs Road Improvements 00500 - 5 Garver Project No. 0605-1700 DOCUMENT 00500 — AGREEMENT (continued) G. Contractor is aware of the general nature of work to be performed by The City of Fayetteville and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Contractor. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. ARTICLE 7 - CONTRACT DOCUMENTS 7.01 CONTENTS: A. The Contract Documents which comprise the entire Agreement between The City of Fayetteville and Contractor concerning the Work consist of the following and may only be amended, modified, or supplemented as provided in the GENERAL CONDITIONS: 1. This Agreement. 2. Exhibits to this Agreement (enumerated as follows): a. Notice to Proceed. b. Contractor's Bid. 00500 Agreement Cato Springs Road Improvements 00500 - 6 Garver Project No. 0605-1700 DOCUMENT 00500 — AGREEMENT (continued) c. Documentation submitted by Contractor prior to Notice of Award. d. Federal funding documentation 3. Performance, Payment, and other Bonds. 4. General Conditions. 5. Supplementary Conditions. 6. Specifications consisting of divisions and sections as listed in table of contents of Project Manual. 7. Drawings consisting of a cover sheet and sheets as listed in the table of contents thereof, with each sheet bearing the following general title: CATO SPRINGS ROAD IMPROVEMENTS RAZORBACK ROAD TO SCHOOL AVENUE. 8. Addenda numbers one (1) to ( ), inclusive. 9. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to the GENERAL CONDITIONS. ARTICLE 8 - MISCELLANEOUS 8.01 TERMS: A. Terms used in this Agreement which are defined in the GENERAL CONDITIONS shall have the meanings stated in the GENERAL CONDITIONS. 00500 Agreement Cato Springs Road Improvements 00500 - 7 Garver Project No. 0605-1700 DOCUMENT 00500 — AGREEMENT (continued) 8.02 ASSIGNMENT OF CONTRACT: A. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by Law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.03 SUCCESSORS AND ASSIGNS: A. The City of Fayetteville and Contractor each binds himself, his partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. 8.04 SEVERABILITY: A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon The City of Fayetteville and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. OTHER PROVISIONS: Not Applicable. IN WITNESS WHEREOF, The City of Fayetteville and Contractor have signed this Agreement in quadruplicate. One counterpart each has been delivered to Contractor and Engineer. Two counterparts each has been delivered to The City of Fayetteville. All portions of the Contract 00500 Agreement Cato Springs Road Improvements 00500 - 8 Garver Project No. 0605-1700 DOCUMENT 00500 — AGREEMENT (continued) Documents have been signed, initialed, or identified by The City of Fayetteville and Contractor or identified by Engineer on their behalf. This Agreement will be effective on Effective Date of the Agreement. CONTRACTOR j7LQ(, r3 ,Ovide, Vv ✓u 6-1c 1h By: Title: K G. (SEAL) , 201, which is the CITY OF FAYETTEVILLE Attest Attest Address for giving notices (SEAL) 40a44-6141A;ati Address for giving notices fa *P 2I -r ieej /fc Gc td - 134440 1vt11,e At -rig iZ ��,,Rp„, -7...761/ 4c!..6-ci ak.,,,,;---t, :-776- • 0 _• u FAVETTFVILLE a License No. 00 ;I L f (2 I (attach evidence of authority to=;.......