Loading...
HomeMy WebLinkAbout26-11 RESOLUTIONRESOLUTION NO. 26-11 A RESOLUTION AWARDING BID #11-15 AND AUTHORIZING A CONTRACT WITH ELK RIVER CONSTRUCTION, INC. IN THE AMOUNT OF $84,825.00 PLUS A FIVE PERCENT (5%) PROJECT CONTINGENCY FOR THE CONSTRUCTION OF STREAM RESTORATION AT NIOKASKA CREEK IN SWEETBRIAR PARK AND APPROVING A BUDGET ADJUSTMENT OF $9,066.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-15 and authorizes the Mayor to sign the contract with Elk River Construction, Inc. (attached as Exhibit "A") in the amount of $84,825.00 plus a five percent (5%) project contingency for the construction of stream restoration at Niokaska Creek in Sweetbriar Park. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves the attached Budget Adjustment in the amount of $9,066.00. PASSED and APPROVED this 15th day of February, 2011. APPROVED: ATTEST: By: SONDRA E. SMITH, City Clerk/Treasurer ggqgii444Pi[ffi;p�P' qv �tK(TR ae� a�i� �aoeraaea s �w iv.: Cs Or as P.6-• a FAYETTEVILLEa e d T-7.•-(1° Qasir 'dsia�G D V 14 C' `qa" AGREEMENT BETWEEN CITY OF FAYETTEVILLE AND CONTRACTOR THIS AGREEMENT is dated as of the eday of J-1th . in the year 2011 by and between the City of Fayetteville, Arkansas (hereinafter called CITY OF FAYETTEVILLE) and Elk River Construction, Inc. (herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The work generally consists of the stream restoration at Niokaska Creek and associated site work in Sweetbriar Park and surrounding properties and all item's indicated in the Drawings and Specifications. The work does not include procurement of materials for the project. Article 2. ENGINEER. The Project has been designed by the Watershed Conservation Resource Center under the direct supervision of: City of Fayetteville Parks and Recreation Department 1455 South Happy Hollow Road Fayetteville, Arkansas 72701 and will be hereinafter called ENGINEER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. A representative from the Parks and Recreation Department will be hereinafter called PARKS AND RECREATION DEPARTMENT PROJECT MANAGER and who is to act as CITY OF FAYETTEVILLE's representative, assume all duties and responsibilities, and have the rights and authority assigned to PROJECT MANAGER in the Contract Documents in connection with completion of the Work in accordance with the Contract documents. Article 3. CONTRACT TIME. 3.1. The Work for Construction of Stream Restoration at Niokaska Creek in Sweetbriar Park shall be substantially completed within 45 consecutive calendar days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with paragraphs 14.07.B & C of the General Conditions within 60 consecutive calendar days after the date when the Contract Time commences to run. 3.2. Liquidated Damages. CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial Toss if the Work is not completed within the times specified in paragraph 3.1 above, plus and extensions thereof allowed in accordance with Article 12 of the General City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbriar Park Page 00 52 13-1 January 13, 2011 Conditions. They also recognize the delays, expense and difficulties involved in proving the actual Toss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, City of Fayetteville and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 3.1 for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 3.1 for completion and readiness for final payment. Article 4. CONTRACT PRICE. CITY OF FAYETTEVILLE shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined from the following Schedule of Values pursuant to paragraphs 4.1 and 4.2 below: 4.1. For all Work other than Unit Price Work, an amount equal to the sum of the established lump sums for each separately identified item of Lump Sum Work; and 4.2. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in this paragraph 4.2.. City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbrier Park Page 00 52 13-2 January 13, 2011 PAYMENT ITEMS Elk River Construction, Inc. ITEF.W DESCRIPTION UNIT EST. QTY. UNIT PRICE TOTAL 1 Mobilization (not to exceed 5% of project bid) L.S. 1.00 83,000.00 $3,000.00 2 Bonds and insurance L.S. 1.00 $4,275.00 $4,275.00 3 Excavation Safety per 29 CFR 1926 Subpart P - Occupational Safety and Health Administration Standards - Excavations L.S. 1.00 52,000.00 $2,000.00 4 Site preparation - including clearing and grubbing L.S. 1.00 83.500.00 $3,500.00 5 Construction of J -Hook Rock Vane - complete in place per specifications and drawings E.A. 5.00 $3,000.00 $15,000.00 6 Construction of Cross Vane - complete in place per specifications and drawings E.A. 2.00 $4,000.00 $8.000.00 7 Construction of Short Rock Vane - complete In place per specifications and drawings E.A. 2.00 82.075.00 84,150.00 8 Construction of Rock and Wood Toe Bench - complete in place per specifications and drawings L.F. 400.00 837.50 $15,000.00 9 Construction of Rock Toe Bench - complete in place per specifications and drawings L.F. 270.00 $16.67 $4,500.00 10 Construction of Soil Mattress Layer - complete In place per specifications and drawings L.F. 1700.00 82.08 $3 500.00 11 Construction of Stacked Rock Bendy - complete in place per specifications and drawings L.F. 100.00 $19.00 $1,900.00 12 Electrical Utility Trenching. Conduit Burial, and Backfill - including dewatering, installation of 4- inch conduit, backfill and coordination with Ozarks Electric Cooperative LS. 1.00 $2,500.00 $2,500.00 13 l.,,n,.-uuwv,,,,, ‘„wwt y,n,mn,IX..,..,r. a„c w,ny,nwu,,.,wGc.M'`.1.4Cri.ab,.,,.a al. drawings E.A. 3.00 51,000.00 83,000.00 14 Stream Channel Excavation, Shaping and Grading C.Y. 1,810.00 82.49 $4,500.00 15 Placement of Coarse Fill C.Y. 282.00 $8.87 $2,500.00 16 Construction of Cul -off Sills (not associated with J -Hook Rock Vanes or Cross Vanes) - complete in place per drawings LF. 150.00 823.33 $3,500.00 17 Excavation end loading of excess gravel for off-site removal by Others C.Y. 500.00 $3.00 81,500.00 18 Site restoration - including placement of topsoil 8 fescue sod S.F. 1000.00 82.50 $2,500.00 TOTAL CONTRACT AMOUNT $84,825.00 As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph 11.03.B of the General Conditions. Article 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions or as modified in the Supplementary Conditions. Applications for Payment will be processed by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in the General Conditions. 5.1. Progress Payments. CITY OF FAYETTEVILLE shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by PARKS ANDRECREATION DEPARTMENT PROJECT MANAGER, on or about the 1st day of each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below and SC -14.02 . All such payments will be measured by the schedule of values established in paragraph 2.07 of the General Conditions and based on the number of units completed in the case of Unit Price Work or, in the event there is no schedule of values, as provided in the General Requirements. 5.1.1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below, but, in case, Tess the aggregate of payments previously made and less such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.B.5 & 14.02.D of the General Conditions. City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbrier Park Page 00 52 13-3 January 13, 2011 90 percent of Work completed (with the balance of 10 percent being retainage), If Work has been 50 percent completed as determined by the PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and if the character and progress of the Work have been satisfactory to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, CITY OF FAYETTEVILLE, on recommendation of PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of work completed, in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100 percent of the Work completed. 