HomeMy WebLinkAbout64-11 RESOLUTIONRESOLUTION NO. 64-11 A RESOLUTION APPROVING AMENDMENT #2 TO THE ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $247,013.00 FOR CONSTRUCTION AND DESIGN PHASE SERVICES FOR THE HIGHWAY 265 WATER AND SEWER RELOCATION PROJECT, AND APPROVING A $20,000.00 PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves amendment #2 to the engineering services agreement with McClelland Consulting Engineers, Inc. in the amount of $247,013.00 for construction and design phase services for the Highway 265 water and sewer relocation project, a copy of which is attached as Exhibit "A". Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a project contingency of $20,000.00. PASSED and APPROVED this 19th day of April, 2011. APPROVED: ATTEST: By N D JORDOayor SODRA E. SMITH, City Clerk/Treasurer EXHIBIT d AMENDMENT NO. 2 To AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES Between CITY OF FAYETTEVILLE, ARKANSAS And McCLELLAND CONSULTING ENGINEERS, INC. FAYETTEVILLE, ARKANSAS For The HIGHWAY 265 (CROSSOVER ROAD) WATER & SEWER IMPROVEMENTS The December 16, 2008 Agreement between the CITY OF FAYETTEVILLE and McCLELLAND CONSULTING ENGINEERS, INC. is hereby amended to provide for engineering services during the construction phase of Phase I of the Crossover Road Water and Sewer Improvement Project from the vicinity of Mission Boulevard to the vicinity of Joyce Boulevard (AHTD Job 040517) and to further provide engineering services during the design and easement preparation phases of Phase II of the Crossover Road Water and Sewer Improvement Project, from the vicinity of Joyce Boulevard to the vicinity of Albright Drive (AHTD Job 040518). The Scope of Services for the Phase II (AHTD Job 040518, Joyce to Albright) Design Services, Property Mapping and Easement Services, and Storm Water Pollution Prevention Plan Services shall be as defined in Sections 2.2, 2.3 and 2.4 of the original Agreement for the Phase I Project (AHTD Job 040517) with revisions as appropriate for the Phase II Project location. The Scope of Services for the Phase I (AHTD Job 040517, Mission to Joyce) Construction Phase Services shall generally include resident construction observation services, conduct and attend a preconstruction conference, preparation and/or review of monthly progress payments, construction administration assistance, periodic and final inspections, final punch list preparation and follow up, preparation of record drawings, coordinate as appropriate with AHTD, and project closeout. The total estimated compensation for the previously approved engineering services, including Amendment No. 1, and these additional services will be increased from $472,614.08 to $719,627.08 as further defined in Appendix A, B, and C to this Amendment No. 2. All other provisions, covenants, recitals, terms and conditions of the Agreement, which are not expressly amended herein, shall remain in full force and effect. . The parties hereby have executed this Amendment No. 2 on this date, the / 9 day of 0rd_, 2011. CITY OF FAYE i EVILLE, ARKANSAS McClelland Consulting Engineers, Inc. By: 0` • epB°°° ° ; FAYETTEVILLE: ° o s.▪ °16)KA NsP. J2; Is�/y/°°°aa•°'O elm FY0t2 i►eiil�m �. ;ent No. 2 ayor City Clerk By: ATTEST: By: President Page 1 APPENDIX A TO AMENDMENT NO. 2 HIGHWAY 265 WATER & SEWER IMPROVEMENTS APRIL 1, 2011 Phase I Project (AHTD Job 040517, Mission to Joyce) Construction Phase Services, Fee Proposal Labor Classification Hours Labor Rate Extended Project Manager 310 $48.00 $14,880 Construction Observer IV 200 $29.00 $5,800 Construction Observer III 1120 $22.00 $24,640 Construction Observer II 1040 $18.00 $18,720 Chief Draftman 30 $22.50 $675 Draftsman II 120 $17.00 $2,040 Clerical 60 $17.80 $1,068 Direct Labor $67,823 Payroll Expense (34.11%) $23,134 Indirect Costs (126.43%) $85,749 Subtotal, Direct Payroll and Indirect Costs $176,706 Travel 400 miles at $0.50 $200 Reproduction $160 Materials & Supplies $120 Subtotal, Reimbursable Expenses $480 Profit (12%) $21,205 Total Construction Phase Services $198,391 APPENDIX B TO AMENDMENT NO. 2 HIGHWAY 265 WATER & SEWER IMPROVEMENTS APRIL 1, 2011 Phase II