• ��y67•q�,�A�0,?... - sign and resolution or other docuni'44l4/G +64.03 # Agent for Service of process authorizing execution of Agreement) (If Contractor is a corporation, attach evidence of authority to sign.) Appro By: orm: Attorney For: 00500 Agreement 00500 - 9 Cato Springs Road Improvements Garver Project No. 0605-1700 DOCUMENT 00500 — AGREEMENT (continued) 00500 Agreement Cato Springs Road Improvements END OF DOCUMENT 00500 00500 - 10 Garver Project No. 0605-1700 City of Fayetteville, Arkansas Budget Adjustment Form V11.0310 Budget Year 2011 Division: Engineering Department: Development Services Request Date 6/7/2011 Adjustment Number BUDGET ADJUSTMENT DESCRIPTION 1 JUSTIFICATION Additional funding is needed for the Cato Springs Road project - 06035.1200. The bid for construction came in at $3,815,173.00 with a contingency of $190.759 for a total of $4,005,932. $2,879,679 of this funding has been earmarked by the AHTD in a cost share agreement. $350,000 of this funding will be contributed from Water & Sewer Revenue Bonds. Divisi ead Bud t Dir r G k. Depa me Director Date Date Date 20-zo�r Finance /rector Chiefs j' tall yor Date Date Date Prepared By: Reference: Type: ehutchens Budget & Research Use Only A B C General Ledger Date Posted to General Ledger Checked / Verified D E 6/7/2011 Initial Initial Date Date Account Name TOTAL BUDGET ADJUSTMENT Account Number 2,879,679 2,879,679 Increase / (Decrease) Expense Revenue Street improvements Federal Grants -Capital Water line improvements Sewer improvements 4470.9470.5809.00 4470.0947.4309.00 5400.5640.5808.00 5400.5740.5815.00 2,879,679 350,000 (350,000) 2,879,679 Project.Sub Number 06035 . 1200 06035 . 1200 06035 . 1200 09018 . 0902 H:1Budget\Budget Adjustments12011 Budget\Liz\BA_06035 06072011.xls 1 of 2 Chris BrownC1 Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 6/7/2011 City Council Meeting Date Agenda Items Only Engineering Division Action Required: Development Services Department A resolution to award a contract Dean Crowder Construction (lowest bidder on Bid 11-37) , in the amount of $3,815,173. for construction of improvements to Cato Springs Road, Razorback Road to School Avenue, and approve a project contingency of 5% in the amount of $190,759. This project will use funds from the 2009 Transportation Bond Issue, a contribution from W&S for relocation of lines, and a federal earmark that was outlined in Resolution 80-06. $585,494 Trans. Bond Money $350,000 W&S contribution $2,879,679 Federal grant/expense Cost of this request 4520.9540.5809.00 5400.5640.5808.00 4470.9470.5809.00 Account Number 06035.1200 Project Number Budgeted Item 907,742.00 2,103,928.00 $ 2,879,679.00 Category / Project Budget $ $ $ Cato Springs Road Program Category / Project Name Street Improvements Waterline improvements Federal Funding/Grant/Earmark Funds Used to Date Program / Project Category Name $ 907,742.00 2009 Street Bonds $ 2,103,928.00 W&S Relocate/2009 Bond Proceeds 2,879,679.00 Federal Earmark Remaining Balance Budget Adjustment Attached X Fund Name Department Dire City A ttorney Finance and Internal Services Director Date 6-20-4I Date Date Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received inCity°5-14_1 1 PO4:39 RCVD Clerk's Office Comments: Revised January 15, 2009 Va�C 2�V1lIC CITY COUNCIL AGENDA MEMO THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE Council Meeting of June 7, 2011 To: Mayor and City Council Thru: Don Marr, Chief of Staff Jeremy Pate, Development Services Director From: Chris Brown, City Engineer Date: May 19, 2011 Subject: A resolution to award a contract to Dean Crowder Construction, Inc. in the amount of $3,815,172.70 for construction of improvements to Cato Springs Road, Razorback Road to School Avenue, approve a project contingency of 5% in the amount of $190,759.00, and approve a Budget Adjustment. PROPOSAL: On May 6th, the City received four (4) construction bids ranging from a low of $3,815,172.70 to a high of $4,445,805.10. Dean Crowder Construction, Inc. submitted the low bid which was 23% below the Engineer's Estimate of $4,703,957,50. The City has received a written recommendation from our consultant engineer, Garver, to award this contract to Crowder Construction and staff concurs with this recommendation. Secondly, staff has prepared the attached spreadsheet which outlines the entire project expenditures from the study/concept/design phase to the future project completion phase showing all proposed funding sources. Although this agenda item only addresses approval of the construction contract with contingency, staff would like the City Council to be fully informed with all estimated project costs. In the future, staff will present the City Council with other contracts, e.g. Arkansas & Missouri Railroad, and at that time will propose additional budget adjustment(s) to cover additional third party contracts (see attached spreadsheet). Please take note that as part of the Federal -Aid process, the Mayor has submitted the required Certification Letter to the Arkansas State Highway and Transportation Department (AHTD) requesting their review of the bid tabulations and concurrence in award of the contract to Dean Crowder Construction, Inc. The actual execution of the construction agreement will occur after receipt of AHTD concurrence. RECOMMENDATION: Staff recommends approval of a resolution awarding a contract to Dean Crowder Construction, Inc. in the amount of $3,815,172.70 for construction of improvements to Cato Springs Road, Razorback Road to School Avenue, approval of a 5% project contingency in the amount of $190,759.00, and approve the attached Budget Adjustment. THE CITY OF FAYETTEVILLE, ARKANSA BUDGET IMPACT: This contract will be paid from the Transportation Bond Fund, the Federal Earmark Fund, and a $350,000 contribution from the Water & Sewer Relocate Fund to assist with the relocation & upgrade of the existing water & sewer lines. 040496 Cato Springs Road (S. School - Razorback) PROJECT EXPENDITURES , :K~~ Y Consultant Engineer ., ,.. SYS.. . Ong Design Contract ' :'v -" 4....� $227,550 _, �,,,.v=. �^�f Amendmt #1 Amendmt #2 $278,150 $196,350 Garver Subtotal $702,050 Engineering Staff Time (2006-2011) Engs, Surveyors, Land Agents $144,627 Const. Project Manager $63,000 Const. Project Inspector $84,000 Staff Engineer $12,600 City Engineer $7,100 In-house Surveying (2 Man) $3,000 Contra Subtotal $344,327 Materials Testing Lab $20,000 _ '. ' Engineering Total r r �$' r _ $1,036,377 3n- . a -' `.:. $258,457 ?„,°" . orb Contingency $50,000 Arkansas Western Gas Right Of Way Total $308,457 $94,312 SWEPCO $177,886 AT&T $0 j f 35, h-iAr .r i ^s'.yem Control House, Gates & Signals Utilities Total 4, lrrnac .`u:tv F �k$272, a ' A� %' . 1..9...8 $166,932 - yf+r 3 l E,,......., � Conc. Panels, Timber Ties, Ballast $189,054 t a a :£?kia.: ..�:sd�.;._:�':,.�- rvss _.._ ,4.K.,,„_„,.. ,ad .F:s..;...t;_,.-....e.-,. Water & Sewer Railroad Total k...r.5y..,� � $355,986 ,b '... «.u'' $691,389 _.., rr, Road $3,123,784 SubTotal $3,815,173 5% Contingency Construction Total - .^ 'Y "F` �a-£�-ctrl:', : '" :pk5'wYi 1 .?+` ,.' :r� f`.-.' u'^�3"Yb. $190,75911 $4,005,932 ./�,_., ..:. .R +.F_ $500 — , ti S� 4T a` f fS.:i Y'M' P t ■y z „, i'-£, .:: ks ADOH NOI $200 STAR $200 Railroad $5,800 ,yys ffq ., Y19% - f ✓'"' �- '.r➢ e� } Lgiw � AHTD Design Admin. Permits,,Total '.4.�'.'� K"$�Y,t' *�'! F ,' S`2 C�� Yhs"� 1� tie -A, 5>?.a:..?�`.—� �'l._,�i.