100 percent of materials and equipment not incorporated in the Work but delivered, suitably stored, and accompanied by documentation satisfactory to CITY OF FAYETTEVILLE as provided in paragraphs 14.02.6.5 & 14.02.D of the General Conditions. That is, if any such items are setup for that type payment in the Specifications. 5.1.2. Upon Substantial Completion, in an amount sufficient to increase total payments to CONTRACTOR to 98 percent of the Contract Price (with the balance of 2 percent being retainage), Tess such amounts as PARKS AND RECREATION DEPARTMENT PROJECT MANAGER shall determine, or CITY OF FAYETTEVILLE may withhold, in accordance with paragraphs 14.02.6.5 & 14.02.D of the General Conditions. 5.3 Final Payment. Upon final completion and acceptance of the Work in accordance with paragraphs 14.07.6 & C of the General Conditions, CITY OF FAYETTEVILLE shall pay the remainder of the Contract Price as recommended by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER as provided in said paragraphs 14.07.B & C. Article 6. CONTRACTOR'S REPRESENTATIONS. In order to induce CITY OF FAYETTEVILLE to enter into this Agreement CONTRACTOR makes the following representations: 6.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in Article 7) and the other related data identified in the Bidding Documents including "technical data." 6.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, or furnishing of the Work. 6.3. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. 6.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site which have been identified in the Supplementary Conditions as provided in paragraph 4.02.A of City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbrier Park Page 00 52 13-4 January 13, 2011 the General Conditions. CONTRACTOR accepts the determination set forth in paragraph SC -4.02 of the Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.02 of the General Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface,. and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to the employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 6.5. CONTRACTOR is aware of the general nature of work to be performed by CITY OF FAYETTEVILLE and others at the site that relates to the Work as indicated in the Contract Documents. 6.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 6.7. CONTRACTOR has given PARKS AND RECREATION DEPARTMENT PROJECT MANAGER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER is acceptable to CONTRACTOR and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbrier Park Page 00 52 13-5 January 13, 2011 Article 7. CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between CITY OF FAYETTEVILLE and CONTRACTOR concerning the Work consist of the following: 7.1. This Agreement (pages 1 to 8, inclusive). 7.2. Performance and Payment Bonds, (Exhibits A and B respectively). 7.3. Certificates of Insurance, (Exhibit C). 7.4. Documentation submitted by CONTRACTOR prior to Notice of Selection (Exhibit D). 7.5. General Conditions (pages 1 to 42, inclusive). 7.6. Supplementary Conditions (pages 1 to 13 inclusive). 7.7. Specifications consisting of Divisions 1 through 31 as listed in table of contents thereof. 7.8. Addenda numbers 1 and 2, inclusive. 7.9. One set of drawings (not attached hereto) consisting of: a cover sheet and additional sheets numbered two through fourteen with each sheet bearing the following general title: Construction of Stream Restoration at Niokaska Creek in Sweetbriar Park. 7.10. The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto: 7.10.1. Notice to Proceed 7.10.2 All Written Amendments and other documents amending, modifying or supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions. The documents listed in paragraphs 7.2 et seq. above are attached to this Agreement (except as expressly noted otherwise above). There are no Contract Documents other than those listed above in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General Conditions. Article 8. MISCELLANEOUS. 