Project (AHTD Job 040518, Joyce to Albright) B-1, Design Phase Services, Fee Proposal Labor Classification Hours Labor Rate Extended Project Manager 510 $48.00 $24,480 Chief Draftman 48 $22.50 $1,080 Draftsman II 370 $17.00 $6,290 Registered Land Surveyor 56 $28.50 $1,596 2 -Man Survey Crew 16 $38.00 $608 1 -Man Survey Crew 72 $21.25 $1,530 Robotic Survey 200 $38.00 $7,600 Survey Technician 144 $24.50 $3,528 Clerical 100 $17.80 $1,780 Direct Labor $48,492 Payroll Expense (34.11%) $16,541 Indirect Costs (126.43%) $61,308 Subtotal, Direct Payroll and Indirect Costs $126,341 Reproduction $600 One Call $1,500 ADH Review Fee $500 Materials & Supplies $400 Subtotal, Reimbursable Expenses $3,000 Profit (12%) $15,161 Total Design Phase Services $144,502 B-2, Property Mapping and Easement Services, Fee Proposal Labor Classification Hours Labor Rate Extended Registered Land Surveyor Supervisor 96 $28.50 $2,736 Registered Land Surveyor 440 $24.00 $10,560 2 -Man Survey Crew 24 $38.00 $912 1 -Man Survey Crew 16 $21.25 $340 Robotic Survey 24 $38.00 $912 Survey Technician 4 $24.50 $98 Clerical 24 $17.80 $427 Direct Labor $15,985 Payroll Expense (34.11%) $5,452 Indirect Costs (126.43%) $20,210 Subtotal, Direct Payroll and Indirect Costs $41,647 Travel 80 miles at $0.50 $40 Subtotal, Reimbursable Expenses $40 Profit (12%) $4,998 Total Property Mapping and Easement Phase Services $46,685 B-3, Storm Water Pollution Prevention Plan Services, Fee Proposal Labor Classification Hours Labor Rate Extended Project Engineer 8 $38.00 $304 Engineering Technician IV 16 $27.50 $440 Clerical 12 $17.80 $214 Direct Labor $958 Payroll Expense (34.11%) $327 Indirect Costs (126.43%) $1,211 Subtotal, Direct Payroll and Indirect Costs $2,496 ADEQ Fee $200 Reproduction $60 Subtotal, Reimbursable Expenses $260 Profit (12%) $300 Total Storm Water Pollution Prevention Plan Phase Services $3,056 APPENDIX C TO AMENDMENT NO. 2 HIGHWAY 265 WATER & SEWER IMPROVEMENTS APRIL 1, 2011 Summary of Costs: Phase I, Construction Phase Services (Appendix A) $198,391 Phase II, Design Services (Appendix B-1) $144,502 Phase II, Easement Services (Appendix B-2) $46,685 Phase II, Storm Water Plan (Appendix B-3) $3,056 Total Amendment No. 2 Fee $392,634 Original Agreement Total Fee $397,621 Estimated Cost to Finish Phase I Design Services Per Original Agreement $252,000 Original Agreement Balance Available to Apply to Amendment No. 2 $145,621 Amendment No. 2 Contract Increase: $392,634-$145,621 $247,013 Total Contract Value: Original Agreement Amendment No. 1 (Completed & Billed In Full) Amendment No. 2 Fee Increase Total Contract Value NOTES: (1) This Contract Amendment does not include Construction Phase Services for the Highway 265 Phase II Project (AHTD Job 040518, Joyce to Albright). A separate amendment will be required for these future construction phase services. (2) Amendment No. 1 covered Construction Phase Services for the 36 -inch water main installed along Township Street. (3) Hourly rates shown are approximate and subject to annual adjustments. $397,621.00 $74,993.08 $247,013.00 $719,627.08 David Jurgens Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 19 -Apr -11 City Council Meeting Date Agenda Items Only Utilities Capital Projects Division Action Required: Utilities Department Approval of Amendment No. 2 to the engineering services agreement with McClelland Consulting Engineers in the amount of $247,013, for construction and design phase services for the Hwy. 265 Water and Sewer Relocation project, and approve a $20,000 contingency. 267,013 Cost of this request Account Number 09018 Project Number Budgeted Item XX 5,405,318 Category / Project Budget W&S Relocations - 2009 Bonds Program Category / Project Name (319) Water & Wastewater Funds Used to Date Program / Project Category Name 5,405,709 Water & Sewer Remaining Balance Fund Name Budget Adjustment Attached IA* II Date 1"/— 471-1/ Date 4—`t -2.