HomeMy WebLinkAbout41-11 RESOLUTIONRESOLUTION NO. 41-11 A RESOLUTION AWARDING BID #11-18 AND AUTHORIZING A CONTRACT WITH SWEETSER CONSTRUCTION, INC. IN THE AMOUNT OF $1,057,331.00 FOR THE CONSTRUCTION OF WATER MAIN INTERCONNECTIONS AND THE STONE MOUNTAIN PUMP STATION FOR THE CANTERBURY ROAD WATER TANK, APPROVING A PROJECT CONTINGENCY OF $53,000.00, AND APPROVING A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-18 and authorizes a contract with Sweetser Construction, Inc. in the amount of $1,057,331.00, plus a $53,000.00 project contingency, for the construction of water main interconnections and the Stone Mountain pump station for the Canterbury Road Water Tank. A copy of the contract is attached as Exhibit "A". Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached as Exhibit "B". PASSED and APPROVED this 15th day of March, 2011. APPROVED: ATTEST: By: By: LD JO , Mayor SONDRA E. SMITH, City Clerk/Treasurer ,1/40"741 -i -N .acc*a Y , E :FAYETTEVILLE: DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the — day of March, 2011 by and between Sweetser Construction, Inc., Fayetteville, Arkansas, herein called the Contractor, and the City of Fayetteville, Arkansas, Owner: WITNESSETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Water Main Interconnections and Stone Mountain Pump Station for Canterbury Road Water Tank, dated November 2010. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond SHEET INDEX Maintenance Bond General Conditions Supplemental Conditions Specifications Drawings (See Sheet Index below) SHEET NO. SHEET DESCRIPTION 1 Cover Sheet 2 Index, Legend and Water Main Location Map 3 Water Main Interconnections, Ridgely Dr / Manor Dr and Lovers Lane, Sta. 0+00 to Sta. 4+00, Plan and Profile 4 Water Main Interconnections, Lovers Lane, Sta. 4+00 to Sta. 9+58, Plan and Profile 5 Water Main Interconnections, Canterbury Road, Sta. 0+00 to Sta. 5+60, Plan and Profile 6 Water Main Interconnections, Canterbury Road, Sta. 5+60 to Sta. 11+60, Plan and Profile 7 Water Main Interconnections, Canterbury Road, Sta. 11+60 to Sta. 17+26.91, Plan and Profile 8 Stone Mountain Pump Station Location Map 9 Stone Mountain Pump Station Site Plan 10 Stone Mountain Pump Station, Pump Station Layout 11 Stone Mountain Pump Station, Pump Station Details 12 Stone Mountain Pump Station, Fence and Bollard Details 13 Water Main Details FY042150 Canterbury Road Water Mains Section 00500 - 1 14 Water Main Details 15 Water Main Details 16 Water Main Details, Combination Air Valve Details 17 Ridgely Drive / Manor Drive and Lovers Lane, Sta. 0+00 to Sta. 9+58, Erosion Control Plan 18 Canterbury Road, Sta. 0+00 to Sta. 11+60, Erosion Control Plan 19 Canterbury Road, Sta. 11+60 to Sta. 17+26.91, Erosion Control Plan 20 Erosion Control Details 21 Hyland Park Waterline Extension, Erosion Control Plan E-1 Stone Mountain Pump Station, Electrical Site Plan and Building Layout JORGENSEN & ASSOCIATES PLANS HYLAND PARK WATERLINE EXTENSION CLIFFSIDE DRIVE TO CANTERBURY ROAD SHEET NO. SHEET DESCRIPTION 1 Cover Sheet, Location Map, Vicinity Map, Index 1-5 Water Plan & Profile, Sta. 0+00 to Sta. 29+12 6 Water Details, Not Used 2. That the City of Fayetteville hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of: One Million, Fifty -Seven Thousand, Three Hundred, Thirty -One Dollars ($1,057331.00) 3. The Work will be completed and ready for final payment in accordance with the General Conditions within 150 calendar days after the date when the Contract Time commences to run, as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Contractor recognize that time is of the essence of this Agreement and the City of Fayetteville will suffer fmancial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay the City of Fayetteville Seven Hundred Dollars ($700.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. FY042150 Canterbury Road Water Mains Section 00500 - 2 6. That upon submission by the Contractor of evidence satisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City ofFayetteville. 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the City of Fayetteville in writing. 9. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Arkansas Freedom of Information Act request is presented to the City of Fayetteville, (Contractor) will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. § 25-19-101 et. Seq.). Only Legally authorized photocopying cost pursuant to the FOIA may be assessed for this compliance. FY042150 Canterbury Road Water Mains Section 00500 - 3 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: WITNESSES: LiALUX\ (-141,L401-LD Se r tary ATTEST: Zifl -rf#,,, el\c):-•-•;-ii • FAYETTEVILLE 4,1 • crot4 9liJilIUIt ,9‘`'‘ C-44,&) • City lerPk lyw1/41L) Sweetser Construction, Inc. CONTRACTOR CITY OF FAYETTEVILLE, ARKANSAS OWNER FY042150 Canterbury Road Water Mains Section 00500 - 4 City of Fayetteville, Arkansas Budget Adjustment Form V11.0222 Budget Year 2011 Division: Utilities Director Department: Utilities Director Request Date 3/15/2011 - Adjustment Number - - BUDGET ADJUSTMENT DESCRIPTION / JUSTIFICATION $1,110,331 is needed in the Mt Sequoyah Pressure Plane Improvement project to construct water main interconnections and the Stone Mountain pump station for the Canterbury Road Water Tank. To recognize impact fee funds to construct a 1,200 gpm water pump station, approximately 413 feet of 18 -inch PVC water main, 3,273 feet of 12 -inch ductile iron water main, 2,000 feet of 8 -inch PVC water main, and for water meter connections, fire hydrants, valves, fillings, street repairs and related facilities to support the Canterbury 500,000 gallon elevated water storage tank. Division Head Director Date --12CZQ Date '25 4141 men rector Date eLLI 3 -1- /a Fina e Director Date - / / Date ate Prepared By: Cheryl Partain Reference: kspringer Budget & Research Use Only Type:A BCDEP General Ledger Date Posted to General Ledger Checked / Verified Initial Date Initial Date TOTAL BUDGET ADJUSTMENT 1,110,331 1,110,331 Increase / (Decrease) Project.Sub Account Name Account Number Expense Revenue Number Contract services 5400.5600.5315.00 1,110,331 Trans from Impact Fee Fnd 5400.0940.6602.30 Transfer to Water & Sewer 2300.9300.7602.40 Water line improvements 2300.9300.5808.00 1,110,331 (1,110,331) - 04036. 1 1,110,331 04036 . 1 07002 . 1002 - 07002. 1 WAUtiities Project Management Team \Stone Mountain Pump Station1BAForm_2011_V5_1MPACT_FEE Stone Mountain New BA Form David Jurgens Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 3/15/2011 City Council Meeting Date Agenda Items Only Utilities Capital Projects Division Action Required: Utilities Department Approval of a construction contract with Sweetser Construction, Inc. for $1,057,331.00, Bid 11-18, with a 5% contingency of $53,000 to construct Water Main Interconnections & Stone Mountain Pump Station for Canterbury Road Water Tank, and a budget amendment. 1,110,331 Cost of this request 5400.5600.5315.00 Account Number 04036.1 Project Number Budgeted Item )0( 529,255 Category / Project Budget 488,127 Funds Used to Date 41,128 Remaining Balance Budget Adjustment Attached Flol Date Date 3-- 9.'161 Finance and Internal Services Director Date Date XX Mt Sequoyah Pressure Plane Imprvm Program Category / Project Name Water Impact Fee Improvements Program / Project Category Name Water Impact Fees Fund Name Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Clerk's Officp- Received in City25-1 1 A11:49 RCVD .. KUIN-c6 Comments: Revised January 15, 2009 ratite To: Fayetteville City Council Thni: Mayor Lioneld Jordan Don Marr, Chief of Staff From: David Jurgens, Utilities Director Fayetteville Water and Sewer Co Date: February 23, 2011 CITY COUNCIL AGENDA MEMO MEETING DATE OF MARCH 15.2011 THE CITY OF FAYETTEVILLE„ ARKANSAS Subject: Construction contract with Sweetser Construction, Inc. for $1,057,331.00 with a 5% contingency of $53,000 to construct Water Main Interconnections & Stone Mountain Pump Station for Canterbury Road Water Tank, and a budget amendment of $1,110,331 RECOMMENDATION City Administration recommends approval of a construction contract Sweetser Construction, Inc. for $1,057,331.00, Bid 11-18, with a 5% contingency of $53,000 to construct Water Main Interconnections & Stone Mountain Pump Station for Canterbury Road Water Tank, and a budget amendment of $1,110,331 BACKGROUND A 500,000 gallon elevated water storage tank is under cOnstruction on Canterbury Road. The tank is being built to meet fire flow requirements, provide adequate flows during high demand periods, and meet industry standards and Health Department minimum storage requirements. Staff met with area residents regarding paint color, fencing style, site layout, and landscaping in October, 2009. Their requests were incorporated into the final design. The second phase of the project is for water main interconnections a new water pump station in the Stone Mountain subdivision off of Highway 265 to provide the required pumping capacity for the additional storage volume. DISCUSSION The Contract is to construct a 1,200 gpm water pump station, approximately 413 feet of 18 -inch PVC water main, 3,273 feet of 12 -inch ductile iron water main, 2,000 feet of 8 -inch PVC water main, and related facilities to support the Canterbury 500,000 gallon elevated water storage tank. The City opened six bids on February 16, 2011. Construction will begin this spring and will be completed this fall. Sweetser Construction C-2 Projects Dean Crowder Construction Redford Construction Goodwin & Goodwin Seven Valley's Concrete Engineer's Estimate $1,057,331.00 $1,168,371.35 $1,259,924.00 $1,274,163.00 $1,435,143.00 Not Licensed $1,225,285.00 The bid was reviewed by McClelland Engineers; their letter recommending award is attached. Sweetser Construction, Inc. has completed multiple projects to the satisfaction of the City of Fayetteville. BUDGET IMPACT Funds are available in the water impact fees budget. The budget amendment for $1,110,331 is attached to transfer funds from the impact fee fund to the water/sewer fund. Telecommunications Device for the Deaf TDD (479) 521-1316 113 West Mountain - Fayetteville, AR 72701 Stone Mtn CCMemo 23Feb2011.doe RESOLUTION NO. A RESOLUTION AWARDING BID #11-18 AND AUTHORIZING A CONTRACT WITH SWEETSER CONSTRUCTION, INC. IN THE AMOUNT OF $1,057,331.00 FOR THE CONSTRUCTION OF WATER MAIN INTERCONNECTIONS AND THE STONE MOUNTAIN PUMP STATION FOR THE CANTERBURY ROAD WATER TANK, APPROVING A PROJECT CONTINGENCY OF $53,000.00, AND APPROVING A BUDGET ADJUSTMENT BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-18 and authorizes a contract with Sweetser Construction, Inc. in the amount of $1,057,331.00, plus a $53,000.00 project contingency, for the construction of water main interconnections and the Stone Mountain pump station for the Canterbury Road Water Tank. A copy of the contract is attached as Exhibit "A". Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment, a copy of which is attached as Exhibit "B". PASSED and APPROVED this 15th day of March, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer DOCUMENT 00500 CONTRACT THIS AGREEMENT, made and entered into on the day of March, 2011 by and between Sweetser Construction, Inc., Fayetteville, Arkansas, herein called the Contractor, and the City of Fayetteville, Arkansas, Owner: WITNES SETH: That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the City of Fayetteville as follows: 1. That the Contractor shall furnish all the materials, and perform all of the work in manner and form as provided by the following enumerated Drawings, Specifications, and Documents, which are attached hereto and made a part hereof, as if fully contained herein and are entitled Water Main Interconnections and Stone Mountain Pump Station for Canterbury Road Water Tank, dated November 2010. Advertisement for Bids Instructions to Bidders Bid and acceptance thereof Performance Bond Payment Bond SHEET INDEX Maintenance Bond General Conditions Supplemental Conditions Specifications Drawings (See Sheet Index below) SHEET NO. SHEET DESCRIPTION 1 Cover Sheet 2 Index, Legend and Water Main Location Map 3 Water Main Interconnections, Ridgely Dr / Manor Dr and Lovers Lane, Sta. 0+00 to Sta. 4+00, Plan and Profile 4 Water Main Interconnections, Lovers Lane, Sta. 4+00 to Sta. 9+58, Plan and Profile 5 Water Main Interconnections, Canterbury Road, Sta. 0+00 to Sta. 5+60, Plan and Profile 6 Water Main Interconnections, Canterbury Road, Sta. 5+60 to Sta. 11+60, Plan and Profile 7 Water Main Interconnections, Canterbury Road, Sta. 11+60 to Sta. 17+26.91, Plan and Profile 8 Stone Mountain Pump Station Location Map 9 Stone Mountain Pump Station Site Plan 10 Stone Mountain Pump Station, Pump Station Layout 11 Stone Mountain Pump Station, Pump Station Details 12 Stone Mountain Pump Station, Fence and Bollard Details 13 Water Main Details FY042150 Canterbury Road Water Mains Section 00500 - 1 14 Water Main Details 15 Water Main Details 16 Water Main Details, Combination Air Valve Details 17 Ridgely Drive / Manor Drive and Lovers Lane, Sta. 0+00 to Sta. 9+58, Erosion Control Plan 18 Canterbury Road, Sta. 0+00 to Sta. 11+60, Erosion Control Plan 19 Canterbury Road, Sta. 11+60 to Sta. 17+26.91, Erosion Control Plan 20 Erosion Control Details 21 Hyland Park Waterline Extension, Erosion Control Plan E-1 Stone Mountain Pump Station, Electrical Site Plan and Building Layout JORGENSEN & ASSOCIATES PLANS HYLAND PARK WATERLINE EXTENSION CLIFFSIDE DRIVE TO CANTERBURY ROAD SHEET NO. SHEET DESCRIPTION 1 Cover Sheet, Location Map, Vicinity Map, Index 1-5 Water Plan & Profile, Sta. 0+00 to Sta. 29+12 6 Water Details, Not Used 2. That the City of Fayetteville hereby agrees to pay to the Contractor for the faithful performance of this Agreement, subject to additions and deductions as provided in the Specifications or Bid, in lawful money of the United States, the amount of: One Million, Fifty -Seven Thousand, Three Hundred, Thirty -One Dollars ($1,057,331.00) 3. The Work will be completed and ready for final payment in accordance with the General Conditions within 150 calendar days after the date when the Contract Time commences to run, as provided in the Notice to Proceed. 4. Liquidated Damages: The City of Fayetteville and Contractor recognize that time is of the essence of this Agreement and the City of Fayetteville will suffer financial loss if the Work is not completed within the times specified in above, plus any extensions thereof allowed in accordance with the General Conditions. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the City of Fayetteville if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City of Fayetteville and Contractor agree that as liquidated damages for delay (but not as a penalty) Contractor shall pay the City of Fayetteville Seven Hundred Dollars ($700.00) for each day that expires after the time specified in Paragraph 3 for completion and readiness for final payment. 5. That within 30 days of receipt of an approved payment request, the City of Fayetteville shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work performed during the preceding calendar month by the Contractor, LESS the retainage provided in the General Conditions, which is to be withheld by the City of Fayetteville until all work within a particular part has been performed strictly in accordance with this Agreement and until such work has been accepted by the City of Fayetteville. FY042150 Canterbury Road Water Mains Section 00500 - 2 6. That upon submission by the Contractor of evidence satisfactory to the City of Fayetteville that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, final payment on account of this Agreement shall be made within 60 days after the completion by the Contractor of all work covered by this Agreement and the acceptance of such work by the City of Fayetteville. 7. It is further mutually agreed between the parties hereto that if, at any time after the execution of this Agreement and the Surety Bond hereto attached for its faithful performance and payment, the City of Fayetteville shall deem the Surety or Sureties upon such bond to be unsatisfactory or if, for any reason such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within 5 days after the receipt of notice from the City of Fayetteville, furnish an additional bond or bonds in such form and amount and with such Surety or Sureties as shall be satisfactory to the City of Fayetteville. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City of Fayetteville. 8. No additional work or extras shall be done unless the same shall be duly authorized by appropriate action by the City of Fayetteville in writing. 9. Freedom of Information Act. City contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Arkansas Freedom of Information Act request is presented to the City of Fayetteville, (Contractor) will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. § 25-19-101 et. Seq.). Only Legally authorized photocopying cost pursuant to the FOIA may be assessed for this compliance. FY042150 Canterbury Road Water Mains Section 00500 - 3 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and date first above written, in three (3) counterparts, each of which shall, without proof or accounting for the other counterpart be deemed an original Contract. SEAL: WITNESSES: Sweetser Construction, Inc. CONTRACTOR By Secretary President ATTEST: CITY OF FAYETTEVILLE, ARKANSAS OWNER By City Clerk Mayor FY042150 Canterbury Road Water Mains Section 00500 -4 •... • . • ... : • : : • . : , : :: " Ci.ty::of:r4kotoviiio .--:?urolhiase: Omer (PO) Request " (Not ti purchase OMet) , : tytpurottassi01445659:shalidae:rrerisfro#a f -Pard Jurdese medical:or 1.0.99 sermica relatart- (Cali x250 With questfana) .....-:::41(00:Rdrgesitihbfi:iiikkaiiriarreto. Ma:Pi:J*1.'004 e-ritailf.:Puier.;hasiagf@ttfayetteville .0. us : Requisition No.: Data: 2I232011 P.0 Number: _ Expected Delivery Date: ASAP Vendor #: 56870 Vendor Name: Sweetser Construction, Inc. Mail Yes'. No: x Address: 590 West Poplar Fob Point 1400 6113 W Mountain Fayetteville, AR 72701 Taxable Yes:_ No:_A_ Quotas Attached Yes: No:_x _ City. Fayetteville State: AR Zip Code-. 72703 Ship to code: Divison H prove!: Requester David Jurgene Requesters Employee A 490 Extension: 330 Item Description Quantity Unit of Issue Unit Cost Extended Cast Account Numbers Project/Sub roject # Inventory # Fixed Asset # 1 2 3 4 6 6 7 8 9 10 Water Main Interconnect:Ions and Stone Moutaln Pump Station, Bid 11-18 1 ea 1,057,331.00 51,057,331.00 5400.5600.5315.00 04038.1 50.00 50.00 sum _ $0.00 $0.00 — 50.00 0.08 50.00 • . Shipping/Handling Lot 50.00 Special Instructions: 13Id 11-18. tax Included in bid r Subtotal: Tax: Total: 51,057,331.00 $97,803.12 11,155,134.12 APPrOvaLs: Mayor Finance Dispatch Deparlment Budget Manager: Utilities Manager! I Director \ti Purchasing Manager. IT Manager: & internal Services Director: Manager: Other: . VR3-1.,,,ta314/11 MrMcCLELLAND =e CONSULTING I DESIGNED T° SERVE ENGINEERS, INC. 1810 N. College Avenue P.O. Box 1229 Fayetteville, Arkansas 72703 / 72702-1229 PHONE: 479-443-2377 FAX 479-443-9241 February 18, 2011 Mr. Shannon Jones, PE Water & Wastewater Engineer City of Fayetteville 113 W. Mountain Fayetteville, AR 72701 RE: Bid Opening Water Main Interconnections and Stone Mt. Pump Station Dear Mr. Jones: Bids were opened on the referenced project at 2:00 PM, Wednesday, February 16, 2011 at Fayetteville City Hall. Six bids were received. Five of the six bidders are properly licensed. Seven Valleys Concrete LLC is licensed for concrete work only. I talked to Mr. Larry Loyd at the Arkansas Contractor's Licensing Board. He advised me that if Seven Valley's had bid under "Seven Valley's Construction Company", they have the appropriate license number for underground utility work and that their bid would have been acceptable. However, Seven Valley's Concrete LLC is not licensed for utility work and cannot submit a bid under the concrete license number for underground utility work. I will advise Seven Valley of this. The bids have been checked and tabulated, and a Bid Tabulation is attached. The low bid was from Sweetser Construction Company in the amount of $1,057,331.00 This is somewhat lower than our Engineer's Estimate of $1,225,285, as submitted on December 1, 2010. Sweetser has successfully completed multiple projects for our Firm and for your city over the last several years. Consequently, we recommend that the Contract be awarded to Sweetser Construction Company in the amount of $1,057,331.00. Please let us know if we can send Sweetser a Notice of Award, and get them started on the pump station submittals. Very Truly Yours, Robert W. White, PE Project Engineer End: Bid Tabulation J:2004/042150/CorrespondenceNnes 2-18-11.doc Ilern 0 DID SCHEDULE Description 1310 TABULATION City of Fayetteville Canterbury Road Water Mains Fayetteville, Arkansas PACE Project 117Y042150 February 16. 2911 Qty. Units Sweetest Construction C-2 Projects Dean Crowder Redford Construction Goodwin & Goodwin Unit Cost Extended Unit Cost Extended Unit Cost Extended Unit Cost Ext. 1 Act 291 1993 Trench & Excavation Safety System 1 LS 02,500.06 5200000 584.30000... two:Do 53991690 533.916.00 52,600.00 52,580-00 000.90 $165,000.00 2 18 -inch PVC, 0-905, DR -18 Water Main 413 LF ;4600 $15,824.00 562.60 025,853.40 383.013 544,30878 575.09 530,925.00 _9185 358.00 323,128.00 3 12-I668 Restrained Joint DIP. Class 360 with Double Polyvoap 78 LF $95.00 57A10.00 $66.20 $6,163.60 569.27 35,40396 570.00 45,460.00 564.00 $4,212.00 4 12-1009 Dottie Iron Pipe, Class 350 with Double Polywrato 3.278 LP 545.00 3147,420.00 553.40 5174.938.40 582.71 3205,43296 563.00 5222,758.00 3413.00 51506913.00 5 84nch Ductile Iron Pipe, Claes 360 with DOuble Polywrap 30 LF 527.50 $825.00 $42.95 51.288.50 541.22 51,236.60 $85.00 51350.60 536.00 31,0E0.00 6 84rich PVC, 1349043, DR -14 Water Main 1,997 LF 524.00 547,928.00 534.16 566.197.65 346.19 590244.43 560.00 6119820.00 526.00 551,922.00 7 '54rich Ductile Iron, Claes 350 Fire Hydrant Stubs with Double Polywrap 40 LF $27.00 51,06000 $28.60 51,14400 338.65 01,544.00 560.00 32,000.00 52000 5800.00 8 24 rich POlyethylems Service Tubing 15 LF 522.00 533000 511.20 5166.00 $16.34 5245.10 520.00 5300.00 $15.00 5225.00 9 14 rich Polyethylene Service Tubing 270 LF $20.00 55,40000 59.20 52.484.90 510.93 52.951.10 510.00 32,70060 59.00 52.430.00 10 184nch Class 250B Butterfly Value wth BOX 3 EA 57,1395.00 523.685.00 55261.50 515.78450 54689.46 514,068.36 54,600.00 513,800.00 55.800.00 517.490.09 11 12 -Inch Class 250B Butterfly Valve with 8ox 1 EA 53,875.00 $3,676.00 52,76000 52.75000 52,027.87 52,027.87 52,300.00 32,300.00 53.000.00 53,000.00 12 84 nch Gate Valve +.041h Box 8 EA 51,885.00 515,080.00 51,500.00 012,000.00 51,138.54 59,108.32 51,100.00 53,800.00 51,600.00 512,800.00 13 84ric12Gate Value with Box 6 EA 51,105.09 56.83000 51 037.00 56,222.00 5796.47 54.776.82 570000 54,290.00 51,200.00 57.200.00 14 24 rich Gate Valve with Box 1 E5. 51318.00 5818.00 5708.00 570800 5537.41 5537.41 3500.00 5506.00 5800.00 5800.00 15 Three Way Hre Hydrant 5 EA 52,966.00 314.830.00 52.867.00 514,285.00 31,99722 59,98610 32,80060 514,000.00 02,400.00 512,000.00 16 Salvage Existing Fire Hydrant 1 EA 5500.00 5500.00 55,540.00 55,54000 5105.00 4105.00 5500.00 5500.00 3500.00 5500.00 17 12 -Inch x 12 -Inch Tapping Sleeve. 12 -Inch Taming Valve wilh Box 1 EA 59,750.00 $9.750.00 1805.00 4605.00 $4,2138.59 54.26559 56,500.90 35,500.00 36.30000 55,300.00 16 Unch x 8 -Inch Tapping Sleeve, 8 -Inch Tapping Valve with Box 2 EA $3,750.00 57.50000 5644.00 51,28800 52,533.23 55,066.45 52,200.90 35,400.00 $3,60000 57,000.00 19 64no12x 6 -Inch Tapping Sleeve. 8 -Inch Tapping Valve with Box 1 EA 52,932.00 52,932.00 $423.00 5493.00 $2.004.06 $2.004.06 52,000.00 52,009.00 52.50000 52.50000 20 Cornett to Existing 18" Water Main 1 EA 5750.00 5750.00 5483,00 5483.00 5575.61 5575.61 32.00060 32,000.00 51,800.00 51.80000 21 Connect to Existing 12" Water Main 1 EA 5760.00 5750.00 5403.00 540360 1606.11 560611 51,500.00 51,500.00 51,200.00 52,200.00 22 Connect to Exishng Er Water klain 1 EA 3500.00 5500-00 5322.00 582260 5558.88 5558.88 51,090.90 51,000.00 51,00000 51,000.00 23 Connect to Existing 6" Water Main 2 EA 5600.00 51,000.00 3322.00 564400 5640.71 01,081.42 0900.00 51,800.00 3800.00 51500.00 24 Connect to Existing_2 114" Water Main 1 EA 5360.00 5360.00 5201.25 5201.25 5674.07 3574.07 5690.00 550060 5400.00 3400.00 25 Abandon Existing Valve 3 EA 5260.00 5750.00 5120.75 5362.25 542.00 5126.00 5150.00 0450.00 5300.00 090000 25 Epoxy Coated Ductile Iron Fittings 4,400 LB 512.00 552.80000 11.20 55,28000 58.14 535,816.00 54.50 510.800.00 59.00 539,800.00 27 14nth Combination Air Valve Assembly 1 EA 51,550.00 51,55000 3644.00 5644.00 52,168.42 52156.42 43 000.00 53,000.00 52.300.00 52,30000 28 Single Meter Setting, Complete, Including Plumber Connacfion To Existing Bldg. Service 1 EA 5380.00 3380.00 5180.00 516000 5595.93 5595.93 51,00000 51,000.00 5550.00 5650.00 29 Seniice Line Connection to Existing Meter Setter 12 EA 545060 55.400,00 $120.75 51,449.00 5e5.56 51.02616 5300.00 53,600.00 5200.00 52 40000 30 16'x 1' Saddle, I-Ineh COrPOration Stop and Tap 1 EA 5450.00 3450.00 332200 5322.00 $30165 5361.65 3560.00 $500.00 5500.00 5500.00 31 12x l"Saddle, linch CoworatIon Stop and Tap 1 EA 5250.00 $250.00 5240.00 524000 $182.67 5182.67 5400.00 $400.00 3300.00 5300.00 32 6'' x ? Saddte, I -I moll Corponttion Stop anti Tap 12 EA 5250.03 53.000.00 $201.00 52,412.00 5175.18 $2,102.18 $350.00 54,200.00 5250.00 53,000.00 33 a' x 2" Saddle, 2 -Inch Corporation Stop and Tap 1 EA 5380.00 $380.00 $201.00 5201.00 5352.59 5352.59 5500.00 5590.00 5450.00 3450.00 34 24 -Inch Direct Bury Steel Casing 811 LF 5160.00 512,800.00 512.00 596000 500.48 06.43580 5150.00 512,000.00 3115.00 53,200.00 35 16 -Inch Direct Buiy Steel Casing 60 LF 5126.00 46,000.00 510.00 A500.00 571.09 53.554.60 510060 55,000.00 5813.00 34,000.00 38 Short 8ore Linder Trees, for 8 -Inch Main, No Casing 60 LF 5109.00 30.09000 520.10 51.206.00 $94.50 55,670.00 5190.00 56,000.00 3185.00 511.100.00 37 Shod Bore or Punch Under Trees, for 2 -Inch to I -Inch Pipe, No Casing 60 LF 530.09 51.800.00 520.10 51,206.00 $47.25 $2,835.00 550.00 53,000.00 540.00 52,400.00 313 Protective Fencing for Trees 4 EA 5280.00 31,120.00 580.50 5322.00 5210.00 584002 5100.00 340000 5500.00 52,000.00 39 Cut and Cap Exiating 2 1M" - Inch Main 1 EA 5250.00 5250.00 5161.90 5161.00 5517.13 5517,13 5100.00 5100.00 5300.00 5300.00 Itain # BID SCHEDULE 1 Description) BID TABULATION Maw. 2 o12} City of Fayetteville Canterbury Road Water 1Aa1t6 Fayetteville, Arkansas MCE Project OFY042150 February 16, 2011 Qty. Links Shatetser Construction 0-2 Projects Dean Crowder Redford Construction GoodwIn & GOO:twin 40 Concrete Thrust Coifs/ Sized for 10 -Inch Mein Thrust Load 2 EA 52.500.00 38000.00 5240.00 $462.00 52,974.94 35,549.68 52.005.00 54 010.00 $450.00 $390.00 41 Asphalt Surface Restoration 3,500 SY 521.50 576,25000 563.25 1221,375.00 555.12 5203,420.00 555.00 5192,500.010 559.00 5203 000.00 42 Concrete Surface Restoration 150 SY 375.00 511,250.00 35165 512,247.50 668,78 310,317.06 575.00 311,250.00 565.00 59,750.00 43 Concrete Sidewalk ReetoratiOn 10 SY 138.00 5380.00 574.75 5747.50 551.43 5814.30 570.00 570000 365.00 5850.00 44 ellfb and Gutter Rosh:Talton Z360 LF 112.00 128.20000 52.03 14,700.00 512.60 529,010.00 512.60 329,375.00 125.00 558.75904 45 Granular EU 2,100 TON 316.00 130600.00 30.80 51,60000 320.43 342,903.00 513.00 551,500.00 525.00 552500.00 46 -french SOibifization Material 40 TON 315.00 5040.00 5000 520000 521.00 1840.00 515.00 5600.00 515.00 5000.00 47 Eroalon Control 1 LS 510,590.00 516.59000 54,025.00 54,025.00 38,81000 56810.00 55,000.00 55,000.00 59.00000 38000.00 5000.00 46 AudioAhdeo TaPit Redurdint95 1 LS 550300 550030 3166.00 6966.00 51.950.00 51,050.00 51,005.00 51,005.00 5800.00 49 Site Photographs 1 LS ;500.00 5500.00 5563.00 5900.00 51,050.00 51360.00 51,000.00 51.000.00 51,000.00 1505.900.00 51.080.00 5305 000.00 50 Stone Mt Pump SU., Prefabricated Pump Sta. Assembly & Enclosure kvith Installation 1 LS 3251,508.00 5251,500.00 5278,050.00 5278050.00 5239,192.50 3259,192.50 3250.000.00 5280,000.00 81 Standby Generator for Stone Mt Pump SlatiOri 1 LS 5105,00000 5105,030.00 599,80000 590,800.00 554,502.31 554502.31 510800300 3106,008.00 5116,003.00 5116000.00 52 Yard Piping far Stone Mt. Pump Station & Ak Release Valves In Stone bk. Subdivision 1 LS 127,79000 527,795.00 519,015.00 519,015.00 527,315,45 127,315.46 515,000.00 115,000.00 622,500.00 522 500.00 53 Ske Work anti Grading for Stone Mt PUMP Station 1 LS 54,050.00 $4,050.00 51,288.00 51,268.00 $6.079.50 $8079.50 55300-00 36.000-08 5600000 $8000.00 54 Fencing for Stone Mt. Pump Malian 1 LS 56,775.00 55.770.00 18,050.00 55050.00 55,860.00 35.890.00 39 000.00 59000.60 511 000.00 511.00000 66 Concrete Floor Slab, Menai< & Generator Pad wr Gravel He for Stone Mt Pump Sta. 1 LS 522.500.00 322.500.00 520,700.00 520,700.00 519,220.25 519,220.25 521,000.00 321,000.00 510000.00 515,000.00 56 Asphalt Paving, Existing Asphalt Repairs, Gravel BEM for Asphak at the Stone Mt. Pump Station 1 10 53,95000 53,99500 55.17500 55,175.00 512,206.35 512,206.35 $4_500.00 34,500.00 11700.00 53,700.00 57 Ekachical Installation for Stone Mt. Pump Station and Standby Generator 1 LS 317,300.09 627,300.00 $49900.00 540.000.00 520,610.00 329,61000 340900.00 $40,000.00 322.000.00 537.000.00 58 Odistelianecus items Neoessacy for a Complete Installation at the Stone Mt P1950 116, 1 LS 322.60000 522,606.00 32,012.50 52,012.50 58,40000 58,400.00 52,500.00 52,500.00 $24.000.00 524,000.00 Signahxe: Date: Robert Whits, PE 04695 .1157 /2,01/ Total Bld Prke 51,057,33100 51,168,371.35 61,259,524.00 51,274,16100 11,435,143.00 DOCUMENT 00300 BID FORM UNIT PRICE NOTE TO BIDDER: Please use BLACK ink for completing this Bid form. ITo: The City of Fayetteville.. Arkansas Address: 113 West Mountain Fayetteville, AR 72701 Project Title: Water Main Interconnections and Stone Mountain Pump Station For Canterbury Road Water Tank Engineer's Project No.: FY042150, Contract Section II Date: Zfro/2P/i Bidder: Sweetser Construction Address: 590 West Poplar FdyetteVille, An 72703 Arkansas Contractor's License No.; ARKANSAS CONTRACTOR LIMN/ 0021470411 Contact Person for additional information on this Bid: Name: 6-ix6o/-st oi-P Telephone: qq,7-?o26 Fax: VIZ it/ ADDENDA The Bidder hereby acknowledges that he has received Addenda Numbers: 4/ (Bidder msert INV. of each Addendum received.) to these Specifications. FY042150 Canterbury Road Water Mains Section 00300-1 SALES AND USE TAXES The Bidder agrees that all federal, state, and local sales and use taxes are included in the stated bid prices for the work. UNIT PRICE BASE BID The Bidder agrees to accept as full payment for the work proposed herein the amount computed under the provisions of the Contract Documents and based on the following unit price amounts, it being expressly understood that the unit prices are independent of the exact quantities involved. The bidder agrees that the unit prices represent a true measure of the labor and materials required to perform the work, including all allowances for overhead and profit for each type and unit of work called for in the Contract Documents. The amounts shall be shown in both words and figures. In case of discrepancy, the amount shown in words shall govern. LS Act 291, 1993 Trench and Excavation Safety System Jae -V-4 44.4449-4,-41 Dollars/LS Words 2. 413 LE 18 -Inch PVC, C-905, DR -18 Water Main -24n41- iVtitrt Dollars/LE 06-44e~'). ($ 449 ) 8.0-7 3. 78 LF 12 -Inch Restrained Joint DIP, Class 350 ($ °•-e ) ($ 1'41 fbte.) with Double PoIywrap VieLdi Dollars/LE Words 4. 3,276 LE 12 -Inch Ductile Iron Pipe, Class 350 with ($ "aka' ) Double Polywrap 777'5 Words Dollars/LF (sid0;412.4'72 42150 Canterbury Road Water Mains Section 00300-3 5. 30 LF 8 -Inch Ductile Iron Pipe, Class 350 with Double Polywrap doerti 14.geo, A," lolla°rs/LF Words 6, 1,997 LF 8 -Inch PVC, C-900, DR. -I4 Water Main ($ OP/ (8 Z aga eai Dollars/LF (8 ) 00 7. 40 LF 6 -Inch Ductile Iron, Class 350 Fire ($,/ ($ Aefe ) Hydrant Stubs with Double Polywrap Aven- Words Dollars/LF 8. 15 LF 24nch Polyethylene Service Tubing ($ c2s2. ) ) A4 0 Dollars/LF Words 9. 270 LF 1 -Inch polyethylene Service Tubing aZi ) 4.011705 ‘.4)44rds Dollars/LF DD 10. 3 EA 18 -Inch Class 250B Butterfly Valve w/ ($ 7M5.i(Litt 6 IS. T Box 11-4;47114.4' All- 41/#114aDollars/EA ords 11. 1 EA 12 -Inch Class 250B Butterfly Valve w/ ($ 387S ) (8 mrzse ) Box tte.444.40,11""ttpol&ars/EA Words 12. 8 EA 8 -Inch Gate Valve w/ Box ($ 14754) (8 AI; 061 atbitollars/EA ‘4911144" Words4i4r1 13. 6 EA 6 -Inch Gate Valve w/ Box (8 //06-1 ) 44 501 44,44, Dollars/EA Words FY042150 Canterbury Road Water Mains Section 003004