8.1. Terms used in the Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbrier Park Page 00 52 13-6 January 13, 2011 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 8.3. CITY OF FAYETTEVILLE and CONTRACTOR each binds itself, it partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents. 8.4. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon stricken provision or part thereof with a valid and enforceable provision that comes as close as possible expressing the intention of the stricken provision. 8.5. Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 8.6. Freedom of Information Act. City contract and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, CONTRACTOR will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. §25-19-101 et. seq.) Only legally authorized photocopying costs pursuant to the FOIA may be assessed for this compliance. 8.7. MBENVBE Requirements. The CONTRACTOR, sub -recipient, or subcontractor shall not discriminate on the basis of race, color, national origin or sex in the performance of this contract. The CONTRACTOR shall carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded under EPA financial assistance agreements. Failure by the CONTRACTOR to carry out these requirements is a material breach of this contract which may result in the termination of this contract or other legally available remedies. City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbriar Park Page 00 52 13-7 January 13, 2011 IN WITNESS WHEREOF, CITY OF FAYETTEVILLE and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to CITY OF FAYETTEVILLE and PARKS AND RECREATION DEPARTMENT PROJECT MANAGER, and one counterpart has been delivered to CONTRACTOR. All portions of the Contract Documents have been signed, initialed, or identified by CITY OF FAYETTEVILLE and CONTRACTOR or identified by PARKS AND RECREATION DEPARTMENT PROJECT MANAGER on their behalf. This Agreement will be effective on Date of The Agreement). CITY OF FAY -TTEVI E: [CORPORATE SEAL] / , 2011 (which is the Effective CONTRACTOR / 1 , i, Ag d Attest Ove c2 •aut *Attest 403 4 l//// :(c 'G -i Y GF!<G� . •� Address for giving JFes • .131 FAYETTEVILLE: 9 •.9,Q A Q=' „, .syr••.t314 SO .o�� [CORPORATE SEAL] * If a Corporation, attest by the Secretary. Address for giving notices -1&)X 39(p Tni-19 (If CITY OF FAYETTEVILLE is a public body, attach License No. evidence of authority to sign and resolution or other documents Agent for service of process: authorizing execution of Agreement.) (If CONTRACTOR is a corporation, attach evidence of authority to sign.) City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek;in Sweetbrier Park Page 00 52 13-8 January 13, 2011 City of Fayetteville, Arkansas Budget Adjustment Form Budget Year Department: Citywide Division: Citywide Program: Sales Tax Capital Improvements Date Requested 2/4/2011 Adjustment Number Project or Item Added/Increased: To increase funding for the Construction of Stream Restoration at Niokaska Creek in Sweetbrier Park in the amount of $9,066. Project or hem Deleted/Reduced: Reduce funding in the Stormwater Quality Mgmt/Nutrient Reduction by $4,170 and allocate funding from the NE Park Land Dedication Quadrant of $4,896. Justification of this Increase: This funding is to assist in the construction of the stream restoration. Justification of this Decrease: This adjustment is administrative: There are adequate funds in these accounts. Account Name Park Improvements 2250 Contract Services 4470 Account Name Greenspace Fees - NE Bridge & Drainage Improve Increase Budget Account Number 9256 5806 9470 5315 Decrease Budget Account Number 2250 0925 4419 4470 9470 5817 Amount Project Number 00 4,896 09025 0901 00 4,170 09025 0901 Amount Project Number 01 4,896 09025 0901 00 4,170 02097 1 2/4/2011 if Budget Director Date Date..... ent L Q.. L ce Director 2/4/2011 _ Date z -Y-2 c 1 Date Date or ate Budget & Research Use Only Type: A B C D Requested By General Ledger Date Posted to General Ledger Posted to Project Accounting Initial Initial V.090403 E Date Date Carole Jones City of Fayetteville Staff Review Form City Council Agenda items and Contracts, Leases or Agreements 2/15/2011 City Council Meeting Date Agenda Items Only Park Planning Division Action Redulred: A resolution awarding Bid #11-15 and approval of a contract with Elk River Construction, Inc. in the amount of $84,825 with a 5% project contingency of $4,241 for a total project cost of $89,066 for the Construction of Stream Restoration at Niokaska Creek in Sweetbrier Park. Parks and Recreation Department $ 4,170.00 $ 4,896.00 80,000.00 Cost of this request 4470.9470.5817.00 2250.9256.5806.00 4470.9470.5315.00 Account Number 02097.1 09025.0901 09025.0901 Project Number Budgeted Item X 442,623.00 69,955.54 312,000.00 Category 1 Project Budget $ 156,540.55 197,535.00 Funds Used to Date 286,082.45 69,955.54 114,465.00 Remaining Balance Budget Adjustment Attached Drainage Studies/Ph. II Storm Water PLD NE Quadrant Niokaska Creek Scream Restoration Program Category1 Project Name Sales Tax Capital Improvements PLD NE Quadrant Niokaska Creek Stream Restoration Program I Project Category Name Sales Tax PLD NE Quadrant Sales Tax/Grant Fund Name ‘1"D partment Direc ^ Date City Attorney Fi ce and Internal Services Director Date Date thL2 1/4/ Date Previous Ordinance or Resolution 4 Original Contract Date: Original Contract Number: Received in Mayor's Office Revised January 15, 2009 Page 1 of 1 City Clerk - Agenda Item for Feb 15 meeting - Bid 11-15 From: To: Date: Subject: CC: Attachments: Carole Jones City Clerk; Johnson, Kimberly 1/28/2011 3:34 PM Agenda Item for Feb 15 meeting - Bid 11-15 Jumper, Alison Bid 11-15 City Council Agenda Packet.01-28-11.pdf This bid is currently in the process of being negotiated; however the low bidder, Elk River Construction, Inc. is currently out of the country and unreachable. The final bid and project cost will be presented at the City Council Agenda session or provided prior to the February 15th City Council meeting. Additionally, we will provide a signed contract as soon as possible. Please contact us if you have any questions. Thanks, Ms. Carole Jones, P.E. Park Planner II Fayetteville Parks & Recreation 113 West Mountain Street Fayetteville, AR 72701 Phone (479) 444-3472 Fax (479) 521-7714 www.accessfayetteville.org Join us for program announcements, updates, pictures and game cancellations at: httpaltwitter.corr/fayparksand rec TDD (Telecommunications Device for the Deaf): (479) 521-1316 file://C:\Documents and Settings\lbranson\Local Settings\Temp\XPgrpwise14D42E1FAFA... 1/28/2011 ave ev? le www.accessfayetteville.org CITY COUNCIL AGENDA MEMO THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff C Connie Edmonston, Parks and Recreation Director C.- � Alison Jumper, Park Planning Superintendent From: Carole Jones, Park Planner GI:" J Date: February 4, 2011 Subject: Bid #11-15, Construction of Stream Restoration at Niokaska Creek in Sweetbriar Park Agenda Request for February 15, 2011 Meeting PROPOSAL: Sweetbriar Park contains 4.05 acres and is located at 2645 E. Sweetbriar Drive. The park is situated in the northeast quadrant of town east of Old Missouri Road and south of Joyce Boulevard. Niokaska Creek, a tributary to Mud Creek, flows through Sweetbriar Park. The creek is located within the Illinois River Watershed. The creek sections are incised and have several banks eroding into the park land and surrounding residential yards which have resulted in vertical cut -banks. These banks contribute excessive sediment to the streams through lateral erosion. Bank erosion presents a safety concern and leads to a lack of riparian canopy. Restoration is necessary to stabilize the creek and prevent further erosion. On September I, 2009, the City Council passed Resolution Number 191-09 authorizing the Parks and Recreation Department and the Engineering Division to accept a Wetland Program Development Grant from EPA Region 6 in the amount of $234,000 (see attached resolution). The Wetland Program Development Grant • is used for projects that promote research, training, demonstrations, and surveys relating to the causes, effects, extent, prevention, reduction, and elimination of water pollution. The project includes construction of a natural stream channel with specified geomorphic features, five major rock vane structures, bankfull benches constructed out of rock and wood materials with soil mattresses, and associated site work. The project was advertised on December 13, December 20 and January 13, and bids were opened on January 27, 2011. Three vendors including Elk River Construction, Inc., Goodwin and Goodwin, Inc. and ERS, Inc. submitted bids. Elk River Construction, Inc. was the low bid in the amount of $84,825. (See attached bid tabulation sheet, bid form and certified cashier check.) If approved, the construction of the project is anticipated to begin in early March 2011 and be completed in May 2011. THE CITY OF FAYETTEVILLE, ARKANSAS RECOMMENDATION: A resolution awarding Bid #11-15 and approval of a contract with Elk River Construction, Inc. in the amount of $84,825 with a 5% project contingency of $4,241 for a total project cost of $89,066 for the Construction of Stream Restoration at Niokaska Creek in Sweetbriar Park. BUDGET IMPACT: The low bid was $4,825 over the certified amount of $80,000 for the project. Parks staff attempted to negotiate the contract with the low bidder, Elk River Construction, Inc. but was unsuccessful. This project is funded with Sales Tax/US EPA Region 6 Grant funds ($80,000), Sales Tax/Capital Improvement funds ($4,170) and Park Land Dedication Ordinance NE Quadrant funds ($4,896). Total project cost including a 5% project contingency is $89,066. Attachments; Staff Review Form Resolution Number 191-09 Bid Tabulation Sheet Bid Form and Submittal Cashier's Check for Bid Bond Contract Agreement Signed by Contractor Purchase Requisition Budget Adjustment RESOLUTION NO. A RESOLUTION AWARDING BID #11-15 AND AUTHORIZING A CONTRACT WITH ELK RIVER CONSTRUCTION, INC. IN THE AMOUNT OF $84,825.00 PLUS A FIVE PERCENT (5%) PROJECT CONTINGENCY FOR THE CONSTRUCTION OF STREAM RESTORATION AT NIOKASKA CREEK IN SWEETBRIAR PARK AND APPROVING A BUDGET ADJUSTMENT OF $9,066.00. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1. That the City Council of the City of Fayetteville, Arkansas hereby awards Bid #11-15 and authorizes the Mayor to sign the contract with Elk River Construction, Inc. (attached as Exhibit "A") in the amount of $84,825.00 plus a five percent (5%) project contingency for the construction of stream restoration at Niokaska Creek in Sweetbriar Park. Section 2. That the City Council of the City of Fayetteville, Arkansas hereby approves the attached Budget Adjustment in the amount of $9,066.00. PASSED and APPROVED this 1561 day of February, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer RESOLUTION NO. A SOLUTION AWARDING BID #11-15 AND AUTHORIZ 1 G A CON CT WITH ELK RIVER CONSTRUCTION, INC. IN THE : OUNT OF $89, 5 66.00 PLUS A FIVE PERCENT (5%) PROJECT CONT ENCY IN THE UNT OF $4,241.00 FOR THE CONSTRUCTION • F STREAM RESTORA •N AT NIOKASKA CREEK IN SWEETBRI. ' PARK AND APPROVING BUDGET ADJUSTMENT OF $9,066.00. BE IT RESOLVE BY THE CITY COU ► CIL OF THE CITY OF FAYETTEVILLE, ARKANSA • Section 1. That the City Co►'1 of the City of F yetteville, Arkansas hereby awards Bid #11-15 and authorizes the Mayor to sigl he contract th EIk River Construction, Inc. (attached as Exhibit "A") in the amount of $89,066. 0 plus a .'ive percent (5%) project contingency in the amount of $4,241.00 for the construction o ` tre.' restoration at Niokaska Creek in Sweetbriar Park. Section 2. That the City Council o ' the i ty of Fayetteville, Arkansas hereby approves the attached Budget Adjustment in the a unt of $' .066.00. PASSED and APPROVED is 15th day of Febru• y, 2011. APPROVED: ATTEST: By: By: LIONELD JO' ) AN, Mayor SONDRA E. SMIT City Clerk/Treasurer RESOLUTION NO. 191-09 A RESOLUTION AUTHORIZING ACCEPTANCE OF AN EPA REGION 6 WETLAND PROGRAM DEVELOPMENT GRANT IN THE AMOUNT OF $234,000.00 FOR A STREAM RESTORATION DEMONSTRATION ON NIOKASKA CREEK THROUGH SWEETBRIAR PARK AND OTHER PROPERTIES; AND APPROVING A BUDGET ADJUSTMENT RECOGNIZING THE GRANT REVENUE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section L That the City Council of the City of Fayetteville, Arkansas hereby authorizes acceptance of an EPA Region 6 Wetland Program Development Grant in the amount of $234,000.00 for a stream restoration demonstration on Niokaska Creek through Sweetbriar Park and other properties. Section I. That the City Council of the City of Fayetteville, Arkansas hereby approves a budget adjustment recognizing the grant revenue. PASSED and APPROVED this 1st day of September, 2009. APPROVED: ATTEST: By:� SO DRA E. SMITH, City GT ?k/Treasurer Bid 11-15, Construction of Stream Restoration at Niokaska Creek in Sweettlrlar Park Detailed Bid Tab: 01/27111 - 2:00 PM, Central Standard Time CfRTIFEO: V i+&& Peon,$ee. Pl.a+drtnoleanener 'NOTICE: Bao aware is contingent upon vendor meeting minimum specifications and formal authorization by City officials. OR !Pim Camaew ion. Inc ERS, inc. Goodwin and Geodede. 1,1- RH AN OESORIP00R (1141 EST. ow uirr PS1CS TOT4,}. Mir PRICE TOTAL WM-PRICE TOTAL 1 GolGoo. India oraed SR of Wird ua} LS. 1.00 510.00.00 29,00000 10020.02 }RW0.00 sosoloo 595000.00 2 Bowl. maInawme LS. 5,00 $1,2250.0 50.275.00 14.00.00 $4.000.00 55.20700 $5,000.® a Goriew.e $wiiiv porn CFR 1122 S.6PR [ P • Oac paSina WO and INfl AWfip ar SWIM@-&wvtlew. La. LIM =MOM 52-000.00 53.000.00 02.00.00 5'.00000 $1.10000 4 ABPrOP•rakn• MAI@ damn retl@Added 1..0. 100 30300.00 53.6b3.00 54500O.00 846,000.00 54.006-00 640.00-00 1 CapueWn PI J -Roca Roaring.-o•uyra M pane per sped6radas•DI mw.npl 00. S06. 00.000.0 813000.00 99,90006 230,000.00 5.00000 5103056 r C•ne7 eeo.I m 9rea v..•- mmp.a• el 7eee Per griwiw and Por.49e 50. 2.00 51.00000 511,000.00 99.0000 30000.1» 53.00000 15,00000 7 common Of snort Rik Veep- eempRN P Awe Per w•reire ere•ed Ma EA 200 2291500 51.15002 62.000.00 51.00-00 12.000.0 30000.20 0 ConsPo l of Reek Ad N:160 TOO pence, CO IC@ I Pe,ee per epetlserne aw drerPeo L.F. 400.00 337.00 515.0000 12330 010.000.00 56000 524.00000 9 [cron:Ion nt Pool Too @path• review kiOwe Pea sixeilalWa ad&owlets L.P. 27000 21617 5460000 015.00 54.060.00 405.0 $77$50,01) 10 SOPOP•tee or Sea eenee=/Aro- mrpaae F Para per apemlgeetian anti - ,-9a Lf- 1700.00 ft 06 55300.00 96.00 5102410.00 95.90 50.50030 11 Codi odese re 01101•0 R222$2200.12,00,20045222002200200 i.e. 100.00 S1H00 51.0000 ;90 On 56000.00 500.00 5000000 12 Wi L.S. 100 #,50000 52.50000 1700000 57300.00 10.00000 26.®.00 E4del11Onto 1nee220. 0e40.66111, Ird 11011-60.5014 66005(000 oto PrAGNr. INOGI@PO mmKI000$1010arkalipoil Cir.CrAi.....,........". 17 614 059 • • EA. 200 $1,00600 05.0100 10,00000 010.00 2100.0 520.00 51000030 222.06200 21232.00 53.00.00 01300.00 512.000-00 14 5025050A40020A+500000. 0000116 le0502dm$ Peeper%oGips. F0 arc 03. L.P. 101000 22600 15000 5249 5007 wean SA .500.00 02.00090 59,500.00 01630 62000 X00 213.530.00 30,000.00 16 16 Corpoutren of CAWS %HPel 6005526E0911 J7foc4 Rock Vanes or Goo Vaned -Lomp** MPH. P1pp00. 11 E..116:0 .111.5 l»0iat of acorn gravel for o5 5e ranural by Opnre e.r. 600-00L 51.00 01.50000 DILDO 53.00.00 13530 617.500.00 11 Sa ndordb6.Madam Mourned rd fowl A Rsr..e Led 5F- 1000.00 62.60 52.500.00 74,00 *We no ;I a0 ;100000 TOTAL BID AMOUNT 504.82500 6180.06030 $921,47030 CfRTIFEO: V i+&& Peon,$ee. Pl.a+drtnoleanener 'NOTICE: Bao aware is contingent upon vendor meeting minimum specifications and formal authorization by City officials. a e vile v ARKANSAS Prosect Check List Bid 11-15, Construction of Stream Restoration at Niokaska Creek in Sweetbrier Park This checklist is for the Bidder's use in preparing & submitting a bid. It is not intended to include all details necessary to prepare a bid and shall not be used as a substitute for the requirements of the bid documents. Information is shown below only as a matter of convenience. Use of this checklist does not relieve the Bidder from the responsibility of meeting all requirements of the Specifications concerning the preparation of an acceptable bid. Bidders are welcome to use this form as a coversheet for a sealed envelope; however, using this form itself is NOT a requirement. /FT5% Bid Bond of the amount bid accompanied by required documentation (Power of Attorney, etc.) In lieu of a bid bond, the bidder may submit a cashier's check for at least five percent (5%) of the amount bid (inclusive of any deducti a alterntes). Cashiers checks shall be made payable to the City of Fayetteville, AR. G (a 1-1 All addenda shall be signed, acknowledged, and submitted on the appropriate forms (submitting the actual addendums or marking acknowledgement on other bid pages). AH line items shall be appropriately tilled out and extended to reveal the line item price as well as the total bid price. Total base bid should be calculated in the provided space. ridAll bidders shall submit a "Statement of Disclosure" on such form provided with the bid documents. x x All bidders shall submit completed EPA Form 6100-3, EPA Form 6100-4 and the MBEIWBEIDBE Compliance Evaluation Form provided with the bid documents (see www.epa.gov/osbp/dbe forms.htm)`: The forms shall be appropriately signed, dated accordingly, and included with submitted bid documents. All pages provided with signature lines shall be appropriately signed, dated accordingly, and included with submitted bid documents. All bid documents shall be delivered in a sealed envelope to the address listed below before the stated deadline on the coversheet of the bid. All bids should be delivered with the name of the bidder (contractor) on the sealed envelope as well as the bidders Arkansas Contractors License Number (if applicable). City of Fayetteville, AR Purchasing Division - Suite 306 113 W. Mountain Fayetteville, AR 72702 CONTRACTOR NAME:, -/PC _471//7. , L/� 4/40 dA), -,c47 -A0 City of Fayetteville Bid 11-15, Construction of Stream Restoration at Niokaska Creek in Sweetbriar Park January 13, 2011 Item Estimated Unit t o. Ouantity Section 00 41 13 BID FORM Description of Item Unit Price Total Amount t 1 Lump Sum Mobilization - (nit to exceed 5% grand bid) � = i�Cjl))iv'i\ NO f � dollars $f $ 9\b�O ' amount wntten m words in figures in figures 2 1 Lump Sum Bonds and insurance 713c0,11 1044)11131P n lTY $( S. 9.5 amount written in words it" X23 in figures $ in figures Excavation Safety per 29 CPR 1926 Subpart P - Occupational Safety and Health Administration 3 1 Lamp Sum Standards - Excavations 1tai dollars $( )IL.S. $ ( 0 U- amount written in words in figures in figures 4 1 Lump Sun Site preparation - including clearing and grubbing tiR`C Fi �`I NA QI 4 r°JI dollars amount written id words Construction of J -Kook Rock Vane - complete in 5 5 Each place per specifications and drawings `cVNUI POkero dollars amount written in words Construction of Cross Vane -complete in place per 6^ 2 Each specifications and drawings (n L\16 ' Ir c f dollars amount written in words nfigures $ i st gores $( YEA. $ l� U0 in figures in figures in figures ice. $. Q C)C�6f) in figures Construction of Short Reek Vane - complete in 7 2 Each place per specifications and drawings ' witted in wordsy n figuresLc C�J ,��hFvy + (j9/122 $ in figures ��Y/ %Jra Clg amount Construction of Rock and Wood Toe Bench - 8^ 400 Linear Feer complete in place per specifications as id drawings / � `G i �'�.C' �7 �r��` `/(V tae)dollars $( 11F- $ 1 T Vel amount written in words in figures in figures This bid form continues on the next page... City of Fayetteville Bid 11-15, Construction of Stream Restoration At Niokaska Creek in Sweetbrier Park Page 00 41 13-1 January 13, 2011