®i Finance and Internal Services Director Date q -V- ? i/ Date Da e Previous Ordinance or Resolution # 234-08, 156-09 Original Contract Date: 12/16/2008 Original Contract Number: 2064 Received in City04-01-1 1 PO4:04 R CV D Clerk's Office Comments: Revised January 15, 2009 a�lte eville CITY COUNCIL AGENDA MEMO MEETING DATE OF APRIL 19, 2011 THE CITY OF FAYETTEVILLE, ARKANSAS / ARKANSAS www.accessfayetteville.org To: Fayetteville City Council Thru: Mayor Lioneld Jordan Don Marr, Chief of Staff From: David Jurgens, Utilities Director Fayetteville Water and Sewer Conl4rljittee Date: April 1, 2011 Subject: Amendment No. 2 to engineering contract, McClelland Consulting Engineers, $247,013 plus a $20,000 contingency, for construction and design services for the Hwy. 265 Water and Sewer Relocation project RECOMMENDATION Staff recommends approval of Amendment No. 2 to the engineering services agreement with McClelland Consulting Engineers for $247,013, for construction and design phase services for the Hwy. 265 Water and Sewer Relocation project, and approval of a $20,000 contingency. BACKGROUND The original design contract was awarded to McClelland Consulting Engineers in December, 2008 to design relocated water and sewer lines as a result of the combined Arkansas Highway Department (AHTD) and City widening of Phase I of Crossover Road (Hwy 265) between Mission and Joyce, upsizing the existing pipes and connecting a 36" transmission line. Work includes installing a 36" and 24" transmission main along Crossover from Joyce to connect to the existing 24" main on Crossover at Mission and to connect to the existing 36" main on Old Wire Road. This work will complete the eastern portion of the loop that was initially constructed when the southern section of Crossover Road between Mission and Huntsville was widened by the AHTD. The contract did not include construction phase services. AHTD is now moving forward with Phase II of the widening of Hwy 265 from Joyce to Albright. This will require relocating water and sewer lines on both sides of the highway. DISCUSSION This amendment covers two separate work tasks: (1) Construction phase engineering services for the Highway 265 water/sewer relocations from Mission — Joyce, including the 36" and 24" water lines, where construction starts this summer. This includes two full time construction observers due to a short construction schedule (the contractor will almost certainly employ multiple construction crews), attending preconstruction conferences, reviewing contractor schedules and submittals, monthly progress meetings, reports to the City and the AHTD, partial pay requests, regular site visits, change order processing, final inspection, final pay request review, developing as-builts, and related activities. (2) The scope of work for design of the project for Hwy 265 from Joyce to Albright consists primarily of: - Field surveys to confirm rights -of -ways and utility locations - project cost estimating with AHTD and Fayetteville shares predicted - right-of-way requirement identification and easement document development - final engineering design This contract does not include construction phase services for the Joyce — Albright section; that will be accomplished by future amendment. BUDGET IMPACT The City's portion will be funded from Water and Sewer revenue bonds; the remainder will be paid by the AHTD. The cost share split will be determined when the design is completed. Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville, AR 72701 McClelland Amenment 2 CCMemo lApri12011.doc RESOLUTION NO. A RESOLUTION APPROVING AMENDMENT #2 TO THE ENGINEERING SERVICES AGREEMENT WITH MCCLELLAND CONSULTING ENGINEERS, INC. IN THE AMOUNT OF $247,013.00 FOR CONSTRUCTION AND DESIGN PHASE SERVICES FOR THE HIGHWAY 265 WATER AND SEWER RELOCATION PROJECT, AND APPROVING A $20,000.00 PROJECT CONTINGENCY BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby approves amendment #2 to the engineering services agreement with McClelland Consulting Engineers, Inc. in the amount of $247,013.00 for construction and design phase services for the Highway 265 water and sewer relocation project, a copy of which is attached as Exhibit "A". Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a project contingency of $20,000.00. PASSED and APPROVED this 19th day of April, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer