HomeMy WebLinkAbout211-11 RESOLUTIONRESOLUTION NO. 211-11 A RESOLUTION TO APPROVE A CONTRACT BETWEEN THE CITY OF FAYETTEVILLE AND PICK -IT CONSTRUCTION, INC. IN THE AMOUNT OF NOT -TO -EXCEED $112,353.00 FOR CONSTRUCTION OF DUGOUTS AND BLEACHER COVERS AT WALKER PARK AND TO APPROVE A BUDGET ADJUSTMENT OF $16,419.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the attached contract between the City of Fayetteville and Pick -It Construction, Inc in the amount of not -to -exceed $112,353.00 for construction of dugouts and bleacher covers at Walker Park, authorizes Mayor Jordan to sign this contract and approves a budget adjustment of$16,419.00. PASSED and APPROVED this 6th day of December, 2011. APPROVED: By: IO ELD ► AN, Mayor ATTEST: zh By: LISA BRANSON, Deputy City Clerk ,`�,,�sstrttrrrryr�� U ••A; FAYETTEVILLE; mss• �R A 'J: Byron Humphry Submitted By City of Fayetteville Staff Review Form City Council Agenda Items and Contracts, Leases or Agreements 12/6/2011 City Council Meeting Date Agenda Items Only Park Maintenance Division Action Required: Parks and Recreation Department resolution awarding Bid #11-67 and approval of a contract with Pick -jt Construction, Inc. in the amount of $102,139 with a 10% project contingency of $10,214 for a total project cost of $112,353 for the Construction of Dugouts and Bleacher Covers at Walker Park and approval of a budget adjustment in the amount of $16,419 from Parks Development Funds. 112,353.00 Cost of this request 2250.925.5315.00 Account Number 11024.1101 Project Number Budgeted Item 116,419.00 Category / Project Budget Contract Servs/Walker Park Baseball Program Category / Project Name 4,066.00 Parks Development / Contract Srvs Funds Used to Date Program / Project Category Name 112,353.00 Remaining Balance Budget Adjustment Attached Parks Development Capital Fund Name Department Dire City Attorney Date Date ri DJ' Finane and Internal Services Director Previous Ordinance or Resolution # Original Contract Date: Original Contract Number: Received in C yt 1 B -1 1 P 0 3: 5 2 1 N Clerk's Office ► i Comments: Revised January 15, 2009 v' a�efl�ville THE CITY OF FAYETTEVILLE, ARKANSAS DEPARTMENT CORRESPONDENCE ARKANSAS www.accessfayetteville.org CITY COUNCIL AGENDA MEMO To: Mayor Lioneld Jordan and City Council Thru: Don Marr, Chief of Staff , Connie Edmonston, Parks and Recreation Director From: Byron Humphry, Maintenance Superintendent Date: November 18, 2011 Subject: Bid #11-67, Construction of Walker Park Dugouts and Bleacher Covers Agenda Request for December 6, 2011 Meeting PROPOSAL.: The Fayetteville Youth Baseball Board of Directors has requested improvements to the Baseball Complex at Walker Park for many years. The Baseball Complex was built by volunteers starting in 1960. It is an old facility that needs improvements to serve the baseball community until the Regional Park's Baseball Complex is built. On August 2, 2011, the City Council passed Resolution Number 132-11 to approve a budget adjustment in the amount of $100,000 to be used to fund Walker Park Baseball Improvements. Parks and Recreation staff have worked with Fayetteville Youth Baseball (FYBB) to develop a list of priority projects including construction of new dugout areas with benches and the addition of bleacher safety/shade structures. These improvements will help Fayetteville to attract more tournaments, but more importantly will serve youth ages 5 to 12 who love to play the game of baseball. Currently there are 855 youth playing baseball at Walker Park. In addition, there are 11 competitive teams who utilize the fields. Improvements are planned to be completed by March 2012, in time for the spring baseball season. The project was advertised for bid on October 19 and 26, and bids were opened on November 4, 2011. Two vendors including Pick -It Construction, Inc. and Heckathorn Construction Company, Inc. submitted bids. Pick - It