HomeMy WebLinkAbout71-11 RESOLUTIONRESOLUTION NO. 71-11 A RESOLUTION AWARDING BID #11-23 AND AUTHORIZING A CONTRACT WITH SCHEFERS ROOFING IN AN AMOUNT NOT TO EXCEED $60,554.40 FOR ROOFING REPAIRS AND UPGRADES RELATED TO ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT FUNDED COMMUNITY REVOLVING LOAN FUND PROJECTS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-23 and authorizes a contract with Schefers Roofing in an amount not to exceed $60,554.40 for roofing repairs and upgrades related to Energy Efficiency and Conservation Block Grant funded Community Revolving Loan Fund projects. PASSED and APPROVED this 3rd day of May, 2011. APPROVED: ATTEST: By: fro LD JO ra! ,Mayor By: ifitteL SO RA E. SMITH,City CTerk/Treasurer 41e74nZ e FAYr1TEVILLE e a i} John Coleman Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 5/3/2011 City Council Meeting Date Agenda Items Only Sustainability & Strategic Planning Sustainability & Strategic Planning Division Department Action Required: The City of Fayetteville will have 5 contracts after all bidding that will make energy efficient improvements in the areas of HVAC, Roofing, Insulation, Window & Door Replacement, and solar equipment. Using funds from the Energy Block Grant, the City will allocate money to each approved project, based an project needs and/or requirements. The funds will be a loan to the project owner, with proceeds of energy savings returning to the Fund. The bid is based upon mark-up of materials and hourly rate. The Roofing lowest qualified bidder is Schefers Roofing (Bid 11-23). Cost of this request 2240.9240.5342.99 Account Number none 09011.0020 Project Number Budgeted Item X NTE $220,000.00/5 contracts $ Category/ Project Budget Energy Block Grant Program Category 1 Project Name 195.00 Energy Block Grant Funds Used to Date Program / Project Category Name NTE $220,000.00/5 contracts Energy Block Grant Remaining Balance Fund Name Budget Adjustment Attached Dep Director orney Finance and Internal Services Director /S r! Date 4 Date 4-w-2eiI Date Date /—e714 e Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in CiQ4 —1 5-1 1 P03:10 R C V D Clerk's Office Comments: Revised January 15, 2009 aye le eV ARKANSAS THE CITY OF FAYETTEVILLE, ARKANSAS CORRESPONDENCE 125 W. Mountain St. Fayetteville, AR 72701 Telephone: (479) 575-8272 TO: Lioneld Jordan, Mayor FROM: John Coleman, Director of Sustainability & Strategic Planning Thru: Don Marr, Chief of Staff DATE: April 11, 2011 SUBJECT: Bid 11-23, Roofing Repairs & Upgrades Description Using funds from the Energy Efficiency and Conservation Block Grant as part of the American Recovery and Reinvestment Act (ARRA), the City has allocated $220,000 to create the Community Revolving Loan Fund. This Fund provides low interest loans to non -profits to perform energy efficiency and renewable energy improvements for which they payback using the energy savings. The purpose of this resolution is to approve Bid 11-23 for Roofing Repairs & Upgrades not to exceed a total cost of $60,554.40 without further approval from City Council. The bid was evaluated based upon mark-up of materials and hourly rates. The contract is for one year with four automatic annual renewal option. Schefers Roofing is the only bidder and is recommended for award. Budget Impact Contract costs will be paid for by Energy Efficiency and Conservation Block Grant funding as obtained by the City of Fayetteville in September 2009. Combined, Bids 11-22, 11-23, 11-25, 11-33, and 11-34 will not exceed $220,000 without further approval from the City Council. Other City Departments are allowed to utilize these annual contracts, but will be required to follow standard procurement procedures. 4115Z011Y John Coleman BidTab 11-23, Roofing nRepairs and Up9rades_pdf Page 1 Ta'yZe Aflt<ANSAS 61D:11-23 DATE: 03122111 TIME: 2:00 PM CITY OF FAYETTEVILLE Bid 11-23., Roofing Repairs and Upgrades Name of Contractor: Schefers Roofing *biMHtJNtI e A14, m. Item Description Mark Up % Contractors Material Cost EstimateMark Amount of Up $S Amount Mark Upi FLUS Material Cost I General Material (Cost plus %) $0-$100 45% x $1,500 $675 $2,175.00 2 General Material (Cost plus %) $101-$500 35% x $1,500 $525 $2,025.00 3 General Material (Cost plus %) $501-$1000 35% x $1,500 $525 $2,025.00 4 General Material (Cost plus %) $1001 -and up 35% x $1,00 m $525 $2,025.00 5 Reflective Paint Material 35% s $2,000 - $700 $2,700.00 6 New Reflective Roof Material - Standing Seam Metal Roof 35% x $30,000 $10,500 $40,500.00 