+� $6,700 1 ._ Fv�a. �? ..r.a . $5,000 AHTD Construction Admin. $25,000 AHTD Admin Total $30,000 GRAND TOTAL PROJECT COST $6,015,650 FUNDING SOURCES Federal Funding (Max.) -$2,879,679 TOTAL COST TO CITY $3,135,971 Water & Sewer Funding , -$350,000 CIP Funding (Excess Project Funds) -$441,335 { TOTAL COST TO BOND PROGRAM $2,344,636 RESOLUTION NO. A RESOLUTION AWARDING BID #11-37 AND AUTHORIZING A CONTRACT WITH DEAN CROWDER CONSTRUCTION, INC. IN THE AMOUNT OF $3,815,173.70 FOR CONSTRUCTION OF IMPROVEMENTS TO CATO SPRINGS ROAD AND RAZORBACK ROAD TO SCHOOL AVENUE, APPROVING A FIVE PERCENT PRJOECT CONTINGENCY, AND APPROVING A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-37 and authorizes a contract with Dean Crowder Construction, Inc. in the amount of $3,815,173.70 for construction of improvements to Cato Springs Road and Razorback Road to School Avenue. A copy of the contract is attached as Exhibit "A". Section 2: That the City Council of the City of Fayetteville, Arkansas hereby approves a five percent project contingency. Section 3: That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached as Exhibit "B". PASSED and APPROVED this 7'h day of June, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer BOOZlZIL Pas!Aab :Je eueJ goledsla :Je6euevl se!;!I!lfl Finance & Internal Services Director: :Ja6euel>til;e6png [U 0 :loloeJIG lueu edea :ie6eum 6ulseyoJnd 0 CO CO 3 :suolpru;sul Iioadg 6unpueHOu!dd!LIS s;UOWOAOJdwl euluJ®;eM 0 0 0 UMOJ9 SIuI3 CO ii 7 r 0 enssi o llufl 00'6L9`6L8'Z to 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 00.6L9'6L9'Z$ 00'6085'0Lb6'O2117 0 0 0 0 0 0 00'9089'O49s OOI lso0 pepualxS sJequinN lunoaoy N 0 o V o 0 c N X 0- 0 00'6L946ZZ'E$ 00'6L9'6ZZ'£$ 00Z6'S£090 0 O N 0 0 O CFi CT a ro rn 0 0 0 @ 0 #;asst' pax!d 7 8 0 0 m O N 0 0 d 0 0 67 lsI 3S1O8 0. 0. 0 N 0 D CD 0. 0 it w 0 N 0. 0 Z 3 m:. u a 0 C• Q O C) d ~ g 0 5 O 6 < • — o D G 0 14 Da ▪ c o4n. m o• a t ro d` 0 n • Z" '° 0 O 'S Z u:t m r� ;11 0 0.1 "a 0 a-' .Q � : a C ttD mi 4,1 f :C fi: -( -1 y co 6X1 c3' To - com 0) z 0 ;aegwnN °-d :•oN uo!l!s!nbea z 0 pegoenv salon° .. • City Of Fayetteville 4 Purchase Order (PO) Request •(NOt a Purchase ORlei) All purehases under$2501 shall be used on a P-Cainil unless medical or 1099 service related. (Call x256 with atresliena) • All PO Request shall be scanned to the Purchasing.B mall:.Puraasingaci.fayetteville.ar,us Requisition No.: t7ate: 511772011 P.O Number: Expected Delivery Date: Vendor #: 16506 Vendor Name: Dean Crowder Construction Marl Yes: XX No: Address: 804 SE 21st 'fob Point: Taxable Yes:_ No :_XX Quotes Attached Yes: No: XX City: Bentonville State: AR Zip Code: 72712 Ship to code: Division Head Approval: Requester: Chris Brown • Requester's Employee #: 2695 Extension: 207 Item Description Quantity Unit of Issue Una Cost Extended Cost Account Numbers Project/SubpioleCt # Inventory # Fixed Asset # 1 2 3 4 5 6 7 8 9 10 Street Improvements 1 . 585,494.00 $54.5,494.00 4520.8540.5809.00 06035.1200 50.00 54.00 60.00 50.00 $0.00 30.00 66.00 60.00 Shipping/Handling Lot 50.00 -Special Instructions: Subtotal: Tax: Total: 5585,494.00 5585,494.00 Approvals: Mayor: Finance Dispatch Department Director. Budget Manager: Utilities Manager: Purchasing Manager: & Internal Services Director: Manager: IT Manager: Other: ftemsed lar20013 r� aye ARKANSAS City of Fayetteville Engineering Division 113 West Mountain Street Fayetteville, Arkansas 72701 PROJECT MANUAL FOR JOB 040496 HWY. 112 - HWY. 71B (CATO SPRINGS RD.) (FAYETTEVILLE) (S) F.A.P. HPP2-1298(1) & HPP2-3758(1) GARVER PROJECT 0605-1700 Garver, LLC 2049 East Joyce, Suite 400 Fayetteville, Arkansas 72703 479-527-9100 FAX 479-527-9101 www.GarverUSA.com BID 11-37 Date: April, 2011