Construction, Inc. was the low bid in the amount of $ 111,054, after taking all deductive alternatives. (See attached bid tabulation sheet.) Because the low bid was $111,054 and only $95,000 was certified, Parks staff negotiated with Pick -It Construction to change the scope of work in order to reduce the contract price. A change order in the amount of $8,915 was agreed upon and is submitted in conjunction with this agreement. The contract price with Change Order No. 1 will be $102,139. If approved, the project is anticipated to begin in December 2011 and be completed by March 2012. THE CITY OF FAYETTEVILLE, ARKANSAS RECOMMENDATION: A resolution awarding Bid #11-67 and approval of a contract with Pick -It Construction, Inc. in the amount of $102,139 with a 10% project contingency of $10,214 for a total project cost of $112,353 for the Construction of Dugouts and Bleacher Covers at Walker Park and approval of a budget adjustment in the amount of $16,419 from Parks Development Funds. BUDGET.iMPACT: This project is funded with Park Development Funds. Total project cost including a 10% project contingency is $112,353. Attachments: Staff Review Form Bid Tabulation Sheet Pick -It Construction, Inc. Bid Submittal Agreement Signed by Contractor Purchase Requisition Budget Adjustment Pick -It Construction Change Order No. 1 Cost Estimate Change Order No. 1 Qeo r ta-a1- #! RESOLUTION NO. A RESOLUTION TO APPROVE A CONTRACT BETWEEN THE CITY OF FAYETTEVILLE AND PICK -IT CONSTRUCTION, INC. IN THE AMOUNT OF NOT -TO -EXCEED $112,353.00 FOR CONSTRUCTION OF DUGOUTS AND BLEACHER COVERS AT WALKER PARK AND TO APPROVE A BUDGET ADJUSTMENT OF $16,419.00 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FAYETTEVILLE, ARKANSAS: Section 1: That the City Council of the City of Fayetteville, Arkansas hereby approves the attached contract between the City of Fayetteville and Pick -It Construction, Inc in the amount of not -to -exceed $112,353.00 for construction of dugouts and bleacher covers at Walker Park, authorizes Mayor Jordan to sign this contract and approves a budget adjustment of $16,419.00. PASSED and APPROVED this 6th day of December, 2011. APPROVED: ATTEST: By: By: LIONELD JORDAN, Mayor SONDRA E. SMITH, City Clerk/Treasurer City of Fayetteville Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Agreement — Between City of Fayetteville and Contractor This agreement is dated as of the 4 day of Deektair in the year of 2011 by and between the City of Fayetteville, Arkansas (hereinafter called CITY OF FAYETTEVILLE) and Pick -It Construction, Inc. (herein after called CONTRACTOR). CITY OF FAYETTEVILLE and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: 1. CONTRACTOR at its own cost and expense shall furnish all labor, materials, supplies, machinery, equipment, tools, supervision, bonds, insurance, tax permits, and all other accessories and services necessary to complete items bid per Bid 11-67 as stated in Pick -It Construction, Inc. bid proposal, and in accordance with specifications attached hereto and made a part hereof under Bid 11-67, all included herein as if spelled out word for word. 2. The CITY OF FAYETTEVILLE shall pay CONTRACTOR based on their bid proposal in an amount not to exceed $111,054.00 (bid price includes taking all three deductive alternates totaling $32,850.00). Payments will be made after approval and acceptance of work and submission of invoice. Payments will be made approximately 30 days after receipt of invoice. 3. The Contract documents which comprise the contract between the CITY OF FAYETTEVILLE and CONTRACTOR consist of this Contract and the following documents attached hereto, and made a part hereof: A. Bid form identified as Invitation to Bid 11-67 with the specifications and conditions typed thereon. B. CONTRACTOR's bid proposal. C. The Notice to Prospective Bidders and the Bid Tabulation. 4. These Contract documents constitute the entire agreement between the CITY OF FAYETTEVILLE and CONTRACTOR and may be modified only by a duly executed written instrument signed by the CITY OF FAYETTEVILLE and CONTRACTOR. 5. CONTRACTOR shall not assign its duties under the terms of this agreement. 6. CONTRACTOR agrees to hold the CITY OF FAYETTEVILLE harmless and indemnify the CITY OF FAYETTEVILLE, against any and all claims for property damage, personal injury or death, arising from CONTRACTOR' s performance of this contract. This clause shall not in any form or manner be construed to waive that tort immunity set forth under Arkansas Law. 7. Contract Time: The Work shall be substantially completed within 45 consecutive calendar days after the date when the Contract Time commences to run and shall be completed and ready for final payment within 60 consecutive calendar days after the date when the Contract Time commences to run. 8. Liquidated Damages: CITY OF FAYETTEVILLE and CONTRACTOR recognize that time is of the essence of the Agreement and that CITY OF FAYETTEVILLE will suffer financial loss if the Work is not completed within the times specified in paragraph 7 above, plus and extensions thereof allowed in accordance with the General Terms and Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by CITY OF FAYETTEVILLE if the Work is not completed on time. Accordingly, instead of requiring any such proof, CITY OF FAYETTEVILLE and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified in paragraph 7 above for Substantial Completion until the Work City of Fayetteville, AR Agreement - Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 1 of 3 is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within the time specified in paragraph 7 above for completion and readiness for final payment or any proper extension thereof granted by CITY OF FAYETTEVILLE, CONTRACTOR shall pay CITY OF FAYETTEVILLE Two hundred and fifty dollars ($250.00) for each day that expires after the time specified above for completion and readiness for final payment. 9. The CONTRACTOR shall be entitled to payment of ninety-five percent (95%) of the earned progress payments when due, with the CITY OF FAYETTEVILLE retaining five percent (5%) to assure faithful performance of the contract. 10. CONTRACTOR shall furnish a certificate of insurance addressed to the CITY OF FAYETTEVILLE, showing that he carries the following insurance which shall be maintained throughout the term of the Contract. Any work sublet, the CONTRACTOR shall require the subcontractor similarly to provide worker's compensation insurance. In case any employee engaged in work on the project under this contract is not protected under Worker's Compensation Insurance, CONTRACTOR shall provide and shall cause each Subcontractor to provide adequate employer's liability insurance for the protection of such of his employees as are not otherwise protected. Workmen's Compensation Statutory Amount Comprehensive General & Automobile Insurance Bodily Injury Liability Property Damage Liability $500,000 for each person injured. $1,000,000 for each accident. $1,000,000 aggregate. The premiums for all insurance and the bond required herein shall be paid by CONTRACTOR. 11. CONTRACTOR to furnish proof of licensure as required by all local and state agencies. 12. This contract may be terminated by the CITY OF FAYETTEVILLE or CONTRACTOR within 10 days written notice. 13. Freedom of Information Act: City of Fayetteville contracts and documents prepared while performing city contractual work are subject to the Arkansas Freedom of Information Act. If a Freedom of Information Act request is presented to the City of Fayetteville, the contractor will do everything possible to provide the documents in a prompt and timely manner as prescribed in the Arkansas Freedom of Information Act (A.C.A. 25- 19-101 et. Seq.). Only legally authorized photo coping costs pursuant to the FOIA may be assessed for this compliance. 14. Changes in Scope or Price: Changes, modifications, or amendments in scope, price or fees to this contract shall not be allowed without a prior formal contract amendment approved by the Mayor and the City Council in advance of the change in scope, cost or fees. 15. No liens against this construction project are allowed. Arkansas law (A.C.A. §§ 18-44-501 through 508) prohibits the filing of any mechanics' or materialmen's liens in relation to this public construction project. Arkansas law requires and the Contractor promises to provide and file with the Circuit Clerk of Washington County a bond in a sum equal to the amount of this contract. Any subcontractor or materials supplier may bring an action for non-payment of labor or materials on the bond. The Contractor promises to notify every subcontractor and materials supplier for this project of this paragraph and obtain their written acknowledgement of such notice prior to commencement of the work of the subcontractor or materials supplier. City of Fayetteville, AR Agreement - Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 2 of 3 WITNESS OUR HANDS THIS DAY OF 1/ Q �' , 2011. CONTRACTOR By: WAruivi azxzx/! /' Printed Contractor Nime & Title ATTEST: v Company Se e ary 01410 10024 N. Campbell Road Business Address Fayetteville, AR. 72701 City, State & Zip Code Date Signed: November 17, 2011 CITY OF FAYETTEVILLE, ARKANSAS ATTEST: Date Signed: City of Fayetteville, AR Agreement - Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 3 of 3 aVe ev1I1e hiiKAN 5A5 BID: 11-67 DATE: 11/04/11 TIME: 2:00 PM CITY OF FAYETTEVILLE Bid 11-67, Construction - Walker Park Dugouts and Bleacher Covers BODER'..: . 1 Hsckathorn Construction Company, Inc. Deductive Alternative 1 $ Deductive Alternative 2 $ Deductive Alternative 3 $ 20,190.00 10,095.00 20,190.00 Total Less Deductives TOTAL $225,023.00 $174,548.00 2 Pick -it Construction, Inc. Deductive Alternative 1 $ 13,140.00 Deductive Alternative 2 $ 6,570.00 Deductive Alternative 3 $ 13,140.00 Total Less Deductives $143,904.00 $111,054.00 'NOTICE; BId award 1s contingent upon vendor meeting minimum specifications and Formal authorization by City officials. CERTIFIED: -P 44 111 ��a// P. VICE, MACH MGR WITNESS r DIYiE City of Fayetteville Bid 11-67, Construction -- Walker Park Dugouts and Bleacher Covers Document 00400: Bid Form Contract Name: Drake Field Security Improvements Bid Number 11-67 BID TO: Owner: The City of Fayetteville, Arkansas 113 West Mountain Street Fayetteville, Arkansas 72701 BID FROM: Bidder: l 1T enti/S% T OA4 4': 14 //L -L- 7?70f Article 1— Intent: A. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with the City in the form included in the Bid Documents to perform and furnish all Work as specified or indicated in the Bid Documents for the Bid price and within the Bid time indicated in this Bid and in accordance with the other terms and conditions of the Bid Documents. Article 2 — Terms & Conditions: A. Bidder accepts ail of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 180 days after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within 15 calendar days after the date of City's Notice of Award. Article 3 — Bidder's Representation: In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that: A. Bidder has examined and carefully studied the Bid Documents, and the following Addenda, receipt of all which is hereby acknowledged: Number Date t A/ /1 /WW WI( City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 21 of 34 B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, performance, and furnishing of the Work. C. Bidder is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work. D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site; and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site. Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder's purposes. Bidder acknowledges that the City and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bid Documents with respect to Underground Facilities at or contiguous to the Site. E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, or furnishing of the Work or which relate to any. aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto. F. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performing and furnishing of the Work in accordance with the times, price, and other terms and conditions of the Bid Documents. G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to Work for which this Bid is submitted as indicated in the Bid Documents. H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports, and drawings identified in the Bid Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bid Documents. I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Bidder. City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 22 of 34 J. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. K. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham bid; Bidder has not solicited or induced any person, firm, or a corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for himself any advantage over any other Bidder or over the City of Fayetteville. This form continues on the next page. City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 23 of 34 Article 4 - Bid Price: Bidder will complete the Work in accordance with the Contract Documents for the following prices listed below: Bid Form: Bid 11.87, Construction -Walker Park Dugouts and Bleacher Covers FIELD # Line item Description Price Per Each Quantity 1 A Dugout $ 6); Zia" " X 2 /TOTTAL $ /GI 6917 — B Bleacher Cover N/A X N/A = N/A 2 A Dugout $ /01345-"-- X 2 $ 4,52/D JCD ,•-. B Bleacher Cover NIA X NIA - N/A 3 A Dugout $ A/ -2)11S x 2 $ / t '� B Bleacher Cover $ b r X 2 . . $ / NO 4 A Dugout $ 6r3 X 2 = $ /2 49.0 " 8 Bleacher Cover $ Atc770 - x 2 - $ 13i / L!O 5 A , Dugout $ /a qs-"'" x 2 = $! 7(090 r B Bleacher Cover l $ (, 5-7C1 -- X 2 = $ 13/114v 6 A Dugout N/A x NIA . N/A B Bleacher Cover $ 4570 x 1 ' $ 4$1 '"� 7 A Dugout $ roc? 1S - X 2 = t, $ 12, ,90 B Bleacher Cover N/A x NIA = N/A 8 A Dugout NIA " NIA N/A B Bleacher Cover $ 41570 ' x 2 = $13,1 itD '- NIA: Other 9 Mobilization (ship not exceed 5% of total bid) x 1 - $ $ J 10 Insurance and Bonds $ 62- 8 17/3 x 1 - $ '..-- TOTAL I'331?D q '' This form continues on the next page. City of Fayetteville, AR Bid 11-67, Construction - Walker Park Dugouts and Bleacher Covers Page 24 of 34 . ���' :� -P -- 11'r a ,,, ,, t1 - C� n" t a a.- SI9 4-,,,,:4-, c � �`� o a • ai r a , o, _� ^2 . _. .. <,, _ / ...e=,° , �! ' 7 i yr r ''a Y r° ° �s ` -ws ..... ia , _ : 'FIELD # Line' Item Description Price Per Each Quantity TOTAL TO DEDUCT 8 B DEDUCTIVE ALTERNATE #t' Price to ��.� $61c x 2 = $ ��l I V Ashould SUBTRACT from the total base bid to remove bleacher covers this contract - Field 8. This match Line item 8B 6 B DEDUCTIVE ALTERNATE #2; Price to �j $ (, / ® x 1 $ ! 4 / 0 SUBTRACT from the total base bid to remove bleacher covers this contract - Field B. This should match Line item BB 3 B DEDUCTIVE ALTERNATE #3; Price to $ 5`70 x 2 = $ . 7,� IJ h .......• 6 V SUBTRACT from the total base bid to remove bleacher covers this contract - Field 3, This match Line item 3B **NOTICE: BIDDERS ARE REQUIRED TO PROVIDE PRICING FOR ALL LINE ITEMS. FAILURE TO PROVIDE DEDUCTIVE ALTERNATE PRICING CAN RESULT IN YOUR BID BEING REJECTED. **THE CITY WILL AWARD THIS CONTRACT TO THE LOWEST QUALIFIED RESPONSIVE RESPONSIBLE BIDDER BASED ON THE LUMP SUM BID AS LONG AS SUCH BID FALLS WITHIN THE AMOUNT OF FUNDS CERTIFIED FOR THE PROJECT (PLUS 25%). IN THE EVENT NO BID FALLS WITHIN THE AMOUNT OF FUNDS CERTIFIED FOR THE PROJCET, PLUS 25%, THE CITY WILL UTILIZE THE DEDUCTIVE ALTERNATES IN ORDER UNTIL BIDS CAN BE COMPARED WITHIN THE AMOUNT CERTIFIED, PLUS 25%. IN THE EVENT ALL DEDUCTIVE ALTERNATES ARE SUBTRACTED AND NO BID FALLS WITHIN THE AMOUNT CERTIFIED, PLUS 25%, ALL BIDS WILL BE REJECTED. This form continues on the next page. City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 25 of 34 Article 5 — Contract Times: A. Bidder agrees that the Work will be substantially completed and completed and ready for final payment within the number of calendar days indicated in the Agreement. B. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. Article 6 — Bid Content: The following documents are attached to and made a condition of this Bid: A. Required Bid se,,rity in the form of a certified or bank cashier's check or a Bid Bond and in the amount of 5 4 r p 7� Dollars ($ )• B. A tabulation of Subcontractors and other persons and organizations required to be identified in this Bid. Sub -contractor name:. i°t 12d Percent of work: 4` Sub -contractor name:___1_/ /Art Percent of work: _ Oe % Sub -contractor name: 1106 Percent of work: Sub -contractor name: Percent of work: % Sub -contractor name: Percent of work: % Article 7 — Bid Communications: Communications concerning this Bid shall be addressed to the Bidder as follows: on /"� e-Conx /u4-x/M,; lop -?-111, (%, ie lb, Fornmet.ia- °7? -7O/ Phone Noble70 73 -7,f E -Mail: _do FAX No. et* City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 26 of 34 Article 8 — Bid Signature: If Bidder is: An Individual Name (type or printed): By: (SEAL) (Individual's Signature) Doing business as: Business address: Phone No.: FAX No.: A Partnership Partnership Name: (SEAL) By: (Signature of general partner — attach evidence of authority to sign) Name (type or printed): Business address: Phone No.: FAX No.: City of Fayetteville, AR Bid 11-67, Construction — Walker Park dugouts and Bleacher Covers Page 27 of 34 A Corporation , Corporation Name: / /4* t T incfre /M� (SEAL) State of Incorporation: A,e 14irSif Type (General Business, Professional,-�-�Service, Limited Liability): ‘::r.07742924 -e— C t fit" ev2 By: (Signature — attach evidence of authority to sign) Name (type or printed): Title: (CORPORATE SEAL) Attest: (Signature of Corporate Secretary) Business address: Phone No.: FAX No.: END OF DOCUMENT 00400 City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 28 of 34 City of Fayetteville Bid 11-67, Construction - Walker Park Dugouts and Bleacher Covers Vendor References The following information is required from ail Bidders so all bids may be reviewed and properly evaluated. All bidders are required to have performed at least four (4) contracts of similar scope within the past five (5) years. COMPANY NAME: [ {GK'" St`guerr®A Arc, BUSINESS ADDRESS: loop if A > ,dba&k1 ZC jb, Xfierrrt4GLE- 7? yb( NUMBER OF YEARS IN BUSINESS: 9, HOW LONG IN PRESENT LOCATION: 751.0 TOTAL NUMBER OF CURRENT EMPLOYEES: FULL TIME IX PART TIME NUMBER OF EMPLOYEES YOU PLAN TO USE TO SERVICE THIS CONTRACT: y' FULL TIME a . PARTTIME PLEASE LIST LOCAL COMMERCIAL AND/OR GOVERNMENTAL REFERENCES THAT YOU HAVE PREVIOUSLY PERFORMED SIMILAR CONTRACT SERVICES FOR WITHIN THE PAST THREE (3) YEARS (All fields must be completed): 1. Alittifki,1/4.1 LST A) at/C .44/022t$ 2. COMPAN NAME COMPANY NAME Fbr & O" 1D1343 CITY, STATE, �/ A7.fbi1E )/t6f..S CONTACT PERSON (20,1-.7 TELEPHONE FAX NUMBER E-MAIL ADDRESS 3. Otit-Wienalf COMPANY NAME CITY, ' TATE, ZIP RAM> F� CONTACT PERSON 4't�-/fT 779) PHONE FAX NUMBER E-MAIL ADDRESS rihal I, A -1:YU.sb CITY, STATE, 21P ,ivbs 144,/vi it CONTACT PERSON L PHO E FAX NUMBER E-MAIL ADDRESS 4. r. (Z _W lags COMPANY NAME CITY, STATE, ZIP Osa �Or/ 071)387—'7573 CONTACT PER ON TELEPHONE FAX NUMBER E-MAIL ADDRESS City of Fayetteville, AR Bid 11-67, Construction - Walker Park Dugouts and Bleacher Covers Page 29 of 34 City of Fayetteville Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Debarment Certification Form — THIS FORM SHOULD BE SUBITTED WITH ALL BIDS As A BIDDER on this project, you are required to provide debarment/suspension certification indicating that you are in compliance with the below Federal Executive Order. Certification can be done by completing and signing this form. Debarment: Federal Executive Order (E.O.) 12549 "Debarment and Suspension" requires that all contractors receiving individual awards, using federal funds, and all sub -recipients certify that the organization and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government. Your signature certifies that neither you nor your principal is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. Questions regarding this form should be directed to the City of Fayetteville Purchasing Division. NAME: �..r5l lT COMPANY: 73C44— L=-6sa PHYSICAL ADDRESS: _../Trail MAILING ADDRESS: 71�rYiE ,rte PHONE: 670 9x73.5 o9 EMAIL: Yiic SIGNATURE: DATE: �'ror FAX: NOTICE: CAUSE: Debarment by an agency pursuant to FAR 9.406-2, GPO Instructions 110.11A, or PS Publication 41, for one or more of the following causes (a) conviction of or civil judgment for fraud violation of antitrust laws, embezzlement, theft, forgery, bribery, false statements, or other offenses indicating a lack of business integrity; (b) violation of the terms of a Government contract, such as a willful failure to perform in accordance with its terms or a history of failure to perform; or (c) any other cause of a serious and compelling nature affecting responsibility. (See Code N- Debarment pursuant to FAR 9.406 2(b)(21 Drug Free Workplace Act of 1988.) TREATMENT: Contractors are excluded from receiving contracts, and agencies shall not solicit offers from, award contracts to renew or otherwise extend the duration of current contracts, or consent to subcontracts with these contractors, unless the City determines that there is a compelling reason for such action. Government prime contractors, when required by the terms of their contract, shall not enter into any subcontract equal to or in excess of $25,000 with a contractor that is debarred, suspended, or proposed for debarment, unless there is a compelling reason to do so. Debarments are for a specified term as determined by the debarring agency and as indicated in the listing. City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 30 of 34 City of Fayetteville Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Statement of Disclosure — To Be Submitted With ALL Bids This page does not count towards page limitations set forth in this request for proposal or bid. Proposer must disclose any possible conflict of interest with the City of Fayetteville, including, but not limited to, any relationship with any City of Fayetteville employee. Your response must disclose if a known relationship exists between any principal or employee of your firm and any City of Fayetteville employee or elected City of Fayetteville official. If, to your knowledge, no relationship exists, this should also be stated in your response. Failure to disclose such a relationship may result in cancellation of a purchase and/or contract as a result of your response. This form must be completed and returned in order for your bid/proposal to be eligible for consideration. PLEASE CHECK ONE OF THE FOLLOWING TWO OPTIONS, AS IT APPROPRIATELY APPLIES TO V YODUR FIRM: 1.) NO KNOWN RELATIONSHIP EXISTS 2.) RELATIONSHIP EXISTS (Please explain) PLEASE FILL OUT THE SECTION BELOW AND SUBMIT THIS FORM WITH YOUR BID OR PROPOSAL: 1.) I, as an officer of this organization, or per the attached letter of authorization, am duly authorized to certify the information provided herein are accurate and true; and 2.) My organization shall comply with all State and Federal Equal Opportunity and Non -Discrimination requirements and conditions of employment. --47-Arked Q� Printed Nam VAre Signature //2/( Date City of Fayetteville, AR Bid 11-67, Construction — Walker Park Dugouts and Bleacher Covers Page 31 of 34