Estimated Cost for Section A (Sum of Items 1-6): $51,450,00 SECTION B. Labor Subject to Davis -Bacon Wage Rates A $ c (A 7c }) Item Description Estimated hours Hourly Rate Estimated Labor Cost 7 8 9 10 Roofing- Rate 1 (Applicatiorllnstaller) l00 x $38.55 $3,855.00 Roofing - Rate 2 (installer/Foreman) I00 x $45.00 $4,500.00 Roofing - Rate 3 (Foreman/Supervisor) g x $53,55 - $428.40 Roofing - Rate 4 (Supervisor/Inspector) 3 x $107,00 $321.00 Estimated Cost for Section B (Sum of items 7-10): $9,104.40 **Total Estimated Cost for Items 1-10 (sum or Section A + Section 8) $60,554.40 *NOTICE: Bid award is contingent upon vendor meeting minimum specifications and Formal authorization by City officials. CERTIFIED: P. VICE, PURCH MGR 6'3 frg WITNESS DATE le ARKhNSAS -° THE CITY OF FAYETTEVILLE, ARKANSAS w. w.accessfayetteuille.org_ ." CONTRACT Reference Bid: 11-23, Roofing Repairs and Upgrades Contractor: Schefers Roofing Company Term: 1 year with 4 automatic renewal options This contract executed this 3'd day of May, 2011, between the City of Fayetteville, Arkansas, and Schefers Roofing Contpanv, In consideration of the mutual covenants contained herein, the parties agree as follows: 1. Schefers Roofing Con pane at its own cost and expense shall furnish all labor, materials, supplies, machinery, equipment, tools, supervision, bonds, insurance, tax permits, and all other accessories and services necessary to complete items bid per Bid 11-23 as stated in Schefers Roofing Company bid proposal, and in accordance with specifications attached hereto and made a part hereof under Bid 11-23. 2. The City of Fayetteville shall pay Schefers Roofing Company based on its bid forth in pricing as shown in bid and attached to this contract. Payments will be made after approval and acceptance of work, submission of detailed invoice, and submission of certified payroll. Payments will be made within a maximum 30 days after acceptance of invoice. Schefers Roofng,Cotnpanv agrees to make detailed invoicing related documentation available to the City or the Department of Energy (DOE) upon request (for example, during a post -award audit), including but not limited to actual cost of material, etc. 3. It is explicitly understood and agreed to by Schefers Roofing Company and the City of Fayetteville that the total amount of funding that the City of Fayetteville may use for this and four other similar contracts it is approving today is capped at $220,000.00. Therefore, the City of Fayetteville will probably not order the full amount of items and services shown on any of the five bids approved by the Fayetteville City Council. The City will order any work to be done by Schefers Roofing Cotnpanv by issuing a Purchase Order for such work or project which shall be the City's assurance that sufficient funds remain to pay for such work or project. Schefers Roofing Company shall not start work on any project unless and until it receives the City's Purchase Order for such work or project. 4, The Contract documents which comprise this contract between the City of Fayetteville and Schefers Roofing Contpanv consist of this Contract and the following documents attached hereto, and made a part hereof: A. Bid form identified as Invitation to Bid 11-23 with the specifications and conditions typed thereon. B. Schefers Rooting Companybid proposal, including mark up on materials and hourly rates. C. The Notice to Prospective Bidders and the Bid Tabulation. 5. These Contract documents constitute the entire agreement between the City of Fayetteville and Schefers Roofing Company and may be modified only by a duly executed written instrument signed by the City of Fayetteville and Schefers Roofing Company. 6. Schefers Roofing Company shall not assign its duties under the terns of this agreement. 7. Schefers Roofing Company agrees to hold the City of Fayetteville harmless and indemnify the City of Fayetteville, against any and all claims for property damage, personal injury or death, arising from performance of this contract. This clause shall not in any form or manner be constnred to waive that tort immunity set forth under Arkansas Law. Bid 11-23, Roofing Repairs and Upgrades Page 1 of 3 8. Scbefers Roofing Company agrees to abide by the following American Recovery and Reinvestment Act (ARRA) Provisions at all times and fully provide efforts to assist the City with compliance: a. Buy American — Section 1605 of the Recovery Act requires that all iron, steel, and manufactured goods used in the project must be produced within the United States except as provided in the following: i. The cost of the domestic iron, steel, and/or manufactured goods would be unreasonable. The cost of domestic iron, steel, or manufactured goods used in the project is unreasonable when the cumulative cost of such material will increase the cost of the overall project by more than 25 percent; ii. The iron, steel, and/or manufactured good is not produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or iii. The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest. iv. If all received quotes do not meet the Section 1605 of the Recovery Act the City of Fayetteville is required to receive independent verification from the Federal Government to move forward. b. Waste Stream — Schefers Roofing Company assures to create or obtain a waste management plan addressing waste generated by a proposed project prior to the project generating waste. This waste management plan will describe the plan to dispose of any sanitary or hazardous waste (e.g., construction and demolition debris, old light bulbs, lead ballasts, piping, roofing material, discarded equipment, debris, and asbestos) generated as a result of the proposed project. Schefers Rooting Company shall ensure that the project is in compliance with all Federal, state and local regulations for waste disposal. Schefers Roofing Company shall snake the waste management plan and related documentation available to the City to or DOE (Department of Energy) upon request (for example, during a post -award audit). c. Davis -Bacon Wage Rates - Schefers Rooting Company agrees to pay wage rates as presented in the latest published wage rates for Davis -Bacon for federally funded projects. Scbefers Roofing Company shall submit certified payrolls to the City of Fayetteville upon delivery of detailed invoicing. 9. Schefers RoofinRCompanv shall furnish a certificate of insurance addressed to the City of Fayetteville, showing that he carries the following insurance which shall be maintained throughout the term of the Contract. Any work sublet, the contractor shall require the subcontractor similarly to provide worker's compensation insurance. In case any employee engaged in work on the project under this contract is not protected under Worker's Compensation Insurance, Schefers Roofing Company shall provide and shall cause each Subcontractor to provide adequate employer's liability insurance for the protection of such of his employees as are not otherwise protected. Workmen's Compensation Statutory Amount Comprehensive General & Automobile Insurance Bodily Injury Liability Property Damage Liability $500,000 for each person injured. $1,000,000 for each accident. $1,000,000 aggregate. The premiums for all insurance and the bond required herein shall be paid by Schefers Roofing Company. 10. Schefers Roofing Company to furnish proof of licensure as required by all local and state agencies. Bid 11-23, Roofing Repairs and Upgrades Page 2 of 3 11. This contract may be terminated without penalty by the City of Fayetteville or Schefers Roofing Company with 10 days' written notice. 12. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25- 19-101 et. Seq.). Only legally authorized photo coping costs pursuant to the FOIA may be assessed for this compliance. 13. Changes itt Scope or Price: Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. SCHEFERS ROOFING COMPANY By: Printed Contractor Name & Title ATTEST: Compo Secreta CITY OF FAYETTEVILLE, ARKANSAS ATTEST; Son ra Smith, City Clerk !3? Y4)2+ Y 3 Date Signed: len Business Address City, State & Zip Code Date Signed: •"",12., a Bid 11-23, Roofing Repairs and Upgrades Page 3 of 3 4/ 6/ off/ WWII/ ',Pilo I, 0.>(j: . p •.pm/.• S-v,� ° F O�C•mBlfl�' Vm e• 13 ,FAYETTEVILLE; Pte. p v • rr A�m�\ a`O :9sy9 , kaNSm ���� G0 °�@ RESOLUTION NO. A RESOLUTION AWARDING BID #11-23 AND AUTHORIZING A CONTRACT WITH SCHEFERS ROOFING IN AN AMOUNT NOT TO EXCEED $60,554.40 FOR ROOFING REPAIRS AND UPGRADES RELATED TO ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT FUNDED COMMUNITY REVOLVING LOAN FUND PROJECTS BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-23 and authorizes a contract with Schefers Roofing in an amount not to exceed $60,554.40 for roofing repairs and upgrades related to Energy Efficiency and Conservation Block Grant funded Community Revolving Loan Fund projects. PASSED and APPROVED this 3rd day of May, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer • ya�e tevlle www.accessfayetteville.org CO TRACT REFERE CE BID: 11-23, Roofing Repairs and Upgrades Contracto Schefers Roofing Company Term: 1 yea with 4 automatic renewal options THE CITY OF FAYETTEVILLE, ARKANSAS This contract exec Schefers Roofing follows: ed this day of , 20 , between the City of Fayetteville, Arkansas, and mpanv. In consideration of the mut al covenants contained herein, the parties agree as 1. Schefers Roofin . Companv at its own cost .. nd expense shall furnish all labor, materials, supplies, machinery, equipm- t, tools, supervision, bo s, insurance, tax permits, and all other accessories and services necessary to omplete items bid pe Bid 11-23 as stated in Schefers Roofing Companv bid proposal, and in accor• nce with specificaf • ns attached hereto and made a part hereof under Bid 11- 23, all included herein as ' spelled out wore for word. 2. The City of Fayetteville sha shown in bid and attached to work, submission of detailed inv a maximum 30 days after acce detailed invoicing related document request (for example, during a pos pay is cont ce, a Sche rs Roofing Companv based on their bid form in pricing as act. Payments will be made after approval and acceptance of d submission of certified payroll. Payments will be made within ce of invoice. Schefers Roofing Company agrees to make tion available to the City or the Department of Energy (DOE) upon and audit), including but not limited to actual cost of material, etc. 3. No work shall be started on any Order (PO). All work perfor Schefers Roofin ' Com an 4. The Contract documents Roofing Company cons' part hereof: project ed by Sc r any location with out the receipt of a City issued Purchase efers Roofin Com • an without a PO is at the risk of w ich comprise this of this Contract and ntract between the City of Fayetteville and Schefers e following documents attached hereto, and made a A. Bid form ident led as Invitation to Bid 11-2 with the specifications and conditions typed thereon. B. Schefers Ro • fin • Com • an bid proposal, includi . mark up on materials and hourly rates. C. The Notice • Prospective Bidders and the Bid Tabul 5. These Contract • ocuments constitute the entire agreement etween the City of Fayetteville and Schefers Roofi a Company and may be modified only by a du executed written instrument signed by the City of Fayetteville and Schefers Roofing Company. 6. Schefers Roofing Company shall not assign its duties under the terms •f this agreement. 7. Schefers Roofing Company agrees to hold the City of Fayetteville harmless and indemnify the City of Fayetteville, against any and all claims for property damage, personal injury or death, arising from performance of this contract. This clause shall not in any form or manner be construed to waive that tort immunity set forth under Arkansas Law. Bid 11-23, Roofing Repairs and Upgrades Page 1 of 3 8. Schefers Roofing Company agrees to abide by the following American Recovery and Reinvestment Act (ARRA) Provisions at all times and fully provide efforts to assist the City wit compliance: a. Buy American — Section 1605 of the Recovery Act requires that all iron, steel, and manufactured goods used in the project must be produced within e United States except as provided in the following: 1. The cost of the domestic iron, steel, and/or manufacture goods would be unreasonable. The cost of domestic iron, steel, or manufacture • goods used in the project is unreasonable when the cumulative cost of such m- erial will increase the cost of the overall project by more than 25 percent; ii. The irony, steel, and/or manufactured good is mt produced, or manufactured in the United S tes in sufficient and reasonably av•.iiable quantities and of a satisfactory quality; or iii. The appiicatioq of the restriction of secti•n 1605 of the Recovery Act would be inconsistent witthe public interest. iv. If all received quos do not meet the : ection 1605 of the Recovery Act the City of Fayetteville is requir d to receive indep: dent verification from the Federal Government to move forward. b. Waste Stream — Schefers hoofing C • mpany assures to create or obtain a waste management plan addressing = ste gen - rated by a proposed project prior to the project generating waste. This waste m- age rent plan will describe the plan to dispose of any sanitary or hazardous waste (e.g., on- ruction and demolition debris, old Tight bulbs, lead ballasts, piping, roofing material, disc- =ped equipment, debris, and asbestos) generated as a result of the proposed project. Schefe Roofing Company shall ensure that the project is in compliance with all Federal, state and loc: I regulations for waste disposal. Schefers Roofing Company shall make the waste ma gem nt plan and related documentation available to the City to or DOE (Department of Ener. ) upon -quest (for example, during a post -award audit). c. Davis -Bacon Wage Rates - S efers Roof g Company agrees to pay wage rates as presented in the latest publishes wage rates f• Davis -Bacon for federally funded projects. Schefers Roofing Company - all submit certifi payrolls to the City of Fayetteville upon delivery of detailed invoicing. 9. Schefers Roofing Company sha Fayetteville, showing that he carrie term of the Contract. Any work su worker's compensation insuranc contract is not protected under provide and shall cause each protection of such of his empl furnish a certificate the following insurance wh let, the contractor shall require In case any employee engag orker's Compensation Insurance, ubcontractor to provide adequate e ees as are not otherwise protected. o insurance addressed to the City of h shall be maintained throughout the the subcontractor similarly to provide d in work on the project under this chefers Roofing Company shall layer's liability insurance for the Workmen's Compensation Statutory Amount Comprehensive General & Automobile Insurance Bodily injury Liability Property Damage Liability Bid 11-23, Roofing Repairs and Upgrades Page 2 of 3 $500,000 for each person injured. $1,000,000 for each accident. $1,000,000 aggregate. The premiums for all insurance and the bond required herein shall be paid by Schefers Roofing Company. 10. Schefers Roofing Company to furnish proof of licensure as required by all local and state agencies. 11. This contract may be terminated by the City of Fayetteville or Schefers Roofing Company with 10 days written notice. 12. Freedom of Information Act: City of Fayetteville contracts and documents repared while performing city contractual work are subject to the Arkansas Freedom of Info tion Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide t e documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Informatio Act (A.C.A. 25-19-101 et. Seq.). Only leg y authorized photo coping costs pursuant to the FOIA ma a assessed for this compliance. 13. Changes in Scope or Price: Changes, modifications, or ame tJments in scope, price or fees to this contract shall not be allowed without a prior formal contract a ndment approved by the Mayor and the City Council in advance of the c ange in scope, cost or fees WITNESS OUR HANDS THIS DAY OF , 2011. 617.5 NY SECRETARY Po 3 a)e, .2 - BUSINESS BUSINESS ADDRES OF FAYETTEVILLE, YETTEVILLE, ARKANSAS LD JORDAN, Mayor ttest. Sondra Smith, City Clerk 602 BY D TITLE Bid 11-23, Roofing Repairs and Upgrades Page 3 of 3 aye A liSAN SA$ BID: 11-23 DATE: 03122/11 TIME: 2:00 PM CITY OF FAYETTEVILLE Bid 11-23, Roofing Repairs and Upgrades Name of Contractor: Schefers Roofing ECTION A♦ Materials Subject toBuy -American Requirements KS ► $ ur S'Fi 0 item Description Mark Up % Contractors Material Cost ,.t Estimate .n Amount of Mark Up SS Amount Mark Up PLUS Material Cost 1 2 3 4 5 6 General Material (Cost plus %) $0-$100 45% x $1,500 _ $675 $2,175.00 General Material (Cost plus %) $101-$500 35% x $1,500 — $525 $2,025.00 General Material (Cost plus %) $501-$1000 35% x $1,500 = $525 $2,025.00 General Material (Cost plus %) $1001 -and up 350/4 x $1,500 $525 $2,025.00 Reflective Paint Material 35% x $2,000 - $700 $2,700.00 New Reflective Roof Material - Standin(; Seam Metal Roof 35% x $30,000 $10,500 $40,500.00 Estimated Cost for Section A (Sum of Items 1-6): $51,450.00 SECTION B: Labor Subject to Davis -Bacon Wage Rates A B C (A x $) Item -^- Description Estimated hours HourlyRate 1 Estimated Labor Cost 7 8 9 10 Roofing - Rate 1 (Applicatior/Installer) 100 x $38.55 = $3,855.00 Roofing - Rate 2 (Installer/Foreman) 100 , x $45.00 = $4,500.00 Roofing - Rate 3 (Foreman/Supervisor) 8 x $53.55 - $428.40 Roofing - Rate 4 (Supervisor/Inspector) 3 x $107.00 = $321.00 Estimated Cost for Section B (Sum of Items 7-10): $9,104.40 $60,554.40 **Total Estimated Cost for Items 1-10 (sum of Section A + Section 0) '"NOTICE: Bid award is contingent upon vendor meeting minimum specifications and formal authorization by City officials. CERTIFIED: P. VICE, PURCH MGR WITNESS C.S7Z/( DATE EXECUTION OF BID - Bidders are requested to indicate by check mark or "Yes/No" on each line of the Technical Specifications the compliance of the item bid. Actual specification of any deficient item must be noted on the bid sheet or separate attachment. If specifications of item bid differ from provided literature, deviation must be documented and certified by the manufacturer as a regular production option. Upon signing this Bid, the bidder certifies that: 1. 1-le/she has read and agrees to the requirements set forth in this proposal, including specifications, terms, standard conditions, and any pertinent information regarding the articles being bid on. 2. Unless otherwise noted and explained, the unit bid and listed meets or exceeds all of these requirements as specified by The City of Fayetteville. 3. The Bidder can and will comply with all specifications and requirements for delivery, documentation and support as specified herein. Unsigned bids will be rejected. Items marked * are mandatory for consideration. *NAME OF FIRM: C - 'Roan Q Purchase Order and /Payments shall be Issued to this name *BUSINESS ADDRESS: (3z',3 T' Pl /CP-eVg_ *CITY:211%ie7D/tLe^ *STATE: fig, *ZIP: 1z,/c02 - *PHONE: 41 - 7(?-Zz-79 FAX: ifi C?r 2z46 *E-MAIL: L.�e- oR1 j , c-0,61 *BY: (PRINTED NAME) --"A *AUTHORIZED SIGNATURE: 14-4 *TITLE: l fl .i KkP'Ci•-lit keI CAS *DATE:% / Z -Z•-- 12O /1 Acknowledge Addendums: Addendum No. 1 Dated: B/ i( Acknowledged by: Addendum No. 2.. Dated:.a/u /if Acknowledged by: Addendum No. J Dated: 5117/1 ( Acknowledged by: Addendum No. Dated: Acknowledged by: Bid 11-23, Addendum 1 — REVISED BID FORM Page 3 of 3 Telecommunications Device for the Deaf MD 079) 521-1316 113 West Mountain • Fayetteville, AR 72701 City of Fayetteville Bid 11-23, Roofing Repairs & Upgrades Bid Pricing Form - REVISED PER ADDEDNUM 1 -V A-NT/or/web litmoveat. oF Pay's rgom TE -OF Rizzo:Tor/IP Bid 11-23, Addendum 1— REVISED BID FORM oem, fog' Pein-/a2if °P Otilf*4 fli4P /1")*(18nCNTO Page 2 of 3 THe-trry 9FON yerreu.u..e I1 boy es. Telecommunications Devlce for tile Deaf TDD (479) 521 -1316 113 West Mountain - Fayetteville, AR 7Z701 BID 11-23, ADDENDUM .. _. _ • L ,-; 1 - REVISED BID FORM Description Mark Up % contractors Material Cot Estimate SS Amount of mat up S Amount Tviark U , Th, , ,,, „fatale cost , 1"-L•'° wa I General Material (Cost plus %) $04100 rilM $1,500 , 6 -,Q - $ 2, i 767 do 2 General Material (Cost plus %) $101-$500 Mii 1 $1,500 II 5.25:04 ''s2 ozs: oo 3 General Material (Cost plus %) $501-$1000 °/, 56 $1,500 z-,-.00 2 0767.00 4 General Material (Cost pins Vo) $1001 -and up 36- cY. 1 $1,500 5 Reflective Paint Material EIN 1 $2,000 i 760. 00 g ..,00 , 00 f' I 6 New Reflective Roof Material - Standing Seam Metal Roof .56— * $30,000 ri /0 Satoo Estimated Cost for Section A (Sum of Items tAr $ 460. CO SECT . Labor!!:": Subj�BacoiWgebte1k ' l'- - j3 ' ' - ,', '''' Description: Most basic tilde is listed as "Rate I". Wit set increases with increasedrate number. stimated hours =Wear° vamp Nowt Rate -.. Estimated Labor Cost ,,, 7 8 9 10 Roofing - Rate I (Applicatiorfinstaller) 100 I $ 38. 65 $ Roofing - Rate 2 (InstalleriForeman) 100 S'sTo.°c) Roofing - Rate 3 (Foreman/Supervisor) 1111111 $ . oofing - Rate 4 (Supervisor/Inspeotor) 3 j $ 0 • Estimated Cost for Section B um of items 7-19): •.40 **Total Estimated Cost for Items 1-10 (sum Section At+ Section El bond required on 5% of "Total Estimated Cost for Items 1-10". - A 100% Performance and Pa ment bond is r- . uired for same within ten da s after notice of contract wand. Name of Contractor 60-162.% R&D•Fi xic, -V A-NT/or/web litmoveat. oF Pay's rgom TE -OF Rizzo:Tor/IP Bid 11-23, Addendum 1— REVISED BID FORM oem, fog' Pein-/a2if °P Otilf*4 fli4P /1")*(18nCNTO Page 2 of 3 THe-trry 9FON yerreu.u..e I1 boy es. Telecommunications Devlce for tile Deaf TDD (479) 521 -1316 113 West Mountain - Fayetteville, AR 7Z701 City of Fayetteville.._ Bid 11-23, Roofing Repairs and Upgrades Bid Proposal Form (shall be submitted with all bids) This page becomes an integral part of the proposal submitted by SCtter6RS ROOF/ 140 (Vendor/Company Name) The undersigned proposes to furnish and deliver, in accordance with the requirements of these bid documents issued February of 2011, prepared by the City of Fayetteville, Purchasing Division, for the time period beginning date of Bid Award and ending twelve months thereafter as per Bid 11- 23, subject to four one (1) year annual renewals. Item numbers below refer to the same numbered paragraph of the Instructions to Bidders and the Specifications. INSTRUCTIONS TO BIDDERS: 1.1. Prices shall include all labor, supervision, materials, equipment, transportation and services necessary to do a top quality job. YES )( NO 1.2. Discounts offered: 1.3. Condition of Bid FIRM? YES $ NO SUBJECT TO ESCALATION ' Method of Escalation, if applicable BIDS MUST BE FIRM FOR ACCEPTANCE FOR 90 Days Bid is Firm /70 Days Weeks 1.4. Bidder will accept total bid only? YES NO_X (or any portion of bid award) YES pc NO 1.5 Bidder has submitted an original bid document? YES X NO 1.6 Bidder will provide Workman's Compensation Insurance as outlined? YES X NO 1.7 Bidder will provide General Liability Insurance as outlined? YES NO 1.8 Bidder will provide Automobile Coverage as outlined? YES S( NO 1.9 Bidder will indemnify the City of Fayetteville? YES NO 2.0 Bidder has included qualification & experience information as required? YES X NO 3.0 PURCHASES BY OTHER PUBLIC AGENCIES: Bidder agrees to extend pricing, terms, and conditions to other public agencies YES n NO City of Fayetteville, AR Bid 11-23, Roofing Repairs and Upgrades Page 24 of 29 4.0 -RESPONSE TIME Bidder agrees to have a person on call for emergencies twenty four hours a day? YES X NO Bidder agrees to one (1) hour emergency response time? YES X NO Bidder agrees to two to three day response time for regular calls unless an extension is approved by City project manager? YES x NO 5.0 DAVIS-BACON PREVAILING WAGE DETERMINATION Bidder agrees meet all wage requirements as outlined and required, including but not limited to certified payroll reporting? YES NO 6.0 BUY AMERICAN Bidder agrees follow all Buy American requirements? YES ) NO 7.0 PROFESSIONAL STANDARDS Bidder agrees to have professional workmanship and perform work in a manner consistent with the industry in which it is related to? YES, NO BIDDER ACKNOWLEDGES RECEIPT OF ADDENDA: ADDENDUM NO. / DATED infigai .f, 2.0 ADDENDUM NO. 4- DATED, MM'J !(!2O// ADDENDUM NO. DATED/htzeih7 7-01( This page becomes an integral part of the proposal submitted by E3CIIrreAs RonnAl67 (Vendor/Company Name) We propose to furnish the equipment/material as indicated in this Bid Blank, provided to the City of Fayetteville with transportation charges prepaid, and for the price quoted below. All equipment/material to be furnished in accordance with City of Fayetteville specifications attached hereto. City of Fayetteville, AR Bid 11-23, Roofing Repairs and Upgrades Page 25 of 29 City -of Fayetteville...... Bid 11-23, Roofing Repairs and Upgrades Vendor References The following information is required from all Proposers so all proposals may be reviewed and properly evaluated COMPANY NAME: 9CtiereeS /200F/4:54 BUSINESS ADDRESS: 13243 lvl)`l'c Z 1 -44 NUMBER OF YEARS IN BUSINESS: l(� HOW LONG IN PRESENT LOCATION: 'yre. TOTAL NUMBER OF CURRENT EMPLOYEES: f02 FULL TIME PART TIME. -6" NUMBER OF EMPLOYEES YOU PLAN TO USE TO SERVICE THIS CONTRACT: /2 FULL TIME 3 PART TIME PLEASE LIST LOCAL COMMERCIAL AND/OR GOVERNMENTAL REFERENCES THAT YOU HAVE PREVIOUSLY PERFORMED SIMILAR CONTRACT SERVICES FOR WITHIN THE PAST THREE (3) YEARS (All fields must be completed): Cra 1.04 eg.st Cr r'i lKettm5A5 2. ru i-FTt O f AMS IL k f LLS � COMPANY NAME l il4a X75 COMPANY NAME / `` iN/NO 'a'r3 r Lam, rive1F.t g m 53S7 I0/4o reAD, 5/X/Tit% 5 loff e� / t(',. s' = .. r3 bo R - c>3 CITY, STATE, ZIP 7,705 CIT(, STATE, ZIP LT05ff L# 611Les ) /tJ ie ,LN UDFR) argiC,409171 1 CONTACT PERSON CONTACT PERSON h79-44- Z e.q /4/7q76:6i93 7q-6-79- 3x71 -- TELEPHONE itrq-fir - 4841 OW -5w; FAX NUMBER J2itkeevibiJecr,cein/ E-MAIL ADDRESS 3. kr -roots COMPANY NAME 607 sou -al -013r &: owevr- CITY, STATE, ZIP eado,Jurae, ppm -7z--n a r wt 5ASS CONTACT PERSON TELEPHONE 7 — 4690 FAX NUMBER Pklog I'I'+€ .rr.n-co . COM E-MAIL ADDRESS 4. VO :R20 cs COMPANY NAME 5 0(My CITY, STATE, ZIP goaerzt,, evree Nogg, 5 CONTACT PERSON 217% 273 - SsCo1c : I zs-/ 2da • 479 'fb - -42 92-r479 -61#7279 TELEPHONE 479- '/ z FAX NUMBER FAX NUMBER MOW.- (k cow @ urr.i,ice. C.L3nn E-MAIL ADDRESS TELEPHONE 4 Z73 -24.53 E-MAIL ADDRESS City of Fayetteville, AR Bid 11-23, Roofing Repairs and Upgrades Page 26 of 29 JPRoStzer sou -W AF Pgw T 6i-lzv1/43erne-Di 6eizs eryoFoute tu4gK CIVAtti[.ate PeaLlt-CF.Thifa!S iitht.cbr0Ce G dues City of Fayetteville Bid 11-23, Roofing Repairs and Upgrades Debarment Certification Form — THIS FORM SHALL BE SUBITTED WITH ALL BIDS As A BIDDER on this project, you are required to provide debarment/suspension certification indicating that you are in compliance with the below Federal Executive Order. Certification can be done by completing and signing this form. bebarment: Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving individual awards, using federal funds, and all sub -recipients certify that the organization and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government. Your signature certifies that neither you nor your principal is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. Questions regarding this form should be directed to the City of Fayetteville Purchasing Division. NAME: 3EF D. Weer--02- COMPANY: SaigregS Af)4(ta ceyaplh-J' Rh - CORRifitiEl116 e. Ail PHYSICAL ADDRESS: /n.7463f?ePre /21) /3 /,445?i*.727b -( '^�tf 640X1' MAILING ADDRESS: p 80K 0( 7 '12 a2(v ! :►/ �, PHONE:47, -717-22-7V8/6 -00 -4002. FAX: 471 -7r? Zz gam'moi-7 u, a� EMAIL: Zi Qn5C 'ier&W r/Aie).CA44 1 SIGNATUR DATE: 3f ie - `r NOTICE: CAUSE: Debarment by an agency pursuant to FAR 9.406-2, GPO Instructions 110.11A, or PS Publication 41, for one or more of the following causes (a) conviction of or civil Judgment for fraud violation of antitrust laws, embezzlement, that, forgery, bribery, false statements, or other offenses indicating a lack of business integrity; (b) violation of the terms of a Government contract, such as a willful failure to perform in accordance with its terms or a history of failure to perform; or (c) any other cause of a serious and compelling nature affecting responsibility. (See Code N- Debarment pursuant to FAR 0.408 2(b)(2) Drug Free Workplace Act of 1988.) TREATMENT: Contractors are excluded from receiving contracts, and agencies shall not solicit offers from, award contracts to renew or otherwise extend the duration of current contracts, or consent to subcontracts with these contractors, unless the City determines that there is a compelling reason for such action. Government prime contractors, when required by the terms of their contract, shall not enter into any subcontract equal to or in excess of $25,000 with a contractor that is debarred, suspended, or proposed for debarment, unless there is a compelling reason to do so. Debarments are for a specified term as determined by the debarring agency and as indicated in the listing. City of Fayetteville, AR Bid 11-23, Roofing Repairs and Upgrades Page 27 of 29. City of Fayetteville Bid 11-23, Roofing Repairs and Upgrades Statement of Disclosure — To Be Submitted With ALL Bids This page does not count towards page limitations set forth in this request for proposal or bid. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any relationship with any City of Fayetteville employee. Your response must disclose if a known relationship exists, between any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may result in cancellation of a purchase and/or contract as a result of your response. This form must be completed and returned in order for your bid/proposal to be eligible for consideration. PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TO YOUR FIRM: 1.) NO KNOWN RELATIONSHIP EXISTS 2.) RELATIONSHIP EXISTS (Please explain) PLEASE FILL OUT THE SECTION BELOW AND SUBMIT THIS FORM WITH YOUR BID OR PROPOSAL: 1.) I, as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the information provided herein are accurate and true; and 2.) My organization shall comply with all State and Federal Equal Opportunity and Non -Discrimination requirements and conditions of employment. W1efree_ P.0M. Printed Name tur "5(r S rl Date 1 AR, City of Fayetteville, AR Bid 11-23, Roofing Repairs and Upgrades Page 28 of 29 THE AMERICAN INSTITUTE OF ARCHITECTS AIA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, THAT WE Schefers Roofing Company P.O. Box 326, Grain Valley, MO 64029 as Principal, hereinafter called the Principal, and Merchants Bonding Company (Mutual) 2100 Fleur Drive, Des Moines, IA 50321-1158 a corporation duly organized under the laws of the State of IA as Surety, hereinafter called the Surety, are held and firmly bound unto City of Fayetteville 113 W. Mountain, Fayetteville, AR 72701 as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid Dollars ($ 5% ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Reroof of Chamber of Commerce & 3 Mount Seauoyah Locations, Curb Work at Botanical Gardens. NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 98th day of Hess) 4:1:1 - (Maness) March Schefers Roofing Company 2011 (P 'noinaq (Seat) Merc = Bonding A10 Kelly any Mut (Title) AIA DOCUMENT A310 is BID BOND • AIA • FEBRUARY 197 ' D. s THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WAS i GTON, D.C. 20006